Srinidhi Residency
NAGA PRAVEEN · Medchal-Malkajgiri · RERA P02200004353
SRINIDHI RESIDENCY is a residential apartment project in GAJULA RAMARAM locality, Qutballapur mandal, Medchal-Malkajgiri district. The registered promoter is Mr./Ms. Naga Praveen Pothineni. The project covers 334.34 sq. m and comprises one proposed residential building with 1 Stilt + 5 upper floors and 10 homes: 5 2BHK and 5 3BHK. It is registered under TG-RERA number P02200004353, and the promoter declared completion by 16.02.2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
12 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | SRINIDHI RESIDENCY RERA record |
| Project type / phase | Residential apartment project; registered portion or phase name not separately disclosed. RERA record RERA filing |
| TG-RERA registration | P02200004353; certificate issued 04/04/2022; validity stated as commencing 04/04/2022 and ending 16/02/2025. Registration validity is not the same as the completion deadline. RERA record Approvals record |
| Registered promoter | Mr./Ms. Naga Praveen Pothineni; Form B is declared by POTHINENI NAGA PRAVEEN. |
| Current RERA status | The supplied registration record shows an end date of 16/02/2025 and says the registration was not extended. Current portal status is not independently established in the supplied record. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | GAJULA RAMARAM locality; revenue-village references include Gajula Ramaram-1, Gajularamaram, and Gajularamaram Village in the supplied records. RERA record RERA filing |
| Mandal / district / PIN | Qutballapur; Medchal-Malkajgiri; 500055. The building permit also labels the mandal Qutubullapur and district MEDCHAL. RERA record RERA filing |
| Project survey numbers | 307/2/6/7, 14, 16, 26. The building-permit extraction renders these as 307/2/6/7,14,16,26; the RERA certificate lists 307/2/6/7, 14, 16, 26 separately. RERA record RERA filing |
| Plot reference | Plot Nos. 49, 50 EAST SIDE PART. RERA filing |
| Site area | 334.34 sq. m total and net; road-affected area 0 and nala-affected area 0.0 in the building-permit extraction. RERA filing |
| Boundaries (RERA filing) | East: PLOT NO 48; West: PLOT NO 50 WEST PART; North: PLOT NO 43 AND 44; South: 40 FEET ROAD. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building approval | Building Permit Order 2185/GHMC/KPL/2022-BP, approved 16 February, 2022; file no. 001424/GHMC/0831/KPL2/2021-BP. Approvals record |
| Approved development | One proposed residential building: 1 Stilt + 5 upper floors. |
| Approved built-up area | Residential upper-floor area: 948.90 Sq.Mt.; stilt area: 177.75 Sq.Mt. The permit separately records Total Parking Area 177.7. RERA filing |
| Building height | 14.99 as recorded in the permit extraction; the unit is not stated there. |
| Unit count | 10 units in one building: 5 2BHK and 5 3BHK, as recorded in the RERA unit information. The filing also reports one total building unit; these are distinct building and dwelling-unit counts. RERA unit table RERA unit details RERA filing |
| Sanctioned floor configuration | Permit states 1 Stilt + 5 upper floors. Basement, podium, parking-level subdivisions and flats-per-floor arrangements are not established by the supplied extracted record. |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configurations | 2BHK: 5 units, saleable area 113.62 sq. m each; 3BHK: 5 units, saleable area 113.53 sq. m each. RERA unit table RERA unit table |
| Booked / available | Portal-derived count shows 0 booked / 5 available in each configuration, 10 available overall. The portal extract carries no as-of date, so these counts are indicative. RERA unit table RERA unit details |
| Promoter-declared completion date | Form B undertakes completion by 16.02.2025; the same date appears as the RERA registration validity end date. |
| Construction stage | No independent site-progress verification or dated construction-stage evidence is supplied. RERA amenity-progress fields show 0 for the listed items; that is a filed progress record, not an independent site inspection. RERA amenities |
| OC / completion certificate | No occupancy or completion certificate is included in the supplied project documents; the supplied evidence does not establish issuance. Document index |
2. The project story
SRINIDHI RESIDENCY is a RERA-registered residential apartment project in the Gajula Ramaram area, on the recorded Plot Nos. 49 and 50 East Side Part and land identified in the filing under Survey Nos. 307/2/6/7, 14, 16 and 26. Its registered site extent is 334.34 sq. m. The GHMC permit describes one residential building with a stilt and five upper floors. The RERA unit record lists ten homes—five 2BHK and five 3BHK. The supplied booking snapshot reports none booked, but provides no capture date. The promoter’s Form B declared a completion target of 16.02.2025. No independently verified construction progress or occupancy certificate is present in the supplied material, so it does not establish whether the building is complete, occupied or certified. RERA record RERA filing RERA unit details Document index
3. Master plan, architecture & building design
The GHMC Building Permit Order identifies a proposed residential building on a 334.34 Sq. Mtrs plot, with 334.34 Sq. Mtrs net plot area. It sanctions 1 Stilt + 5 upper floors, records residential upper-floor area of 948.90 Sq.Mt., stilt area of 177.75 Sq.Mt., and building height of 14.99 (unit not stated in the extracted record). The permit lists a 12 M ROAD and setbacks of Front 3, Rear 2, Side I 2, and Side II 2; the extracted figures do not specify units for the setbacks.
