GAUTHAM SAI INFRASTRUCTURES is a residential apartment project located at Gajula Ramaram-1, Qutballapur Mandal, Medchal-Malkajgiri District. It is being developed by the registered promoter M/S Gowtham Sai Infrastructures, a partnership. The project occupies 633.92 m² and comprises one building with 1 Stilt + 5 upper floors and 15 apartments: 10 2BHK and 5 3BHK. It is registered with TG-RERA under P02200001103, with proposed completion on 26/03/2025.
More from Gowtham Sai Infrastructures · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | GAUTHAM SAI INFRASTRUCTURES RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Phase is not separately identified in the supplied record; the registration identifies Plots 53 & 54 and the project site. |
| TG-RERA registration | P02200001103; granted under section 5, issued 05/08/2019. |
| Registration validity | Certificate states 05/08/2019 to 26/03/2025; no extension is recorded in the supplied certificate. Registration validity is distinct from the completion undertaking and from occupancy certification. |
| Registered promoter | M/S Gowtham Sai Infrastructures, a partnership. RERA record Corporate record |
| RERA status in supplied record | The project is registered; the certificate’s stated validity has ended, and the supplied record does not show an extension. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | Gajula Ramaram-1; the building permit names Gajularamaram. RERA record RERA filing |
| Mandal / district / PIN | Qutballapur / Medchal-Malkajgiri / 500055. RERA record |
| Project survey numbers | 307/2/7, 14, 16 & 26 are stated in the RERA registration certificate. The building permit also names 307/2/6, 7, 14, 16 & 26. |
| Site extent | 633.92 m²; the RERA land details report total area and net area as 633.92 m², with affected area 0. RERA filing |
| Plots identified | Plots 53 & 54. RERA filing |
| Boundaries in RERA filing | East: ROAD WIDTH 12; West: PLOT NO 63 AND 64; North: PLO NO 55; South: NEIGHBOURS LAND. RERA filing |
| Project survey subdivisions | No subdivision beyond the survey-number forms above is specified in the registration certificate or building permit. |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). |
| Principal building approval | Approval No. 2/C26/04975/2019, dated 26 March, 2019; permit file No. 2/C26/01637/2019. Approvals record |
| Approved building use and form | Residential building, 1 Stilt + 5 upper floors, stated height 14.99 m. |
| Approved built-up area | 1,811.01 m² as reported in the RERA filing. RERA filing |
| Building / tower count | The RERA filing reports one building unit; one block/tower is reflected in the unit summary. RERA filing RERA unit table |
| Parking / other area figures in permit | Permit extraction lists Cellar 1,478.25, Stilt 319.88, RM 99.56, 30 Trees, TOTAL: 646,619.00, and 148.09; the supplied extraction does not label all these figures sufficiently to interpret them as parking counts or areas. |
| Approved versus RERA-declared units | The RERA filing reports 1 total building unit and 1 proposed building unit; the unit inventory separately records 15 apartments: 10 two-bedroom and 5 three-bedroom. RERA filing RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| Unit types | 2BHK and 3BHK apartments. RERA unit table RERA unit details |
| RERA-filed saleable areas | 2BHK: 46.84 m²; 3BHK: 102.43 m². RERA unit table RERA unit table |
| Booked / available | RERA portal-derived inventory records 0 booked and 10 available 2BHK units, and 0 booked and 5 available 3BHK units. The portal record has no stated as-of date; figures are indicative. RERA unit table RERA unit table |
| Construction stage | No independently verified site progress or construction-stage report is supplied. RERA-filed progress entries report water supply at 50% and most other listed infrastructure items at 0%; these are filing figures, not a site inspection. RERA amenities |
