RS RESIDENCES is an apartment project in Sri Balaji Layout, Gajula Ramaram-1, Qutballapur mandal, Medchal-Malkajgiri district, developed by the registered promoter Dharma Infra. It occupies 445.67 sq. m and comprises one residential building with 1 Stilt + 5 upper floors and 10 3BHK units. The project is registered under TG-RERA number P02200009531, and the promoter’s declared proposed completion date is 11/03/2028.
More from Dharma Infra · 5 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | RS RESIDENCES |
| Project type / registered portion | Apartment project; one residential building is identified in the filed building-permit record. No separate phase name is disclosed. RERA record |
| TG-RERA registration | P02200009531 |
| Registration validity | 11/03/2025 to 11/03/2028, unless extended by the Authority. This is the registration period, not the construction-completion deadline. |
| Registered promoter | Dharma Infra, identified as a partnership in the project filing. RERA filing |
| RERA status in supplied record | Registered; the certificate states a three-year validity period. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / layout description | Sri Balaji Layout; the building-permit record also describes the site as Gajularamaram / Balaji Layout Main Road. RERA record RERA filing |
| Revenue village | Gajula Ramaram-1 in the RERA certificate and project identity; the filed building-permit record uses GAJULARAMARAM. |
| Mandal / district / PIN | Qutballapur; Medchal-Malkajgiri; 500055. RERA record |
| Project survey numbers | 178P, 179, 180, 181, 182, 183, 189, 193, 194, 195, 196. The building-permit instrument further lists 178P TO183, 188, 189, 190P, 193 TO 196; these are reproduced as filed, including the additional numbers stated there. |
| Plot identification | Plot Nos. 16 & 17, Block No. 5, in the building-permit instrument. |
| Registered site extent | 445.67 sq. m; the permit record reports plot area and net plot area as 445.67 sq. m, with road-affected and nala-affected areas each recorded as 0.0. |
| Boundaries in RERA filing | East: 40 FT WIDE ROAD; West: PLOT NO 2 AND 3; North: PLOT NO 18; South: PLOT NO 15. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). |
| Principal building-permit number / date | 4970/GHMC/KPL/2025-BP, approved 11 March 2025. |
| Related file number | 013148/GHMC/6036/KPL2/2024-BP. |
| Approved built-up area | RERA project filing reports 1502.94 sq. m approved built-up area. The building-permit record separately reports total proposed built-up area excluding parking of 1238.40, including parking of 1486.08, and total BUA of 1502.94. These are distinct filed measures. RERA filing |
| Building count / configuration | One residential building, 1 Stilt + 5 upper floors; the permit record states six floors and a building height of 14.95 MT excluding stilt, with total height also recorded as 20.34mt. |
| Parking levels / area | Stilt is designated for parking; approved parking area is 247.68 sq. mts in the filed permit data. No separate parking-space count is supplied. |
| Unit count | 10 units in the building-permit record and 10 RERA-filed units. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 3BHK, 10 units; 3 booked and 7 available in the portal-derived count, which has no stated as-of date and is therefore indicative. RERA unit table |
| RERA-filed saleable area | 155.61 sq. m per unit. RERA unit table |
| Construction / completion record | The promoter’s Form B declaration undertakes completion by 11/03/2028; the building permit also states construction to be completed before 11 March, 2028. |
| Occupancy certificate | An occupancy certificate is recorded for the residential building under 018955/CMC/01173/SWOC/QTB2/2026, dated 06/06/2026. The filed architect’s certificate dated 05/08/2026 certifies overall completion of the registered project. |
| Completion-record figures | The occupancy-certificate extraction records completion built-up area of 1294.575 sq. metres, sanctioned built-up area of 1238.4 sq. metres, and total deviated built-up area of 56.17; it also records compounding fees of 685230.0 INR. |
2. The project story
RS RESIDENCES is a single-building residential apartment project on Plot Nos. 16 and 17 in Sri Balaji Layout, Gajula Ramaram-1, Qutballapur, Medchal-Malkajgiri. The GHMC permit describes a 1 Stilt + 5 upper-floor residential building on a 445.67 sq. m site, with 10 units. RERA record
The RERA filing lists ten 3BHK homes, with three booked and seven available in the portal count supplied; that count has no stated “as of” date. The RERA-filed saleable area is 155.61 sq. m per home. The supplied records include an occupancy certificate dated 06/06/2026 and an architect’s overall-completion certificate dated 05/08/2026 for the registered project. These are documentary records of certification, not an independent site inspection. RERA unit table
3. Master plan, architecture & building design
The approved building-permit record describes one residential building, “A (RESI BUILDING),” arranged as 1 Stilt + 5 upper floors. The permit gives a plot area and net plot area of 445.67 sq. m and records 1238.40 sq. m of proposed built-up area excluding parking, 1486.08 sq. m including parking, and 1502.94 sq. m as total BUA. Those figures are retained as separately labelled quantities in the supplied documents; they should not be treated as interchangeable area measures.
