Sign in

Golden Orchid

LASKAR RAJASHEKAR REDDY AND SHAIK ABDUL ADIL · Rangareddy · RERA P02400006851

GOLDEN ORCHID is a plotted development in Peddamma Thanda, Kandukur Mandal, Ranga Reddy District, developed by the registered promoter LASKAR RAJASHEKAR REDDY AND SHAIK ABDUL ADIL. The registered site area is 9914.45 sq. m, and the draft HMDA layout records 27 plots; plot-size configurations are not supplied. The project is registered with TG-RERA as P02400006851, and its proposed completion date is 30/11/2026.

📘 Project brochure from the promoter’s website ↗

01What we found

Period endedTG-RERA registration ran to 20 May 2026 - check its extension on TG-RERA
12documents on file - each fact links to its page
6court cases on this project's land (survey 57, Pulimamidi)
8items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Pulimamidi, Kandukur, Ranga Reddy · geocoded — approximate.

Project at a glance

Project identity

ItemRecord
Registered project nameGOLDEN ORCHID RERA record
Project typePlotted development / open-plot layout RERA record
Phase or registered portionPhase not specified in the TG-RERA registration evidence; the registered project is identified as GOLDEN ORCHID
TG-RERA registrationP02400006851; registered 5 September 2023; certificate states validity through 20 May 2026. No extension is recorded in the supplied certificate.
Registered promoterLaskar Rajashekar Reddy and Shaik Abdul Adil; organization type recorded as “Others,” described in the filing as a partnership RERA filing Corporate record
Registration / project statusRegistration certificate issued under section 5; the project record labels it “New Project.” This does not establish completion or an occupancy/completion certificate. RERA record

Land and geographic identity

ItemRecord
LocalityPeddamma Thanda RERA filing
Revenue villagePULIMAMIDI (also rendered “Pulumamidi” in the filed approval documents) RERA record
Mandal / district / PINKandukur / Ranga Reddy / 509325 RERA record
Project survey number(s) and subdivisionSurvey No. 57/1/1/1; the RERA certificate and HMDA draft layout letter identify this survey. No further project subdivision is stated in those records. RERA record
Total site area9,914.45 sq m RERA filing
Road-affected area291.33 sq m RERA filing
Net layout area9,623.12 sq m RERA filing
Boundaries in RERA filingEast: existing 60-feet-wide road; west and north: neighbours’ land; south: existing 50-feet-wide road RERA filing

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA) Approvals record
Principal layout approvalLayout Permit No. 000101/LO/Plg/HMDA/2023, dated 20 May 2023; the filed document describes this as a draft layout letter. Approvals record
Application reference059820/SMD/LT/U6/HMDA/28022023
Approved built-up area5,532.03 sq m is recorded as approved built-up area in the RERA filing; the layout letter identifies the same figure as plotted area. RERA filing
Plot count / building configurationThe layout letter states 27 plots. Building count, floors and parking levels are not applicable or not disclosed for this plotted layout.
Approval-stage restrictions relevant to the layoutThe draft letter identifies plots 27–31, 945.80 sq m, as mortgaged to HMDA and states that buildings must not be constructed on plots until final layout approval is issued.

Offering and status

ItemRecord
Unit typePlots; the registration record does not provide a plot-by-plot unit schedule or plot-size range. RERA record RERA filing
RERA-filed plot count / inventoryThe filed HMDA draft layout letter states 27 plots. Booked and available counts are not supplied.
Construction / development stageNo independently verified site-progress evidence is supplied. The HMDA document is a draft layout letter, not evidence that the layout works are complete.
Completion datesThe Form B declaration states a completion undertaking of 20 May 2026; the project header records proposed completion as 30 November 2026. The supplied evidence does not establish that either date is a revised or approved extension. RERA record
Registration validityThrough 20 May 2026, per the registration certificate; this is distinct from the completion undertaking and does not establish completion.
Occupancy / completion certificateNo occupancy or completion certificate for the layout is supplied. Document index

