Sign in

Prime Vista

PRIME PROJECTS · Medchal-Malkajgiri · RERA P02200010558

PRIME VISTA is a residential apartment project in Bandlaguda, Uppal Mandal, Medchal-Malkajgiri District, developed by registered promoter PRIME PROJECTS. The project covers 1682.3 sq.m and comprises 1 building, BUILDING-1, with 1 Cellar + 1 Stilt + 5 Floors and 25 homes, configured as 3BHK apartments. It is registered with TG-RERA under P02200010558, and the proposed completion date is 11/04/2029.

01What we found

RegisteredTG-RERA - valid till 11 Dec 2028
13documents on file - each fact links to its page
1court case on this project's land (survey 41, Bandlaguda)
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

FieldProject record
Registered name / typePRIME VISTA; residential apartment project. RERA record
Registered portion / phaseOne registered project portion is evidenced; it is identified as BUILDING-1. No separate phase name is disclosed.
TG-RERA registrationP02200010558; registered from 11/12/2025 to 11/12/2028. Registration validity is distinct from the construction deadline. RERA record
Registered promoterPRIME PROJECTS. RERA record
RERA statusThe supplied registration record identifies the project as registered; the supplied certificate states a three-year validity period. RERA record

Land and geographic identity

FieldProject record
LocalityBandlaguda. RERA record
Revenue villageBandlaguda Village.
MandalUppal. RERA record
DistrictMedchal-Malkajgiri. RERA record
PIN500039. RERA record
Project survey number(s)Survey No. 41; no project subdivision is stated in the supplied registration or building-permit identification. Land records
Plot numbers240, 241, 242, 242/A and 242/B.
Registered site extent1682.3 sq.m; the building-permit extraction records both gross and net plot area as 1682.3 sq.m. Land records
BoundariesNot disclosed in the supplied project record. Land records

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building-permit approval2221/GHMC/SWBP/LBN1/2025, approved 11/12/2025. The associated file number is 001091/GHMC/00742/SWBP/LBN1/2025. Approvals record
Approved built-up areaThe building-permit extraction records Total Proposed BUA excluding Parking: 3574.78 sq.m and Total Proposed BUA including Parking: 5163.21 sq.m; it separately records Gross BUA: 5457.43 sq.m and Total Net BUA: 3574.78 sq.m. These are distinct labels in the filed approval data.
Building count and configuration1 building (BUILDING-1): 1 Cellar + 1 Stilt + 5 Floors.
Parking levels / provisionCellar and stilt are approved for parking. The plan records 49.00 car parking spaces and 162.22 visitor parking area (the supplied plan labels the area in its parking schedule).
Unit counts25 dwelling units in the GHMC permit and 25 units in the TG-RERA configuration record. RERA unit table

Offering and status

FieldProject record
RERA-filed configuration3BHK, 25 units; filed saleable area 187.01 sq.m. RERA unit table RERA unit details
Booked / availableTG-RERA portal-derived record shows 0 booked and 25 available; no as-of date is provided for those counts, so they are indicative. RERA unit table
Construction stageThe project is recorded as a New Project. No independently verified site-progress assessment is supplied. RERA record
Completion datesPromoter’s Form B declares completion by 11-12-2028; the GHMC permit states construction is to be completed before 11/12/2028. The header records a proposed completion date of 11/04/2029. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied for this building. The GHMC permit requires an occupancy certificate before occupation.

The project story

PRIME VISTA is a residential apartment project on plots 240, 241, 242, 242/A and 242/B in Survey No. 41, Bandlaguda Village, Uppal Mandal, Medchal-Malkajgiri District. The GHMC permit describes one residential building, BUILDING-1, with a cellar, stilt and five upper floors, and 25 dwelling units.