The supplied extract does not establish the floor-by-floor flat arrangement, footprint, lift or stair count, internal circulation, landscaping dimensions, or common-area and residential-area breakdown. It records two TDR DRC numbers—00226/TDR/2020 and 00141/TDR/2020—and their areas and floor-related entries; detailed interpretation of approval conditions belongs with the approvals review.
The building permit records a Total Parking Area 177.7 and stilt approved for parking. It also states that five rainwater-harvesting pits are to be provided, space for a transformer is to be provided, and a strip of greenery is to be maintained around the site. These are permit-recorded requirements, not confirmation of completed works.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 113.62 sq. m | Not supplied | Not supplied |
| 3BHK | 5 | 0 | 5 | 113.53 sq. m | 100.2 sq. m (software-measured) | Not supplied |
RERA counts and saleable areas are from the project filing; booking and availability counts are from the portal snapshot without an as-of date. The 3BHK carpet figure is software-measured from one approved floor-plan drawing, not a RERA-filed measurement, and is flagged as needing review. Carpet area describes the measured home floor-plan area; RERA saleable area is a separate filed figure that includes the home’s share of common areas. No loading figure is supplied. RERA unit details RERA unit table Floor plans
The measured 3BHK drawing includes three labelled bedrooms, living/dining spaces, a kitchen, toilets, a wash area and a 1.00 M. WIDE BALC. The drawing extract gives room dimensions, but the measured plan is only one flat design; another drawing is awaiting scan review. RERA unit details
5. Parking & vehicle circulation
The GHMC permit records Total Parking Area 177.7 and identifies the stilt as approved for parking. Its conditions say that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking without partition walls or rolling shutters. The permit does not provide a count of car or two-wheeler spaces, visitor or accessible bays, or an allotment schedule. The supplied records do not establish parking-space allocations to individual homes, a ramp or driveway arrangement, separate pedestrian circulation, mechanical parking, or EV charging. A parking area shown or sanctioned does not by itself establish exclusive parking rights for a buyer. RERA unit table
6. Amenities, recreation & open spaces
| Description / size | RERA amenity entry says YES; no size stated. |
|---|---|
| Evidence source | RERA amenities RERA amenities |
| Declared progress / verified status | Filed progress 0; not independently verified complete. |
| Description / size | Five pits required by the building permit; RERA amenity entry says water conservation/rainwater harvesting YES. |
|---|---|
| Evidence source | GHMC permit and RERA amenities RERA amenities |
| Declared progress / verified status | Filed progress 0; not independently verified complete. |
| Description / size | RERA amenity entry says YES; permit requires an occupancy FIRE NOC before issue of an Occupancy Certificate. |
|---|---|
| Evidence source | RERA amenities and GHMC permit RERA amenities |
| Declared progress / verified status | Filed progress 0; no completion or NOC evidence supplied. |
| Description / size | Listed in third-party vendor information; not established as a RERA-filed or sanctioned facility in the supplied project records. |
|---|---|
| Evidence source | Vendor Promoter website |
| Declared progress / verified status | No verified status supplied. |
| Description / size | Listed in third-party vendor information; no size or capacity supplied. |
|---|---|
| Evidence source | Vendor Promoter website |
| Declared progress / verified status | No verified status supplied. |
| Description / size | Listed in third-party vendor information; no size supplied. |
|---|---|
| Evidence source | Vendor Promoter website |
| Declared progress / verified status | No verified status supplied. |
| Description / size | RERA amenity fields are present; no area or capacity supplied. |
|---|---|
| Evidence source | RERA amenities RERA amenities |
| Declared progress / verified status | Filed progress 0; not independently verified complete. |
The vendor-listed items are third-party descriptions, not evidence that the facilities are sanctioned, delivered or operational. Promoter website RERA amenities
7. Utilities, building services & safety
| Service | Supplied evidence and status |
|---|---|
| Water | The vendor lists treated water supply and 24×7 water supply; these are third-party claims. The RERA amenity extract lists water supply with progress 0. No source, storage or treatment capacity is supplied. Promoter website RERA amenities |
