ULTIMA DEVELOPERS 1 is a residential apartment project in SAIDABAD COLONY PART CIRCLE-SANTHOSHNAGAR, Saidabad mandal, Hyderabad district. The registered promoter is ULTIMA DEVELOPERS 1, recorded as a Partnership. The project has a total area of 529.48 m² and one building with one stilt plus five upper floors, comprising 10 3BHK apartments, each with a saleable area of 143.99 m². Its TG-RERA registration number is P02500001503, and its proposed completion date is 20/04/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | ULTIMA DEVELOPERS 1 RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Phase designation not disclosed; TG-RERA registration is for the project identified in the certificate |
| TG-RERA registration number | P02500001503 |
| Registration validity | 27/12/2019 to 20/04/2025; certificate says validity may be extended by the Authority. No extension is recorded in the supplied certificate |
| Registered promoter | ULTIMA DEVELOPERS 1; promoter type recorded as Partnership RERA record Corporate record |
| RERA status in supplied record | “New Project” in the project record. Registration validity ended on 20/04/2025; current registration status is not established by the supplied material RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | SAIDABAD COLONY PART CIRCLE-SANTHOSHNAGAR; the filed certificate also gives Saidabad Colony(Blighted), Saidabad RERA record |
| Revenue village | Saidabad Colony(Blighted), as recorded in the project identity; the building permit describes Saidabad Colony part RERA record |
| Mandal / district / PIN | Saidabad / Hyderabad / 500059 RERA record |
| Survey numbers and subdivisions | Survey Nos. 174, 175, 176 and 181; no subdivisions are stated in the supplied project identity or sanction RERA record |
| Plot / house identifiers | Plot Nos. 10, 11, 12 and H.NO 17-1-382/SN/1/10,11,12 RERA filing |
| Sanction-record site extent | Site Area 529.48 m²; road-affected area 11.85 m²; net area 517.64 m² in the building permit |
| RERA-filed land figures | Total area 529.48 m²; area affected by road widening/FTL of tanks/nala widening 11.85 m²; net area 517.63 m² RERA filing |
| Boundaries | East: ROAD WIDTH 7; West: PLOT NO 9; North: NEIGHBOURS PROPERTY; South: ROAD WIDTH 9 RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building-permit number and date | 2/C7/06199/2019; 20 April, 2019 |
| Other file number shown on the permit | 2/C7/21073/2018 |
| Approved built-up area | 1,182.20 m² shown in the sanction parameters; the project fields record approved built-up area as 1,182.22 m² RERA filing |
| Building count | One building is shown in the project filing and permit description RERA filing |
| Sanctioned configuration | One stilt plus five upper floors; stated height 14.9 m |
| Parking levels | The permit specifies that cellar and stilts approved for parking must be used exclusively for vehicle parking. The supplied extract does not establish a cellar level or give parking-space counts |
| Unit count | RERA-filed unit schedule: 10 apartments. The project fields separately state total building units (as per approved plan): 1 and proposed building units (as per agreement): 1; the meaning of those “building units” fields is not clarified in the supplied record RERA unit table RERA filing |
| Mortgage area | 118.33 m² in the project fields RERA filing |
Offering and status
| Field | Project record |
|---|---|
| Unit type | 3BHK apartments RERA unit table |
| RERA-filed saleable area | 143.99 m² per unit RERA unit table |
| Booked / available | 0 booked and 10 available in the portal-derived filing data; no as-of date is supplied, so counts are indicative RERA unit table |
| Construction stage | Not established by the supplied documents; no independently verified site progress is provided Document index |
| Completion dates | The project record gives proposed completion as 20/04/2025; the building permit states construction was to commence before 20 October, 2020 and be completed before 20 April, 2025 RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied material. The permit makes occupancy certification a condition before occupation |
2. The project story
ULTIMA DEVELOPERS 1 is registered as a residential apartment project in Saidabad, Hyderabad. Its recorded site is associated with Saidabad Colony(Blighted), Saidabad mandal, Hyderabad district, PIN 500059, and Survey Nos. 174, 175, 176 and 181. The GHMC permit identifies the site as Saidabad Colony part (Circle-SanthoshNgr) and sanctions a residential building described as one stilt plus five upper floors RERA record.
