Sign in

Sri Venkateswara Gardens And Estates Orange City

SRI VENKATESWARA GARDENS AND ESTATES · Khammam · RERA P00800004909

SRI VENKATESWARA GARDENS AND ESTATES ORANGE CITY is a plotted development in Arempala, Khammam (Rural) Mandal, Khammam district, developed by the registered promoter SRI VENKATESWARA GARDENS AND ESTATES, a partnership. The RERA-filed site area is 31212.46 sq. m., and the draft layout approval records 105 proposed plots; plot-size configurations are not disclosed. The project is registered under TG-RERA P00800004909, with a proposed completion date of 26/07/2024.

01What we found

Period endedTG-RERA registration ran to 26 Jul 2024 - check its extension on TG-RERA
9documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Arempala, Khammam, Khammam · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameSRI VENKATESWARA GARDENS AND ESTATES ORANGE CITY RERA record
Project typePlotted development RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; registration is for the project on Survey Nos. 215 and 215/A, Arempala
TG-RERA registrationP00800004909
Registration validity29/08/2022 to 26/07/2024; the supplied certificate records no extension
RERA status in supplied recordCertificate period has ended; current registration status is not established by the supplied record
Registered promoterSRI VENKATESWARA GARDENS AND ESTATES, a partnership RERA filing Corporate record
Registration status label“New Project” in the RERA filing RERA record RERA filing

Land and geographic identity

FieldRecord
Locality / revenue villageArempala RERA record RERA filing
MandalKhammam (Rural) Mandal RERA record
DistrictKhammam RERA record
PIN507163 RERA record
Survey numbers and subdivisions215 and 215/A RERA record
RERA-filed site area31212.46 sq. m. RERA filing
Net / total areaNet area 31212.46 sq. m.; total area 31212.46 sq. m. in the RERA filing RERA filing
Boundaries recorded in the filingEast: vacant land; West: road width - 12; North: vacant land; South: road width - 12 RERA filing

Development identity

FieldRecord
Layout sanctioning authorityStambhadri Urban Development Authority (SUDA-Stambhadri); the filing names DTCP as the authority RERA filing
Principal layout approvalTLP.NO.3147/Arempala/2020/0933, approved 26 July 2021; draft technical layout pattern approval
RERA-filed plan approval number3147/AREMPALA/2020/0 RERA filing Approvals record
Layout area in the approval extraction31212.46 sq. m.
Plotted area / approved built-up area fieldPlotted area 19135.56 sq. m.; the RERA filing separately lists “Approved Built up Area” as 19135.56 sq. m. RERA filing
Plot count105 proposed plots in the draft layout approval
Building / floor configurationNot applicable to the supplied plotted-layout record; no building or floor configuration is disclosed
Layout land-use allocation recorded in approvalOpen space (Park): 2342.27 sq. m. (7.5%); social infrastructure: 781.15 sq. m. (2.5%); utility: 346.9 sq. m. (1.11%); roads: 8606.58 sq. m. (27.57%); plotted area: 19135.56 sq. m. (61.31%). Mortgage area is separately listed as 3043.49 sq. m. (15.9%)
ParkingNo parking count or parking arrangement is established in the supplied record RERA amenities

Offering and status

FieldRecord
Offered productPlots; the draft approval records 105 proposed plots RERA record
Plot size range / plot-by-plot scheduleNot disclosed in the supplied material
Booked / available countsNot supplied RERA record
Construction / development stageThe RERA filing labels the project “New Project” and records a proposed completion date of 26/07/2024; no independently verified site progress is supplied RERA record
Promoter completion undertaking26/07/2024
Layout development period in sanctionSpecified development works to be completed within three years
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied documents; no building-specific OC status is established for this plotted development Document index

2. The project story

Orange City is registered as a plotted development at Arempala, in Khammam (Rural) Mandal, Khammam district, on Survey Nos. 215 and 215/A. The RERA certificate identifies the project as P00800004909 and covers the project site described in the filing as 31212.46 sq. m. RERA record

The layout approval extraction describes a proposed 105-plot arrangement, with roads, park/open space, social infrastructure and utility land identified separately. It also records land reserved for mortgage to SUDA-Stambhadri and conditions concerning development works and subsequent release of the final layout. The supplied material does not establish plot-by-plot dimensions, sales or booking status, or verified completion of the layout works.

