ASHWIN REDDY TOWN SHIP is a plotted development in Neradigonda, Neradigonda Mandal, Adilabad District, with registered promoter CHINNOLLA VENKAT REDDY AND OTHERS. The registered site area is 15062.18 sq. m, and the draft layout approval provides for 48 plots; buildings and floors are not disclosed. The TG-RERA registration number is P00100010395, and the proposed completion date is 08/02/2025.

01What we found

RegisteredTG-RERA
14documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Neradigonda, Neradigonda, Adilabad · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameASHWIN REDDY TOWN SHIP
Project typePlotted development / layout RERA record
Phase or registered portionThe registration and draft layout concern the plotted layout on the listed survey land; no separate phase designation is disclosed.
TG-RERA registrationP00100010395
Registration validityCertificate states validity from 09/02/2023 through 08/02/2025. This is the registration period, not a statement of current registration validity.
Registered promoterCHINNOLLA VENKAT REDDY AND OTHERS
Entity typeRERA filing describes the organisation as “Others”; legal entity type is not further identified. RERA filing
RERA statusProject information records “On-Going Project.” RERA filing

Land and geographic identity

ItemRecord
Locality / revenue villageNeradigonda; the layout approval identifies Neradigonda Grampanchayat. RERA record
MandalNeradigonda RERA record
DistrictAdilabad RERA record
PIN504323
Survey numbers and subdivisions45/A1/1, 45/A1/2, 45/A1/4 & 45/A1/5 RERA filing
Registered site area15062.18 sq. m recorded in the RERA land details. RERA filing
Approved layout extentAc. 3.721 Cents.; 18014.22 Sq. Yds.
RERA land-area fieldsTotal area 15062.18 sq. m; net area 15062.18 sq. m; area affected in road widening/FTL/Nala widening 0. RERA filing
BoundariesEast: N H 44 NERADIGONDA TO ADILABAD; west, north and south: OPEN LAND OF OTHERS. RERA filing

Development identity

ItemRecord
Sanctioning authorityRegional Deputy Director of Town and Country Planning, Warangal; the approval states delegation to Neradigonda Gram Panchayat.
Principal approvalDraft - TLP.No.02/2023/WRO/W, approved 09-02-2023; file number Lr.Roc.No.51/2023/WRO/W. It is a Revised Draft Technical Layout Pattern for a 48-plot layout.
Subsequent Panchayat proceedingNeradigonda Gram Panchayat proceeding Proc.No. 37 /GPN/2023, dated 06.07.2023, records draft technical layout permission.
Approved built-up area8512.24 sq. m is recorded in the RERA filing. RERA filing
Layout composition in approval48 plots; approved area statement lists plotted area Ac. 2.103 Cents.; 10180.56 Sq. Yds. (56.51%), roads Ac. 1.245 Cents.; 6024.33 Sq. Yds. (33.45%), and open space Ac. 0.373 Cents.; 1809.33 Sq. Yds. (10.04%).
Buildings / floorsNot disclosed as a multi-building or apartment development; the approval is for a plotted layout. The filed conditions refer to detached single-family dwelling houses on individual sites.
Mortgage areaRERA filing records 1300.63 sq. m. The layout approval separately lists mortgage area Ac. 0.321 Cents.; 1555.55 Sq. Yards. (15.51%). RERA filing

Offering and status

ItemRecord
OfferingPlots in a 48-plot layout; individual plot sizes and current sale inventory are not provided in the supplied records.
Booked / available countsNot disclosed in the supplied project data. RERA filing
Construction / development stageRERA records “On-Going Project.” A filed Work Completion Certificate records layout works as completed; this is a certificate for layout works, not an occupancy certificate for a building. RERA filing
Completion datePromoter’s Form B completion undertaking: 08/02/2025. The RERA project fields give proposed and revised proposed completion dates as 08/02/2025. RERA filing
Occupancy certificate statusNo occupancy certificate is identified in the supplied records. The development is a plotted layout; no building-level OC status is disclosed. Document index

2. The project story

  • ASHWIN REDDY TOWN SHIP is registered as a plotted development in Neradigonda, Adilabad District, on survey subdivisions 45/A1/1, 45/A1/2, 45/A1/4 and 45/A1/5. Its filed draft layout approval provides for 48 plots, with land designated for plotted area, roads and open space. The approval conditions describe detached, single-family dwelling houses on individual plots; the supplied materials do not establish apartment blocks, villa construction or other buildings as part of the registered offering. RERA record
  • A RERA-filed Work Completion Certificate records completion of layout works, including roads and drains, open-space greenery and fencing, street lighting, electricity, sewerage disposal and protected water supply. The project information nevertheless labels the project “On-Going Project,” and the supplied records do not establish final layout release or building-level occupancy certification. These statements describe different recorded aspects: the work certificate covers layout infrastructure, while the RERA status and completion/OC fields do not document final layout release or an OC. RERA filing

