Cyber City is a residential plotted development in Amistapur Revenue Village, Bhoothpur Mandal, Mahabubnagar District. The registered promoter is Kotla Narsimulu. The site covers 10,105.19 sq.mts and the layout contains 40 residential plots, with drawing-derived plot sizes ranging from 78.9 sq.m to 216.72 sq.m. It is registered under TG-RERA P01400007479, with a proposed completion date of 30/09/2025.

01What we found

Period endedTG-RERA registration ran to 30 Sep 2025 - check its extension on TG-RERA
17documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered nameCyber City
Project typePlotted development / residential layout RERA record
Phase or registered portionA single registered project is identified; no separate phase name or phase-wise scope is disclosed. RERA record
TG-RERA registrationP01400007479
Registration validityCertificate states validity commencing 02/01/2024 and ending 30/09/2025, unless extended by the Authority. This is the registration period, not a statement of completion or occupancy.
Registered promoterKotla Narsimulu; the registration certificate gives the address as House No. 5-77, Amistapur, Bhoothpur, Mahabubnagar, PIN 509382.
RERA statusThe supplied certificate records registration. No extension order or current registration-status confirmation is supplied.

Land and geographic identity

ItemRecord
Locality / revenue villageAmistapur locality; Amistapur Revenue Village. RERA record
Mandal / district / PINBhoothpur / Mahabubnagar / 509382. RERA record
Project survey number and subdivisionSy. No. 166/1a. No other project survey number or subdivision is disclosed in the supplied project record.
Registered site extentRERA land details state total area 10,105.19 sq.mts, affected area 166.80 sq.mts, and net area 9,938.39 sq.mts. RERA filing
Layout-plan area figuresThe filed layout-plan extraction records total layout area 10,105.19 sq.mt, net area of plot 9,938.39, and total net layout 9,937.84.
BoundariesEast: Road; West: Others Land; North: Existing Plots; South: Others Land. RERA filing

Development identity

ItemRecord
Sanctioning authorityBhoothpur Municipality/Municipal Corporation, as named in the tentative layout approval.
Principal approvalTentative layout approval 0005/LO/3106/2022, dated 27 October, 2022. The approved drawing also bears TS/044615/2022, dated 12-07-2022.
Development form and scaleThe filed layout records 40 residential plots.
Built-up area / buildingsApproved built-up area is recorded as 0.00 for the layout; no building count or building-floor configuration is supplied.
Roads and reserved landLayout-plan extraction records roads 3,479.46 sq.m; organized open space/park 904.17 sq.m; social infrastructure 251.39 sq.m; and utilities 101.89 sq.m.
ParkingProposed parking is recorded as 0 in the layout-plan parameters; no project parking allocation or parking arrangement is supplied.

Offering and status

ItemRecord
Offered productResidential plots; the layout approval identifies 40 plots.
Plot sizesSoftware-read drawing data identifies 40 plots with sizes ranging from 78.9 sq.m to 216.72 sq.m; median 125.36 sq.m. These are drawing-derived measurements, not RERA-filed unit-size disclosures. Layout record
Booked / availableNo booked-versus-available plot counts are supplied. RERA filing
Declared completion date30/09/2025 in the RERA project record. RERA record
Construction stage / verificationProject completeness is recorded as 80% in the supplied header, but no dated progress certificate or independent site verification is supplied. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied; the development is a plotted layout, and the supplied records do not establish final layout release. Document index

2. The project story

Cyber City is a residential plotted layout in Amistapur Revenue Village, Bhoothpur Mandal, Mahabubnagar District, on Sy. No. 166/1a. The TG-RERA certificate identifies the project and promoter, while the filed tentative layout approval describes a 40-plot residential layout.

The layout drawing allocates land to plots, roads, a park/open space, social infrastructure and utilities. The approval requires the layout applicant to undertake infrastructure and amenity works, including roads, drainage, internal water supply, electrical works and park development; the approval text is a requirement for development, not evidence that those works have been completed.

The supplied header reports 80% completeness, but gives no measurement date or supporting progress certificate. Treat this as a reported project status, not independently verified physical progress. No final layout-release or occupancy/completion certificate is included in the supplied materials. RERA record Document index

3. Master plan, architecture & building design

This is a plotted layout rather than an apartment or multi-storey building project. The filed layout-plan extraction records 40 residential plots, with 5,200.93 sq.m allocated to plotted area, 3,479.46 sq.m to roads, 904.17 sq.m to organized open space/park, 251.39 sq.m to social infrastructure and 101.89 sq.m to utilities. The drawing-derived area statement also records 0.00 sq.m for amenity area. Layout record

The drawing lists 9.14 MT. WIDE ROAD, 13.71 MT WIDE EXISTING, 18.00 MT WIDE PROPOSED ROAD and 18.29MT WIDE PROPOSED ROAD. The approval requires roads to be opened for access to neighbouring sites and says the developer shall not construct a compound wall or fencing around the site.

No residential building count, approved building footprint, floor configuration, tower height or building built-up area is evidenced. The layout-plan parameters state proposed built-up area 0.00 and proposed parking 0. These are layout-plan fields, not evidence of completed construction.

4. Homes, configurations & floor plans

The offering evidenced in the RERA-filed layout material is 40 residential plots. The plot schedule and sizes below are software-read from the approved layout drawing and should be checked against the drawing; they are not RERA-filed plot-by-plot saleable-area disclosures. Layout record

Plot informationDrawing-derived figure
Plot count40
Smallest plot78.9 sq.m (94.4 sq.yd)
Median plot125.36 sq.m (149.9 sq.yd)
Largest plot216.72 sq.m (259.2 sq.yd)
0–100 sq.yd band1 plot
100–150 sq.yd band21 plots
150–200 sq.yd band13 plots
200–250 sq.yd band4 plots
250–300 sq.yd band1 plot

No RERA configuration-level unit table, booked or available plot count, or plot-specific agreement and allotment details are supplied. The supplied floor-plan review contains two layout sheets and no apartment floor plans or measured apartment areas. Floor plans RERA unit table

5. Parking & vehicle circulation

The layout-plan parameters record proposed parking as 0. No resident or visitor parking count, accessible parking, dedicated parking area, plot-wise parking allocation, or parking-allotment document is supplied.