The RERA record gives 26/07/2024 as the proposed completion date, and the promoter’s Form B undertaking repeats that date. These are registration/declaration details, not independent verification of physical completion. No completion or occupancy certificate is supplied. RERA record Document index

3. Master plan, architecture & building design

This is a plotted layout, not a multi-storey building project in the supplied evidence. The draft technical layout pattern approval records 31212.46 sq. m. of layout area and 105 proposed plots. Its land-use schedule identifies 19135.56 sq. m. of plotted area, 8606.58 sq. m. of roads, 2342.27 sq. m. of park/open space, 781.15 sq. m. of social infrastructure and 346.9 sq. m. of utility land. The RERA filing also reports 19135.56 sq. m. as “Approved Built up Area”; the supplied record does not explain that field further. RERA filing

The approval describes roads of 18 mts and above and requires layout development to include road formation, drainage, water supply, electrical supply, street lighting, sewerage disposal, utilities, greenery, park development and rainwater-harvesting pits. The approval extraction states that roads and open-space areas are to be handed over to the local body by registered gift deed before release of the final layout.

No building footprints, house designs, floor configurations, tower heights, plot-size schedule or drawing-based plot arrangement are available in the supplied material. The listed layout-plan document is not extracted, and the two floor-plan drawings remain unmeasured scans; building-level architectural features therefore cannot be described from the available records. Document index Floor plans

4. Homes, configurations & floor plans

The registered offering is plots rather than apartments or villas. The supplied evidence does not provide plot numbers, individual plot areas, size bands, or booked and available inventory. RERA record

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Plots105 proposed in the draft layout approvalNot suppliedNot suppliedPlot-by-plot areas not suppliedNot applicableNot supplied

No apartment carpet-area or saleable-area schedule applies in the supplied record. The two listed floor-plan drawings are scans pending measurement and contain no measured carpet-area results; they do not establish plot dimensions or inventory. Floor plans

5. Parking & vehicle circulation

The supplied records do not state a number of resident, visitor, accessible or two-wheeler parking spaces, nor do they specify a parking allocation arrangement. This is a plotted layout, and the draft approval does not establish parking bays or exclusive parking rights for individual plots. RERA amenities

The approval extraction records internal roads and road widths of 18 mts and above, but does not provide a vehicle-circulation drawing, entry/exit count, ramp, pedestrian-separation details or EV charging provision.

6. Amenities, recreation & open spaces

The layout approval and RERA amenity record identify planned layout facilities. The RERA amenity list shows several entries as available, but the supplied data records 0% progress for listed amenities and does not independently verify delivery. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Clubhouse / indoor
Community buildingsListed in the RERA amenity record; no size or further description supplied RERA amenitiesRERA amenity record0%; completion not independently verified RERA amenities
Sports / recreation
Park / open space2342.27 sq. m. (7.5%) in the draft layout approvalDraft layout approval and RERA amenity recordAmenity record shows 0%; completion not independently verified RERA amenities
Green strip / tot lot / parkListed without a separate size or quantity RERA amenitiesRERA amenity record“YES” in the record; 0% progress; completion not independently verified RERA amenities
Landscape / open space
Avenue plantation and greeneryIncluded among the layout development works; no count or area suppliedDraft layout approvalPlanned condition; completion not independently verified
Convenience / community
Social infrastructure781.15 sq. m. (2.5%) in the draft layout approvalDraft layout approvalNo delivered-status evidence supplied
Utility land346.9 sq. m. (1.11%) in the draft layout approvalDraft layout approvalNo delivered-status evidence supplied

7. Utilities, building services & safety

The draft layout approval lists internal water supply, protected water supply including OHT and sumps, underground drainage lines, common septic tank / STP, independent sewerage disposal, storm-water drains, street lighting, a transformer, underground ducting of utilities and rainwater-harvesting pits as components of layout development. These are approval-stage requirements or listed provisions; the supplied records do not establish their installed capacity, commissioning or completed status.

