Build Urban Aavaas

BUILD URBAN CONSTRUCTIONS · Karimnagar · RERA P02700006331

BUILD URBAN AAVAAS is a residential apartment project in Rampur / Indraprastha Colony, Karimnagar District / 505001; the mandal is not disclosed. The registered promoter is BUILD URBAN CONSTRUCTIONS. The project occupies 668.87 sq.m. and comprises one residential apartment building with 1 stilt + 5 upper floors and 15 2BHK units, each with a recorded saleable area of 70.55 sq.m. Its TG-RERA registration number is P02700006331, and the RERA header lists proposed completion as 30/11/2026.

More from Build Urban Constructions · 3 projects →

01What we found

Period endedTG-RERA registration ran to 26 Apr 2026 - check its extension on TG-RERA
11documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameBUILD URBAN AAVAAS RERA record
Project type / phaseResidential apartment project; phase or separately identified registered portion: not disclosed. RERA record RERA filing
TG-RERA registrationP02700006331; registered from 07/07/2023 to 26/04/2026. The record says registration was not extended; registration validity is distinct from the stated project completion date. RERA record Approvals record
Registered promoterBUILD URBAN CONSTRUCTIONS. RERA record Corporate record
RERA-record statusThe project is registered. The registration certificate records validity through 26/04/2026; the evidence supplied does not establish a current post-expiry registration status. Approvals record

Land and geographic identity

FieldProject record
LocalityRampur / Indraprastha Colony, Karimnagar town locality, as stated across the RERA-filed land and approval records. RERA record Land records
Revenue villageRERA identity: Rampur. The building approval extraction identifies the village as KARIMNAGAR; the supplied records do not resolve this naming difference. RERA record Land records
MandalNot disclosed. Land records
District / PINKarimnagar / 505001. RERA record
Survey number(s) and subdivisionsSurvey No. 820; title records also describe Sy.No.820/Part and one development-agreement record transcribes it as Sy.No.B20/Part. RERA record Land records
Registered plot referencesPlots 14, 17 and 19. RERA filing
Site extent668.87 sq.m. in the RERA land record and approval extraction. Approval extraction separately states Net Area 666.94 sq.m. Land records
BoundariesEast: PLOT NO S 18 16 AND 15; west: 9M ROAD; north: PLOT NO 13; south: 9M ROAD. RERA filing

Development identity

FieldProject record
Sanctioning authorityKarimnagar Municipal Corporation. Approvals record
Principal building approval0009/BP/3011/2023, approved 26 April 2023; file number 001069/BP/DTCP/3011/0007/2023. Approvals record
Approved built-up area1,609.25 sq.m. recorded as residential upper-floor area; the approval also lists 322.27 sq.m. for the stilt. These are the areas as labelled in the approval extraction, not saleable or carpet areas. Approvals record
Building count and floorsOne residential apartment building, 1 stilt + 5 upper floors; sanctioned height 14.99 m. RERA filing
Parking levelsStilt is approved for parking; no parking-space count is supplied.
Approved versus RERA-filed unitsApproval conditions say sanctioned unit numbers must not be increased without prior approval, but the supplied approval extraction does not give the sanctioned unit count. The RERA filing lists 15 2BHK units. RERA unit table

Offering and status

FieldProject record
RERA-filed configuration2BHK, 15 units; saleable area 70.55 sq.m. per unit as recorded. RERA unit table RERA unit details
Booked / available0 booked / 15 available, as last read from the TG-RERA portal; the record gives no as-of date, so these counts are indicative. RERA unit table
Construction stageNo project construction-progress figure or independently verified site progress is supplied. RERA amenities
Completion datePromoter’s Form B declaration records a completion date transcribed as “?6.0,4-2026”; a clear original/revised completion date is not established by that extraction. The RERA header lists proposed completion 30/11/2026. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. The building approval requires a completion notice and occupancy certificate before occupation. Document index

2. The project story

BUILD URBAN AAVAAS is a RERA-registered residential apartment project on the recorded site at Rampur, Karimnagar, associated in the land and approval documents with Survey No. 820 and plots 14, 17 and 19. The RERA filing describes a single building and offers 15 two-bedroom apartments; the municipal building approval describes one residential building with a stilt and five upper floors. RERA record Land records RERA unit table

The project’s registration certificate and building-construction approval are on file. The supplied evidence does not establish how much construction has been completed, whether the building is occupied, or whether an occupancy certificate has been issued. The approval’s conditions require an occupancy certificate before occupation.