The building-permit record shows a stilt area of 236.53 Sq.Mt., parking area of 247.68, and a building height of 14.95 MT. excluding stilt; it also lists total height as 20.34mt. One entry and one exit are specified, with minimum width of 4.5mts. and height clearance of 5mts. The filed records do not provide a verified flat-per-floor schedule, lift count, stair arrangement, landscape area, or internal circulation drawing measurements.
The permit records a tot-lot as “NA,” while its conditions refer to a tot-lot and greenery requirements. No separate layout-area schedule or measured open-space allocation is supplied.
4. Homes, configurations & floor plans
The RERA filing lists 10 3BHK units, with 3 booked and 7 available in the supplied portal-derived count. The count has no stated as-of date. RERA-filed saleable area is 155.61 sq. m per unit. RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 3 | 7 | 155.61 sq. m | Software-measured range: 81.2–89.0 sq. m; median: 88.0 sq. m | 43% |
The carpet-area figures are software measurements from the approved floor-plan drawing geometry, not RERA-filed disclosures; the supplied measurement record says they need review. The measured drawings cover four flat designs. For one drawn flat, the plan labels living/dining, kitchen, three bedrooms, toilets, foyer, balconies and a utility area. The drawing-measured balcony and utility areas are identified separately from carpet area; the supplied room schedule lists a balcony of 3.89 sq. m and utility of 3.88 sq. m for that flat. Verify measurements against the drawing. Floor plans RERA unit details
Saleable area and carpet area are different reported measures: the RERA-filed saleable area is not the software-measured carpet area. No unit-specific allocation of common-area loading or registered buyer agreement is supplied here. RERA unit table Floor plans
5. Parking & vehicle circulation
Parking is provided in the stilt, which the building-permit record says is to be used exclusively for parking. The approved parking area is 247.68 sq. mts; the completion-certificate extraction records the same parking area as sanctioned and completed. The project records do not establish the number of individual car or two-wheeler spaces, visitor or accessible bays, or any buyer-specific parking allocation. A plan provision does not by itself establish exclusive ownership of a bay.
The permit specifies one entry and one exit to the premises, each subject to a minimum width of 4.5mts. and height clearance of 5mts. It also requires EV-charging infrastructure in building parking areas. The supplied records do not confirm installed EV chargers or describe a separate ramp, driveway, or pedestrian-separation arrangement.
6. Amenities, recreation & open spaces
The RERA amenity record reports water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station at 100%; the supplied record does not identify what that percentage measures, so it is presented as a RERA-recorded progress figure rather than independent confirmation. It records several other amenity categories at 0%. RERA amenities
| Description / size | No capacity or source specified in the RERA amenity entry. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA record: YES, 100%; not independently verified. |
| Description / size | Category recorded as “Sewerage (Chamber, Lines, Septic Tank, STP)”; no system capacity specified. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA record: YES, 100%; not independently verified. |
| Description / size | No dimensions or capacity specified. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA record: YES, 100%; not independently verified. |
| Description / size | Permit refers to rainwater-harvesting pits and a percolation pit; the permit record lists 4 pits, while the occupancy-certificate extraction lists 1 sanctioned and 1 at completion. |
|---|---|
| Declared progress / verified status | RERA amenity record: YES, 100%; documentary completion status is recorded in the occupancy-certificate extraction. |
| Description / size | Permit includes space for a transformer. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA record: YES, 100%; not independently verified. |
| Description / size | Permit data lists “Tot Lot NA”; permit conditions refer to a tot-lot, tree planting and maintenance of perimeter greenery. No area or completion evidence supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity record: 0%; no independent completion verification supplied. |
| Description / size | No facility or size specified. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity record: 0%. |
| Description / size | No facility or quantity specified. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity record: 0%. |
A third-party/vendor record lists a swimming pool, gym, children’s play area, clubhouse and covered car parking, but these are not established as sanctioned or delivered facilities in the supplied project-filed evidence. Promoter website
7. Utilities, building services & safety
The building-permit record specifies an underground static water-storage tank of 25, 000 lits. and a terrace tank of 25,000lits. It lists a sump, septic tank, distribution transformer and lift among the project’s utilities or services. No lift capacity, water-source arrangement, sewage-treatment capacity, backup-power capacity, or installed equipment schedule is supplied.
