Gvr Residency
SKYLINE CONSTRUCTIONS AND DEVELOPERS · Rangareddy · RERA P02400002682
GVR RESIDENCY is a residential apartment project in Brindavan Colony, Lingogiguda, Saroornagar mandal, Ranga Reddy district, developed by the registered promoter Skyline Constructions And Developers. The registered site area is 525.26 sq. m, and the approved development is one residential building with 1 Stilt + 5 upper floors, comprising 10 3BHK apartments. The TG-RERA registration number is P02400002682, and the proposed completion date is 14 February 2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | GVR RESIDENCY RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | No separate phase name is disclosed; the registration is for the project on the identified site. RERA record |
| TG-RERA registration | P02400002682, granted on 17/03/2021; recorded validity is 17/03/2021 to 14/02/2026. Registration validity is distinct from the completion date. RERA record |
| Registered promoter | Skyline Constructions And Developers; the promoter is identified as a proprietorship in the RERA filing. RERA record Corporate record |
| RERA status in supplied record | Registration certificate issued; no extension is recorded in the supplied certificate. The stated validity ended on 14/02/2026. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / project location as filed | Brindavan Colony, Lingogiguda; the registration certificate gives locality as Lingogiguda. RERA record |
| Revenue village | Lingogiguda (also rendered “Lingojiguda” in project documents). RERA record Land records |
| Mandal / district / PIN | Saroornagar / Ranga Reddy / 500035. RERA record |
| Survey number(s) | Survey No. 1; no subdivision is specified in the RERA registration certificate. RERA record |
| Plot identifiers in registration certificate | Plot Nos. 225, 226, 223 Part and 224 Part, 10-6-26/3 and 10-6-231/2. |
| Registered site extent | 525.26 sq. m is stated as the site area in the building permit and project filing. RERA record |
| Total / net land area | The RERA land details state total area 525.26 sq. m, affected area 15.37 sq. m, and net area 509.89 sq. m. The building permit states net area 509.9 m². RERA filing Land records |
| Boundaries | East: Plot Nos. 223 Part and 224 Part; west: 30 feet wide road; north: Plot Nos. 227 and 222; south: 25 feet wide road. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal approval | Building permit 2/C4/02141/2020, dated 14 February 2020; related file number 2/C4/19253/2019. Approvals record |
| Approved building form | One residential building, 1 Stilt + 5 upper floors. |
| Approved area figures | Plan records TOTAL BUA: 1504.51, TOTAL NET BUA: 1267.38; the RERA project fields separately state approved built-up area 1253.75 sq. m. These are the filed labels and figures, not interchangeable area measures. RERA filing |
| Height | Building permit records 14.99 m; the plan extraction also records TOTAL Ht. 20.44 mt. and 17.94 mt. from GL. |
| Parking | The plan records 10 proposed parkings. |
| Unit counts | RERA fields state total building units 1 and proposed building units 1; the unit schedule separately records 10 3BHK homes. The supplied material does not clarify the distinction between those building-unit fields and apartment count. RERA filing RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| Configuration | 3BHK apartments; RERA unit schedule records 10 units. RERA unit table RERA unit details |
| RERA saleable area | 148.18 sq. m per listed configuration. RERA unit table RERA unit details |
| Booking / availability | 0 booked; 10 available, as last read from the TG-RERA portal; the portal record has no as-of date, so counts are indicative. RERA unit table RERA unit details |
| Construction stage | No independently verified site-progress record is supplied. The RERA amenity schedule records 0% for its listed progress fields; this does not independently establish current construction status. RERA amenities |
| Completion deadline | The promoter’s Form B declaration undertakes completion by 14 February 2026; the RERA registration certificate gives the same date as the end of registration validity. |
| Original / revised completion dates | The supplied material gives the stated completion date above; no revised completion date is recorded. |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project records. The building permit states that an occupancy certificate is required before occupation. |
2. The project story
GVR RESIDENCY is registered as a residential apartment project on Survey No. 1 at Lingogiguda, Saroornagar, Ranga Reddy district. The RERA certificate identifies Plot Nos. 225, 226, 223 Part and 224 Part, along with the listed plot identifiers, within the registered site.
The GHMC-filed building permit and plan describe one residential building with a stilt floor and five upper floors. The RERA unit schedule lists ten 3BHK apartments, each with a filed saleable area of 148.18 sq. m. The supplied documents do not establish the current on-site construction stage or certify any completed or occupied portion. RERA unit table
The promoter’s Form B declaration undertakes completion by 14 February 2026. The registration certificate records validity through that date, but registration validity, the completion undertaking and occupancy certification are separate matters; no occupancy certificate is supplied here.