| Completion dates | Form B declares completion by 17/01/2025. The RERA project record states proposed completion 26/03/2025. These are separate recorded dates. RERA record |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is included in the supplied project documents. The building permit states an occupancy certificate is compulsory before occupation. Document index |
2. The project story
This is a residential apartment project registered with TG-RERA as GAUTHAM SAI INFRASTRUCTURES, on a 633.92 m² site identified with Plots 53 and 54 at Gajula Ramaram-1, Qutballapur Mandal, Medchal-Malkajgiri District. The filing identifies survey numbers 307/2/7, 14, 16 and 26; GHMC’s building permit also names survey 307/2/6. RERA record RERA filing
The GHMC permit describes one residential building of one stilt level and five upper floors, with a stated height of 14.99 m. The RERA inventory lists 15 apartments—10 2BHK and 5 3BHK. The material supplied does not establish the number of apartments on each floor, the present construction stage through independent inspection, or whether any portion is complete or occupied. RERA unit table RERA unit details
The RERA filing reports water supply at 50% and the other listed infrastructure entries predominantly at 0%. This is reported project information, not independently verified construction progress. No occupancy or completion certificate is supplied. RERA amenities Document index
3. Master plan, architecture & building design
The supplied GHMC building permit is for a residential building on a 633.92 m² site, with 1 Stilt + 5 upper floors and a stated height of 14.99 m. The RERA filing reports approved built-up area of 1,811.01 m². These figures are reported separately; the supplied material does not provide a verified breakdown of floor area, building footprint, floor-by-floor layout, or FSI-counted area. RERA filing
The permit extraction lists cellar and stilt figures, but does not establish a count of parking bays or a complete, interpretable area schedule. It also lists a tot-lot, 30 trees, transformer space, a garbage house, a rainwater-harvesting structure (percolation pit), and an ETP. The permit requires greenery on the site periphery and fencing and maintenance of the tot-lot as greenery before an occupancy certificate is issued.
The supplied floor-plan records contain two drawings, but no measured drawings or extracted flat layouts are available. Consequently, the evidence does not establish flats per floor, internal circulation, lifts, stairs, entrances, exits, or a detailed residential/common-area distribution. Floor plans
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 46.84 m² | Not available | Not supplied |
| 3BHK | 5 | 0 | 5 | 102.43 m² | Not available | Not supplied |
Unit counts, booking figures and saleable areas are from the RERA inventory; the booking record has no stated as-of date and should be treated as indicative. The supplied floor-plan review reports two drawings but no measured flats, so no drawing-based carpet-area or room-dimension figures are available. RERA unit table RERA unit details Floor plans
The RERA-filed saleable area is not a measured carpet-area figure. The evidence supplied does not quantify carpet area, balcony or utility areas, or common-area loading for either configuration. RERA unit details Floor plans
5. Parking & vehicle circulation
The GHMC permit extraction lists a cellar and stilt level and states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not partitioned or converted to other uses. The RERA filing reports a mortgage area of 148.09 m², but the supplied record does not establish a sanctioned parking-space count, resident or visitor allocation, accessible spaces, bay ownership, or parking allocation to particular apartments. RERA filing
The permit extraction’s cellar and stilt figures are not sufficiently labelled to treat them as parking counts. No ramp, driveway, vehicle-entry arrangement, pedestrian separation, mechanical-parking system, or EV-charging provision is evidenced in the supplied material.
