Celebritys Nimz Hill View 2
GOLDENMIST AGROFARMS & PLANTATIONS · Sangareddy · RERA P01100007182
CELEBRITYS NIMZ HILL VIEW 2 is a plotted development in Siddapur, JARASANGAM Mandal, Sangareddy District, developed by registered promoter GOLDENMIST AGROFARMS & PLANTATIONS. The registered total area is 194046.765 sqmts, and the project is for plots; the number of plots and plot configurations are not stated. It is registered under TG-RERA number P01100007182, with a promoter completion undertaking stating 27.12.2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | CELEBRITYS NIMZ HILL VIEW 2 RERA record |
| Project type | Plotted development RERA record RERA filing |
| Phase / registered portion | “HILL VIEW 2” is identified in the registered project name; the registration certificate lists Survey Nos. 31/P and 69/P. Further phase or parcel boundaries are not established in the supplied record. |
| TG-RERA registration | P01100007182 Approvals record |
| Registration validity | 25/10/2023–27/12/2023; the supplied certificate records no extension. This is registration validity, not a current completion or occupancy certificate. Approvals record |
| Registered promoter | GOLDENMIST AGROFARMS & PLANTATIONS RERA record Corporate record |
| RERA status | The project is recorded as “New Project”; registration was granted under section 5. The supplied record does not establish a current construction or occupancy status. RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | Siddapur; the registration certificate separately lists locality as JARASANGAM. The registered land identity gives Siddapur as the village. RERA record RERA filing |
| Mandal / district / PIN | JARASANGAM, Sangareddy, 503230 RERA record RERA filing |
| Project survey numbers | 31/P AND 69/P; the registration certificate lists 31/P and 69/P. RERA record RERA filing Land records |
| Registered total area | 194046.765 sqmts RERA filing |
| Registered area affected in road widening/FTL of tanks/nala widening | 77052.04 sqmts RERA filing |
| Registered net area | 116994.73 sqmts RERA filing |
| Boundaries in the RERA filing | East, west, north and south: OTHERS LAND RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority named in RERA filing | DTCP RERA filing |
| Principal approval number / date | Approval number is not disclosed in the supplied project fields. The filing records an approved date of 28/12/2021; the underlying plan particulars cannot be reliably identified from the supplied commencement-certificate OCR. RERA filing |
| Approved built-up area | 95824.56 sqmts RERA filing |
| Buildings, floors and parking levels | Not established in the supplied evidence. The project is a plotted development, and no reliable building or floor schedule is available. RERA filing |
| Approved versus RERA-declared plot count | Not disclosed in the supplied records. RERA filing Document index |
Offering and status
| Field | Project record |
|---|---|
| Unit type | Plots; individual plot configurations, plot sizes and counts are not available in the supplied data. RERA record RERA filing |
| Booked / available counts | Not available in the supplied records. Document index |
| Construction / development stage | No independently verified site progress is supplied. The amenity record lists several infrastructure items as “YES” with 10% progress; the remaining listed items show 0%. These are recorded progress figures, not independent site verification. RERA amenities |
| Completion dates in RERA-filed declarations | One Form B undertaking states 27.12.2023; a separate Form B states 27.12.2025. These are promoter declarations in the respective filings. |
| Occupancy / completion certificate | Not supplied or established for this plotted development. Document index |
2. The project story
This is a registered plotted development named CELEBRITYS NIMZ HILL VIEW 2, associated in the project filing with Siddapur village, JARASANGAM Mandal, Sangareddy District, and Survey Nos. 31/P AND 69/P. The registered land figures distinguish a total area of 194046.765 sqmts, an affected area of 77052.04 sqmts, and a net area of 116994.73 sqmts. RERA record RERA filing RERA filing
The supplied record does not identify individual plot sizes or counts, a reliable sanctioned layout drawing, or independently verified construction progress. The amenity schedule records 10% progress for internal roads and footpaths, sewerage infrastructure, and street lighting; it records 0% for the other listed items. Those percentages are filed progress information, not an independent inspection finding. RERA amenities
The registration certificate was valid through 27/12/2023. The supplied documents contain two promoter completion undertakings—27.12.2023 and 27.12.2025—and do not establish a later approved completion date or an occupancy/completion certificate.