3. Master plan, architecture & building design
- The GHMC-filed plan is for one residential building, identified as Building A / Building A-1, with 1 Stilt + 5 upper floors. The plan records site area 525.26 sq. m, net plot area 509.90 sq. m, proposed coverage area 250.75 at 49.18%, and vacant plot area 259.14. These are plan labels and figures.
- The filed area schedule includes NET BUA RESIDENTIAL 1253.75, BUILT UP AREA 1267.38, TOTAL NET BUA: 1267.38, and TOTAL BUA: 1504.51. The RERA project fields separately state approved built-up area 1253.75 sq. m. The supplied records do not define a carpet-area figure or provide a basis for converting these distinct filed area measures into one another. RERA filing
- The plan and permit specify a stilt and five upper floors. The plan extraction records TOTAL Ht. 20.44mt., 17.94 mt. from GL, and 14.99 mt. Excluding Stilt Floor; the building-permit extraction records height 14.99 m.
- The available plan extracts do not establish the number of flats per floor, lift or stair specifications, internal circulation details, or a detailed residential/common-area split. The plan records 10 proposed parkings and vacant-plot area, but the supplied material does not provide a detailed landscape or open-space layout.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 148.18 sq. m | Not available | Not available |
Unit count, booking count and saleable area are RERA-filed values; the booking record is indicative because it has no as-of date. RERA unit table RERA unit details
- No software-measured carpet area or room-dimension data is supplied. The available drawing records comprise two drawings, but neither is recorded as having measured unit geometry. Accordingly, no carpet area or room layout is stated here. Floor plans
- The filed saleable area is not a carpet-area measurement; the supplied records do not provide a unit-specific breakdown of carpet, balcony or utility areas, or common-area loading. RERA unit details Floor plans
5. Parking & vehicle circulation
- The GHMC-filed plan records 10 proposed parkings. The supplied material does not specify how these spaces are divided by vehicle type, whether they are resident or visitor spaces, their exact level or layout, or any accessible-space or EV-charging provision.
- A stilt floor is part of the approved building description, but the available record does not establish that every proposed parking space is on that level or document exclusive parking allocation to any apartment.
6. Amenities, recreation & open spaces
The following table separates the RERA amenity schedule from items stated in the GHMC permit. RERA schedule progress is recorded as 0% for the listed entries; this is a recorded progress field, not independent verification of present site conditions. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | Listed; no size stated | RERA amenity schedule RERA amenities | 0%; not independently verified |
| Green Strip / TOT LOT / Park | Listed as available “YES”; no size stated | RERA amenity schedule RERA amenities | 0%; not independently verified |
| Community Buildings | Listed; no size stated | RERA amenity schedule RERA amenities | 0%; not independently verified |
| Aggregate area of recreational Open Space | Listed; no area stated | RERA amenity schedule RERA amenities | 0%; not independently verified |
| Tot-lot | 0 m² recorded | GHMC building permit | Permit record; delivery not verified |
Vendor material lists a gym, jogging track, common garden, children’s play area, swimming pool and clubhouse, among other features. These are vendor-listed claims, not confirmed here as GHMC-sanctioned or delivered project facilities. Promoter website
7. Utilities, building services & safety
| Service / system | Supplied evidence |
|---|---|
| Water and conservation | RERA amenity schedule lists water supply as “YES” and water conservation/rainwater harvesting as “YES”. The GHMC permit requires a rainwater-harvesting percolation pit. No water-source, storage or treatment capacity is stated. RERA amenities |
| Sewerage and drainage | RERA amenity schedule lists sewerage (chamber, lines, septic tank, STP) as “YES”; storm-water drains and treatment/disposal of sewage and sullage water are listed. No capacities or completion evidence are supplied. RERA amenities |
| Electrical | RERA amenity schedule lists an electrical meter room, sub-station and receiving station as “YES”; the GHMC permit lists space for a transformer. No backup capacity or supply details are stated in the project records. RERA amenities |
| Fire and life safety | Fire protection and fire safety are listed in the RERA amenity schedule. The building permit requires an occupancy Fire NOC from the Director (EV&DM) before issue of an occupancy certificate. No Fire NOC is supplied. RERA amenities |
| Waste | RERA amenity schedule lists solid-waste management and disposal. The GHMC permit lists a garbage house. No operational or completion evidence is supplied. RERA amenities |
| Vertical transportation and accessibility | No project-specific lift, accessible-route or ramp specifications are supplied in the RERA filing or extracted approval records. RERA amenities Document index |
8. Location, access & connectivity
- The registered location is Brindavan Colony, Lingogiguda, Saroornagar mandal, Ranga Reddy district, Telangana 500035. Project documents also describe the site as Sai Nagar (Lingojiguda-3B). RERA record
- The filed site boundaries identify roads on the west (30 feet wide road) and south (25 feet wide road). The GHMC-filed plan lists road widths 7.62 and 9.00, while the building-permit extraction also records “18 mt. road widths.” No additional approach-route detail is established by the supplied project records. RERA filing
- The location data includes a sampled Outer Ring Road interchange distance of 7.8 km. This is a supplied measured distance and is not a travel-time estimate. Location record
9. Developer & development status
- The registered promoter is Skyline Constructions And Developers, identified in the RERA filing as a proprietorship. Gondi Ravindar Reddy is named as proprietor and authorised signatory. The supplied records do not establish a separate corporate entity type or provide a verified official website or project contact number. Corporate record Parties record
- The promoter’s Form B affidavit, dated 13 February 2021, declares legal title to the project land, states that the land is free from encumbrances, and undertakes completion by 14 February 2026. These are promoter declarations.
