SHATAMANAM is a residential apartment project in Gopanpally, NIZAMABAD RURAL (NEW), Nizamabad. The registered promoter is SRI VENKATESWRA CONSTRUCTIONS, a partnership. The project has a total/site area of 6069.46 sq.m and three residential blocks—A, B and C—each with 1 Stilt + 5 upper floors, comprising 114 apartments: 2BHK and 3BHK. It is registered under TG-RERA number P03100002302, and its proposed completion date is 30/11/2026.

01What we found

Period endedTG-RERA registration ran to 7 Jun 2026 - check its extension on TG-RERA
10documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameSHATAMANAM RERA record
Project typeResidential apartment project RERA record
Phase / registered portionPhase not separately identified in the available record; registration is for SHATAMANAM RERA record
TG-RERA registrationP03100002302; granted under section 5; issued 31/10/2020; certificate validity stated as 31/10/2020–07/06/2026. The portal record was captured on 10 September 2026 and shows the validity end date; no extension is recorded in the supplied certificate RERA record Approvals record
Registered promoterSRI VENKATESWRA CONSTRUCTIONS; partnership RERA record Corporate record
RERA statusListed as “New Project” in the project record RERA record

Land and geographic identity

FieldRecord
LocalityGopanpally; the building-permit document describes the locality as “GOOPAN PALLY, NIZAMABAD” RERA record RERA filing
Revenue villageGopanpally in the project record; the building-permit document states “Nizambad.” The supplied record does not establish a more specific revenue-village identity beyond these descriptions RERA record Land records
Mandal / district / PINNIZAMABAD RURAL (NEW) / Nizamabad / 503002 RERA record
Project survey number(s)410/P3 RERA record Land records
Site areaTotal/site area 6069.46 sq.m; net area 5845.39 sq.m; road-affected area 224.07 sq.m RERA filing
Boundaries in the RERA project recordNorth: other land; south: road; east: other land; west: other land RERA filing

Development identity

FieldRecord
Sanctioning authorityNizamabad Urban Development Authority; building-permit order dated 07 June 2020 Approvals record
Principal building-permit number3146/Nizambad/2020/0031 Approvals record
RERA-filed plan approval number3146/Nizambad/2020/0 RERA record Approvals record
Approved built-up area12,055.75 sq.m is recorded as approved built-up area in the project filing RERA filing
Buildings and sanctioned floorsThree residential blocks—A, B and C—each sanctioned as 1 Stilt + 5 upper floors
Parking provisionThe permit says cellar and stilts approved for parking; the extracted building configuration identifies stilt, but no parking-space count or cellar level count is supplied
Unit count114 units in the RERA unit record; the building-permit extraction does not provide an approved unit count for comparison RERA unit table RERA unit table

Offering and status

FieldRecord
Configurations2BHK and 3BHK apartments RERA unit table
RERA-filed saleable areas2BHK: 35.99 sq.m; 3BHK: 65.8 sq.m RERA unit table RERA unit table
Booked / available2BHK: 0 booked / 84 available; 3BHK: 0 booked / 30 available. Counts are indicative: the portal record supplies no as-of date RERA unit table
Construction stageNo independently verified site-progress record is supplied. The RERA amenity-progress entries report some infrastructure items at 10% and many at 0%; these are filing entries, not independent site verification RERA amenities
Completion dateThe project record states proposed completion as 30/11/2026 RERA record
Occupancy / completion certificateThe building-permit extraction marks completion certification as false and requires an occupancy certificate before occupation. No occupancy or completion certificate is supplied

2. The project story

SHATAMANAM is a RERA-registered residential apartment project on Survey No. 410/P3, identified in the project filing with Gopanpally, NIZAMABAD RURAL (NEW), Nizamabad, PIN 503002. The filed site figures are 6069.46 sq.m total and 5845.39 sq.m net, with 224.07 sq.m recorded as road-affected area. RERA record RERA filing

The building permit describes three residential blocks—A, B and C—each with one stilt level and five upper floors. The RERA unit record lists 114 apartments: 84 2BHK and 30 3BHK. The portal’s booked and available counts show all 114 as available, but the record has no count-as-of date. RERA unit table

The project record gives 30/11/2026 as its proposed completion date. The supplied material does not establish current construction progress through an independent site inspection, and no occupancy/completion certificate is provided. Accordingly, the permit’s approval, the promoter’s proposed timeline and the actual construction or occupancy status should be understood as separate matters. RERA record RERA amenities