3. Master plan, architecture & building design
The project is recorded as a plotted development. The RERA filing reports a total land area of 194046.765 sqmts, an affected area of 77052.04 sqmts, a net area of 116994.73 sqmts, and an approved built-up area of 95824.56 sqmts. These are filed figures; the supplied material does not provide a reliably readable sanctioned layout from which to describe plot arrangement, road widths, parks, utility land, or land-use distribution. RERA filing RERA filing
The filing names DTCP as the authority and records an approved date of 28/12/2021, but the supplied commencement-certificate OCR does not establish the certificate’s heading, issuing authority, land particulars or approval conditions. Building counts, floor configurations, parking levels, and architectural arrangements are not established in the available records. RERA filing
4. Homes, configurations & floor plans
The registered offering is plotted development, but the supplied records do not establish a plot schedule, plot count, plot-size bands, booked or available inventory, or measured plot areas. RERA record RERA filing Document index
One floor-plan drawing is recorded, but it is pending scanning; no software-measured carpet areas are available. Apartment-style saleable-area or carpet-area figures therefore cannot be presented for this plotted project. Floor plans
5. Parking & vehicle circulation
The supplied records do not establish a sanctioned parking count, parking allocation, visitor or accessible parking, or a parking layout. The amenity schedule lists internal roads and footpaths as “YES” with 10% progress, but does not provide road dimensions, vehicle entries or exits, driveway details, or pedestrian-vehicle separation. RERA amenities Document index
6. Amenities, recreation & open spaces
The RERA amenity schedule lists the following facilities and progress. Progress percentages are as recorded in that schedule; they are not independent verification of completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | No dimensions supplied | RERA amenity schedule RERA amenities | “YES”; 10% recorded; not independently verified |
| Water Supply | No source, capacity or system details supplied | RERA amenity schedule RERA amenities | 0% recorded |
| Sewerage (Chamber, Lines, Septic Tank, STP) | No capacity or system details supplied | RERA amenity schedule RERA amenities | “YES”; 10% recorded; not independently verified |
| Storm Water Drains | No dimensions or system details supplied | RERA amenity schedule RERA amenities | 0% recorded |
| Green Strip/TOT LOT/Park | No area or facility details supplied | RERA amenity schedule RERA amenities | 0% recorded |
| Street Lighting | No specifications supplied | RERA amenity schedule RERA amenities | “YES”; 10% recorded; not independently verified |
| Community Buildings | No description or size supplied | RERA amenity schedule RERA amenities | 0% recorded |
| Treatment and Disposal of Sewage and Sullage Water | No system or capacity details supplied | RERA amenity schedule RERA amenities | 0% recorded |
| Solid Waste Management and Disposal | No system details supplied | RERA amenity schedule RERA amenities | 0% recorded |
| Water Conservation, Rain Water Harvesting | No system or capacity details supplied | RERA amenity schedule RERA amenities | 0% recorded |
| Energy management | No system details supplied | RERA amenity schedule RERA amenities | 0% recorded |
| Fire Protection and Fire Safety Requirements | No system details supplied | RERA amenity schedule RERA amenities | 0% recorded |
| Electrical Meter Room, Sub-Station, Receiving Station | No capacity or equipment details supplied | RERA amenity schedule RERA amenities | 0% recorded |
| Aggregate area of recreational Open Space | Area not supplied | RERA amenity schedule RERA amenities | 0% recorded |
7. Utilities, building services & safety
The amenity schedule records water supply, sewerage, storm-water drainage, sewage and sullage treatment, waste management, rainwater harvesting, energy management, fire protection, and electrical facilities, but supplies no technical descriptions, capacities or detailed designs. It records sewerage as “YES” with 10% progress; water supply, storm-water drains and the other listed service items show 0%. RERA amenities
No supplied evidence establishes water sources or storage, treatment capacity, drainage design, electrical supply or backup capacity, fire-system specifications, security arrangements, accessibility provisions, or completed utility infrastructure. The available progress figures should not be read as independent verification or as proof of statutory compliance. RERA amenities Document index
8. Location, access & connectivity
The registered land location is Siddapur village, JARASANGAM Mandal, Sangareddy District, Telangana, PIN 503230. The registration certificate lists locality as JARASANGAM and the land identity lists Siddapur; the certificate also gives the promoter office address separately. RERA record RERA filing
The supplied location data gives a parcel-centroid coordinate of 17.415275719570207, 78.35458902767974 and records Financial District (Nanakramguda), 1.2 km as a connectivity anchor. No approach-road, public-transport, or other landmark details are provided. Location record
9. Developer & development status
The registered promoter is GOLDENMIST AGROFARMS & PLANTATIONS, recorded as a partnership in the project information. The supplied corporate identifier is GSTIN 36AAJCG9541J1Z5. The project record gives the promoter address as 111, PRASHASAN NAGAR, SIDDAPUR, SIDDAPUR, JARASANGAM, Sangareddy, 503230. RERA record RERA filing Corporate record
The registration certificate lists a separate promoter office at Village: JOURNALSIT COLONY, Mandal: Shaikpet, District: Hyderabad, Pin: 500033.