The TG-RERA unit schedule lists ten 3BHK apartments, each with a filed saleable area of 143.99 m². The portal-derived schedule shows all ten as available and none booked, but provides no count date. That schedule is not evidence of present availability RERA unit table.
The filed completion target was 20/04/2025, and the registration certificate runs through that date. The supplied record does not establish construction progress or show an occupancy/completion certificate; therefore it does not support describing the project as completed, occupied or independently verified as under construction RERA record Document index.
3. Master plan, architecture & building design
The GHMC building-permit extract describes one residential building, “Building - BLDG (VENKATESHWAR REDDY),” with one stilt and five upper floors and a stated height of 14.9 m. The permit records a site area of 529.48 m², road-affected area of 11.85 m² and net area of 517.64 m². The RERA filing separately records net area as 517.63 m²; these are the values as shown in their respective records RERA filing.
The filed approved built-up-area figure is 1,182.22 m², while the permit parameters show 1,182.20 m². These are labelled built-up figures, not carpet or saleable area RERA filing. The drawing-derived floor-plan data covers four measured 3BHK designs, but the supplied information does not establish a complete building arrangement, flats per floor, footprint, lift or stair details, entries, internal circulation, landscaping or open-space dimensions Floor plans.
The permit lists a tot-lot area of 0 m², two rainwater-harvesting pits and 25 trees. It also requires a peripheral greenery strip, transformer space, a garbage house and an ETP; the supplied material does not establish their completion.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 143.99 m² per unit | Software-measured range: 89.7–96.5 m²; median 91.8 m² | 36% |
The unit counts, booking figures and saleable area are TG-RERA filing data; the booking count has no supplied as-of date. Carpet-area measurements were software-measured from the approved floor-plan drawing geometry, are not RERA-filed figures and need review against the drawing RERA unit table Floor plans.
The drawing data includes a typical-floor plan identified as “TYPICAL - 1, 3, 4& 5 FLOOR PLAN” and one measured flat example, Flat 02. Its extracted room areas include living/dining, three bedrooms, kitchen and toilets; two balconies are shown but excluded from the measured carpet area. The supplied measurements do not describe all four measured designs or establish that every unit has the same arrangement RERA unit details.
Carpet area concerns the internal usable space measured from the drawing; balconies are separately shown, and saleable area is the RERA-filed figure. The supplied record does not provide a separate balcony-area total or a verified decomposition of common-area loading Floor plans RERA unit details.
5. Parking & vehicle circulation
The GHMC permit states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied permit extract does not state the number of car or two-wheeler spaces, visitor or accessible spaces, or a parking-allocation arrangement for individual apartments.
The RERA unit schedule marks the 3BHK units as mortgaged, but it does not establish an individual parking entitlement. A space shown or described as parking provision does not, on this record, establish exclusive ownership or allocation to a particular unit RERA unit table.
6. Amenities, recreation & open spaces
The table distinguishes facilities appearing in the GHMC permit from items in the RERA amenity schedule. Amenity entries show 0% progress where a percentage is supplied; these figures are not independent verification of site condition RERA amenities.
Clubhouse / indoor
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | No size or specific facility stated | RERA amenities | 0% recorded; completion not independently verified |
Sports / recreation
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot | 0 m² in permit parameters | Permit-record figure; completion not independently verified |
Landscape / open space
| Description / size | Listed in amenity schedule; permit requires a peripheral greenery strip. No park area is stated in the supplied records |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% recorded in amenity schedule; completion not independently verified |
| Description / size | 25 trees stated in permit parameters |
|---|---|
| Declared progress / verified status | Permit-record requirement; planting status not established |
Convenience / community
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Garbage house | Required within the premises by the permit | Completion not independently verified | |
| Solid-waste management and disposal | Listed in RERA amenity schedule | RERA amenities | 0% recorded; completion not independently verified |
The vendor record also lists a swimming pool, gym and clubhouse, but these are vendor-reported amenities, not established as sanctioned or delivered by the supplied project documents Promoter website.
