AURA VALLEY is a new plotted development with open plots in Mavala, Mavala mandal, Adilabad district. The registered promoter is MITTAL SANJEEV KUMAR. The layout covers a total land area of 57410.31 sq.mt and has 36 open plots; building or floor configuration is not provided. It is registered under TG-RERA number P00100009832, and the promoter’s Form B declares completion by 26,05.2026.

01What we found

Period endedTG-RERA registration ran to 26 May 2026 - check its extension on TG-RERA
14documents on file - each fact links to its page
12court cases on this project's land (survey 181, Adilabad)
9items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameAURA VALLEY
Project type / statusNew project; plotted development with open plots RERA record
Phase / registered portionPhase not disclosed. The RERA certificate identifies the land as Survey No. 181/19 OLD 181/36 NEW; the filed layout drawing also lists Survey Nos. 181/11 and 181/13
TG-RERA registrationP00100009832
Registration validity03/05/2025 to 26/05/2026, unless extended by the Authority
Registered promoterMITTAL SANJEEV KUMAR (also styled “Sanjeev Kumar Mittal” in filed land/layout documents)
Legal entity type / RERA statusEntity type not disclosed; the certificate records a project registration Corporate record

Land and geographic identity

ItemRecord
Locality / revenue villageMavala / Mavala village
Mandal / district / PINMavala mandal; Adilabad district; 504001 RERA filing
Project survey numbers and subdivisions181/19 OLD 181/36 NEW; 181/11; 181/13. The RERA certificate identifies 181/19 OLD 181/36 NEW; the filed layout records list all four survey references
ExtentTotal land area 57410.31 sq.mt; net layout area 56899.39 sq.mt RERA filing
BoundariesEast: 33 WIDE ROAD; West: UTILITY AREA; North: OTHER S LAND; South: 30 WIDE ROAD RERA filing

Development identity

ItemRecord
Layout authorityTS-DTCP; layout details document records approval no. TS/007233/2025, dated 08-02-2025
Principal tentative layout approvalAdilabad Municipality/Municipal Corporation, approval no. 0005/LO/3025/2025, dated 03 May, 2025; application no. 001491/LO/ADIL/3025/0006/2025
Development form / plot countPlotted layout; 36 individual plots in the filed drawing
Approved built-up area0.00 proposed built-up area, both excluding and including parking, in the layout details
Building / floor configurationNot applicable to the filed open-plot layout; no building count or floor configuration is provided
ParkingNo common parking area is recorded in the layout details; plot-level parking counts or allocations are not disclosed

Offering and status

ItemRecord
Offered productOpen plots; 36 plots are stated in the filed layout drawing
Plot sizes / booked and available countsIndividual plot sizes and booked/available counts are not provided in the supplied RERA records. Drawing-derived plot schedule measurements are summarized below under “Homes, configurations & floor plans” Layout record
Construction / development stageNo independently verified site-progress information is supplied. The approval requires the developer to complete layout infrastructure and amenities; the RERA certificate requires quarterly updates
Completion datesForm B promoter declaration: completion by 26,05.2026. The tentative layout approval requires infrastructure and amenities within two years from 03 May, 2025, i.e. by 03 May, 2027
Registration expiry vs completionRegistration validity ended 26/05/2026 unless extended; this is distinct from the Form B completion undertaking and the layout-infrastructure deadline above
Occupancy / completion certificateNo occupancy certificate or completion certificate is identified in the supplied records. For this plotted layout, no building-wise OC scope is stated Document index

2. The project story

AURA VALLEY is registered as a plotted development at Mavala, Adilabad, comprising a layout of open plots rather than apartment blocks or villas. The RERA certificate identifies Survey No. 181/19 OLD 181/36 NEW; the layout records additionally name 181/11 and 181/13. The filed layout documents describe 36 plots and reserve land for roads, open space, social infrastructure and utilities.

The RERA registration certificate is valid through 26/05/2026 unless extended. The promoter’s Form B declares completion by 26,05.2026, while the municipal tentative-layout approval sets a separate two-year period from 03 May, 2025 for completion of infrastructure and amenities. These are recorded as different obligations and dates; the supplied evidence does not independently establish construction progress or completion.