In Form B, P. Sushmitha identifies herself as a partner and authorized signatory and declares project completion by 27.12.2023; another Form B declaration by P. Sushmitha states 27.12.2025. The supplied record does not establish the current development stage, a revised RERA completion date, or an occupancy/completion certificate. RERA amenities
10. Approvals, official records & documents
| Record | What the supplied evidence establishes |
|---|---|
| TG-RERA registration certificate | Form C records registration of CELEBRITYS NIMZ HILL VIEW 2 under P01100007182, granted under section 5; validity stated as 25/10/2023–27/12/2023. |
| Principal authority / approval date | RERA project fields name DTCP and record approved date 28/12/2021; an approval number is not disclosed in the supplied project fields. RERA filing |
| Commencement-certificate document | The filing includes a document labelled “Commencement Certificates for each building in each phase”; its OCR does not reliably identify the instrument, authority, land or terms. |
| Layout plan | A layout-plan document is listed, but no readable plan or approval particulars are supplied. |
| Form B declarations | Filed promoter declarations state completion by 27.12.2023 and 27.12.2025, respectively. |
| Occupancy / completion certificate | Not supplied in the reviewed project records. Document index |
1. Project at a glance
Project identity
Registered project name: CELEBRITYS NIMZ HILL VIEW 2
Project type: Plotted development
Phase / registered portion: “HILL VIEW 2” is identified in the registered project name; the registration certificate lists Survey Nos. 31/P and 69/P. Further phase or parcel boundaries are not established in the supplied record.
TG-RERA registration: P01100007182
Registration validity: 25/10/2023–27/12/2023; the supplied certificate records no extension. This is registration validity, not a current completion or occupancy certificate.
Registered promoter: GOLDENMIST AGROFARMS & PLANTATIONS
RERA status: The project is recorded as “New Project”; registration was granted under section 5. The supplied record does not establish a current construction or occupancy status.
Land and geographic identity
Locality / revenue village: Siddapur; the registration certificate separately lists locality as JARASANGAM. The registered land identity gives Siddapur as the village.
Mandal / district / PIN: JARASANGAM, Sangareddy, 503230
Project survey numbers: 31/P AND 69/P; the registration certificate lists 31/P and 69/P.
Registered total area: 194046.765 sqmts
Registered area affected in road widening/FTL of tanks/nala widening: 77052.04 sqmts
Registered net area: 116994.73 sqmts
Boundaries in the RERA filing: East, west, north and south: OTHERS LAND
Development identity
Sanctioning authority named in RERA filing: DTCP
Principal approval number / date: Approval number is not disclosed in the supplied project fields. The filing records an approved date of 28/12/2021; the underlying plan particulars cannot be reliably identified from the supplied commencement-certificate OCR.
Approved built-up area: 95824.56 sqmts
Buildings, floors and parking levels: Not established in the supplied evidence. The project is a plotted development, and no reliable building or floor schedule is available.