3. Master plan, architecture & building design

  • The principal plan evidence is the Revised Draft Technical Layout Pattern, approved 09-02-2023 for 48 plots across the four listed survey subdivisions. Its stated area distribution is 56.51% plotted area (Ac. 2.103 Cents.; 10180.56 Sq. Yds.), 33.45% road area (Ac. 1.245 Cents.; 6024.33 Sq. Yds.) and 10.04% open space (Ac. 0.373 Cents.; 1809.33 Sq. Yds.).
  • The RERA filing separately records site total and net area as 15062.18 sq. m and approved built-up area as 8512.24 sq. m; the supplied records do not define the built-up-area figure as plot saleable area or provide a plotted-area schedule by individual plot. RERA filing RERA filing
  • The layout approval calls for roads, side drains, storm-water channelization, rainwater-harvesting pits, avenue planting, open-space fencing, street lighting, electricity, sewerage disposal and protected water supply. It also requires the open space and roads to be gifted to the Gram Panchayat before release of the final layout.
  • The plan is a draft layout approval, and the Panchayat proceeding records permission for a draft technical layout pattern. The supplied evidence does not include a readable layout drawing, individual plot dimensions, final layout release, building plans, floor configurations or architectural details.

4. Homes, configurations & floor plans

The registered offering is plotted development, not apartments. The draft approval records 48 plots, but no RERA unit schedule showing plot-by-plot dimensions, configuration bands, booked units, available units or saleable-area values is included in the supplied data. RERA filing

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Plots48 in the draft layout approvalNot disclosedNot disclosedNot disclosedNot applicable / not suppliedNot supplied

Two floor-plan drawings are listed, but neither has been measured and both are marked as scans pending. No drawing-based carpet or room measurements can therefore be reported. The supplied floor-plan information is apartment-oriented and does not provide plot measurements for this layout. Floor plans

5. Parking & vehicle circulation

  • No sanctioned parking count, visitor or accessible parking provision, parking allocation, or parking structure is disclosed in the supplied records. As a plotted layout, the evidence describes roads and access rather than a building parking system. The approval requires roads to be opened for accessibility to neighbouring sites and prohibits a compound wall or fencing around the site; it also requires the designated open spaces to be fenced.
  • The approval identifies plots 12, 13, 14, 15, 16, 17 & 18, extent 1555.55 Sq.Yards, as mortgage plots in favour of Neradigonda Gram Panchayat and states that the mortgaged area is not for sale.

6. Amenities, recreation & open spaces

The following distinguishes the layout approval’s requirements from the RERA-filed completion certificate and the RERA amenities record. “Available: YES” is a filed amenities value; the completion certificate is a documentary record of the listed layout works, not an independent site inspection in this evidence pack. RERA amenities

Open space / green area
Description / sizeAc. 0.373 Cents.; 1809.33 Sq. Yds. (10.04%) in the draft layout area statement; approval requires greenery and avenue planting.
Declared progress / verified statusRERA-filed Work Completion Certificate records greenery and fencing; no independent site verification supplied.
Internal roads and footpaths
Description / sizeRoads occupy Ac. 1.245 Cents.; 6024.33 Sq. Yds. (33.45%) in the draft layout area statement.
Declared progress / verified statusWork Completion Certificate records roads, drains and associated road works as completed; no independent site verification supplied.
Avenue plantation
Description / sizeRequired in the layout, including public open spaces.
Declared progress / verified statusWork Completion Certificate records greenery/avenue plantation; no independent site verification supplied.
Park / green strip
Description / sizeRERA amenities record lists “Green Strip/TOT LOT/Park” as available. No separate size is supplied.
Evidence sourceRERA amenities
Declared progress / verified statusFiled as available; no independent verification supplied.
Community buildings
Description / sizeNo community building is listed as available in the supplied amenities record.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenities record shows 0%.
Indoor or sports facilities
Description / sizeNo clubhouse, indoor facility or sports facility is identified in the supplied project evidence.
Evidence sourceRERA amenities Document index
Declared progress / verified statusNot disclosed.

7. Utilities, building services & safety

The draft layout approval requires storm-water drains and channelization, rainwater-harvesting pits, street lighting, electricity, sewerage disposal and protected water supply. Its Work Completion Certificate records street lighting, electricity, sewerage disposal and protected water supply as provided, and records road drains and storm-water channelization works. The same certificate states (0) no of Rain Water Harvesting (RWHS) pits; it does not record completed harvesting pits. These are filed statements; no independent utility testing or site verification is supplied.

Water
Evidence in the project recordProtected water supply system is required by the layout approval and recorded as extended to the layout in the Work Completion Certificate.
Status / limitsSource, capacity, storage and treatment details are not supplied.
Sewerage and drainage
Evidence in the project recordApproval requires sewerage disposal, side drains and storm-water channelization; the completion certificate records sewerage disposal and drainage-related works.
Status / limitsNo STP capacity, reuse scheme or independent operational verification is supplied.
Rainwater
Evidence in the project recordApproval calls for rainwater-harvesting pits. The Work Completion Certificate records (0) no pits.
Status / limitsNo completed pit count beyond the certificate’s stated zero is established.
Electrical
Evidence in the project recordStreet lighting and electricity facilities are required and recorded as provided. The RERA amenities record also marks an electrical meter room/sub-station/receiving station available. RERA amenities
Status / limitsCapacity, backup supply and EV charging are not disclosed.
Fire and life safety
Evidence in the project recordNo fire-protection or fire-safety requirement is marked available in the supplied amenities record. RERA amenities
Status / limitsNo fire-system details or building-level clearances are supplied.
Waste and security
Evidence in the project recordNo solid-waste management/disposal or security-system detail is established in the supplied records. RERA amenities
Status / limitsNot disclosed.
Accessibility
Evidence in the project recordLayout approval requires roads to be opened for access to neighbouring sites.
Status / limitsNo separate pedestrian, accessible-route or ramp design is supplied.

