Sign in

Divine Space

DIVINE HOMES · Sangareddy · RERA P01100005787

DIVINE SPACE is a residential apartment project in Osman Nagar Village, Ramachandrapuram Mandal, Sangareddy district, developed by registered promoter Divine Homes. The project covers 30,462.50 sq.m.; the HMDA permission describes 9 residential blocks with 2 Cellars + Stilt + 12 Floors (11th and 12 Floor with TDR). The RERA-filed home configurations are 2BHK: 86 units and 3BHK: 792 units, with saleable areas of 114.71 sq.m. and 155.61–184.88 sq.m., respectively. Its TG-RERA registration is P01100005787, registered from 15/03/2023 to 19/11/2027, and the proposed completion is 19/03/2028.

01What we found

RegisteredTG-RERA - valid till 19 Nov 2027
73documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.inPhoto from magicbricks.com
▦ View all 2 photos
Osmannagar, Rc Puram, Sangareddy · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameDIVINE SPACE RERA record
Project typeResidential apartment project; the HMDA permission describes a multistoried residential apartment. RERA record
Phase / registered portionThe TG-RERA certificate identifies the registered project but does not specify a phase name. The HMDA permission covers the stated project site and nine residential blocks.
TG-RERA registrationP01100005787; registered from 15/03/2023 to 19/11/2027, unless extended by the Authority. This is the registration-validity period, not an occupancy certificate or proof of completion.
Registered promoterDivine Homes (also styled M/s. DIVINE HOMES in filed documents); partnership. RERA record RERA filing Corporate record
RERA status in the supplied recordRegistered under section 5; the certificate states validity through 19/11/2027 unless extended.

Land and geographic identity

ItemRecord
Locality / revenue villageOsman Nagar Village (also recorded as OSMANNAGAR; HMDA permission says Osman Nagar(TM)). RERA record
MandalRamachandrapuram; the RERA header/certificate also records RC PURAM. RERA record
DistrictSangareddy (the HMDA permission spells it “Sanga Reddy”). RERA record
PIN502032 in the project identity and RERA certificate. RERA record
Project survey numbersSY NOs 37/A/3, 37/A/2, 37/AA1, 37/A/1, 37/AA/2, 37/A/4 AND 37/A/5 as stated on the RERA certificate. The HMDA permission lists 37/A/1, 37/A/2, 37/A/3, 37/A/4, 37/A/5, 37/AA/1 and 37/AA/2.
Site extent30,462.50 sq.m. in the HMDA permission and RERA land record. The RERA land record shows total area and net area both as 30462.50 sq.m., with affected area 0.0 sq.m. Land records
Boundaries recorded in RERA fieldsNorth: 60 FEET ROAD GOPANPALLY TO OSMAN NAGAR; South and East: LAND IN SY NO 37 PART OF OSMAN NAGAR VILLAGE; West: LAND IN SY NO 9 PART OF OSMAN NAGAR VILLAGE. RERA filing
Survey-level mortgage area recorded in RERA fields12976.52 sq.m. RERA filing

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA), Planning Department. The permission delegates specified functions to Tellapur Municipality. Approvals record
Principal building-permission file003449/BP/HMDA/0621/SKP/2022, approved 19-11-2022. Approvals record
Approved built-up area128687.31 sq.m. is recorded in the RERA project fields. RERA filing
Buildings / blocksHMDA permission: 9 Blocks. RERA land details: 10 total building units, while the normalized unit record reports 10 blocks/towers (9 homes and 1 amenity). RERA filing RERA unit table
Sanctioned floor configuration2 Cellars + Stilt + 12 Floors (11th and 12 Floor with TDR), as stated in the HMDA permission.
Parking levels and countsTwo cellar levels are shown in the sanctioned configuration. A total parking-space count, parking allocation, or resident/visitor breakdown is not established in the supplied material. RERA amenities
Unit-count recordsRERA land fields record 10 total and 10 proposed building units; the unit-table normalization separately reports 883 total units. These are different record fields and are shown in their respective contexts. RERA filing RERA unit table

Offering and status

ItemRecord
RERA-filed home configurations2BHK: 86 units; 3BHK: 792 units. The filing also includes one row labelled HOTEL ROOMS, which the record does not classify as a home configuration. RERA unit details RERA unit table
RERA-filed commercial unitOne row labelled SUPER MARKET ANDHALL, recorded as a commercial unit. RERA unit details RERA unit table
RERA-filed saleable areas2BHK: 114.71 sq.m.; 3BHK: 155.61–184.88 sq.m. The commercial row is 927.17 sq.m.; the HOTEL ROOMS row is 751.55 sq.m. and remains unclassified in the supplied normalization. RERA unit details RERA unit table
Booked / available countsThe normalized RERA unit-table read reports 295 booked and 588 available out of 883 total units. It has no as-of date, so counts are indicative, not a dated inventory confirmation. RERA unit table
Construction stageRERA amenity/infrastructure records show differing declared percentages for selected site works; the supplied record does not establish an overall construction-completion percentage or independently verified site progress. RERA amenities
Completion datesThe RERA Form C registration validity ends 19/11/2027; the project header records proposed completion 19/03/2028. The Form B declaration undertakes completion by 19/11/2027. These dates are reported as filed, not as proof of completion. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied project documents. Scope: project-level materials provided here; no tower-wise OC status is established. Document index

