HARI DURGA HOMES is a residential apartment project in Chaitanyapuri, Karimnagar, Karimnagar district; the mandal is not disclosed in the supplied project record. The registered promoter is LAHOTI CONSTRUCTIONS. The project covers 546.72 m² and comprises one building with 1 Stilt + 5 upper floors and 10 3BHK units, filed as “TRIPLE BEDROOM,” each with a saleable area of 141.38 m². Its TG-RERA registration is P02700002669, and the proposed completion date recorded in the project information is 30/11/2026.

01What we found

Period endedTG-RERA registration ran to 11 Mar 2026 - check its extension on TG-RERA
12documents on file - each fact links to its page
1court case on this project's land (survey 1246, Karimnagar)
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameHARI DURGA HOMES RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified; the registration covers the project recorded for Survey No. 1246/A Land records
TG-RERA registrationP02700002669; registration certificate issued 06/03/2021, valid from 06/03/2021 to 11/03/2026; no extension is recorded in the supplied certificate Approvals record
Registered promoterLAHOTI CONSTRUCTIONS RERA record Corporate record
RERA statusThe supplied record identifies it as a “New Project”; the certificate records a five-year registration period ending 11/03/2026. Current registration status is not established by the supplied records. RERA filing

Land and geographic identity

FieldProject record
LocalityChaitanyapuri, Karimnagar; the building-permit record identifies the site as Chaitanyapuri_W48.
Revenue villageNot disclosed in the supplied project record. Land records
MandalNot disclosed in the supplied project record. Land records
District / PINKarimnagar / 505001 RERA record
Project survey number(s) and subdivision(s)Survey No. 1246/A Land records
Registered site extent546.72 m²; the RERA land details record total area and net area as 546.72 m². RERA filing
Boundaries recordedEast: 9M WIDE ROAD; West: EXISTING BUUILDING; North: EXISTING BUILDING; South: VACANT LAND RERA filing

Development identity

FieldProject record
Sanctioning authorityKarimnagar Municipal Corporation, as identified in the filed building-permit order
Principal building approval3011/W48/2019/5600, approved 11 March, 2020 Approvals record
Approved built-up areaRERA project information records 1,676.91 m² as “Approved Built up Area”; the building-permit order separately lists 1,385.45 m² for five residential upper floors and 263.64 m² for the stilt parking level. RERA filing
Building countOne building/unit is recorded in the RERA land details. RERA filing
Sanctioned configuration1 Stilt + 5 upper floors; building height 14.95 m.
Parking levelOne stilt parking level is shown in the sanction; its listed area is 263.64 m².
Unit count10 units are recorded in the RERA unit data. The sanction describes a tenements/flats building. RERA unit table

Offering and status

FieldProject record
Unit type3BHK, filed as “TRIPLE BEDROOM” RERA unit table
RERA-filed saleable area141.38 m² per unit RERA unit table RERA unit details
Booked / available0 booked and 10 available in the portal data supplied; the portal record has no as-of date, so these counts are indicative. RERA unit table RERA unit details
Construction stageNo independently verified or dated construction-progress evidence is supplied. The RERA amenity record lists progress as 0% for its listed items. RERA amenities
Completion undertakingPromoter’s Form B declares completion by 11/03/2026; the RERA project information separately records a proposed completion date of 30/11/2026. These are recorded as separate filed/declared fields, not as verified completion. RERA filing
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. The building-permit order says an occupancy certificate is required before occupation. Document index

2. The project story

HARI DURGA HOMES is recorded with TG-RERA as a residential apartment project in Chaitanyapuri, Karimnagar, on Survey No. 1246/A. The site is recorded as 546.72 m² and is bounded on the east by a 9M WIDE ROAD. The revenue village and mandal are not disclosed in the supplied project record. RERA record Land records

The filed building permit sanctions one residential building with a stilt parking level and five upper floors. The RERA unit record lists ten 3BHK units, filed as “TRIPLE BEDROOM,” each with a saleable area of 141.38 m². Portal counts show all ten as available and none booked, but the portal record has no as-of date. RERA unit table RERA unit details

The supplied evidence does not establish the project’s current construction stage or independently verify progress on site. The RERA amenity record reports 0% progress for its listed items. No occupancy or completion certificate is included; the building-permit order requires an occupancy certificate before occupation. RERA amenities Document index