Roads are part of the layout, with the drawing listing road widths of 9.14 m, 13.71 m existing, 18.00 m proposed and 18.29 m proposed. The approval says roads are to be opened for access to neighbouring sites. No separate information is supplied on vehicle entry/exit points, pedestrian separation, or EV charging.

6. Amenities, recreation & open spaces

The layout approval and its conditions identify the following proposed or reserved areas and works. Listed approval requirements do not establish that a facility has been delivered; the supplied records give no independently verified completion status.

Park / organized open space
Description / size904.17 sq.m; 9.10% in the layout-plan area statement.
Evidence sourceTentative layout plan and area statement
Declared progress / verified statusReserved/proposed in plan; completion not independently verified.
Social infrastructure
Description / size251.39 sq.m; 2.53%.
Evidence sourceLayout-plan area statement
Declared progress / verified statusReserved in plan; facility details and completion status not supplied.
Utility area
Description / size101.89 sq.m; 1.03%.
Evidence sourceLayout-plan area statement
Declared progress / verified statusReserved in plan; completion not independently verified.
Tot-lot
Description / sizeNamed in the layout-plan amenities/utility text; no size or equipment details supplied.
Evidence sourceLayout plan
Declared progress / verified statusProposed/identified; completion not independently verified.
Roads
Description / size3,479.46 sq.m; road widths listed as 9.14 m, 13.71 m existing, 18.00 m proposed and 18.29 m proposed.
Evidence sourceLayout plan and tentative approval
Declared progress / verified statusDevelopment work required by approval; completion not independently verified.

No clubhouse or indoor recreation facilities are evidenced. The RERA amenity register lists internal roads and footpaths, green strip/tot-lot/park, and street lighting as “YES”; its supplied progress percentages are 0. RERA amenities

7. Utilities, building services & safety

The tentative layout approval describes required development works including road formation with black top; storm-water drains; underground drainage lines and a common septic tank/STP; internal water-supply pipelines and an overhead tank; an assured water-supply source; electrical supply lines, street lights and a transformer; avenue plantation; park development; and rainwater-harvesting pits. It also says the applicant is responsible for constructing an overhead tank or sump and septic tank, as applicable, and sufficient harvesting pits. These are approval-condition descriptions, not evidence of installation or operating capacity.

The RERA amenity register lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire protection, and electrical meter room/substation/receiving station. The supplied register shows 0 progress percentages for the listed items; no capacities, completion certificates, or independent service verification are provided. RERA amenities

No project-specific details are supplied for backup power, security systems, accessibility features, fire-service access, or completed safety inspections. RERA amenities Document index

8. Location, access & connectivity

The registered location is Amistapur, Bhoothpur Mandal, Mahabubnagar District, Telangana, PIN 509382. The project land is identified as Sy. No. 166/1a; the supplied cadastral parcel centroid is 16.72772710233941, 78.04708612632547. RERA record Cadastral map

The supplied location data identifies the nearest sampled Outer Ring Road interchange at approximately 69.1 km. No other measured distances, public-transport information, approach-road description or nearby-landmark distances are supplied. Location record

9. Developer & development status

The TG-RERA registration certificate names Kotla Narsimulu as the promoter and gives the promoter address as House No. 5-77, Amistapur, Bhoothpur, Mahabubnagar, PIN 509382. The legal entity type and corporate identifiers are not disclosed in the supplied project record. Corporate record

The RERA record gives a proposed completion date of 30/09/2025; the supplied header reports 80% completeness without a dated supporting certificate. No extension order, project-specific construction-progress certificate, or final layout-release evidence is supplied. Registration validity through 30/09/2025 is a separate certificate term and does not itself establish completion or final approval. RERA record Document index

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C registration certificate for Cyber City, registration P01400007479; names Kotla Narsimulu and records the registration period and certificate conditions.
Layout approvalTentative residential layout approval 0005/LO/3106/2022, dated 27 October, 2022, issued by Bhoothpur Municipality/Municipal Corporation for Sy. No. 166/1a and 40 plots; the approval states tentative approval is not proof of title.
Approved drawingLayout drawing bearing TS/044615/2022, dated 12-07-2022, with layout area, plot, road, open-space, social-infrastructure and utility information.
Project declarationForm B filed by Kotla Narsimulu includes project and fund-management declarations; the supplied extraction contains an apparent OCR-corrupted completion-date text, so it is not reproduced as a date.
Completion / occupancy / final layout releaseNo such certificate or release document is supplied in the materials reviewed. Document index

The tentative approval also lists development, mortgage, gift-deed and other conditions. This overview records the approval and drawing evidence; the full conditions and their status are addressed in the approvals review.

Frequently asked questions

Is Cyber City registered with Telangana RERA?

Yes. Cyber City is registered with the Telangana Real Estate Regulatory Authority as P01400007479; the registration status is New Project.

Who is the developer of Cyber City?

The promoter named in the RERA registration is Kotla.

Where is Cyber City located?

Cyber City is in Amistapur, Bhoothpur, Mahabubnagar, Telangana (509382).

When will Cyber City be completed?

The promoter's proposed date of completion filed with RERA is 30/09/2025. This is the promoter's declaration, not a guarantee.