6. Amenities, recreation & open spaces
| Description / size | Tot-lot is listed; size is not stated. Permit requires it to be fenced and maintained as greenery before occupancy certification. |
|---|---|
| Evidence source | GHMC permit |
| Declared progress / verified status | Permit condition; completion not verified |
| Description / size | 30 Trees listed. |
|---|---|
| Evidence source | GHMC permit |
| Declared progress / verified status | Listed in permit; planting status not verified |
| Description / size | Rain Water Harvesting Structure (percolation pit); size not supplied. |
|---|---|
| Evidence source | GHMC permit; RERA filing RERA amenities |
| Declared progress / verified status | RERA filing marks water conservation/rainwater harvesting “YES” and 0%; completion not verified |
| Description / size | RERA filing lists community buildings. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% reported; not independently verified |
| Description / size | Listed in vendor material, without sizes or capacities. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Promoter/vendor material only; not established as sanctioned or delivered in the supplied record |
| Description / size | Listed in vendor material; count and allocation not supplied. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Promoter/vendor material only; no delivery or unit allocation verified |
7. Utilities, building services & safety
| Evidence in supplied record | RERA filing marks water supply “YES” and reports 50%. RERA amenities |
|---|---|
| Status / limitation | Filing-reported progress; source, storage capacity and treatment are not specified or independently verified. |
| Evidence in supplied record | RERA filing lists sewerage and treatment/disposal of sewage and sullage water, both at 0%. The GHMC permit lists an ETP. RERA amenities |
|---|---|
| Status / limitation | No capacity, design details or completion evidence supplied. |
| Evidence in supplied record | Listed in the RERA filing at 0%. RERA amenities |
|---|---|
| Status / limitation | No system details or completed status supplied. |
| Evidence in supplied record | RERA filing marks the item “YES” at 0%; permit lists a percolation pit. RERA amenities |
|---|---|
| Status / limitation | Declared/listed provision; completion not verified. |
| Evidence in supplied record | Permit requires space for a transformer; RERA filing lists electrical meter room/sub-station/receiving station at 0%. RERA amenities |
|---|---|
| Status / limitation | No capacity, supply arrangement, backup or completed status supplied. |
| Evidence in supplied record | Listed in the RERA filing at 0%. RERA amenities |
|---|---|
| Status / limitation | Specific equipment, escape arrangements and clearances are not established by the supplied records. |
| Evidence in supplied record | Permit lists a garbage house; RERA filing lists solid-waste management and disposal at 0%. RERA amenities |
|---|---|
| Status / limitation | No segregation or operating details supplied. |
| Evidence in supplied record | No lift or service-lift details, accessibility features, CCTV or access-control system are evidenced in the supplied material. |
|---|---|
| Status / limitation | Not disclosed in the supplied records. |
8. Location, access & connectivity
The official project location is recorded as Gajula Ramaram-1, Qutballapur Mandal, Medchal-Malkajgiri District, PIN 500055. The GHMC permit names Gajularamaram and identifies MITHILANAGAR ROAD in its location extraction. The supplied location record describes its coordinates as a cadastral parcel centroid, not as a separately surveyed entrance point. RERA record Location record
The location dataset lists the following distances: New Era The Lead School 0.2 km; an unnamed park 0.5 km; Store World 1.1 km; Usha Mullapudi Cardiac Centre 1.2 km; Union Bank of India 1.6 km; Auto Stand 2.0 km; Sri Chaitanya Junior College 2.9 km; and KPHB Colony Metro 4.5 km. These are the supplied location-record measurements; no travel times are provided. Location record
9. Developer & development status
The registered promoter is M/S Gowtham Sai Infrastructures, identified in the RERA filing as a partnership. The supplied partnership information names Srinivasa Rao Kandula as an authorized signatory and Suneetha Kandula as a partner. The promoter address in the RERA filing is HOME, SUMITHRA NAGAR, GAJULA RAMARAM, Qutballapur, Medchal-Malkajgiri, 500055. The RERA certificate separately records a promoter office in Kukatpally, Qutballapur, Medchal-Malkajgiri, PIN 500072. No official contact number, email or promoter website is established in the supplied RERA information. Corporate record Parties record RERA record
The project’s Form B affidavit, dated 25/05/2019, declares completion by 17/01/2025. The project record gives a proposed completion date of 26/03/2025, while the registration certificate states validity through 26/03/2025 and records no extension. These are distinct completion and registration records; the supplied evidence does not confirm actual completion or occupancy certification. RERA record Document index
10. Approvals, official records & documents
| Details | Form C; registration P02200001103, granted under section 5; issued 05/08/2019; certificate states validity through 26/03/2025 and no extension. |
|---|
| Details | Approval 2/C26/04975/2019, dated 26 March, 2019; file 2/C26/01637/2019; residential building permit for 1 Stilt + 5 upper floors. |
|---|
| Details | Promoter affidavit dated 25/05/2019, including a declared title and encumbrance statement and completion undertaking. |
|---|
| Details | A layout-plan document is listed in the RERA record, but its supplied extraction is not readable. |
|---|
| Details | No such certificate is present in the supplied document list. |
|---|---|
| Evidence | Document index |
The project approval record lists the technical persons as architect KANCHERLA PRASANNA KUMARI (license No. ca/2015/69457) and structural engineer T CHAKRAPANI (license No. 84/STRL/ENGG/TP-10/GHMC/12).