The RERA-filed offering is 25 three-bedroom apartments. The portal-derived inventory shows all 25 as available and none booked, but the record does not give an as-of date for those counts. RERA unit details RERA unit table No construction-progress percentage or independent site inspection is included in the supplied evidence; the project’s recorded “New Project” status should not be treated as a verified construction-stage assessment. RERA record

The GHMC permit and promoter declaration give 11/12/2028 as the construction/completion date, while the project header records a proposed completion date of 11/04/2029. These dates are reproduced with their respective source labels; no occupancy or completion certificate is supplied. RERA record

Master plan, architecture & building design

The GHMC-filed plan describes a single residential building on a site of 1682.3 sq.m, with proposed coverage of 786.27 sq.m and vacant plot area of 880.02 sq.m. It specifies 1 Cellar + 1 Stilt + 5 Upper Floors. The plan records proposed BUA excluding parking as 3574.78 sq.m, proposed BUA including parking as 5163.21 sq.m, and separately lists Gross BUA: 5457.43 sq.m and Total Net BUA: 3574.78 sq.m. These approval labels are not RERA-filed carpet or saleable-area figures.

The supplied approval extraction lists a 9m Wide Main Road, a 1.00 m WIDE GREENERY strip, and proposed setbacks of front 3.0 m, rear 9.33 m, side 1 3.86 m and side 2 5.0 m. It also records the building height as 17.99 m from GL; 14.89 m excluding Stilt, with 15.00 m permissible building height.

The permit identifies cellar and stilt parking, a tot-lot, rainwater-harvesting provisions, transformer space, a garbage house and a lift. The supplied material does not establish the number of flats per floor, lift capacity, stair count, or a detailed internal circulation or landscaping layout.

Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK25025187.01 sq.m106.2 sq.m median; range 104.3–117.6 sq.m43%

Unit counts, booked/available counts and saleable area are from the TG-RERA filing-derived record; the booked/available figures have no supplied as-of date. Carpet areas and loading are software measurements from the approved floor-plan drawings, not RERA-filed measurements, and are flagged for review. The drawing-measured median carpet area is 1143 sq.ft, with a range of 1122–1266 sq.ft. RERA unit details Floor plans

For one measured fourth-floor plan, flat 402, the drawing extraction identifies a drawing room, bedrooms, kitchen, living/dining area, puja space, toilets, utility area and balcony. The utility area and balcony are marked excluded from the measured carpet area. These are drawing-derived measurements and labels, not separate RERA disclosures. RERA unit details

Carpet area is the usable apartment area as defined in the Act; saleable area is a separate filed figure and may include the apartment’s proportionate common-area share under the applicable Telangana Rules. The supplied record does not provide a RERA-filed apartment-by-apartment carpet schedule. RERA unit details § Rules r.2

Parking & vehicle circulation

The GHMC plan records 49.00 car parking spaces, required parking area of 1072.43 sq.m and proposed parking area of 1588.43 sq.m. It records visitor parking area of 107.24 (10.00 %) required and 162.22 (15.13 %) proposed. The cellar and stilt are approved for parking and are required by the permit conditions to be used exclusively for vehicle parking.

The supplied record does not specify individual unit parking allocations, accessible parking spaces, two-wheeler counts, EV charger quantities, or a detailed ramp and driveway arrangement. A parking space shown or counted in the plan does not by itself establish exclusive allocation or ownership for a particular buyer.

Amenities, recreation & open spaces

Clubhouse / indoor
Description / sizeNo clubhouse or indoor recreation facility is identified in the supplied project records.
Evidence sourceRERA amenities
Declared progress / verified statusNot disclosed.
Sports / recreation
Description / sizeTot-lot; the plan also records a vacant plot area of 880.02 sq.m, but does not identify that entire area as recreational open space.
Declared progress / verified statusPlan/permit provision; no completed status supplied.
Landscape / open space
Description / sizePerimeter greenery and tree plantation are required by the GHMC permit; the permit lists 75 trees.
Declared progress / verified statusPermit condition / listed provision; completion not independently verified.
Convenience / community
Description / sizeGarbage house and transformer space are listed in the permit material.
Declared progress / verified statusPermit-listed provisions; completion not independently verified.