Rainwater harvesting is included in the permit record. The RERA amenity record also lists water supply, sewerage, storm-water drains and water conservation/rainwater harvesting as available at 100%; that is a filed progress entry, not an independent technical inspection. RERA amenities
The permit assigns structural-safety and fire-safety responsibilities to the owner, builder/developer and technical professionals, and refers to fire-fighting installations and a Fire NOC before an occupancy certificate. It also requires a garbage house within the premises and provides for construction and demolition waste to be taken to a designated collection point. The supplied extracts do not itemize installed fire systems, escape-stair dimensions, security/CCTV arrangements, accessibility features, or waste-segregation facilities.
8. Location, access & connectivity
The registered project location is Plot Nos. 16 & 17, Gajula Ramaram-1, Qutballapur, Medchal-Malkajgiri, 500055, in Sri Balaji Layout. The building-permit record identifies the site as Block No. 5 and refers to Balaji Layout Main Road. RERA filing
The layout-plan extraction lists 12.00 MT WIDE EXISTING, 12.00 MT WIDE PROPOSED ROAD, and 12.0M (40'0") WIDE ROAD. A supplied location record gives HITEC City as an anchor at 10.6 km. No travel time or public-transport route details are supplied. Location record
9. Developer & development status
The registered promoter is Dharma Infra, identified in the project filing as a partnership. The supplied corporate identifier is GSTIN 36AATDF1098G1Z3. The RERA certificate gives the promoter’s registered office as Village: Kukatpally, Mandal: Kukatpally, District: Medchal-Malkajgiri, Pin: 500072. The project filing identifies Gautham G as an authorized signatory. RERA filing Corporate record Parties record
The promoter’s Form B declaration, dated 7th day of MARCH 2025, undertakes project completion by 11/03/2028. The submitted completion records include an occupancy certificate dated 06/06/2026 and an architect’s overall-completion certificate dated 05/08/2026. The project register’s unit availability figures are indicative because no count date is provided. RERA unit table
10. Approvals, official records & documents
| Identifier / date | P02200009531; valid 11/03/2025–11/03/2028 |
|---|---|
| What the supplied record establishes | Registration certificate for RS RESIDENCES naming Dharma Infra as promoter. |
| Identifier / date | 4970/GHMC/KPL/2025-BP; approved 11 March, 2025 |
|---|---|
| What the supplied record establishes | Building-permit order for one residential building, 1 Stilt + 5 upper floors. Related file number: 013148/GHMC/6036/KPL2/2024-BP. |
| Identifier / date | Document 550388; plan record dated 21-11-2024 |
|---|---|
| What the supplied record establishes | Supplied plan extraction for the proposed residential building on Plot Nos. 16 & 17, Block No. 5. |
| Identifier / date | 018955/CMC/01173/SWOC/QTB2/2026; 06/06/2026 |
|---|---|
| What the supplied record establishes | Occupancy-certificate record for the residential building at Plot Nos. 16 and 17, Gajularamaram. |
| Identifier / date | Dated 05/08/2026 |
|---|---|
| What the supplied record establishes | Architect’s certificate states overall completion of the registered project and records the occupancy-certificate number above. |
| Identifier / date | 7th day of MARCH 2025 |
|---|---|
| What the supplied record establishes | Promoter declaration includes a completion undertaking of 11/03/2028 and project-fund, audit and approval undertakings. |
| Identifier / date | Document IDs 550377, 550379, 550381–550386, 550387, 550389, 550393, 550388 |
|---|---|
| What the supplied record establishes | Include partnership/entity, authorization, title, encumbrance, allotment and agreement-template material; these records are indexed here, with their subject-specific detail addressed in the relevant report sections. Document index |
1. Project at a glance
Project identity
Registered name: RS RESIDENCES
Project type / registered portion: Apartment project; one residential building is identified in the filed building-permit record. No separate phase name is disclosed.