3. Master plan, architecture & building design

The filed site figures are 6069.46 sq.m total area, 224.07 sq.m road-affected area and 5845.39 sq.m net area. The building-permit extraction also identifies a 610.29 sq.m “Tot-lot.” These are site/land-use entries; the record does not provide a separate FSI-counted-area figure. RERA filing

The sanctioned arrangement comprises three residential blocks, each approved as 1 Stilt + 5 upper floors, with a stated building height of 14.77 m. The permit extraction provides block-level area entries, but not a complete drawing-based description of floor layouts, apartment distribution per floor, lifts, stairs, entrances, internal circulation or landscaped-area totals. The project filing records 12,055.75 sq.m as approved built-up area; this is not a carpet-area or saleable-area figure. RERA filing

The permit lists a tot-lot, periphery tree planting and a strip of greenery, and requires a rainwater-harvesting percolation pit and space for a transformer. It also states that stilts and any cellar approved for parking are to be used exclusively for vehicle parking. The supplied material does not include an extracted approved layout drawing sufficient to describe road geometry or building footprints in detail.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK8408435.99 sq.mNot availableNot supplied
3BHK3003065.8 sq.mNot availableNot supplied

The unit counts, booking figures and saleable areas are from the TG-RERA unit record; its booking data has no as-of date. Two floor-plan drawings are recorded, but the supplied drawing analysis reports zero measured flat designs for both configurations. No software-measured carpet area or room dimensions can therefore be reported. RERA unit table RERA unit details Floor plans

The record distinguishes RERA saleable area from drawing-measured carpet area, but does not provide a carpet-area measurement or loading figure for these units. A saleable-area figure should not be treated as a carpet-area figure. RERA unit table Floor plans

5. Parking & vehicle circulation

The building permit states that the stilt levels—and any cellar approved in the plan—are for vehicle parking, and that these areas are not to be partitioned or converted to another use. The RERA filing records a mortgage area of 1303.58 sq.m and identifies the second floor as the floor handed over for that area; the supplied material does not explain this entry as a parking allocation. RERA filing

No count of sanctioned car or two-wheeler spaces, visitor or accessible parking spaces, or unit-specific parking allocation is supplied. The record also does not describe ramps, driveways, parking-level access or pedestrian separation. The permit’s parking designation establishes the intended use of those areas, not an exclusive parking entitlement for an individual buyer.

6. Amenities, recreation & open spaces

The following progress percentages are RERA-filed entries. No independent completion verification is supplied. RERA amenities

Tot-lot / green strip
Description / sizePermit identifies a 610.29 sq.m tot-lot and requires it to be fenced and maintained as greenery before occupancy certificate; no separate progress percentage for this item is available from the permit
Evidence sourceBuilding-permit order
Declared progress / verified statusPermit requirement; completion not independently verified
Green Strip/TOT LOT/Park
Description / sizeSize not stated in the RERA amenity entry
Evidence sourceRERA amenity entry; permit RERA amenities
Declared progress / verified status10% filed; not independently verified
Community buildings
Description / sizeNo description or size supplied
Evidence sourceRERA amenity entry RERA amenities
Declared progress / verified status0% filed
Internal Roads & Footpaths
Description / sizeNo dimensions or layout details supplied
Evidence sourceRERA amenity entry RERA amenities
Declared progress / verified status0% filed

No project-specific RERA evidence in the supplied record establishes clubhouse, gym, swimming pool or indoor-games facilities. RERA amenities

7. Utilities, building services & safety

Water and electricity
What the record statesThe permit refers to public water and electricity connections and says they will be provided only on production of an occupancy certificate; the RERA amenity entry lists water supply RERA amenities
Status / limitationWater supply: 0% filed. No source, storage or treatment capacity is supplied; connections are not established as completed
Sewage and drainage
What the record statesRERA lists sewerage (chambers, lines, septic tank, STP) and storm-water drains RERA amenities
Status / limitationSewerage: 10% filed; storm-water drains: 10% filed. No capacity, treatment process or reuse details supplied
Rainwater harvesting
What the record statesPermit requires a rainwater-harvesting percolation pit and records 15 RWHPs; RERA lists water conservation/rainwater harvesting RERA amenities
Status / limitationRERA progress: 0%; completion not independently verified
Electrical infrastructure
What the record statesPermit requires space for a transformer. The RERA electrical meter room/sub-station/receiving-station entry shows 0% RERA amenities
Status / limitationNo transformer capacity, backup-power provision or completed electrical installation evidence supplied
Fire and life safety
What the record statesThe permit assigns responsibility for fire-safety requirements and necessary firefighting installations to the owner, builder/developer, architect and site engineer; the RERA fire-protection entry shows 0% RERA amenities
Status / limitationNo fire-system specification, clearance or completion evidence supplied
Waste management
What the record statesPermit requires a garbage house within the premises. RERA solid-waste management and disposal shows 0% RERA amenities
Status / limitationNo waste-processing or segregation details supplied
Lifts, accessibility and security
What the record statesNo project-specific lift count or capacity, accessibility arrangement, CCTV or access-control specification is supplied in the RERA amenity record or permit extraction RERA amenities
Status / limitationNot established by the supplied records