Approved versus RERA-declared plot count: Not disclosed in the supplied records.
Offering and status
Unit type: Plots; individual plot configurations, plot sizes and counts are not available in the supplied data.
Booked / available counts: Not available in the supplied records.
Construction / development stage: No independently verified site progress is supplied. The amenity record lists several infrastructure items as “YES” with 10% progress; the remaining listed items show 0%. These are recorded progress figures, not independent site verification.
Completion dates in RERA-filed declarations: One Form B undertaking states 27.12.2023; a separate Form B states 27.12.2025. These are promoter declarations in the respective filings.
Occupancy / completion certificate: Not supplied or established for this plotted development.
2. The project story
This is a registered plotted development named CELEBRITYS NIMZ HILL VIEW 2, associated in the project filing with Siddapur village, JARASANGAM Mandal, Sangareddy District, and Survey Nos. 31/P AND 69/P. The registered land figures distinguish a total area of 194046.765 sqmts, an affected area of 77052.04 sqmts, and a net area of 116994.73 sqmts.
The supplied record does not identify individual plot sizes or counts, a reliable sanctioned layout drawing, or independently verified construction progress. The amenity schedule records 10% progress for internal roads and footpaths, sewerage infrastructure, and street lighting; it records 0% for the other listed items. Those percentages are filed progress information, not an independent inspection finding.
The registration certificate was valid through 27/12/2023. The supplied documents contain two promoter completion undertakings—27.12.2023 and 27.12.2025—and do not establish a later approved completion date or an occupancy/completion certificate.
3. Master plan, architecture & building design
The project is recorded as a plotted development. The RERA filing reports a total land area of 194046.765 sqmts, an affected area of 77052.04 sqmts, a net area of 116994.73 sqmts, and an approved built-up area of 95824.56 sqmts. These are filed figures; the supplied material does not provide a reliably readable sanctioned layout from which to describe plot arrangement, road widths, parks, utility land, or land-use distribution.
The filing names DTCP as the authority and records an approved date of 28/12/2021, but the supplied commencement-certificate OCR does not establish the certificate’s heading, issuing authority, land particulars or approval conditions. Building counts, floor configurations, parking levels, and architectural arrangements are not established in the available records.
4. Homes, configurations & floor plans
The registered offering is plotted development, but the supplied records do not establish a plot schedule, plot count, plot-size bands, booked or available inventory, or measured plot areas.
One floor-plan drawing is recorded, but it is pending scanning; no software-measured carpet areas are available. Apartment-style saleable-area or carpet-area figures therefore cannot be presented for this plotted project.
5. Parking & vehicle circulation
The supplied records do not establish a sanctioned parking count, parking allocation, visitor or accessible parking, or a parking layout. The amenity schedule lists internal roads and footpaths as “YES” with 10% progress, but does not provide road dimensions, vehicle entries or exits, driveway details, or pedestrian-vehicle separation.
6. Amenities, recreation & open spaces
The RERA amenity schedule lists the following facilities and progress. Progress percentages are as recorded in that schedule; they are not independent verification of completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | No dimensions supplied | RERA amenity schedule | “YES”; 10% recorded; not independently verified |
| Water Supply | No source, capacity or system details supplied | RERA amenity schedule | 0% recorded |
| Sewerage (Chamber, Lines, Septic Tank, STP) | No capacity or system details supplied | RERA amenity schedule | “YES”; 10% recorded; not independently verified |
| Storm Water Drains | No dimensions or system details supplied | RERA amenity schedule | 0% recorded |
| Green Strip/TOT LOT/Park | No area or facility details supplied | RERA amenity schedule | 0% recorded |
| Street Lighting | No specifications supplied | RERA amenity schedule | “YES”; 10% recorded; not independently verified |
| Community Buildings | No description or size supplied | RERA amenity schedule | 0% recorded |
| Treatment and Disposal of Sewage and Sullage Water | No system or capacity details supplied | RERA amenity schedule | 0% recorded |
| Solid Waste Management and Disposal | No system details supplied | RERA amenity schedule | 0% recorded |
| Water Conservation, Rain Water Harvesting | No system or capacity details supplied | RERA amenity schedule | 0% recorded |
| Energy management | No system details supplied | RERA amenity schedule | 0% recorded |
| Fire Protection and Fire Safety Requirements | No system details supplied | RERA amenity schedule | 0% recorded |
| Electrical Meter Room, Sub-Station, Receiving Station | No capacity or equipment details supplied | RERA amenity schedule | 0% recorded |
| Aggregate area of recreational Open Space | Area not supplied | RERA amenity schedule | 0% recorded |
7. Utilities, building services & safety
The amenity schedule records water supply, sewerage, storm-water drainage, sewage and sullage treatment, waste management, rainwater harvesting, energy management, fire protection, and electrical facilities, but supplies no technical descriptions, capacities or detailed designs. It records sewerage as “YES” with 10% progress; water supply, storm-water drains and the other listed service items show 0%.