TG-RERA registration: P02200009531
Registration validity: 11/03/2025 to 11/03/2028, unless extended by the Authority. This is the registration period, not the construction-completion deadline.
Registered promoter: Dharma Infra, identified as a partnership in the project filing.
RERA status in supplied record: Registered; the certificate states a three-year validity period.
Land and geographic identity
Locality / layout description: Sri Balaji Layout; the building-permit record also describes the site as Gajularamaram / Balaji Layout Main Road.
Revenue village: Gajula Ramaram-1 in the RERA certificate and project identity; the filed building-permit record uses GAJULARAMARAM.
Mandal / district / PIN: Qutballapur; Medchal-Malkajgiri; 500055.
Project survey numbers: 178P, 179, 180, 181, 182, 183, 189, 193, 194, 195, 196. The building-permit instrument further lists 178P TO183, 188, 189, 190P, 193 TO 196; these are reproduced as filed, including the additional numbers stated there.
Plot identification: Plot Nos. 16 & 17, Block No. 5, in the building-permit instrument.
Registered site extent: 445.67 sq. m; the permit record reports plot area and net plot area as 445.67 sq. m, with road-affected and nala-affected areas each recorded as 0.0.
Boundaries in RERA filing: East: 40 FT WIDE ROAD; West: PLOT NO 2 AND 3; North: PLOT NO 18; South: PLOT NO 15.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building-permit number / date: 4970/GHMC/KPL/2025-BP, approved 11 March 2025.
Related file number: 013148/GHMC/6036/KPL2/2024-BP.
Approved built-up area: RERA project filing reports 1502.94 sq. m approved built-up area. The building-permit record separately reports total proposed built-up area excluding parking of 1238.40, including parking of 1486.08, and total BUA of 1502.94. These are distinct filed measures.
Building count / configuration: One residential building, 1 Stilt + 5 upper floors; the permit record states six floors and a building height of 14.95 MT excluding stilt, with total height also recorded as 20.34mt.
Parking levels / area: Stilt is designated for parking; approved parking area is 247.68 sq. mts in the filed permit data. No separate parking-space count is supplied.
Unit count: 10 units in the building-permit record and 10 RERA-filed units.
Offering and status
RERA-filed configuration: 3BHK, 10 units; 3 booked and 7 available in the portal-derived count, which has no stated as-of date and is therefore indicative.
RERA-filed saleable area: 155.61 sq. m per unit.
Construction / completion record: The promoter’s Form B declaration undertakes completion by 11/03/2028; the building permit also states construction to be completed before 11 March, 2028.
Occupancy certificate: An occupancy certificate is recorded for the residential building under 018955/CMC/01173/SWOC/QTB2/2026, dated 06/06/2026. The filed architect’s certificate dated 05/08/2026 certifies overall completion of the registered project.
Completion-record figures: The occupancy-certificate extraction records completion built-up area of 1294.575 sq. metres, sanctioned built-up area of 1238.4 sq. metres, and total deviated built-up area of 56.17; it also records compounding fees of 685230.0 INR.
2. The project story
RS RESIDENCES is a single-building residential apartment project on Plot Nos. 16 and 17 in Sri Balaji Layout, Gajula Ramaram-1, Qutballapur, Medchal-Malkajgiri. The GHMC permit describes a 1 Stilt + 5 upper-floor residential building on a 445.67 sq. m site, with 10 units.
The RERA filing lists ten 3BHK homes, with three booked and seven available in the portal count supplied; that count has no stated “as of” date. The RERA-filed saleable area is 155.61 sq. m per home. The supplied records include an occupancy certificate dated 06/06/2026 and an architect’s overall-completion certificate dated 05/08/2026 for the registered project. These are documentary records of certification, not an independent site inspection.
3. Master plan, architecture & building design
The approved building-permit record describes one residential building, “A (RESI BUILDING),” arranged as 1 Stilt + 5 upper floors. The permit gives a plot area and net plot area of 445.67 sq. m and records 1238.40 sq. m of proposed built-up area excluding parking, 1486.08 sq. m including parking, and 1502.94 sq. m as total BUA. Those figures are retained as separately labelled quantities in the supplied documents; they should not be treated as interchangeable area measures.