The project story

GOLDEN ORCHID is registered as a plotted development in Survey No. 57/1/1/1, Pulimamidi revenue village, Kandukur mandal, Ranga Reddy district. The RERA-filed HMDA document describes a 27-plot open layout on a net layout area of 9,623.12 sq m, within a stated total site area of 9,914.45 sq m. RERA record

The project’s principal planning document in the supplied file is an HMDA draft layout letter dated 20 May 2023. It sets out proposed layout infrastructure and conditions for final release, including handing over roads, organised open space and social-infrastructure land to the local body by registered gift deed, and completing development works. The document also says construction in plots is not to be allowed until final layout plans are issued. The evidence supplied does not establish the present completion status of those conditions or works.

The RERA Form B is a promoter declaration, including a completion undertaking of 20 May 2026 and statements about title, encumbrances and project obligations; it is not independent verification of physical progress. No site inspection, measured progress certificate or final layout-release evidence is supplied here. Document index

Master plan, architecture & building design

This is a plotted layout, not a building or apartment project. The RERA-filed HMDA draft layout letter gives a total site area of 9,914.45 sq m, a 291.33 sq m master-plan-road-affected area and a 9,623.12 sq m net site area. Its area statement identifies 5,532.03 sq m as plotted area, 3,010.72 sq m as layout road area, 839.36 sq m as park area and 241.00 sq m as social-infrastructure area; amenities area is recorded as 0.

The letter states that the layout contains 27 plots and identifies plots 27–31, with an area of 945.80 sq m, as mortgaged to HMDA as security for layout obligations. It also requires the road, organised open-space and social-infrastructure areas to be handed over to the local body by registered gift deed before final layout plans are released. These are approval-document statements and conditions; the supplied evidence does not verify their subsequent completion.

No building footprints, floor configuration, apartment or villa arrangement, or building-level drawings are provided. The drawing-derived layout record is software-read and notes that plot-count and size readings need verification against the drawing; it does not provide a complete plot-size schedule. Layout record Document index

Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Plots27, as stated in the HMDA draft layout letterNot suppliedNot suppliedNot suppliedNot applicableNot supplied

The available record does not provide plot-by-plot areas or a complete plot-size range. No measured carpet-area schedule applies to this plotted layout. The software-derived drawing record cautions that its plot readings are incomplete and should be checked against the approved drawing. Layout record

Parking & vehicle circulation

The project is a plotted layout, and no sanctioned parking-space count, visitor or accessible parking provision, parking levels, or individual plot parking allocation is supplied. The draft layout letter identifies internal layout roads and requires them to remain open for access to neighbouring sites; this does not establish a parking allocation or exclusive rights to any drawn area. Document index

Amenities, recreation & open spaces

Internal layout roads
Description / size3,010.72 sq m; the draft letter also refers to road widths including “18 mts and above” and “60 feet and above.”
Evidence sourceHMDA draft layout letter
Declared progress / verified statusApproval-document provision/condition; completion not independently verified
Park / organised open space
Description / size839.36 sq m
Evidence sourceHMDA draft layout letter
Declared progress / verified statusRequired for handover to the local body before final layout release; handover/progress not verified
Social infrastructure
Description / size241.00 sq m
Evidence sourceHMDA draft layout letter
Declared progress / verified statusRequired for handover to the local body before final layout release; handover/progress not verified
Avenue plantation and park development
Description / sizeListed among layout utilities and development works; no quantity or completion evidence supplied.
Evidence sourceHMDA draft layout letter
Declared progress / verified statusListed in the approval document; delivery not independently verified
Cycling tracks
Description / sizeListed among proposed layout facilities; no size or completion evidence supplied.
Evidence sourceHMDA draft layout letter
Declared progress / verified statusListed in the approval document; delivery not independently verified

The RERA amenity register marks internal roads and footpaths, water supply, sewerage, green strip/TOT lot/park, rainwater harvesting and an electrical meter room/sub-station/receiving station as “YES,” but records 0% progress for the listed amenity rows. This is a filed status record, not an independent completion inspection. RERA amenities

Utilities, building services & safety

The HMDA draft layout letter lists storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, an overhead tank, electrical supply lines, street lights, a transformer, rainwater-harvesting pits, a bio-compost unit, solid-waste arrangements and LED lighting among the planned layout works. These are stated in the approval document as layout provisions; the supplied evidence does not verify their installation, operational status, capacity or statutory clearances.