7. Utilities, building services & safety
| Evidence in supplied project record | Water supply is listed in the RERA amenity schedule. The vendor record states borewell supply RERA amenities Promoter website |
|---|---|
| Status / limitation | No source capacity, storage, treatment detail or completion verification is supplied |
| Evidence in supplied project record | Sewerage, treatment/disposal of sewage and sullage water, and storm-water drains appear in the RERA amenity schedule. The permit requires an ETP RERA amenities |
|---|---|
| Status / limitation | No plant capacity, reuse scheme or installed/completed status is established |
| Evidence in supplied project record | Two rainwater-harvesting pits are listed in the permit; the RERA schedule also lists water conservation/rainwater harvesting RERA amenities |
|---|---|
| Status / limitation | Provision is recorded; installation and operation are not independently verified |
| Evidence in supplied project record | Energy management and an electrical meter room/sub-station/receiving station are listed in the RERA amenity schedule. The permit requires space for a transformer RERA amenities |
|---|---|
| Status / limitation | No electrical capacity, backup arrangement or completion status is supplied |
| Evidence in supplied project record | No lift or service-lift information supplied |
|---|---|
| Status / limitation | Not disclosed in the supplied project material |
| Evidence in supplied project record | Fire protection and fire safety requirements are listed in the RERA amenity schedule; the vendor record also lists fire safety RERA amenities Promoter website |
|---|---|
| Status / limitation | No system specifications, clearance record or independent compliance verification supplied |
| Evidence in supplied project record | Solid-waste management is in the RERA amenity schedule; vendor-listed CCTV/security are not established by the supplied project documents RERA amenities Promoter website |
|---|---|
| Status / limitation | No installed or independently verified status supplied |
| Evidence in supplied project record | No accessibility or accessible-circulation details supplied |
|---|---|
| Status / limitation | Not disclosed in the supplied project material |
8. Location, access & connectivity
The filed location is Saidabad Colony(Blighted), Saidabad mandal, Hyderabad district, PIN 500059; the building permit describes Saidabad Colony part (Circle-SanthoshNgr). The project record provides a geocode at latitude 17.359533 and longitude 78.5147979 RERA record Location record.
The supplied location data identifies the nearest sampled Outer Ring Road interchange at approximately 12.0 km. No route, travel time or public-transport distance is supplied Location record. The vendor record describes proximity to schools, airports, restaurants, bus stops and railway stations, but gives no measured distances; treat these as vendor-reported descriptions, not verified connectivity measurements Promoter website.
9. Developer & development status
The registered promoter is ULTIMA DEVELOPERS 1, recorded as a partnership. The project filing lists its address at 9-5-2/A, Champapet, Saidabad, Saidabad Colony Part Circle-Santhoshnagar, Saidabad, Hyderabad, Telangana 500059. The supplied record does not provide a verified corporate registration identifier, official website or contact details Corporate record RERA filing.
The project evidence names ALGOTI VENKATESHWAR REDDY as an authorized signatory and lists the partnership’s members. The GHMC permit identifies DENDI NARMADA & OTHERS represented by ULTIMA DEVELOPERS as applicants Parties record. These are filed identities; this section does not determine ownership or development rights.
The promoter’s RERA-filed completion target was 20/04/2025. No construction-progress certificate, current site-progress evidence or occupancy/completion certificate is supplied, so physical completion and present operating status remain unverified RERA record Document index.
10. Approvals, official records & documents
| What the supplied record establishes | Form C registration under section 5 for ULTIMA DEVELOPERS 1, registration P02500001503, with validity from 27/12/2019 to 20/04/2025 |
|---|
| What the supplied record establishes | Building Permit Order 2/C7/06199/2019 dated 20 April, 2019, for a residential building on Survey Nos. 174, 175, 176 and 181; one stilt plus five upper floors |
|---|
| What the supplied record establishes | 2/C7/21073/2018 |
|---|
| What the supplied record establishes | Site and boundary fields, survey numbers, unit schedule and area figures recorded in the project data |
|---|---|
| Reference | RERA filing RERA unit table |
| What the supplied record establishes | Form B affidavit-cum-declaration filed by ALGOTI VENKATESHWAR REDDY for ULTIMA DEVELOPERS |
|---|
| What the supplied record establishes | Drawing record used for software measurement of 3BHK carpet-area designs; measurement is not a RERA disclosure |
|---|---|
| Reference | Floor plans |
| What the supplied record establishes | None included in the supplied records |
|---|---|
| Reference | Document index |
The GHMC permit states that the sanction does not confer ownership rights, requires a commencement notice before construction, and requires completion notice and an occupancy certificate before occupation.