The RERA amenity record lists water supply, sewerage, storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management and disposal, water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station as available; it records 0% progress for those entries. No capacities, water-source details, treatment specifications, electrical backup, fire-system specifications, CCTV/security provision, accessibility features or independent completion verification are supplied. RERA amenities

8. Location, access & connectivity

The registered project location is Arempala village, Khammam (Rural) Mandal, Khammam district, Telangana, PIN 507163. The RERA filing identifies Survey Nos. 215 and 215/A and records vacant land on the east and north boundaries, with “ROAD WIDTH - 12” on the west and south. RERA record RERA filing RERA filing

The supplied location data lists an approximate distance of 153.4 km to the nearest sampled Outer Ring Road interchange. No local public-transport information, project approach-road name, or travel-time evidence is supplied. Location record

9. Developer & development status

The registered promoter is SRI VENKATESWARA GARDENS AND ESTATES, identified in the RERA filing as a partnership. Its GSTIN is 36AECFS8639B1ZY. The supplied promoter information names POTTA LAXMI as a partner and POTTA CHANDRA SEKHAR RAO as authorized signatory. Corporate record RERA filing Parties record

The listed promoter address is BLUE SEA VILLAS, VELUGUMATLA, KHAMMAM, KHAMMAM, Khammam (Rural) Mandal, Khammam, 507163. The registration certificate separately contains a promoter-office entry whose PIN is 507318. No official website, phone number or email address for the registered promoter is supplied. Parties record

The promoter’s Form B undertaking states a completion date of 26/07/2024. The RERA certificate records validity ending on the same date and no extension in the supplied certificate; neither the undertaking nor the registration dates independently establish completed works.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP00800004909, issued 29/08/2022; validity to 26/07/2024
What the supplied material establishesForm C registration for the named project under section 5, covering Survey Nos. 215 and 215/A
Draft technical layout pattern approval
Identifier / dateTLP.NO.3147/Arempala/2020/0933, 26 July 2021
What the supplied material establishesSUDA-Stambhadri approval extraction for the proposed 105-plot layout, land-use allocation and development conditions
RERA-filed plan approval reference
Identifier / date3147/AREMPALA/2020/0
What the supplied material establishesApproval number shown in the RERA filing RERA filing
Form B affidavit-cum-declaration
Identifier / dateRERA document 215483
What the supplied material establishesPromoter’s authorized signatory declaration, including title and encumbrance assertions, separate-account undertakings and completion-date undertaking
Layout-plan document
Identifier / dateRERA document 215453
What the supplied material establishesListed in the filing, but not extracted in the supplied evidence Document index
Encumbrance statement
Identifier / dateRERA document 255541
What the supplied material establishesOCR does not provide legible EC metadata, property schedule, transaction rows or certification result Document index
Title-report materials
Identifier / dateRERA documents 215448, 215449 and 220751
What the supplied material establishesSale-deed/title-report materials are listed; the supplied extracts do not provide a complete, legible chain and property schedule Document index
Agreement for Sale template
Identifier / dateRERA document 215484
What the supplied material establishesPartially filled template; allottee, land, project, unit, price and execution details are blank Document index
Completion / occupancy certificate
Identifier / dateNot supplied
What the supplied material establishesNo certificate establishing completed layout works or an occupancy-certified building is included in the supplied material Document index

The draft layout approval specifies development and handover conditions; this overview records those provisions as stated in the available approval extract and does not establish that the required works or handovers have occurred.

Frequently asked questions

Is SRI VENKATESWARA GARDENS AND ESTATES ORANGE CITY registered with Telangana RERA?

Yes. SRI VENKATESWARA GARDENS AND ESTATES ORANGE CITY is registered with the Telangana Real Estate Regulatory Authority as P00800004909; the registration status is New Project.

Who is the developer of SRI VENKATESWARA GARDENS AND ESTATES ORANGE CITY?

The promoter named in the RERA registration is SRI VENKATESWARA GARDENS AND ESTATES.

Where is SRI VENKATESWARA GARDENS AND ESTATES ORANGE CITY located?

SRI VENKATESWARA GARDENS AND ESTATES ORANGE CITY is in KHAMMAM, Arempala, Khammam (Rural) Mandal, Telangana (507163).

When will SRI VENKATESWARA GARDENS AND ESTATES ORANGE CITY be completed?

The promoter's proposed date of completion filed with RERA is 26/07/2024. This is the promoter's declaration, not a guarantee.

More projects in Arempala