The permit also states that services such as sanitation, plumbing, fire safety, lifts and electrical installations are to be executed under qualified technical supervision. This condition is not evidence that those services are complete or operational.

8. Location, access & connectivity

The project’s registered location is Gopanpally, NIZAMABAD RURAL (NEW), Nizamabad, Telangana, PIN 503002; the RERA filing identifies the adjoining southern boundary as a road. The building-permit document describes the site as “GOOPAN PALLY, NIZAMABAD.” RERA record RERA filing

The supplied location record includes a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and a listed distance of 1.2 km to Financial District (Nanakramguda). No basis or method for the distance measurement is supplied. Beyond the road boundary, the record does not identify project approach roads, public-transport services or other measured landmark distances. Location record

9. Developer & development status

The registered promoter is SRI VENKATESWRA CONSTRUCTIONS, recorded as a partnership. The supplied promoter record names LOKA PALLAVI REDDY and ADMALA VAISHNAVI as partners and identifies LOKA PALLAVI REDDY as authorised signatory. The promoter’s registered office address and corporate identifier are not fully disclosed in the supplied records. Corporate record Parties record

The TG-RERA certificate identifies the promoter as Sri Venkateswra Constructions. The building-permit extraction names M/S SRI VENKATESHWARA DEVELOPERS as the applicant and identifies two representatives; it does not describe that applicant in the extracted text as the registered TG-RERA promoter.

The RERA project record gives proposed completion as 30/11/2026 and reports 114 units, while the supplied evidence contains no independently verified construction-stage assessment. The building-permit extraction marks completion certification as false and no occupancy/completion certificate is included. The separate TG-RERA registration-validity dates are set out in the identity table above. RERA record RERA unit table

10. Approvals, official records & documents

TG-RERA registration
Available evidenceForm C registration certificate; P03100002302, issued 31/10/2020
Scope / noteSHATAMANAM; certificate states validity through 07/06/2026
Building permit
Available evidenceOrder 3146/Nizambad/2020/0031, issued 07 June 2020 by Nizamabad Urban Development Authority
Scope / noteThree residential blocks, each 1 Stilt + 5 upper floors; includes permit conditions
RERA-filed plan reference
Available evidence3146/Nizambad/2020/0 RERA record Approvals record
Scope / noteRecorded as the plan-approval number in the project filing
Commencement / occupancy record
Available evidenceBuilding-permit document is titled “Commencement Certificates for each building in each phase”; extracted content is a building-permit order. It requires an occupancy certificate before occupation and marks completion certification false
Scope / noteNo separate occupancy/completion certificate supplied
Form B declaration
Available evidenceAffidavit-backed Form B declaration
Scope / noteVisible extracted text covers prescribed documents, non-discrimination and verification; it does not identify the promoter, project registration number, title basis, completion undertaking, date or place
Floor-plan material
Available evidenceTwo drawings recorded; no flat designs measured in the supplied analysis Floor plans
Scope / noteNo drawing-derived room dimensions or carpet areas available

The supplied record does not include an extracted, authority-stamped layout plan, an occupancy/completion certificate, or a complete drawing-based account of building circulation and services.

Frequently asked questions

Is SHATAMANAM registered with Telangana RERA?

Yes. SHATAMANAM is registered with the Telangana Real Estate Regulatory Authority as P03100002302; the registration status is New Project.

Who is the developer of SHATAMANAM?

The promoter named in the RERA registration is SRI VENKATESWRA CONSTRUCTIONS.

Where is SHATAMANAM located?

SHATAMANAM is in GOPANPALLY, NIZAMABAD RURAL (NEW), Nizamabad, Telangana (503002).

When will SHATAMANAM be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.