- The RERA schedule lists 10 apartments, with 0 booked and 10 available, but without an as-of date. No independent construction-progress evidence or occupancy/completion certificate is supplied. RERA unit table
10. Approvals, official records & documents
| Identifier / date | P02400002682; issued 17/03/2021; valid to 14/02/2026 |
|---|---|
| What it establishes in the supplied material | Registration of GVR RESIDENCY and listed registration conditions. |
| Identifier / date | 2/C4/02141/2020; 14 February 2020; file 2/C4/19253/2019 |
|---|---|
| What it establishes in the supplied material | Conditional building permission for a residential building at Sai Nagar (Lingojiguda-3B), with stilt plus five upper floors; includes the requirement for an occupancy certificate before occupation. |
| Identifier / date | 2/C4/02141/2020; drawing date 25-02-2020 |
|---|---|
| What it establishes in the supplied material | Plan record for one residential building and the stated site, area, height and parking figures. |
| Identifier / date | 13 February 2021 |
|---|---|
| What it establishes in the supplied material | Promoter’s declarations concerning title, encumbrances, completion date and project obligations. |
| Identifier / date | Not supplied |
|---|---|
| What it establishes in the supplied material | The permit requires an occupancy certificate before occupation; no certificate is present in the supplied records. |
| Identifier / date | Advocate’s report dated 17-02-2021; title deeds and partition deed included in project file |
|---|---|
| What it establishes in the supplied material | Supporting title documents are available in the project file; title assessment is addressed in the Land & Title section. Document index |
1. Project at a glance
Project identity
Registered project name: GVR RESIDENCY
Project type: Residential apartment project
Phase / registered portion: No separate phase name is disclosed; the registration is for the project on the identified site.
TG-RERA registration: P02400002682, granted on 17/03/2021; recorded validity is 17/03/2021 to 14/02/2026. Registration validity is distinct from the completion date.
Registered promoter: Skyline Constructions And Developers; the promoter is identified as a proprietorship in the RERA filing.
RERA status in supplied record: Registration certificate issued; no extension is recorded in the supplied certificate. The stated validity ended on 14/02/2026.
Land and geographic identity
Locality / project location as filed: Brindavan Colony, Lingogiguda; the registration certificate gives locality as Lingogiguda.
Revenue village: Lingogiguda (also rendered “Lingojiguda” in project documents).
Mandal / district / PIN: Saroornagar / Ranga Reddy / 500035.
Survey number(s): Survey No. 1; no subdivision is specified in the RERA registration certificate.
Plot identifiers in registration certificate: Plot Nos. 225, 226, 223 Part and 224 Part, 10-6-26/3 and 10-6-231/2.
Registered site extent: 525.26 sq. m is stated as the site area in the building permit and project filing.
Total / net land area: The RERA land details state total area 525.26 sq. m, affected area 15.37 sq. m, and net area 509.89 sq. m. The building permit states net area 509.9 m².
Boundaries: East: Plot Nos. 223 Part and 224 Part; west: 30 feet wide road; north: Plot Nos. 227 and 222; south: 25 feet wide road.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal approval: Building permit 2/C4/02141/2020, dated 14 February 2020; related file number 2/C4/19253/2019.
Approved building form: One residential building, 1 Stilt + 5 upper floors.
Approved area figures: Plan records TOTAL BUA: 1504.51, TOTAL NET BUA: 1267.38; the RERA project fields separately state approved built-up area 1253.75 sq. m. These are the filed labels and figures, not interchangeable area measures.