3. Master plan, architecture & building design

The project is a plotted layout with 36 individual sub-plots in the filed layout drawing. The drawing’s land-use schedule records a net layout area of 56899.38 sq.mt: plotted area 38692.61 sq.mt (68.00%), roads 9786.35 sq.mt (17.20%), organized open space/park 5167.36 sq.mt (9.08%), social infrastructure 1437.19 sq.mt (2.53%), utility area 574.20 sq.mt (1.01%), and buffer-zone area 1241.67 sq.mt (2.18%). These are drawing-record figures, not building floor areas.

The tentative layout approval also records 36 plots and land-use areas in acres, guntas and square yards, and identifies five plots—Nos. 11, 12, 13, 14 and 15—as mortgaged to the Municipality. The supplied drawings contain no building arrangement, building footprint, residential floor configuration, or building-level common-area design; the approved built-up area is recorded as 0.00.

Software-read plot schedule data indicates 36 plots with sizes from 473.11 sq.m (565.8 sq.yd) to 1629.83 sq.m (1949.3 sq.yd); the median is 1021.93 sq.m (1222.2 sq.yd). The supplied size-band summary records 11 plots in the 500–1000 sq.yd band and 25 in the 1000+ sq.yd band. These are drawing-derived measurements and should be checked against the approved drawing. Layout record

4. Homes, configurations & floor plans

This is a plotted project, so the available product information is a plot schedule rather than apartment configurations. No RERA-filed plot-wise saleable areas, booking counts or availability counts are supplied.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Open plots36 plots stated in the filed layoutNot disclosedNot disclosedNot disclosed plot-by-plotNot applicableNot supplied

The drawing-derived plot schedule reports 36 plot sizes: smallest 473.11 sq.m (565.8 sq.yd), median 1021.93 sq.m (1222.2 sq.yd), and largest 1629.83 sq.m (1949.3 sq.yd). The supplied size bands are 11 plots at 500–1000 sq.yd and 25 plots at 1000+ sq.yd. These are software-read figures from the layout drawing, not RERA-filed plot-area disclosures. Layout record

5. Parking & vehicle circulation

The layout details record 0.00 common parking area. No sanctioned parking-space count, visitor or accessible parking provision, vehicle-ramp arrangement, EV charging provision, or plot-specific parking allocation is supplied. A layout plot schedule or drawn space does not by itself establish exclusive parking rights.

The layout documents identify internal roads and road-width entries, including 18 mts and above in the tentative approval and multiple widths in the TS-DTCP layout details. The tentative approval requires roads to remain open for access to neighbouring sites; the supplied material does not specify separate pedestrian circulation or vehicle-entry arrangements.

6. Amenities, recreation & open spaces

The layout drawing identifies open space, social infrastructure, utilities and infrastructure works. The records do not provide verified completion status for these facilities; the tentative approval assigns development responsibility to the applicant and requires infrastructure and amenities to be completed within the stated period.

Open space / park
Description / size5167.36 sq.mt; 9.08% in the layout land-use schedule; tentative approval states 1 Acer 11.08 Gts 6180 Sq. Yds
Declared progress / verified statusProvided for in the layout record; completion not independently verified
Roads
Description / size9786.35 sq.mt; 17.20% in the layout schedule; tentative approval states 2 Acer 16.73 Gts 11705 Sq. Yds
Declared progress / verified statusRequired layout infrastructure; completion not independently verified
Social infrastructure
Description / size1437.19 sq.mt; 2.53% in the layout schedule
Declared progress / verified statusReserved in the drawing; specific facility and delivery status not disclosed
Utilities area
Description / size574.20 sq.mt; 1.01% in the layout schedule; approval lists water reservoir, septic tank/STP, electric transformer and solid-waste management among intended utility provisions
Declared progress / verified statusReserved/proposed; completion not independently verified
Tot-lot / green strip / park
Description / sizeIdentified in the layout/RERA amenity record; no separate size supplied
Evidence sourceRERA amenities
Declared progress / verified statusListed; progress field is 0 and no independent completion evidence is supplied
Clubhouse, gym, play area, athletic turf
Description / sizeListed in vendor-provided material only; no sizes supplied
Evidence sourcePromoter website
Declared progress / verified statusMarketing/vendor listing; not established as sanctioned or delivered

7. Utilities, building services & safety

The tentative layout approval lists the required layout works as road formation with black top, storm-water drains, underground drainage lines and a common septic tank/STP, internal water-supply pipelines and overhead tank, an assured water-supply source, electrical supply lines and streetlights, transformer, avenue plantation, park development and rainwater-harvesting pits. These are approval requirements and proposed works; the supplied evidence does not independently verify their installation or operational status.