1. Project at a glance
Project identity
Registered project name: GAUTHAM SAI INFRASTRUCTURES
Project type: Residential apartment project
Phase / registered portion: Phase is not separately identified in the supplied record; the registration identifies Plots 53 & 54 and the project site.
TG-RERA registration: P02200001103; granted under section 5, issued 05/08/2019.
Registration validity: Certificate states 05/08/2019 to 26/03/2025; no extension is recorded in the supplied certificate. Registration validity is distinct from the completion undertaking and from occupancy certification.
Registered promoter: M/S Gowtham Sai Infrastructures, a partnership.
RERA status in supplied record: The project is registered; the certificate’s stated validity has ended, and the supplied record does not show an extension.
Land and geographic identity
Locality / revenue village: Gajula Ramaram-1; the building permit names Gajularamaram.
Mandal / district / PIN: Qutballapur / Medchal-Malkajgiri / 500055.
Project survey numbers: 307/2/7, 14, 16 & 26 are stated in the RERA registration certificate. The building permit also names 307/2/6, 7, 14, 16 & 26.
Site extent: 633.92 m²; the RERA land details report total area and net area as 633.92 m², with affected area 0.
Plots identified: Plots 53 & 54.
Boundaries in RERA filing: East: ROAD WIDTH 12; West: PLOT NO 63 AND 64; North: PLO NO 55; South: NEIGHBOURS LAND.
Project survey subdivisions: No subdivision beyond the survey-number forms above is specified in the registration certificate or building permit.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building approval: Approval No. 2/C26/04975/2019, dated 26 March, 2019; permit file No. 2/C26/01637/2019.
Approved building use and form: Residential building, 1 Stilt + 5 upper floors, stated height 14.99 m.
Approved built-up area: 1,811.01 m² as reported in the RERA filing.
Building / tower count: The RERA filing reports one building unit; one block/tower is reflected in the unit summary.
Parking / other area figures in permit: Permit extraction lists Cellar 1,478.25, Stilt 319.88, RM 99.56, 30 Trees, TOTAL: 646,619.00, and 148.09; the supplied extraction does not label all these figures sufficiently to interpret them as parking counts or areas.
Approved versus RERA-declared units: The RERA filing reports 1 total building unit and 1 proposed building unit; the unit inventory separately records 15 apartments: 10 two-bedroom and 5 three-bedroom.
Offering and status
Unit types: 2BHK and 3BHK apartments.
RERA-filed saleable areas: 2BHK: 46.84 m²; 3BHK: 102.43 m².
Booked / available: RERA portal-derived inventory records 0 booked and 10 available 2BHK units, and 0 booked and 5 available 3BHK units. The portal record has no stated as-of date; figures are indicative.
Construction stage: No independently verified site progress or construction-stage report is supplied. RERA-filed progress entries report water supply at 50% and most other listed infrastructure items at 0%; these are filing figures, not a site inspection.
Completion dates: Form B declares completion by 17/01/2025. The RERA project record states proposed completion 26/03/2025. These are separate recorded dates.
Occupancy / completion certificate: No occupancy certificate or completion certificate is included in the supplied project documents. The building permit states an occupancy certificate is compulsory before occupation.
2. The project story
This is a residential apartment project registered with TG-RERA as GAUTHAM SAI INFRASTRUCTURES, on a 633.92 m² site identified with Plots 53 and 54 at Gajula Ramaram-1, Qutballapur Mandal, Medchal-Malkajgiri District. The filing identifies survey numbers 307/2/7, 14, 16 and 26; GHMC’s building permit also names survey 307/2/6.
The GHMC permit describes one residential building of one stilt level and five upper floors, with a stated height of 14.99 m. The RERA inventory lists 15 apartments—10 2BHK and 5 3BHK. The material supplied does not establish the number of apartments on each floor, the present construction stage through independent inspection, or whether any portion is complete or occupied.