Height: Building permit records 14.99 m; the plan extraction also records TOTAL Ht. 20.44 mt. and 17.94 mt. from GL.
Parking: The plan records 10 proposed parkings.
Unit counts: RERA fields state total building units 1 and proposed building units 1; the unit schedule separately records 10 3BHK homes. The supplied material does not clarify the distinction between those building-unit fields and apartment count.
Offering and status
Configuration: 3BHK apartments; RERA unit schedule records 10 units.
RERA saleable area: 148.18 sq. m per listed configuration.
Booking / availability: 0 booked; 10 available, as last read from the TG-RERA portal; the portal record has no as-of date, so counts are indicative.
Construction stage: No independently verified site-progress record is supplied. The RERA amenity schedule records 0% for its listed progress fields; this does not independently establish current construction status.
Completion deadline: The promoter’s Form B declaration undertakes completion by 14 February 2026; the RERA registration certificate gives the same date as the end of registration validity.
Original / revised completion dates: The supplied material gives the stated completion date above; no revised completion date is recorded.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project records. The building permit states that an occupancy certificate is required before occupation.
2. The project story
GVR RESIDENCY is registered as a residential apartment project on Survey No. 1 at Lingogiguda, Saroornagar, Ranga Reddy district. The RERA certificate identifies Plot Nos. 225, 226, 223 Part and 224 Part, along with the listed plot identifiers, within the registered site.
The GHMC-filed building permit and plan describe one residential building with a stilt floor and five upper floors. The RERA unit schedule lists ten 3BHK apartments, each with a filed saleable area of 148.18 sq. m. The supplied documents do not establish the current on-site construction stage or certify any completed or occupied portion.
The promoter’s Form B declaration undertakes completion by 14 February 2026. The registration certificate records validity through that date, but registration validity, the completion undertaking and occupancy certification are separate matters; no occupancy certificate is supplied here.
3. Master plan, architecture & building design
- The GHMC-filed plan is for one residential building, identified as Building A / Building A-1, with 1 Stilt + 5 upper floors. The plan records site area 525.26 sq. m, net plot area 509.90 sq. m, proposed coverage area 250.75 at 49.18%, and vacant plot area 259.14. These are plan labels and figures.
- The filed area schedule includes NET BUA RESIDENTIAL 1253.75, BUILT UP AREA 1267.38, TOTAL NET BUA: 1267.38, and TOTAL BUA: 1504.51. The RERA project fields separately state approved built-up area 1253.75 sq. m. The supplied records do not define a carpet-area figure or provide a basis for converting these distinct filed area measures into one another.
- The plan and permit specify a stilt and five upper floors. The plan extraction records TOTAL Ht. 20.44mt., 17.94 mt. from GL, and 14.99 mt. Excluding Stilt Floor; the building-permit extraction records height 14.99 m.
- The available plan extracts do not establish the number of flats per floor, lift or stair specifications, internal circulation details, or a detailed residential/common-area split. The plan records 10 proposed parkings and vacant-plot area, but the supplied material does not provide a detailed landscape or open-space layout.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 148.18 sq. m | Not available | Not available |
Unit count, booking count and saleable area are RERA-filed values; the booking record is indicative because it has no as-of date.
- No software-measured carpet area or room-dimension data is supplied. The available drawing records comprise two drawings, but neither is recorded as having measured unit geometry. Accordingly, no carpet area or room layout is stated here.
- The filed saleable area is not a carpet-area measurement; the supplied records do not provide a unit-specific breakdown of carpet, balcony or utility areas, or common-area loading.
5. Parking & vehicle circulation
- The GHMC-filed plan records 10 proposed parkings. The supplied material does not specify how these spaces are divided by vehicle type, whether they are resident or visitor spaces, their exact level or layout, or any accessible-space or EV-charging provision.
- A stilt floor is part of the approved building description, but the available record does not establish that every proposed parking space is on that level or document exclusive parking allocation to any apartment.
6. Amenities, recreation & open spaces
The following table separates the RERA amenity schedule from items stated in the GHMC permit. RERA schedule progress is recorded as 0% for the listed entries; this is a recorded progress field, not independent verification of present site conditions.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | Listed; no size stated | RERA amenity schedule | 0%; not independently verified |
| Green Strip / TOT LOT / Park | Listed as available “YES”; no size stated | RERA amenity schedule | 0%; not independently verified |
| Community Buildings | Listed; no size stated | RERA amenity schedule | 0%; not independently verified |
| Aggregate area of recreational Open Space | Listed; no area stated | RERA amenity schedule | 0%; not independently verified |
| Tot-lot | 0 m² recorded | GHMC building permit | Permit record; delivery not verified |
Vendor material lists a gym, jogging track, common garden, children’s play area, swimming pool and clubhouse, among other features. These are vendor-listed claims, not confirmed here as GHMC-sanctioned or delivered project facilities.