2. The project story

DIVINE SPACE is registered as a residential apartment project at Osman Nagar Village, Ramachandrapuram Mandal, Sangareddy district. The registered site extent is 30,462.50 sq.m. The HMDA building permission describes nine multistoried residential blocks, each within a sanctioned configuration of 2 Cellars + Stilt + 12 Floors (11th and 12 Floor with TDR). RERA record Land records

The RERA unit table includes 2BHK and 3BHK homes, a commercial row labelled SUPER MARKET ANDHALL, and a separate unclassified row labelled HOTEL ROOMS. It also contains entries for amenity spaces; those entries are not presented here as homes for sale. The filing’s normalized inventory indicates 295 booked and 588 available, but does not provide an as-of date. RERA unit details RERA unit table

The RERA infrastructure table reports progress for certain items—for example, Water Supply 20%, Sewerage (Chamber, Lines, Septic Tank, STP) 30%, and Green Strip/TOT LOT/Park 40%. These are record-reported percentages; the supplied evidence does not independently verify construction progress at the site. No project-wide completion or tower-by-tower completion status is established here. RERA amenities

3. Master plan, architecture & building design

The HMDA permission is for a multi-storied residential apartment, identifies 9 Blocks, and specifies 2 Cellars + Stilt + 12 Floors (11th and 12 Floor with TDR). It covers a site extent of 30,462.50 sq.m. The RERA fields record approved built-up area as 128687.31 sq.m. The supplied extracted permission does not set out a block-by-block footprint, flat count per floor, tower heights, internal-road dimensions, landscaping area, or a detailed open-space schedule. RERA filing RERA filing

The RERA fields record 10 total and proposed building units, while the HMDA permission identifies nine residential blocks and the normalized unit record reports 10 blocks/towers, including one amenity block. The record supplied here does not provide a drawing-based reconciliation or a detailed phase organization. RERA filing RERA unit table

The RERA unit table includes spaces labelled GYM AND SPA, INDOOR GAMES, and THEATRE AND LEISURE, each recorded as a separate row rather than a home configuration. The supplied material does not establish their exact building placement or whether these labels correspond to sanctioned, completed facilities. RERA unit table RERA unit table

4. Homes, configurations & floor plans

The figures below are from the RERA unit-table normalization. Saleable area is the area recorded for sale in the RERA filing; it is not a carpet-area measurement. The supplied floor-plan record says the drawing geometry has not yet been measured: 24 drawings, 0 measured, and 24 scans pending. Therefore, no software-measured carpet area or room dimensions can be reported. RERA unit details RERA unit table Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK863848114.71 sq.m.Not measuredNot supplied
3BHK792257535155.61–184.88 sq.m.Not measuredNot supplied

The RERA table also contains one commercial row, SUPER MARKET ANDHALL (927.17 sq.m., 0 booked, 1 available), and one unclassified row, HOTEL ROOMS (751.55 sq.m., 0 booked, 1 available). These are kept separate from the home-configuration table because the supplied normalization does not classify the latter as a home type. RERA unit details RERA unit table

Booked and available counts are portal-derived and have no as-of date in the supplied record. The 24 submitted floor-plan drawings remain unmeasured in the supplied software-measurement record, so room layouts, orientations, balcony or utility dimensions, and carpet areas cannot be described from this evidence. RERA unit table Floor plans

5. Parking & vehicle circulation

The HMDA-sanctioned configuration includes 2 Cellars. The permission also requires one entry and one exit to the premises, each with a minimum width of 4.5 mrs and height clearance of 5 mtrs.