1. Project at a glance
Project identity
Registered project name: ULTIMA DEVELOPERS 1
Project type: Residential apartment project
Phase / registered portion: Phase designation not disclosed; TG-RERA registration is for the project identified in the certificate
TG-RERA registration number: P02500001503
Registration validity: 27/12/2019 to 20/04/2025; certificate says validity may be extended by the Authority. No extension is recorded in the supplied certificate
Registered promoter: ULTIMA DEVELOPERS 1; promoter type recorded as Partnership
RERA status in supplied record: “New Project” in the project record. Registration validity ended on 20/04/2025; current registration status is not established by the supplied material
Land and geographic identity
Locality: SAIDABAD COLONY PART CIRCLE-SANTHOSHNAGAR; the filed certificate also gives Saidabad Colony(Blighted), Saidabad
Revenue village: Saidabad Colony(Blighted), as recorded in the project identity; the building permit describes Saidabad Colony part
Mandal / district / PIN: Saidabad / Hyderabad / 500059
Survey numbers and subdivisions: Survey Nos. 174, 175, 176 and 181; no subdivisions are stated in the supplied project identity or sanction
Plot / house identifiers: Plot Nos. 10, 11, 12 and H.NO 17-1-382/SN/1/10,11,12
Sanction-record site extent: Site Area 529.48 m²; road-affected area 11.85 m²; net area 517.64 m² in the building permit
RERA-filed land figures: Total area 529.48 m²; area affected by road widening/FTL of tanks/nala widening 11.85 m²; net area 517.63 m²
Boundaries: East: ROAD WIDTH 7; West: PLOT NO 9; North: NEIGHBOURS PROPERTY; South: ROAD WIDTH 9
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building-permit number and date: 2/C7/06199/2019; 20 April, 2019
Other file number shown on the permit: 2/C7/21073/2018
Approved built-up area: 1,182.20 m² shown in the sanction parameters; the project fields record approved built-up area as 1,182.22 m²
Building count: One building is shown in the project filing and permit description
Sanctioned configuration: One stilt plus five upper floors; stated height 14.9 m
Parking levels: The permit specifies that cellar and stilts approved for parking must be used exclusively for vehicle parking. The supplied extract does not establish a cellar level or give parking-space counts
Unit count: RERA-filed unit schedule: 10 apartments. The project fields separately state total building units (as per approved plan): 1 and proposed building units (as per agreement): 1; the meaning of those “building units” fields is not clarified in the supplied record
Mortgage area: 118.33 m² in the project fields
Offering and status
Unit type: 3BHK apartments
RERA-filed saleable area: 143.99 m² per unit
Booked / available: 0 booked and 10 available in the portal-derived filing data; no as-of date is supplied, so counts are indicative
Construction stage: Not established by the supplied documents; no independently verified site progress is provided
Completion dates: The project record gives proposed completion as 20/04/2025; the building permit states construction was to commence before 20 October, 2020 and be completed before 20 April, 2025
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied material. The permit makes occupancy certification a condition before occupation
2. The project story
ULTIMA DEVELOPERS 1 is registered as a residential apartment project in Saidabad, Hyderabad. Its recorded site is associated with Saidabad Colony(Blighted), Saidabad mandal, Hyderabad district, PIN 500059, and Survey Nos. 174, 175, 176 and 181. The GHMC permit identifies the site as Saidabad Colony part (Circle-SanthoshNgr) and sanctions a residential building described as one stilt plus five upper floors.
The TG-RERA unit schedule lists ten 3BHK apartments, each with a filed saleable area of 143.99 m². The portal-derived schedule shows all ten as available and none booked, but provides no count date. That schedule is not evidence of present availability.
The filed completion target was 20/04/2025, and the registration certificate runs through that date. The supplied record does not establish construction progress or show an occupancy/completion certificate; therefore it does not support describing the project as completed, occupied or independently verified as under construction.