3. Master plan, architecture & building design

The municipal approval describes a single residential building with 1 stilt + 5 upper floors, a sanctioned height of 14.99 m, residential upper-floor area of 1,609.25 sq.m., and stilt area of 322.27 sq.m. The approval extraction gives a site area of 668.87 sq.m. and net area of 666.94 sq.m.

The approval records a rainwater-harvesting structure, space for a transformer and a garbage house within the premises. It also states that the sanctioned plan must be followed, that construction modifications require prior approval, and that the sanctioned plan is to be displayed at the site.

No detailed floor-by-floor arrangement, building footprint, flats per floor, lift or stair specifications, internal circulation drawing, landscaping plan, or residential/common-area schedule is available in the supplied material. See Homes, configurations & floor plans above for the RERA-filed unit inventory. RERA unit table Document index

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1501570.55 sq.m.Not supplied for this configurationNot supplied

The configuration, count, booking status and saleable area are RERA-filed figures; the booking snapshot has no stated as-of date. The supplied drawing-measurement record relates to a 1BHK plan, which is not listed in the RERA filing’s 2BHK inventory. Its software-measured carpet area is 51.0 sq.m. (549 sq.ft.), based on two measured flat designs; it is a drawing-derived measurement, not a RERA disclosure, and is not presented as a measurement of the filed 2BHK units. RERA unit table RERA unit details Floor plans

Carpet area and saleable area are different measures: the supplied measurement note says saleable area includes the home’s share of common areas, while the drawing-based carpet measurement is software-derived and needs review. No RERA-filed carpet area, balcony/utility area, or loading figure for the 2BHK units is supplied. Floor plans RERA unit details

5. Parking & vehicle circulation

The building approval identifies the stilt as a parking level and states that approved stilt parking is to be used exclusively for vehicles, without partition walls or rolling shutters. No sanctioned parking-space count, visitor or accessible-space provision, parking allocation by unit, or parking circulation plan is supplied. A parking level in the approval does not establish an exclusive parking allocation to an apartment.

6. Amenities, recreation & open spaces

The amenity schedule contains 14 listed infrastructure or amenity categories. The RERA record shows 0% progress for each listed category where a percentage is stated. This is a filed progress status, not independent confirmation of site conditions. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot lot / parkSize not supplied; building approval lists tot-lot area as NA.RERA amenitiesRERA schedule: 0%; no independent completion verification.
Aggregate recreational open spaceArea not supplied.RERA amenitiesRERA schedule: 0%; no independent completion verification.
Community buildingsNo description or size supplied.RERA amenitiesRERA schedule: 0%; no independent completion verification.
Internal roads and footpathsNo dimensions supplied.RERA amenitiesRERA schedule: 0%; no independent completion verification.
Street lightingNo further details supplied.RERA amenitiesRERA schedule: 0%; no independent completion verification.

No clubhouse, indoor recreation or sports facility is specified in the supplied project evidence.

7. Utilities, building services & safety

The RERA amenity schedule marks Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Water Conservation, Rain water Harvesting, and Electrical Meter Room, Sub-Station, Receiving Station as available, while recording 0% progress. The schedule does not specify water source, storage or treatment capacity; sewerage-system type or capacity; or electrical supply and backup arrangements. RERA amenities

The building approval requires a rainwater-harvesting structure (percolation pit), space for a transformer and a garbage house within the premises. It also requires a completion notice and occupancy certificate before occupation. These are approval requirements; the supplied material does not verify installation or completion.