The RERA filing reports water supply at 50% and the other listed infrastructure entries predominantly at 0%. This is reported project information, not independently verified construction progress. No occupancy or completion certificate is supplied.
3. Master plan, architecture & building design
The supplied GHMC building permit is for a residential building on a 633.92 m² site, with 1 Stilt + 5 upper floors and a stated height of 14.99 m. The RERA filing reports approved built-up area of 1,811.01 m². These figures are reported separately; the supplied material does not provide a verified breakdown of floor area, building footprint, floor-by-floor layout, or FSI-counted area.
The permit extraction lists cellar and stilt figures, but does not establish a count of parking bays or a complete, interpretable area schedule. It also lists a tot-lot, 30 trees, transformer space, a garbage house, a rainwater-harvesting structure (percolation pit), and an ETP. The permit requires greenery on the site periphery and fencing and maintenance of the tot-lot as greenery before an occupancy certificate is issued.
The supplied floor-plan records contain two drawings, but no measured drawings or extracted flat layouts are available. Consequently, the evidence does not establish flats per floor, internal circulation, lifts, stairs, entrances, exits, or a detailed residential/common-area distribution.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 46.84 m² | Not available | Not supplied |
| 3BHK | 5 | 0 | 5 | 102.43 m² | Not available | Not supplied |
Unit counts, booking figures and saleable areas are from the RERA inventory; the booking record has no stated as-of date and should be treated as indicative. The supplied floor-plan review reports two drawings but no measured flats, so no drawing-based carpet-area or room-dimension figures are available.
The RERA-filed saleable area is not a measured carpet-area figure. The evidence supplied does not quantify carpet area, balcony or utility areas, or common-area loading for either configuration.
5. Parking & vehicle circulation
The GHMC permit extraction lists a cellar and stilt level and states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not partitioned or converted to other uses. The RERA filing reports a mortgage area of 148.09 m², but the supplied record does not establish a sanctioned parking-space count, resident or visitor allocation, accessible spaces, bay ownership, or parking allocation to particular apartments.
The permit extraction’s cellar and stilt figures are not sufficiently labelled to treat them as parking counts. No ramp, driveway, vehicle-entry arrangement, pedestrian separation, mechanical-parking system, or EV-charging provision is evidenced in the supplied material.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / greenery | Tot-lot is listed; size is not stated. Permit requires it to be fenced and maintained as greenery before occupancy certification. | GHMC permit | Permit condition; completion not verified |
| Trees | 30 Trees listed. | GHMC permit | Listed in permit; planting status not verified |
| Rainwater harvesting | Rain Water Harvesting Structure (percolation pit); size not supplied. | GHMC permit; RERA filing | RERA filing marks water conservation/rainwater harvesting “YES” and 0%; completion not verified |
| Community buildings | RERA filing lists community buildings. | 0% reported; not independently verified | |
| Clubhouse, swimming pool, gym, children’s play area | Listed in vendor material, without sizes or capacities. | Promoter/vendor material only; not established as sanctioned or delivered in the supplied record | |
| Covered car parking | Listed in vendor material; count and allocation not supplied. | Promoter/vendor material only; no delivery or unit allocation verified |
7. Utilities, building services & safety
| Evidence in supplied record | RERA filing marks water supply “YES” and reports 50%. |
|---|---|
| Status / limitation | Filing-reported progress; source, storage capacity and treatment are not specified or independently verified. |
| Evidence in supplied record | RERA filing lists sewerage and treatment/disposal of sewage and sullage water, both at 0%. The GHMC permit lists an ETP. |
|---|---|
| Status / limitation | No capacity, design details or completion evidence supplied. |
| Evidence in supplied record | Listed in the RERA filing at 0%. |
|---|---|
| Status / limitation | No system details or completed status supplied. |
| Evidence in supplied record | RERA filing marks the item “YES” at 0%; permit lists a percolation pit. |
|---|---|
| Status / limitation | Declared/listed provision; completion not verified. |
| Evidence in supplied record | Permit requires space for a transformer; RERA filing lists electrical meter room/sub-station/receiving station at 0%. |
|---|---|
| Status / limitation | No capacity, supply arrangement, backup or completed status supplied. |
| Evidence in supplied record | Listed in the RERA filing at 0%. |
|---|---|
| Status / limitation | Specific equipment, escape arrangements and clearances are not established by the supplied records. |
| Evidence in supplied record | Permit lists a garbage house; RERA filing lists solid-waste management and disposal at 0%. |
|---|---|
| Status / limitation | No segregation or operating details supplied. |
| Evidence in supplied record | No lift or service-lift details, accessibility features, CCTV or access-control system are evidenced in the supplied material. |
|---|---|
| Status / limitation | Not disclosed in the supplied records. |
8. Location, access & connectivity
The official project location is recorded as Gajula Ramaram-1, Qutballapur Mandal, Medchal-Malkajgiri District, PIN 500055. The GHMC permit names Gajularamaram and identifies MITHILANAGAR ROAD in its location extraction. The supplied location record describes its coordinates as a cadastral parcel centroid, not as a separately surveyed entrance point.