The RERA amenity register records water supply, sewerage, rainwater harvesting and an electrical meter room/sub-station/receiving station as “YES,” with 0% progress shown for the listed items. It does not establish water source or storage capacity, sewage-treatment capacity or reuse, power-backup arrangements, fire systems, CCTV/security provision, or accessible circulation. RERA amenities

Location, access & connectivity

The registered location is Peddamma Thanda locality, Pulimamidi revenue village, Kandukur mandal, Ranga Reddy district, PIN 509325. The site boundaries in the RERA filing identify an existing 60-feet-wide road on the east and an existing 50-feet-wide road on the south. RERA record RERA filing

The location record gives the nearest sampled Outer Ring Road interchange at approximately 16.0 km. This is a supplied approximate distance; no travel time or public-transport details are provided. Location record

Developer & development status

The registered promoter is LASKAR RAJASHEKAR REDDY AND SHAIK ABDUL ADIL. The RERA filing records the organization type as “Others” and describes it as a partnership. The registration certificate lists the promoter’s office as Village: Serilingampally, Mandal: Serilingampally, District: Ranga Reddy, PIN 500019. RERA filing Corporate record

The Form B affidavit is made by Mr. Laskar Rajashekar Reddy on behalf of the promoter and gives a completion undertaking of 20 May 2026. The supplied record does not include a verified construction-progress assessment or evidence of final layout release. Document index

Approvals, official records & documents

RecordSupplied evidence and scope
TG-RERA registration certificateFORM C for GOLDEN ORCHID, registration no. P02400006851, issued 5 September 2023; identifies Survey No. 57/1/1/1 and validity through 20 May 2026.
HMDA layout permissionDraft layout letter, Layout Permit No. 000101/LO/Plg/HMDA/2023, dated 20 May 2023; concerns a 27-plot layout in Survey No. 57/1/1/1, Pulimamidi.
HMDA application reference059820/SMD/LT/U6/HMDA/28022023.
Mortgage identified in layout filePlots 27–31, 945.80 sq m, stated as mortgaged to HMDA; the letter refers to mortgage deed no. 6318/2023.
Gift deed identified in layout fileDocument no. 7103/2023, associated in the draft letter with the 291.33 sq m area affected under the proposed 100-foot master-plan road.
Promoter declarationForm B affidavit dated 21 July 2023, signed by Mr. Laskar Rajashekar Reddy for the registered promoter.
Occupancy/completion or final layout-release evidenceNot supplied in the reviewed project evidence. Document index

The HMDA drawing stamp is recorded as dated 20 May 2023, with the plan number read from the drawing text layer and marked as needing review. The supplied file does not include a separate final-layout release record. Approvals record

Frequently asked questions

Is GOLDEN ORCHID registered with Telangana RERA?

Yes. GOLDEN ORCHID is registered with the Telangana Real Estate Regulatory Authority as P02400006851; the registration status is New Project.

Who is the developer of GOLDEN ORCHID?

The promoter named in the RERA registration is LASKAR RAJASHEKAR REDDY AND SHAIK ABDUL ADIL.

Where is GOLDEN ORCHID located?

GOLDEN ORCHID is in Peddamma Thanda, PULIMAMIDI, Kandukur, Rangareddy, Telangana (509325).

When will GOLDEN ORCHID be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.

More projects in Pulimamidi