| Sewerage and drainage | RERA lists sewerage, sewage/sullage treatment and disposal, and storm-water drains; each has progress 0 in the supplied extract. No STP capacity or reuse details are supplied. RERA amenities |
| Rainwater harvesting | The building permit requires 5 rainwater-harvesting pits; RERA marks water conservation/rainwater harvesting YES, with progress 0. RERA amenities |
| Electrical supply | The permit requires space for a transformer and the RERA amenity list marks electrical meter room/sub-station/receiving station YES, with progress 0. Equipment capacity is not stated. RERA amenities |
| Backup power | Power backup is listed by the vendor only; capacity and coverage are not supplied. Promoter website |
| Lifts | No lift count, type or capacity is established by the supplied records. Document index |
| Fire and life safety | RERA marks fire protection and fire safety requirements YES, with progress 0. The permit requires an occupancy FIRE NOC before an Occupancy Certificate. No NOC or completed-system evidence is supplied. RERA amenities |
| Waste and security | RERA lists solid-waste management/disposal with progress 0. The vendor lists 24×7 security; CCTV, access-control arrangements and waste-system details are not supplied. RERA amenities Promoter website |
| Accessibility | No accessible-route, ramp or accessibility details are established in the supplied extracts. Document index |
8. Location, access & connectivity
The project’s RERA and permit records place it at Gajula Ramaram/Gajularamaram, in Qutballapur mandal, Medchal-Malkajgiri district, PIN 500055, on the recorded south boundary of a 40 FEET ROAD. The building-permit extract also records 12 M ROAD. The supplied location record provides a cadastral parcel centroid at 17.522871484143366, 78.40461261202259 and lists HITEC City — 9.3 km. No project-specific public-transport or landmark distances are established in the RERA evidence provided. Vendor connectivity statements are not used to describe the registered location or access in this overview. RERA record RERA filing RERA filing Location record Promoter website
9. Developer & development status
The registered promoter is Mr./Ms. Naga Praveen Pothineni; the project Form B is declared by POTHINENI NAGA PRAVEEN. The promoter’s legal-entity type and corporate identifiers are not established in the supplied records. The registration material gives an address at SPRINT AVENUES, PLOT NO 129, GAAJULA RAMARAM, GAJULA RAMARAM, Qutballapur, Medchal-Malkajgiri, 500055; no official contact details or website are supplied. Corporate record Parties record
The promoter declared that the project would be completed by 16.02.2025. The RERA registration certificate states validity through 16/02/2025 and records that it was not extended in the supplied extract. No independent progress update or occupancy certificate establishes the project’s present physical completion or occupancy status. RERA amenities
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | FORM ‘C’ registration for SRINIDHI RESIDENCY, P02200004353, issued 04/04/2022, valid through 16/02/2025 as recorded in the certificate. |
| GHMC building permit | Building Permit Order 2185/GHMC/KPL/2022-BP, approved 16 February, 2022; file no. 001424/GHMC/0831/KPL2/2021-BP. |
| Permit-associated identifiers | Approved Layout No./LRS Proceeding No./Subdivision No. 4107/MP2/PLG/HUDA; TDR DRC Nos. 00226/TDR/2020 and 00141/TDR/2020. |
| Commencement/building permit document | Supplied as “Commencement Certificates for each building in each phase”; extracted content is a GHMC Building Permit Order for one building. |
| RERA promoter declaration | Form B affidavit-cum-declaration dated 11th day of March 2022, including a promoter-declared completion date of 16.02.2025. |
| Title and land documents filed with RERA | Advocate’s title-search report (225124), registered sale-deed extract (223380), development-agreement/title-report extract (223378) and encumbrance statement (225125). Document index |
| Floor-plan material | RERA filing includes a floor-plan document record 223383; the supplied software measurement of a 3BHK is based on that drawing. Floor plans |
| OC / completion certificate | No occupancy or completion certificate is present in the supplied document set. Document index |
1. Project at a glance
Project identity
Registered name: SRINIDHI RESIDENCY
Project type / phase: Residential apartment project; registered portion or phase name not separately disclosed.