The supplied project material does not establish the sanctioned number of parking spaces, parking allocation to particular apartments, accessible or visitor spaces, two-wheeler provision, EV charging, or the detailed ramp and driveway arrangement. The promoter-provided specifications describe parking signage, driveways and parking-management equipment, but do not establish quantities or legally documented unit allocations. Promoter website

6. Amenities, recreation & open spaces

The table separates RERA-recorded site-infrastructure items from facilities mentioned in promoter-provided specifications. “Progress” below is the percentage in the RERA amenity record where supplied; it is not independent verification of completion. RERA amenities Promoter website

Community buildings
Description / sizeNo size or detailed facility description supplied
Evidence sourceRERA amenity record
Declared progress / verified status0% recorded; completion not independently verified. RERA amenities
Green Strip/TOT LOT/Park
Description / sizeNo area supplied
Evidence sourceRERA amenity record
Declared progress / verified status40% recorded; completion not independently verified. RERA amenities
Aggregate recreational open space
Description / sizeArea not supplied
Evidence sourceRERA amenity record
Declared progress / verified status0% recorded. RERA amenities
Indoor games
Description / sizeRERA unit table lists one row labelled INDOOR GAMES, 812.87 sq.m.; promoter specifications also mention an indoor games room
Evidence sourceRERA unit table; promoter-provided specifications
Declared progress / verified statusRERA table entry; no completion verification supplied. RERA unit table Promoter website
Gym and spa
Description / sizeRERA unit table lists one row labelled GYM AND SPA, 927.17 sq.m.
Evidence sourceRERA unit table
Declared progress / verified statusRERA table entry; no completion verification supplied. RERA unit table
Theatre and leisure
Description / sizeRERA unit table lists one row labelled THEATRE AND LEISURE, 637.84 sq.m.
Evidence sourceRERA unit table
Declared progress / verified statusRERA table entry; no completion verification supplied. RERA unit table
Other leisure facilities
Description / sizePromoter-provided specifications list a mini theater, family swimming pool, yoga/meditation, squash court, outdoor sitting, clubhouse, swimming pool, banquet hall, guest accommodation and gymnasium; sizes and capacities are not supplied
Evidence sourcePromoter-provided specifications
Declared progress / verified statusPromoter-listed; the supplied record does not establish sanctioned or delivered status. Promoter website

7. Utilities, building services & safety

Water
What the record saysHMDA conditions specify separate underground static storage and residential terrace tanks, each recorded as 25,000 litres. The permission says the applicant should approach HMWS & SB for bulk supply or provide a water treatment plant. Promoter-provided specifications describe a centralized underground sump, hydro-pneumatic supply, separate municipal and bore-well kitchen lines, and a water-softening plant. Promoter website
Status supported by supplied evidenceSanction conditions and promoter-provided specifications; completion is not independently verified. RERA records Water Supply: 20%. RERA amenities
Sewerage and drainage
What the record saysHMDA conditions require an STP, treatment of sewage/domestic discharge, and reuse of treated water for gardening; they also address connection of treated sewerage/overflow where municipal drains exist. Promoter specifications state treated water would be used for landscaping and flushing. Promoter website
Status supported by supplied evidenceRequired/proposed in the permission and described in promoter specifications. RERA records sewerage at 30% and treatment/disposal of sewage and sullage water at 50%; no independent completion verification is supplied. RERA amenities
Rainwater and storm water
What the record saysHMDA permission requires rainwater-harvesting structures and says rooftop harvesting may be incorporated, with storm-water drains.
Status supported by supplied evidenceSanction condition; RERA records water conservation/rainwater harvesting at 50% and storm-water drains at 0%. RERA amenities
Electrical supply and backup
What the record saysHMDA permission requires provision for a transformer, generator/alternate electric supply and emergency lighting in corridors, common passages and staircases. Promoter specifications state 3-phase supply per unit, prepaid meters, and 1KVA backup per flat. Promoter website
Status supported by supplied evidencePermission conditions and promoter-provided specifications; installed or operational status is not independently verified.
Lifts and vertical circulation
What the record saysThe HMDA permission requires fire-resistant swing doors for collapsible lifts. Promoter specifications state an 8 passengers lift would be provided. Promoter website
Status supported by supplied evidenceLift count, capacity by block, and completion status are not established in the supplied project record.
Fire and life safety
What the record saysHMDA conditions include fire-safety requirements, fire-resistant lift doors, extinguishers, manual alarm system, hose reel/down-comer and sprinkler provision if basement area exceeds 200 Sq.mtrs; the permission also requires clearance from T.S. Fire Services before applying for the occupancy certificate.
Status supported by supplied evidenceSanctioned conditions and required clearance; the supplied evidence does not establish that the clearance has been obtained or that systems are complete. Promoter specifications also describe hydrants, sprinklers, alarms and a public-address system. Promoter website
Waste management
What the record saysHMDA permission provides for a garbage house and refuse chute, and requires a comprehensive municipal-solid-waste collection, transport and disposal system.
Status supported by supplied evidenceRequired/proposed; RERA records solid-waste management and disposal at 0%. RERA amenities
Security and access control
What the record saysPromoter specifications describe round-the-clock security/surveillance and visitor screening. Promoter website
Status supported by supplied evidencePromoter-described; no independent installation or operating-status evidence supplied.
Accessibility
What the record saysThe supplied records do not specify accessible parking, ramps, or accessible circulation details. Promoter website
Status supported by supplied evidenceNot established in the supplied evidence.