The building-permit record shows a stilt area of 236.53 Sq.Mt., parking area of 247.68, and a building height of 14.95 MT. excluding stilt; it also lists total height as 20.34mt. One entry and one exit are specified, with minimum width of 4.5mts. and height clearance of 5mts. The filed records do not provide a verified flat-per-floor schedule, lift count, stair arrangement, landscape area, or internal circulation drawing measurements.
The permit records a tot-lot as “NA,” while its conditions refer to a tot-lot and greenery requirements. No separate layout-area schedule or measured open-space allocation is supplied.
4. Homes, configurations & floor plans
The RERA filing lists 10 3BHK units, with 3 booked and 7 available in the supplied portal-derived count. The count has no stated as-of date. RERA-filed saleable area is 155.61 sq. m per unit.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 3 | 7 | 155.61 sq. m | Software-measured range: 81.2–89.0 sq. m; median: 88.0 sq. m | 43% |
The carpet-area figures are software measurements from the approved floor-plan drawing geometry, not RERA-filed disclosures; the supplied measurement record says they need review. The measured drawings cover four flat designs. For one drawn flat, the plan labels living/dining, kitchen, three bedrooms, toilets, foyer, balconies and a utility area. The drawing-measured balcony and utility areas are identified separately from carpet area; the supplied room schedule lists a balcony of 3.89 sq. m and utility of 3.88 sq. m for that flat. Verify measurements against the drawing.
Saleable area and carpet area are different reported measures: the RERA-filed saleable area is not the software-measured carpet area. No unit-specific allocation of common-area loading or registered buyer agreement is supplied here.
5. Parking & vehicle circulation
Parking is provided in the stilt, which the building-permit record says is to be used exclusively for parking. The approved parking area is 247.68 sq. mts; the completion-certificate extraction records the same parking area as sanctioned and completed. The project records do not establish the number of individual car or two-wheeler spaces, visitor or accessible bays, or any buyer-specific parking allocation. A plan provision does not by itself establish exclusive ownership of a bay.
The permit specifies one entry and one exit to the premises, each subject to a minimum width of 4.5mts. and height clearance of 5mts. It also requires EV-charging infrastructure in building parking areas. The supplied records do not confirm installed EV chargers or describe a separate ramp, driveway, or pedestrian-separation arrangement.
6. Amenities, recreation & open spaces
The RERA amenity record reports water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station at 100%; the supplied record does not identify what that percentage measures, so it is presented as a RERA-recorded progress figure rather than independent confirmation. It records several other amenity categories at 0%.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | No capacity or source specified in the RERA amenity entry. | RERA record: YES, 100%; not independently verified. | |
| Sewerage | Category recorded as “Sewerage (Chamber, Lines, Septic Tank, STP)”; no system capacity specified. | RERA record: YES, 100%; not independently verified. | |
| Storm-water drains | No dimensions or capacity specified. | RERA record: YES, 100%; not independently verified. | |
| Water conservation / rainwater harvesting | Permit refers to rainwater-harvesting pits and a percolation pit; the permit record lists 4 pits, while the occupancy-certificate extraction lists 1 sanctioned and 1 at completion. | RERA amenity record: YES, 100%; documentary completion status is recorded in the occupancy-certificate extraction. | |
| Electrical meter room / sub-station / receiving station | Permit includes space for a transformer. | RERA record: YES, 100%; not independently verified. | |
| Green strip / tot-lot / park | Permit data lists “Tot Lot NA”; permit conditions refer to a tot-lot, tree planting and maintenance of perimeter greenery. No area or completion evidence supplied. | RERA amenity record: 0%; no independent completion verification supplied. | |
| Community buildings | No facility or size specified. | RERA amenity record: 0%. | |
| Street lighting | No facility or quantity specified. | RERA amenity record: 0%. |
A third-party/vendor record lists a swimming pool, gym, children’s play area, clubhouse and covered car parking, but these are not established as sanctioned or delivered facilities in the supplied project-filed evidence.
7. Utilities, building services & safety
The building-permit record specifies an underground static water-storage tank of 25, 000 lits. and a terrace tank of 25,000lits. It lists a sump, septic tank, distribution transformer and lift among the project’s utilities or services. No lift capacity, water-source arrangement, sewage-treatment capacity, backup-power capacity, or installed equipment schedule is supplied.