3. Master plan, architecture & building design
The GHMC building-permit extract describes one residential building, “Building - BLDG (VENKATESHWAR REDDY),” with one stilt and five upper floors and a stated height of 14.9 m. The permit records a site area of 529.48 m², road-affected area of 11.85 m² and net area of 517.64 m². The RERA filing separately records net area as 517.63 m²; these are the values as shown in their respective records.
The filed approved built-up-area figure is 1,182.22 m², while the permit parameters show 1,182.20 m². These are labelled built-up figures, not carpet or saleable area. The drawing-derived floor-plan data covers four measured 3BHK designs, but the supplied information does not establish a complete building arrangement, flats per floor, footprint, lift or stair details, entries, internal circulation, landscaping or open-space dimensions.
The permit lists a tot-lot area of 0 m², two rainwater-harvesting pits and 25 trees. It also requires a peripheral greenery strip, transformer space, a garbage house and an ETP; the supplied material does not establish their completion.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 143.99 m² per unit | Software-measured range: 89.7–96.5 m²; median 91.8 m² | 36% |
The unit counts, booking figures and saleable area are TG-RERA filing data; the booking count has no supplied as-of date. Carpet-area measurements were software-measured from the approved floor-plan drawing geometry, are not RERA-filed figures and need review against the drawing.
The drawing data includes a typical-floor plan identified as “TYPICAL - 1, 3, 4& 5 FLOOR PLAN” and one measured flat example, Flat 02. Its extracted room areas include living/dining, three bedrooms, kitchen and toilets; two balconies are shown but excluded from the measured carpet area. The supplied measurements do not describe all four measured designs or establish that every unit has the same arrangement.
Carpet area concerns the internal usable space measured from the drawing; balconies are separately shown, and saleable area is the RERA-filed figure. The supplied record does not provide a separate balcony-area total or a verified decomposition of common-area loading.
5. Parking & vehicle circulation
The GHMC permit states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied permit extract does not state the number of car or two-wheeler spaces, visitor or accessible spaces, or a parking-allocation arrangement for individual apartments.
The RERA unit schedule marks the 3BHK units as mortgaged, but it does not establish an individual parking entitlement. A space shown or described as parking provision does not, on this record, establish exclusive ownership or allocation to a particular unit.
6. Amenities, recreation & open spaces
The table distinguishes facilities appearing in the GHMC permit from items in the RERA amenity schedule. Amenity entries show 0% progress where a percentage is supplied; these figures are not independent verification of site condition.
Clubhouse / indoor
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | No size or specific facility stated | 0% recorded; completion not independently verified |
Sports / recreation
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot | 0 m² in permit parameters | Permit-record figure; completion not independently verified |
Landscape / open space
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | Listed in amenity schedule; permit requires a peripheral greenery strip. No park area is stated in the supplied records | 0% recorded in amenity schedule; completion not independently verified | |
| Trees | 25 trees stated in permit parameters | Permit-record requirement; planting status not established |
Convenience / community
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Garbage house | Required within the premises by the permit | Completion not independently verified | |
| Solid-waste management and disposal | Listed in RERA amenity schedule | 0% recorded; completion not independently verified |
The vendor record also lists a swimming pool, gym and clubhouse, but these are vendor-reported amenities, not established as sanctioned or delivered by the supplied project documents.