No supplied evidence establishes water sources or storage, treatment capacity, drainage design, electrical supply or backup capacity, fire-system specifications, security arrangements, accessibility provisions, or completed utility infrastructure. The available progress figures should not be read as independent verification or as proof of statutory compliance.
8. Location, access & connectivity
The registered land location is Siddapur village, JARASANGAM Mandal, Sangareddy District, Telangana, PIN 503230. The registration certificate lists locality as JARASANGAM and the land identity lists Siddapur; the certificate also gives the promoter office address separately.
The supplied location data gives a parcel-centroid coordinate of 17.415275719570207, 78.35458902767974 and records Financial District (Nanakramguda), 1.2 km as a connectivity anchor. No approach-road, public-transport, or other landmark details are provided.
9. Developer & development status
The registered promoter is GOLDENMIST AGROFARMS & PLANTATIONS, recorded as a partnership in the project information. The supplied corporate identifier is GSTIN 36AAJCG9541J1Z5. The project record gives the promoter address as 111, PRASHASAN NAGAR, SIDDAPUR, SIDDAPUR, JARASANGAM, Sangareddy, 503230.
The registration certificate lists a separate promoter office at Village: JOURNALSIT COLONY, Mandal: Shaikpet, District: Hyderabad, Pin: 500033.
In Form B, P. Sushmitha identifies herself as a partner and authorized signatory and declares project completion by 27.12.2023; another Form B declaration by P. Sushmitha states 27.12.2025. The supplied record does not establish the current development stage, a revised RERA completion date, or an occupancy/completion certificate.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C records registration of CELEBRITYS NIMZ HILL VIEW 2 under P01100007182, granted under section 5; validity stated as 25/10/2023–27/12/2023.
Principal authority / approval date: RERA project fields name DTCP and record approved date 28/12/2021; an approval number is not disclosed in the supplied project fields.
Commencement-certificate document: The filing includes a document labelled “Commencement Certificates for each building in each phase”; its OCR does not reliably identify the instrument, authority, land or terms.
Layout plan: A layout-plan document is listed, but no readable plan or approval particulars are supplied.
Form B declarations: Filed promoter declarations state completion by 27.12.2023 and 27.12.2025, respectively.
Occupancy / completion certificate: Not supplied in the reviewed project records.
Frequently asked questions
Is CELEBRITYS NIMZ HILL VIEW 2 registered with Telangana RERA?
Yes. CELEBRITYS NIMZ HILL VIEW 2 is registered with the Telangana Real Estate Regulatory Authority as P01100007182; the registration status is New Project.
Who is the developer of CELEBRITYS NIMZ HILL VIEW 2?
The promoter named in the RERA registration is GOLDENMIST AGROFARMS & PLANTATIONS.
Where is CELEBRITYS NIMZ HILL VIEW 2 located?
CELEBRITYS NIMZ HILL VIEW 2 is in SIDDAPUR, JARASANGAM, Sangareddy, Telangana (503230).
When will CELEBRITYS NIMZ HILL VIEW 2 be completed?
The promoter's proposed date of completion filed with RERA is 27/12/2023. This is the promoter's declaration, not a guarantee.