3. Master plan, architecture & building design

The filed building-permit order identifies a 546.72 m² site and sanctions a single residential building configured as 1 Stilt + 5 upper floors, with a stated height of 14.95 m. It records 1,385.45 m² for the five residential upper floors and 263.64 m² for the stilt parking level. The RERA project fields separately label 1,676.91 m² as approved built-up area; these figures retain their respective source labels and are not treated as interchangeable measurements. RERA filing

The building permit records setbacks of Front 3, Rear 2.5, Side I 3.5 and Side II 4.5. It lists six rainwater-harvesting pits and requires a tot-lot to be fenced and maintained as greenery before issue of the occupancy certificate; the permit’s stated tot-lot area is “NA.”

The available evidence does not establish the floor-by-floor flat arrangement, flats per floor, lift or stair configuration, building footprint, internal circulation, or residential/common-area distribution. The project’s sanctioned drawing is identified as document 149436, but it is not extracted as a complete architectural plan in the supplied records. Document index

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK (“TRIPLE BEDROOM” in the RERA filing)10010141.38 m²99.7–103.9 m²; median 101.8 m²28%

RERA unit counts, booking status and saleable area are filing data; the booked/available figures are indicative because the portal data has no as-of date. Carpet-area figures are software measurements from approved floor-plan drawing geometry, not RERA-filed measurements, and are marked as needing review. The supplied drawing record reports four measured 3BHK designs. RERA unit table RERA unit details Floor plans

The measured drawing for flat “02” labels three bedrooms, a hall, a kitchen, three toilets and two balconies. One balcony is recorded with dimensions of 1.67 m × 1.13 m and an area of 1.89 m²; balcony areas are excluded from the supplied carpet measurement. Room dimensions and areas are drawing-derived measurements, not RERA disclosures. RERA unit details

Saleable area is the RERA-filed figure; measured carpet area is a separate drawing-based figure. The supplied evidence does not provide a RERA-filed room schedule or a verified unit-specific common-area allocation. RERA unit details Floor plans

5. Parking & vehicle circulation

The sanctioned plan includes one stilt parking level with an area of 263.64 m² and states that the stilt approved for parking is to be used exclusively for vehicle parking, without partition walls or rolling shutters. The building-permit order does not state a parking-space count.

The supplied vendor record lists “10 Covered Parking spaces,” but this is a vendor claim rather than a count established by the filed building-permit data. No unit-specific parking allocation, visitor or accessible parking count, ramp arrangement, driveway plan, or pedestrian/vehicle separation details are established by the supplied evidence. Promoter website

6. Amenities, recreation & open spaces

The TG-RERA amenity record lists the following project provisions. Each listed item has reported progress of 0%; the supplied data does not independently verify completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot-lot / parkPermit records tot-lot area as “NA” and requires it to be fenced and maintained as greenery before occupancy certificate.RERA amenitiesRERA record: 0%; not independently verified
Internal roads & footpathsListed as available in the RERA amenity record; no dimensions supplied.RERA amenities0%; not independently verified
Community buildingsListed; no description or size supplied.RERA amenities0%; not independently verified
Water conservation / rainwater harvestingAmenity record lists rainwater harvesting; permit specifies six rainwater-harvesting pits.RERA amenities0%; not independently verified
Water supplyListed; source, capacity and delivery status not supplied.RERA amenities0%; not independently verified
Sewerage and sewage/sullage treatment and disposalSewerage (chambers, lines, septic tank, STP) and treatment/disposal are listed; system details are not supplied.RERA amenities0%; not independently verified
Storm-water drainsListed; no design or capacity supplied.RERA amenities0%; not independently verified
Street lightingListed; no specification supplied.RERA amenities0%; not independently verified
Solid-waste management and disposalListed; no system details supplied.RERA amenities0%; not independently verified
Energy managementListed; no system details supplied.RERA amenities0%; not independently verified
Fire protection and fire-safety requirementsListed; no system details supplied.RERA amenities0%; not independently verified
Electrical meter room / sub-station / receiving stationListed; the permit also requires space for a transformer.RERA amenities0%; not independently verified
Recreational open spaceAggregate area listed without a supplied measurement.RERA amenities0%; not independently verified