TG-RERA registration: P02200004353; certificate issued 04/04/2022; validity stated as commencing 04/04/2022 and ending 16/02/2025. Registration validity is not the same as the completion deadline.
Registered promoter: Mr./Ms. Naga Praveen Pothineni; Form B is declared by POTHINENI NAGA PRAVEEN.
Current RERA status: The supplied registration record shows an end date of 16/02/2025 and says the registration was not extended. Current portal status is not independently established in the supplied record.
Land and geographic identity
Locality / revenue village: GAJULA RAMARAM locality; revenue-village references include Gajula Ramaram-1, Gajularamaram, and Gajularamaram Village in the supplied records.
Mandal / district / PIN: Qutballapur; Medchal-Malkajgiri; 500055. The building permit also labels the mandal Qutubullapur and district MEDCHAL.
Project survey numbers: 307/2/6/7, 14, 16, 26. The building-permit extraction renders these as 307/2/6/7,14,16,26; the RERA certificate lists 307/2/6/7, 14, 16, 26 separately.
Plot reference: Plot Nos. 49, 50 EAST SIDE PART.
Site area: 334.34 sq. m total and net; road-affected area 0 and nala-affected area 0.0 in the building-permit extraction.
Boundaries (RERA filing): East: PLOT NO 48; West: PLOT NO 50 WEST PART; North: PLOT NO 43 AND 44; South: 40 FEET ROAD.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building approval: Building Permit Order 2185/GHMC/KPL/2022-BP, approved 16 February, 2022; file no. 001424/GHMC/0831/KPL2/2021-BP.
Approved development: One proposed residential building: 1 Stilt + 5 upper floors.
Approved built-up area: Residential upper-floor area: 948.90 Sq.Mt.; stilt area: 177.75 Sq.Mt. The permit separately records Total Parking Area 177.7.
Building height: 14.99 as recorded in the permit extraction; the unit is not stated there.
Unit count: 10 units in one building: 5 2BHK and 5 3BHK, as recorded in the RERA unit information. The filing also reports one total building unit; these are distinct building and dwelling-unit counts.
Sanctioned floor configuration: Permit states 1 Stilt + 5 upper floors. Basement, podium, parking-level subdivisions and flats-per-floor arrangements are not established by the supplied extracted record.
Offering and status
RERA-filed configurations: 2BHK: 5 units, saleable area 113.62 sq. m each; 3BHK: 5 units, saleable area 113.53 sq. m each.
Booked / available: Portal-derived count shows 0 booked / 5 available in each configuration, 10 available overall. The portal extract carries no as-of date, so these counts are indicative.
Promoter-declared completion date: Form B undertakes completion by 16.02.2025; the same date appears as the RERA registration validity end date.
Construction stage: No independent site-progress verification or dated construction-stage evidence is supplied. RERA amenity-progress fields show 0 for the listed items; that is a filed progress record, not an independent site inspection.
OC / completion certificate: No occupancy or completion certificate is included in the supplied project documents; the supplied evidence does not establish issuance.
2. The project story
SRINIDHI RESIDENCY is a RERA-registered residential apartment project in the Gajula Ramaram area, on the recorded Plot Nos. 49 and 50 East Side Part and land identified in the filing under Survey Nos. 307/2/6/7, 14, 16 and 26. Its registered site extent is 334.34 sq. m. The GHMC permit describes one residential building with a stilt and five upper floors. The RERA unit record lists ten homes—five 2BHK and five 3BHK. The supplied booking snapshot reports none booked, but provides no capture date. The promoter’s Form B declared a completion target of 16.02.2025. No independently verified construction progress or occupancy certificate is present in the supplied material, so it does not establish whether the building is complete, occupied or certified.