7. Utilities, building services & safety
| Evidence in supplied project record | Water supply is listed in the RERA amenity schedule. The vendor record states borewell supply |
|---|---|
| Status / limitation | No source capacity, storage, treatment detail or completion verification is supplied |
| Evidence in supplied project record | Sewerage, treatment/disposal of sewage and sullage water, and storm-water drains appear in the RERA amenity schedule. The permit requires an ETP |
|---|---|
| Status / limitation | No plant capacity, reuse scheme or installed/completed status is established |
| Evidence in supplied project record | Two rainwater-harvesting pits are listed in the permit; the RERA schedule also lists water conservation/rainwater harvesting |
|---|---|
| Status / limitation | Provision is recorded; installation and operation are not independently verified |
| Evidence in supplied project record | Energy management and an electrical meter room/sub-station/receiving station are listed in the RERA amenity schedule. The permit requires space for a transformer |
|---|---|
| Status / limitation | No electrical capacity, backup arrangement or completion status is supplied |
| Evidence in supplied project record | No lift or service-lift information supplied |
|---|---|
| Status / limitation | Not disclosed in the supplied project material |
| Evidence in supplied project record | Fire protection and fire safety requirements are listed in the RERA amenity schedule; the vendor record also lists fire safety |
|---|---|
| Status / limitation | No system specifications, clearance record or independent compliance verification supplied |
| Evidence in supplied project record | Solid-waste management is in the RERA amenity schedule; vendor-listed CCTV/security are not established by the supplied project documents |
|---|---|
| Status / limitation | No installed or independently verified status supplied |
| Evidence in supplied project record | No accessibility or accessible-circulation details supplied |
|---|---|
| Status / limitation | Not disclosed in the supplied project material |
8. Location, access & connectivity
The filed location is Saidabad Colony(Blighted), Saidabad mandal, Hyderabad district, PIN 500059; the building permit describes Saidabad Colony part (Circle-SanthoshNgr). The project record provides a geocode at latitude 17.359533 and longitude 78.5147979.
The supplied location data identifies the nearest sampled Outer Ring Road interchange at approximately 12.0 km. No route, travel time or public-transport distance is supplied. The vendor record describes proximity to schools, airports, restaurants, bus stops and railway stations, but gives no measured distances; treat these as vendor-reported descriptions, not verified connectivity measurements.
9. Developer & development status
The registered promoter is ULTIMA DEVELOPERS 1, recorded as a partnership. The project filing lists its address at 9-5-2/A, Champapet, Saidabad, Saidabad Colony Part Circle-Santhoshnagar, Saidabad, Hyderabad, Telangana 500059. The supplied record does not provide a verified corporate registration identifier, official website or contact details.
The project evidence names ALGOTI VENKATESHWAR REDDY as an authorized signatory and lists the partnership’s members. The GHMC permit identifies DENDI NARMADA & OTHERS represented by ULTIMA DEVELOPERS as applicants. These are filed identities; this section does not determine ownership or development rights.
The promoter’s RERA-filed completion target was 20/04/2025. No construction-progress certificate, current site-progress evidence or occupancy/completion certificate is supplied, so physical completion and present operating status remain unverified.
10. Approvals, official records & documents
| Record | What the supplied record establishes | Reference |
|---|---|---|
| TG-RERA registration certificate | Form C registration under section 5 for ULTIMA DEVELOPERS 1, registration P02500001503, with validity from 27/12/2019 to 20/04/2025 | |
| GHMC building permit | Building Permit Order 2/C7/06199/2019 dated 20 April, 2019, for a residential building on Survey Nos. 174, 175, 176 and 181; one stilt plus five upper floors | |
| Permit file number | 2/C7/21073/2018 | |
| Project land and unit filing | Site and boundary fields, survey numbers, unit schedule and area figures recorded in the project data | |
| Promoter declaration | Form B affidavit-cum-declaration filed by ALGOTI VENKATESHWAR REDDY for ULTIMA DEVELOPERS | |
| Floor-plan material | Drawing record used for software measurement of 3BHK carpet-area designs; measurement is not a RERA disclosure | |
| Occupancy/completion certificate | None included in the supplied records |
The GHMC permit states that the sanction does not confer ownership rights, requires a commencement notice before construction, and requires completion notice and an occupancy certificate before occupation.
Frequently asked questions
Is ULTIMA DEVELOPERS 1 registered with Telangana RERA?
Yes. ULTIMA DEVELOPERS 1 is registered with the Telangana Real Estate Regulatory Authority as P02500001503; the registration status is New Project.
Who is the developer of ULTIMA DEVELOPERS 1?
The promoter named in the RERA registration is ULTIMADEVELOPERS 1.
Where is ULTIMA DEVELOPERS 1 located?
ULTIMA DEVELOPERS 1 is in SAIDABAD COLONY PART CIRCLE-SANTHOSHNAGAR, Saidabad Colony(Blighted), Saidabad, Hyderabad, Telangana (500059).
When will ULTIMA DEVELOPERS 1 be completed?
The promoter's proposed date of completion filed with RERA is 20/04/2025. This is the promoter's declaration, not a guarantee.
More projects in Saidabad Colony