8. Location, access & connectivity

The registered project location is Osman Nagar Village, Ramachandrapuram Mandal, Sangareddy district, with the RERA project record listing PIN 502032. The recorded northern boundary is the 60 FEET ROAD GOPANPALLY TO OSMAN NAGAR. RERA record RERA filing

The location record gives an approximate geocode of 17.4418133, 78.2782231 and reports the nearest sampled Outer Ring Road interchange at 7.0 km. The supplied location data does not identify a public-transport stop or provide independently measured distances to other landmarks. Location record

9. Developer & development status

The registered promoter is DIVINE HOMES, recorded as a partnership, with GSTIN 36AALFD3963A1ZL. The RERA project record lists its address as DIVINE HOMES, PHASE 1, SY NOs 37/A/3, 37/A/2, 37/AA1, 37/A/1, 37/AA/2, 37/A/4 AND 37/A/5, OSMAN NAGAR VILLAGE, RAMACHANDRAPURAM MANDAL, RC PURAM, Sangareddy, 502032. Corporate record Parties record RERA filing

The RERA record identifies PENTYALA RADHAKRISHNA MURTHY as authorized signatory and lists MADDINENI NAVAJEEVAN, BUYYANI HARI GOPAL, NAGABHYRAVA SRINIVASAN, VADDEPALLY DAMODAR RAO, and DARAPUREDDY VEERA ANJANAYA PRASAD as partners. The RERA certificate gives a promoter-office entry of Village: Mandal: District: Hyderabad, Pin: 500049. Parties record

Form B, signed by P. Radha Krishna Murthy on behalf of Divine Homes, declares the stated title and development-agreement-cum-GPA rights and undertakes completion by 19/11/2027. The RERA header separately records proposed completion as 19/03/2028. These are filed/declaration dates; the supplied evidence does not establish an overall site-completion percentage or an occupancy certificate. RERA record Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Reference and scopeForm C; P01100005787, DIVINE SPACE; valid 15/03/2023–19/11/2027, unless extended.
EvidenceRegistration certificate.
HMDA building permission
Reference and scopeFile 003449/BP/HMDA/0621/SKP/2022, approved 19-11-2022; nine residential blocks on 30,462.50 Sq.mts in the stated Osman Nagar survey numbers.
EvidenceHMDA Planning Department permission.
HMDA mortgage instruments
Reference and scopeMortgage document Nos. 34448/2022, 34449/2022 and 34450/2022, dated 07.10.2022, in favour of MC, HMDA, for the areas specified in the permission.
EvidencePermission record identifies the instruments and reserved built-up areas.
Environmental record referenced by HMDA
Reference and scopeEC22B039TG168192, dated 06.05.2022, is cited in the permission among project conditions/clearances.
EvidenceHMDA permission reference; the separate terms-of-reference document states that granting ToR does not itself grant Environmental Clearance.
Structural-clearance record referenced by HMDA
Reference and scopeJNTU/CEH/CIVIL/PC/7035/2022, dated 08.09.2022.
EvidenceCited as submitted in the HMDA permission.
Title and development documents
Reference and scopeFiled materials include Sale Deed No. 25775/2021, a Development Agreement-cum-Irrevocable GPA, RERA Form B, and revenue/title-report documents.
EvidenceThe documents are available in the supplied project record; this overview does not independently verify their legal effect.
Building/layout drawings
Reference and scopeHMDA approval is identified, but the supplied public layout-lookup record says no LP number is recorded and the HMDA DPMS lookup is not publicly reachable. HMDA
EvidenceDetailed layout-sheet review is not established in the supplied evidence.
Occupancy/completion certificate
Reference and scopeNo OC or completion certificate is identified in the supplied project documents. Document index
EvidenceProject-level certificate status is not established by this evidence set.

The HMDA permission also cites a bank guarantee, treasury and fee challans, and statutory references among its supporting records; the full conditions are in the permission document. This overview does not treat a cited or required approval as evidence that a later-stage certificate has been issued.

Frequently asked questions

Is DIVINE SPACE registered with Telangana RERA?

Yes. DIVINE SPACE is registered with the Telangana Real Estate Regulatory Authority as P01100005787; the registration status is New Project.

Who is the developer of DIVINE SPACE?

The promoter named in the RERA registration is DIVINE HOMES.

Where is DIVINE SPACE located?

DIVINE SPACE is in OSMAN NAGAR VILLAGE, RAMACHANDRAPURAM MANDAL, OSMANNAGAR, RC PURAM, Sangareddy, Telangana (502032).

When will DIVINE SPACE be completed?

The promoter's proposed date of completion filed with RERA is 19/03/2028. This is the promoter's declaration, not a guarantee.

More projects in Osmannagar