The vendor record also lists backup electricity, CCTV, compound, lift, security personnel and waste disposal; these are vendor-listed claims and are not established in the supplied sanctioned-plan extraction as completed facilities. Promoter website

7. Utilities, building services & safety

The RERA amenity record lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, rainwater harvesting, energy management, electrical infrastructure, fire protection, solid-waste management and street lighting. Its listed progress entries are 0%; capacities, detailed designs and independently verified completion are not supplied. RERA amenities

The building-permit order requires construction of a rainwater-harvesting structure, provision of transformer space, and a garbage house within the premises. It also requires the tot-lot to be fenced and maintained as greenery before issue of the occupancy certificate, and states that an occupancy certificate is compulsory before occupation. These are permit conditions, not evidence that the facilities have been completed.

The supplied records do not establish water source or storage capacity, an STP’s capacity or reuse arrangements, electrical backup capacity, lift number or capacity, fire-system specifications, CCTV or access-control installation, accessibility features, or verified site completion of any utility or safety system. RERA amenities Promoter website Document index

8. Location, access & connectivity

The project is recorded in Chaitanyapuri, Karimnagar, Telangana, PIN 505001. The building-permit record identifies the site as Chaitanyapuri_W48; the project’s revenue village and mandal are not disclosed in the supplied RERA land details. RERA record Land records

The recorded eastern boundary is a 9M WIDE ROAD. The supplied location data gives a “Financial District (Nanakramguda)” anchor at 1.2 km; the data does not establish the route, measurement method or travel time, so this is reported only as the supplied location-record distance. RERA filing Location record

No further approach-road, public-transport or landmark details are established in the supplied project records. Location record

9. Developer & development status

The registered promoter is LAHOTI CONSTRUCTIONS, recorded as a proprietorship. The promoter address supplied in the project record is Lahoti Nilayam, Jafri Road, Chaitanyapuri, Karimnagar, Karimnagar district, PIN 505001. VINOD KUMAR LAHOTI is recorded as the authorized signatory; the Form B declaration identifies VINOD LAHOTI as promoter and LAHOTI CONSTRUCTIONS as proprietor. Corporate record Parties record

The Form B affidavit dated 21 January 2021 declares that the project land is free from encumbrances, sets out the promoter’s separate-account and audit undertakings, and states a completion undertaking of 11/03/2026. The RERA project information separately records a proposed completion date of 30/11/2026. Neither date establishes actual completion. RERA filing

The supplied records identify one building and do not establish a separate phase-wise construction schedule or independently verified construction progress. RERA filing RERA amenities

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for HARI DURGA HOMES, registration P02700002669; issued 06/03/2021 and valid through 11/03/2026, subject to its stated conditions.
Building permit / principal sanctionKarimnagar Municipal Corporation building-permit order 3011/W48/2019/5600, approved 11 March, 2020; sanctions 1 Stilt + 5 upper floors.
Registered project land identitySurvey No. 1246/A; site area 546.72 m²; PIN 505001. Revenue village and mandal are not disclosed in the supplied project record. Land records
Approved drawing recordDrawing document 149436 is identified in the project records; the supplied evidence does not provide a complete extracted architectural-plan description. Document index
Form B declarationPromoter declaration dated 21 January 2021, including declared completion date and project-fund, audit and approval undertakings.
Occupancy / completion certificateNo such certificate is included in the supplied project documents. The building-permit order specifies that an occupancy certificate is required before occupation. Document index
Other approval identifiers on the building-permit orderLayout / Sub Divn. Nos. G2/2584/48/2015/KNR and G2/2587/48/2015/KNR; S.R.O. Karimnagar reference 14552/19 dated 27 December, 2019.

Frequently asked questions

Is HARI DURGA HOMES registered with Telangana RERA?

Yes. HARI DURGA HOMES is registered with the Telangana Real Estate Regulatory Authority as P02700002669; the registration status is New Project.

Who is the developer of HARI DURGA HOMES?

The promoter named in the RERA registration is LAHOTI CONSTRUCTIONS.

Where is HARI DURGA HOMES located?

HARI DURGA HOMES is in KARIMNAGAR, Telangana (505001).

When will HARI DURGA HOMES be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.

More projects in Karimnagar