3. Master plan, architecture & building design
The GHMC Building Permit Order identifies a proposed residential building on a 334.34 Sq. Mtrs plot, with 334.34 Sq. Mtrs net plot area. It sanctions 1 Stilt + 5 upper floors, records residential upper-floor area of 948.90 Sq.Mt., stilt area of 177.75 Sq.Mt., and building height of 14.99 (unit not stated in the extracted record). The permit lists a 12 M ROAD and setbacks of Front 3, Rear 2, Side I 2, and Side II 2; the extracted figures do not specify units for the setbacks.
The supplied extract does not establish the floor-by-floor flat arrangement, footprint, lift or stair count, internal circulation, landscaping dimensions, or common-area and residential-area breakdown. It records two TDR DRC numbers—00226/TDR/2020 and 00141/TDR/2020—and their areas and floor-related entries; detailed interpretation of approval conditions belongs with the approvals review.
The building permit records a Total Parking Area 177.7 and stilt approved for parking. It also states that five rainwater-harvesting pits are to be provided, space for a transformer is to be provided, and a strip of greenery is to be maintained around the site. These are permit-recorded requirements, not confirmation of completed works.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 113.62 sq. m | Not supplied | Not supplied |
| 3BHK | 5 | 0 | 5 | 113.53 sq. m | 100.2 sq. m (software-measured) | Not supplied |
RERA counts and saleable areas are from the project filing; booking and availability counts are from the portal snapshot without an as-of date. The 3BHK carpet figure is software-measured from one approved floor-plan drawing, not a RERA-filed measurement, and is flagged as needing review. Carpet area describes the measured home floor-plan area; RERA saleable area is a separate filed figure that includes the home’s share of common areas. No loading figure is supplied.
The measured 3BHK drawing includes three labelled bedrooms, living/dining spaces, a kitchen, toilets, a wash area and a 1.00 M. WIDE BALC. The drawing extract gives room dimensions, but the measured plan is only one flat design; another drawing is awaiting scan review.
5. Parking & vehicle circulation
The GHMC permit records Total Parking Area 177.7 and identifies the stilt as approved for parking. Its conditions say that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking without partition walls or rolling shutters. The permit does not provide a count of car or two-wheeler spaces, visitor or accessible bays, or an allotment schedule. The supplied records do not establish parking-space allocations to individual homes, a ramp or driveway arrangement, separate pedestrian circulation, mechanical parking, or EV charging. A parking area shown or sanctioned does not by itself establish exclusive parking rights for a buyer.
6. Amenities, recreation & open spaces
| Description / size | RERA amenity entry says YES; no size stated. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Filed progress 0; not independently verified complete. |
| Description / size | Five pits required by the building permit; RERA amenity entry says water conservation/rainwater harvesting YES. |
|---|---|
| Evidence source | GHMC permit and RERA amenities |
| Declared progress / verified status | Filed progress 0; not independently verified complete. |
| Description / size | RERA amenity entry says YES; permit requires an occupancy FIRE NOC before issue of an Occupancy Certificate. |
|---|---|
| Evidence source | RERA amenities and GHMC permit |
| Declared progress / verified status | Filed progress 0; no completion or NOC evidence supplied. |
| Description / size | Listed in third-party vendor information; not established as a RERA-filed or sanctioned facility in the supplied project records. |
|---|---|
| Evidence source | Vendor |
| Declared progress / verified status | No verified status supplied. |
| Description / size | Listed in third-party vendor information; no size or capacity supplied. |
|---|---|
| Evidence source | Vendor |
| Declared progress / verified status | No verified status supplied. |
| Description / size | Listed in third-party vendor information; no size supplied. |
|---|---|
| Evidence source | Vendor |
| Declared progress / verified status | No verified status supplied. |
| Description / size | RERA amenity fields are present; no area or capacity supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Filed progress 0; not independently verified complete. |
The vendor-listed items are third-party descriptions, not evidence that the facilities are sanctioned, delivered or operational.
7. Utilities, building services & safety
Water: The vendor lists treated water supply and 24×7 water supply; these are third-party claims. The RERA amenity extract lists water supply with progress 0. No source, storage or treatment capacity is supplied.