7. Utilities, building services & safety
Water and conservation: RERA amenity schedule lists water supply as “YES” and water conservation/rainwater harvesting as “YES”. The GHMC permit requires a rainwater-harvesting percolation pit. No water-source, storage or treatment capacity is stated.
Sewerage and drainage: RERA amenity schedule lists sewerage (chamber, lines, septic tank, STP) as “YES”; storm-water drains and treatment/disposal of sewage and sullage water are listed. No capacities or completion evidence are supplied.
Electrical: RERA amenity schedule lists an electrical meter room, sub-station and receiving station as “YES”; the GHMC permit lists space for a transformer. No backup capacity or supply details are stated in the project records.
Fire and life safety: Fire protection and fire safety are listed in the RERA amenity schedule. The building permit requires an occupancy Fire NOC from the Director (EV&DM) before issue of an occupancy certificate. No Fire NOC is supplied.
Waste: RERA amenity schedule lists solid-waste management and disposal. The GHMC permit lists a garbage house. No operational or completion evidence is supplied.
Vertical transportation and accessibility: No project-specific lift, accessible-route or ramp specifications are supplied in the RERA filing or extracted approval records.
8. Location, access & connectivity
- The registered location is Brindavan Colony, Lingogiguda, Saroornagar mandal, Ranga Reddy district, Telangana 500035. Project documents also describe the site as Sai Nagar (Lingojiguda-3B).
- The filed site boundaries identify roads on the west (30 feet wide road) and south (25 feet wide road). The GHMC-filed plan lists road widths 7.62 and 9.00, while the building-permit extraction also records “18 mt. road widths.” No additional approach-route detail is established by the supplied project records.
- The location data includes a sampled Outer Ring Road interchange distance of 7.8 km. This is a supplied measured distance and is not a travel-time estimate.
9. Developer & development status
- The registered promoter is Skyline Constructions And Developers, identified in the RERA filing as a proprietorship. Gondi Ravindar Reddy is named as proprietor and authorised signatory. The supplied records do not establish a separate corporate entity type or provide a verified official website or project contact number.
- The promoter’s Form B affidavit, dated 13 February 2021, declares legal title to the project land, states that the land is free from encumbrances, and undertakes completion by 14 February 2026. These are promoter declarations.
- The RERA schedule lists 10 apartments, with 0 booked and 10 available, but without an as-of date. No independent construction-progress evidence or occupancy/completion certificate is supplied.
10. Approvals, official records & documents
| Identifier / date | P02400002682; issued 17/03/2021; valid to 14/02/2026 |
|---|---|
| What it establishes in the supplied material | Registration of GVR RESIDENCY and listed registration conditions. |
| Identifier / date | 2/C4/02141/2020; 14 February 2020; file 2/C4/19253/2019 |
|---|---|
| What it establishes in the supplied material | Conditional building permission for a residential building at Sai Nagar (Lingojiguda-3B), with stilt plus five upper floors; includes the requirement for an occupancy certificate before occupation. |
| Identifier / date | 2/C4/02141/2020; drawing date 25-02-2020 |
|---|---|
| What it establishes in the supplied material | Plan record for one residential building and the stated site, area, height and parking figures. |
| Identifier / date | 13 February 2021 |
|---|---|
| What it establishes in the supplied material | Promoter’s declarations concerning title, encumbrances, completion date and project obligations. |
| Identifier / date | Not supplied |
|---|---|
| What it establishes in the supplied material | The permit requires an occupancy certificate before occupation; no certificate is present in the supplied records. |
| Identifier / date | Advocate’s report dated 17-02-2021; title deeds and partition deed included in project file |
|---|---|
| What it establishes in the supplied material | Supporting title documents are available in the project file; title assessment is addressed in the Land & Title section. |
Frequently asked questions
Is GVR RESIDENCY registered with Telangana RERA?
Yes. GVR RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02400002682; the registration status is New Project.
Who is the developer of GVR RESIDENCY?
The promoter named in the RERA registration is SKYLINE CONSTRUCTIONS AND DEVELOPERS.
Where is GVR RESIDENCY located?
GVR RESIDENCY is in BRINDAVAN COLONY, Lingogiguda, Saroornagar, Rangareddy, Telangana (500035).
When will GVR RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 14/02/2026. This is the promoter's declaration, not a guarantee.
More projects in Lingogiguda