The TG-RERA amenity record lists infrastructure categories including water supply, sewerage, storm-water drains, internal roads and footpaths, street lighting, solid-waste management, water conservation/rainwater harvesting, energy management, electrical meter room/sub-station/receiving station, and fire protection. Most entries show 0 progress; “YES” appears for energy management, fire protection, electrical meter room/sub-station/receiving station, water supply and sewerage. These entries are recorded declarations, not independent verification of installation or completion. RERA amenities

Utilities, building services & safety

  • Water: The RERA amenity record marks water supply “YES.” The GHMC permit requires water-feasibility evidence from HMWS&SB at the time of occupancy-certificate application. The supplied material does not state a water source, storage capacity or treatment capacity. RERA amenities
  • Sewerage, drainage and rainwater: The RERA record marks sewerage “YES” and lists storm-water drainage and water conservation/rainwater harvesting. The permit lists 4 rainwater-harvesting pits and requires a percolation pit. No STP capacity, reuse quantity or drainage design details are supplied. RERA amenities
  • Electrical and energy: The RERA record marks an electrical meter room/sub-station/receiving station and energy management “YES”; the permit lists a transformer. No electrical load, backup-power capacity or completed EV-charging installation is documented. RERA amenities
  • Vertical transportation: A lift is listed in the building-permit material; the supplied record does not state its number or capacity.
  • Fire and life safety: Fire protection/fire-safety requirements are marked “YES” in the RERA amenity record. The GHMC permit requires an occupancy Fire NOC from the Director (EV&DM) before an occupancy certificate. The supplied evidence does not establish that the NOC has been issued or that systems are complete. RERA amenities
  • Waste and access: The permit lists a garbage house; the RERA amenity schedule includes solid-waste management. No segregation method, CCTV, security system or access-control specification is supplied in the project approval material. RERA amenities
  • Accessibility: No project-specific accessibility provision is identified in the supplied records. RERA amenities

Location, access & connectivity

The registered project location is Bandlaguda Village, Uppal Mandal, Medchal-Malkajgiri District, PIN 500039, on Survey No. 41 and plots 240, 241, 242, 242/A and 242/B. RERA record

The plan records a 9.0 m road and a 9.00 m (30 '- 0") road width, and separately refers to a site abutting an 18 mt. road for a compound-wall condition. The project location record supplies one measured connectivity distance: Financial District (Nanakramguda) — 1.2 km. Location record

Developer & development status

The registered promoter is PRIME PROJECTS, identified in the RERA record as a partnership. The supplied GSTIN is 36AAZFP8912F1ZM. The promoter’s listed address is JAYABHERI THE PEAK, NARSINGI, BANDLAGUDA, BANDLAGUDA, Uppal, Medchal-Malkajgiri, 500039; the evidence does not supply an official project contact number or website. Parties record Corporate record

The GHMC permit names Concrete Infra Projects India LLP as developer/builder; the registered promoter remains PRIME PROJECTS. The supplied record does not describe separate phases or provide independently verified construction progress. The promoter’s Form B declares completion by 11-12-2028.

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200010558; valid 11/12/2025–11/12/2028
Scope and status in supplied evidenceForm C registration certificate for PRIME VISTA and PRIME PROJECTS.
GHMC building permit
Identifier / date2221/GHMC/SWBP/LBN1/2025; approved 11/12/2025
Scope and status in supplied evidencePermit for one residential building, BUILDING-1, with 25 dwelling units at the identified Survey No. 41 plots.
GHMC file number
Identifier / date001091/GHMC/00742/SWBP/LBN1/2025
Scope and status in supplied evidenceBuilding-permit file reference.
Layout/building plan filing
Identifier / datePortal reference f2693b53-7954-4538-b925-0edaf9db8b25
Scope and status in supplied evidenceRERA-filed plan material includes the building configuration and site/parking schedules.
Promoter declaration
Identifier / dateForm B
Scope and status in supplied evidencePromoter-declared title basis, encumbrance statement, separate-account undertaking and completion date.
Occupancy/completion certificate
Identifier / dateNot supplied
Scope and status in supplied evidenceNo certificate is present in the reviewed project documents; the GHMC permit requires an occupancy certificate before occupation.

Frequently asked questions

Is PRIME VISTA registered with Telangana RERA?

Yes. PRIME VISTA is registered with the Telangana Real Estate Regulatory Authority as P02200010558; the registration status is New Project.

Who is the developer of PRIME VISTA?

The promoter named in the RERA registration is PRIME PROJECTS.

Where is PRIME VISTA located?

PRIME VISTA is in BANDLAGUDA, Uppal, Medchal-Malkajgiri, Telangana (500039).

When will PRIME VISTA be completed?

The promoter's proposed date of completion filed with RERA is 11/04/2029. This is the promoter's declaration, not a guarantee.

More projects in Bandlaguda