Water
Evidence in supplied recordsWater reservoir, overhead tank, internal pipelines and an assured supply source are specified in the tentative approval
Status / limitationRequired/proposed; capacity, source details and completion not established
Sewerage and drainage
Evidence in supplied recordsUnderground drainage lines, common septic tank/STP and storm-water drains are specified
Status / limitationRequired/proposed; capacity and completion not established
Rainwater harvesting
Evidence in supplied recordsRainwater-harvesting pits are listed in the approval
Status / limitationRequired/proposed; installed status not verified
Electrical
Evidence in supplied recordsSupply lines, streetlights and transformer are listed
Status / limitationRequired/proposed; capacity and completion not disclosed
Waste management
Evidence in supplied recordsSolid-waste management is listed among utilities
Status / limitationProposed; operating arrangements and completion not verified
Fire/life safety, lifts and accessibility
Evidence in supplied recordsNo project-specific system, equipment, lift, accessible-route or fire-clearance details are supplied Document index
Status / limitationNot disclosed in the supplied records

8. Location, access & connectivity

The registered location is Mavala, Adilabad, Telangana 504001. The RERA certificate identifies the project location as Mavala, Adilabad; the filed layout describes the site as within Adilabad Municipality limits. The recorded parcel boundaries include a 33 WIDE ROAD on the east and a 30 WIDE ROAD on the south. RERA filing

The layout approval requires roads to remain open for access to neighbouring sites and lists road widths, including 18 mts and above in the tentative approval. The supplied location record includes a cadastral parcel centroid at 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km; the supplied evidence does not establish a measured route or travel time for that distance. Location record

9. Developer & development status

The TG-RERA certificate names MITTAL SANJEEV KUMAR as the registered promoter. The entity type, corporate identifiers and official contact details beyond the address field are not disclosed in the supplied records. The certificate gives the promoter’s address as House No.: 7-2-53/8, Village: Mandal: District: Adilabad, Pin: 504001 State of Telangana; village and mandal are not completed in that address line. Corporate record

The promoter’s Form B declares that the project will be completed by 26,05.2026. The tentative municipal layout approval separately requires the layout infrastructure and amenities to be completed within two years from 03 May, 2025. No independent site-progress verification or completion/occupancy certificate is included in the supplied records. Document index

10. Approvals, official records & documents

RecordWhat the supplied record identifies
TG-RERA registration certificateForm C certificate for AURA VALLEY, registration no. P00100009832; validity 03/05/2025–26/05/2026, unless extended
TS-DTCP layout detailsApproval no. TS/007233/2025, dated 08-02-2025; layout details for Survey Nos. 181/19(OLD), 181/36(NEW), 181/11 and 181/13
Municipal tentative layout approvalApproval no. 0005/LO/3025/2025, dated 03 May, 2025; application no. 001491/LO/ADIL/3025/0006/2025; 36 plots
Mortgage record cited in layout approvalMortgage Deed no. 3164, dated 28 April, 2025, covering Plot Nos. 11–15, stated extent 0 Acer 67.05 Gts 8114 Sq. Yds, in favour of Adilabad Municipality/Municipal Corporation
Form B declarationPromoter declaration records a title basis, states the land is free from encumbrances, and undertakes completion by 26,05.2026
Occupancy/completion certificateNo OC or completion certificate is identified in the supplied records Document index

Frequently asked questions

Is AURA VALLEY registered with Telangana RERA?

Yes. AURA VALLEY is registered with the Telangana Real Estate Regulatory Authority as P00100009832; the registration status is New Project.

Who is the developer of AURA VALLEY?

The promoter named in the RERA registration is MITTAL.

Where is AURA VALLEY located?

AURA VALLEY is in ADILABAD, Mavala, Telangana (504001).

When will AURA VALLEY be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.