The RERA schedule also lists storm-water drains, sewage and sullage treatment/disposal, solid-waste management, energy management and fire protection/fire-safety requirements, with 0% progress recorded. No detailed design, capacities, fire-system specifications, lift information, accessibility arrangements or independent compliance verification is supplied. RERA amenities

8. Location, access & connectivity

The project’s RERA-filed location is Rampur, Karimnagar District, Telangana, PIN 505001; the land record identifies the locality as Rampur and the title documents refer to Indraprastha Colony, Rampur locality of Karimnagar town. The mandal is not disclosed. RERA record Land records

A supplied connectivity record lists Financial District (Nanakramguda) — 1.2 km. The underlying record describes the location coordinate as a cadastral parcel centroid; no route, travel time or measurement method for the listed distance is provided. No project approach-road or public-transport details are supplied beyond the two boundary references to 9M roads. Location record RERA filing

9. Developer & development status

The registered promoter is BUILD URBAN CONSTRUCTIONS, recorded as a partnership. Its supplied corporate identifier is GSTIN 36AAWFB5362L1ZS. The RERA-filed promoter address is 1-5-346, Raghavendra Nagar, Indraprasthacolony, Rampur, Karimnagar, 505001. No official contact details are supplied. Corporate record Parties record

The RERA record names SUSHANTH REDDY MADDULA as authorized signatory and KRUPAKAR REDDY MADDULA and SUNANDA MADDULA as partners. Landowner records name SRIRANGAM RADHAKRISHNA and SREEDASYAM SUREKHA under area-share arrangements. Parties record Land records

The promoter’s Form B affidavit declares a completion date transcribed as “?6.0,4-2026” and states that 70% of amounts realised from allottees will be placed in a separate scheduled-bank account. The RERA header separately lists a proposed completion date of 30/11/2026. No construction-progress percentage or occupancy certificate is established by the supplied evidence. RERA record Document index

10. Approvals, official records & documents

RecordWhat the supplied document establishes
TG-RERA registration certificate — P02700006331Form C certificate for BUILD URBAN AAVAAS; records registration from 07/07/2023 to 26/04/2026.
Building construction approval — 0009/BP/3011/2023Karimnagar Municipal Corporation approval dated 26 April 2023, for a residential apartment building on Survey No. 820, with 1 stilt + 5 upper floors. File number: 001069/BP/DTCP/3011/0007/2023.
RERA-filed title reportAdvocate’s title opinion dated 08-05-2023 covering an 800 Sq.yds plot in Sy.No.820/Part and describing the landowners’ title, development rights and municipal mortgage.
Development Agreement-cum-GPARERA-filed agreement dated 25 November 2022 for development of 800.00 square yards; the supplied extraction describes a 40% landowner / 60% developer constructed-area allocation.
Encumbrance statementRERA-filed statement L224609L7 lists three returned transactions and says 3 out of 5 are included in the statement.
Form B declarationPromoter declaration filed in 2023, including its statements on title basis, encumbrances, completion and project accounts.
Occupancy / completion certificateNot included in the supplied project documents. Document index

The building approval’s conditions include requirements concerning the sanctioned plan, commencement and completion notices, occupancy before occupation, rainwater harvesting, transformer space and stilt parking. This overview records the approval evidence supplied; it does not establish that those works or requirements have been completed.

Frequently asked questions

Is BUILD URBAN AAVAAS registered with Telangana RERA?

Yes. BUILD URBAN AAVAAS is registered with the Telangana Real Estate Regulatory Authority as P02700006331; the registration status is New Project.

Who is the developer of BUILD URBAN AAVAAS?

The promoter named in the RERA registration is BUILD URBAN CONSTRUCTIONS.

Where is BUILD URBAN AAVAAS located?

BUILD URBAN AAVAAS is in RAMPUR, Karimnagar, Telangana (505001).

When will BUILD URBAN AAVAAS be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.