Sewerage and drainage: RERA lists sewerage, sewage/sullage treatment and disposal, and storm-water drains; each has progress 0 in the supplied extract. No STP capacity or reuse details are supplied.
Rainwater harvesting: The building permit requires 5 rainwater-harvesting pits; RERA marks water conservation/rainwater harvesting YES, with progress 0.
Electrical supply: The permit requires space for a transformer and the RERA amenity list marks electrical meter room/sub-station/receiving station YES, with progress 0. Equipment capacity is not stated.
Backup power: Power backup is listed by the vendor only; capacity and coverage are not supplied.
Lifts: No lift count, type or capacity is established by the supplied records.
Fire and life safety: RERA marks fire protection and fire safety requirements YES, with progress 0. The permit requires an occupancy FIRE NOC before an Occupancy Certificate. No NOC or completed-system evidence is supplied.
Waste and security: RERA lists solid-waste management/disposal with progress 0. The vendor lists 24×7 security; CCTV, access-control arrangements and waste-system details are not supplied.
Accessibility: No accessible-route, ramp or accessibility details are established in the supplied extracts.
8. Location, access & connectivity
The project’s RERA and permit records place it at Gajula Ramaram/Gajularamaram, in Qutballapur mandal, Medchal-Malkajgiri district, PIN 500055, on the recorded south boundary of a 40 FEET ROAD. The building-permit extract also records 12 M ROAD. The supplied location record provides a cadastral parcel centroid at 17.522871484143366, 78.40461261202259 and lists HITEC City — 9.3 km. No project-specific public-transport or landmark distances are established in the RERA evidence provided. Vendor connectivity statements are not used to describe the registered location or access in this overview.
9. Developer & development status
The registered promoter is Mr./Ms. Naga Praveen Pothineni; the project Form B is declared by POTHINENI NAGA PRAVEEN. The promoter’s legal-entity type and corporate identifiers are not established in the supplied records. The registration material gives an address at SPRINT AVENUES, PLOT NO 129, GAAJULA RAMARAM, GAJULA RAMARAM, Qutballapur, Medchal-Malkajgiri, 500055; no official contact details or website are supplied.
The promoter declared that the project would be completed by 16.02.2025. The RERA registration certificate states validity through 16/02/2025 and records that it was not extended in the supplied extract. No independent progress update or occupancy certificate establishes the project’s present physical completion or occupancy status.
10. Approvals, official records & documents
TG-RERA registration: FORM ‘C’ registration for SRINIDHI RESIDENCY, P02200004353, issued 04/04/2022, valid through 16/02/2025 as recorded in the certificate.
GHMC building permit: Building Permit Order 2185/GHMC/KPL/2022-BP, approved 16 February, 2022; file no. 001424/GHMC/0831/KPL2/2021-BP.
Permit-associated identifiers: Approved Layout No./LRS Proceeding No./Subdivision No. 4107/MP2/PLG/HUDA; TDR DRC Nos. 00226/TDR/2020 and 00141/TDR/2020.
Commencement/building permit document: Supplied as “Commencement Certificates for each building in each phase”; extracted content is a GHMC Building Permit Order for one building.
RERA promoter declaration: Form B affidavit-cum-declaration dated 11th day of March 2022, including a promoter-declared completion date of 16.02.2025.
Title and land documents filed with RERA: Advocate’s title-search report (225124), registered sale-deed extract (223380), development-agreement/title-report extract (223378) and encumbrance statement (225125).
Floor-plan material: RERA filing includes a floor-plan document record 223383; the supplied software measurement of a 3BHK is based on that drawing.
OC / completion certificate: No occupancy or completion certificate is present in the supplied document set.
Frequently asked questions
Is SRINIDHI RESIDENCY registered with Telangana RERA?
Yes. SRINIDHI RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02200004353; the registration status is New Project.
Who is the developer of SRINIDHI RESIDENCY?
The promoter named in the RERA registration is NAGA PRAVEEN.
Where is SRINIDHI RESIDENCY located?
SRINIDHI RESIDENCY is in GAJULA RAMARAM, Gajula Ramaram-1, Qutballapur, Medchal-Malkajgiri, Telangana (500055).
When will SRINIDHI RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 16/02/2025. This is the promoter's declaration, not a guarantee.
More projects in Gajula Ramaram 1