8. Location, access & connectivity

  • The registered location is Neradigonda, Neradigonda Mandal, Adilabad District, Telangana, PIN 504323. The RERA land record identifies the eastern boundary as N H 44 NERADIGONDA TO ADILABAD. RERA record RERA filing
  • The location data gives an approximate Outer Ring Road sampled-interchange distance of 185.9 km. No other measured distance or public-transport information is supplied. Location record

9. Developer & development status

  • The registered promoter is CHINNOLLA VENKAT REDDY AND OTHERS; the RERA organisation type is recorded as “Others,” without a more specific legal entity type. The supplied RERA address is recorded as B, NEW BOPPARAM, NERADIGONDA VILLAGE, NERADIGONDA MANDAL, Neradigonda, Adilabad, 504323. The registration certificate separately lists a promoter office location as “Village: Mandal: District: Adilabad, Pin: 504105.” No official website, telephone or email is supplied. RERA filing Parties record
  • The Form B declaration names Chinnolla Venkat Reddy as the promoter and undertakes completion by 08/02/2025. A filed MOU describes arrangements between Chinnolla Venkat Reddy and Gothi Sunder Singh for development, financing, plot-sharing and joint sale activity; it is an MOU, not a registered deed transferring title in the supplied text.
  • The RERA project fields label the project “On-Going Project.” The supplied Work Completion Certificate records completed layout works, but the file set does not establish a final layout release or occupancy certificate. RERA filing Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP00100010395; valid 09/02/2023–08/02/2025
What the supplied evidence establishesForm C certificate for ASHWIN REDDY TOWN SHIP, naming CHINNOLLA VENKAT REDDY AND OTHERS as promoter.
Revised Draft Technical Layout Pattern
Identifier / dateDraft - TLP.No.02/2023/WRO/W; approved 09-02-2023; file Lr.Roc.No.51/2023/WRO/W
What the supplied evidence establishesDraft layout approval for 48 plots in the four project survey subdivisions, with stated conditions and layout land-use areas.
Gram Panchayat proceeding
Identifier / dateProc.No. 37 /GPN/2023; 06.07.2023
What the supplied evidence establishesNeradigonda Gram Panchayat proceeding recording draft technical layout permission and conditions.
Layout Work Completion Certificate
Identifier / date02/2023/WRO/W
What the supplied evidence establishesRERA-filed certificate recording completed layout works and listed infrastructure.
Mortgage deed
Identifier / date368/2023
What the supplied evidence establishesRERA-filed document describes a mortgage of seven layout plots in favour of Neradigonda Gram Panchayat as security for completion of layout works and amenities.
Gift settlement deed
Identifier / date367/2023
What the supplied evidence establishesCited in the RERA-filed title report in relation to open space and roads gifted to the Governor of Telangana State and Gram Panchayat Neradigonda.
Advocate title search report
Identifier / dateDated 09-12-2025
What the supplied evidence establishesRERA-filed report by advocate U. Bhaskar Rao concerning the project survey land; it records title-chain material and calls for originals and subsequent encumbrance verification.
Promoter Form B declaration
Identifier / dateForm B
What the supplied evidence establishesPromoter declaration concerning title basis, encumbrance, completion, project funds and pending approvals.
MOU
Identifier / dateASHWIN REDDY TOWNSHIP
What the supplied evidence establishesFiled MOU between Chinnolla Venkat Reddy and Gothi Sunder Singh concerning plotted development arrangements.
Layout-plan document entry
Identifier / dateDocument ID 627524
What the supplied evidence establishesThe RERA document register lists a layout-plan document, but the supplied entry is not extracted.

Frequently asked questions

Is ASHWIN REDDY TOWN SHIP registered with Telangana RERA?

Yes. ASHWIN REDDY TOWN SHIP is registered with the Telangana Real Estate Regulatory Authority as P00100010395; the registration status is On-Going Project.

Who is the developer of ASHWIN REDDY TOWN SHIP?

The promoter named in the RERA registration is CHINNOLLA VENKAT REDDY AND OTHERS.

Where is ASHWIN REDDY TOWN SHIP located?

ASHWIN REDDY TOWN SHIP is in NERADIGONDA MANDAL, Neradigonda, Adilabad, Telangana (504323).

When will ASHWIN REDDY TOWN SHIP be completed?

The promoter's proposed date of completion filed with RERA is 08/02/2025. This is the promoter's declaration, not a guarantee.