Rainwater harvesting is included in the permit record. The RERA amenity record also lists water supply, sewerage, storm-water drains and water conservation/rainwater harvesting as available at 100%; that is a filed progress entry, not an independent technical inspection.
The permit assigns structural-safety and fire-safety responsibilities to the owner, builder/developer and technical professionals, and refers to fire-fighting installations and a Fire NOC before an occupancy certificate. It also requires a garbage house within the premises and provides for construction and demolition waste to be taken to a designated collection point. The supplied extracts do not itemize installed fire systems, escape-stair dimensions, security/CCTV arrangements, accessibility features, or waste-segregation facilities.
8. Location, access & connectivity
The registered project location is Plot Nos. 16 & 17, Gajula Ramaram-1, Qutballapur, Medchal-Malkajgiri, 500055, in Sri Balaji Layout. The building-permit record identifies the site as Block No. 5 and refers to Balaji Layout Main Road.
The layout-plan extraction lists 12.00 MT WIDE EXISTING, 12.00 MT WIDE PROPOSED ROAD, and 12.0M (40'0") WIDE ROAD. A supplied location record gives HITEC City as an anchor at 10.6 km. No travel time or public-transport route details are supplied.
9. Developer & development status
The registered promoter is Dharma Infra, identified in the project filing as a partnership. The supplied corporate identifier is GSTIN 36AATDF1098G1Z3. The RERA certificate gives the promoter’s registered office as Village: Kukatpally, Mandal: Kukatpally, District: Medchal-Malkajgiri, Pin: 500072. The project filing identifies Gautham G as an authorized signatory.
The promoter’s Form B declaration, dated 7th day of MARCH 2025, undertakes project completion by 11/03/2028. The submitted completion records include an occupancy certificate dated 06/06/2026 and an architect’s overall-completion certificate dated 05/08/2026. The project register’s unit availability figures are indicative because no count date is provided.
10. Approvals, official records & documents
| Identifier / date | P02200009531; valid 11/03/2025–11/03/2028 |
|---|---|
| What the supplied record establishes | Registration certificate for RS RESIDENCES naming Dharma Infra as promoter. |
| Identifier / date | 4970/GHMC/KPL/2025-BP; approved 11 March, 2025 |
|---|---|
| What the supplied record establishes | Building-permit order for one residential building, 1 Stilt + 5 upper floors. Related file number: 013148/GHMC/6036/KPL2/2024-BP. |
| Identifier / date | Document 550388; plan record dated 21-11-2024 |
|---|---|
| What the supplied record establishes | Supplied plan extraction for the proposed residential building on Plot Nos. 16 & 17, Block No. 5. |
| Identifier / date | 018955/CMC/01173/SWOC/QTB2/2026; 06/06/2026 |
|---|---|
| What the supplied record establishes | Occupancy-certificate record for the residential building at Plot Nos. 16 and 17, Gajularamaram. |
| Identifier / date | Dated 05/08/2026 |
|---|---|
| What the supplied record establishes | Architect’s certificate states overall completion of the registered project and records the occupancy-certificate number above. |
| Identifier / date | 7th day of MARCH 2025 |
|---|---|
| What the supplied record establishes | Promoter declaration includes a completion undertaking of 11/03/2028 and project-fund, audit and approval undertakings. |
| Identifier / date | Document IDs 550377, 550379, 550381–550386, 550387, 550389, 550393, 550388 |
|---|---|
| What the supplied record establishes | Include partnership/entity, authorization, title, encumbrance, allotment and agreement-template material; these records are indexed here, with their subject-specific detail addressed in the relevant report sections. |
Frequently asked questions
Is RS RESIDENCES registered with Telangana RERA?
Yes. RS RESIDENCES is registered with the Telangana Real Estate Regulatory Authority as P02200009531; the registration status is New Project.
Who is the developer of RS RESIDENCES?
The promoter named in the RERA registration is DHARMA INFRA.
Where is RS RESIDENCES located?
RS RESIDENCES is in SRI BALAJI LAYOUT, Gajula Ramaram-1, Qutballapur, Medchal-Malkajgiri, Telangana (500055).
When will RS RESIDENCES be completed?
The promoter's proposed date of completion filed with RERA is 11/03/2028. This is the promoter's declaration, not a guarantee.