The location dataset lists the following distances: New Era The Lead School 0.2 km; an unnamed park 0.5 km; Store World 1.1 km; Usha Mullapudi Cardiac Centre 1.2 km; Union Bank of India 1.6 km; Auto Stand 2.0 km; Sri Chaitanya Junior College 2.9 km; and KPHB Colony Metro 4.5 km. These are the supplied location-record measurements; no travel times are provided.
9. Developer & development status
The registered promoter is M/S Gowtham Sai Infrastructures, identified in the RERA filing as a partnership. The supplied partnership information names Srinivasa Rao Kandula as an authorized signatory and Suneetha Kandula as a partner. The promoter address in the RERA filing is HOME, SUMITHRA NAGAR, GAJULA RAMARAM, Qutballapur, Medchal-Malkajgiri, 500055. The RERA certificate separately records a promoter office in Kukatpally, Qutballapur, Medchal-Malkajgiri, PIN 500072. No official contact number, email or promoter website is established in the supplied RERA information.
The project’s Form B affidavit, dated 25/05/2019, declares completion by 17/01/2025. The project record gives a proposed completion date of 26/03/2025, while the registration certificate states validity through 26/03/2025 and records no extension. These are distinct completion and registration records; the supplied evidence does not confirm actual completion or occupancy certification.
10. Approvals, official records & documents
| Details | Form C; registration P02200001103, granted under section 5; issued 05/08/2019; certificate states validity through 26/03/2025 and no extension. |
|---|
| Details | Approval 2/C26/04975/2019, dated 26 March, 2019; file 2/C26/01637/2019; residential building permit for 1 Stilt + 5 upper floors. |
|---|
| Details | Promoter affidavit dated 25/05/2019, including a declared title and encumbrance statement and completion undertaking. |
|---|
| Details | A layout-plan document is listed in the RERA record, but its supplied extraction is not readable. |
|---|
| Details | No such certificate is present in the supplied document list. |
|---|
The project approval record lists the technical persons as architect KANCHERLA PRASANNA KUMARI (license No. ca/2015/69457) and structural engineer T CHAKRAPANI (license No. 84/STRL/ENGG/TP-10/GHMC/12).
Frequently asked questions
Is GAUTHAM SAI INFRASTRUCTURES registered with Telangana RERA?
Yes. GAUTHAM SAI INFRASTRUCTURES is registered with the Telangana Real Estate Regulatory Authority as P02200001103; the registration status is New Project.
Who is the developer of GAUTHAM SAI INFRASTRUCTURES?
The promoter named in the RERA registration is M/S GOWTHAM SAI INFRASTRUCTURES.
Where is GAUTHAM SAI INFRASTRUCTURES located?
GAUTHAM SAI INFRASTRUCTURES is in GAJULA RAMARAM, Gajula Ramaram-1, Qutballapur, Medchal-Malkajgiri, Telangana (500055).
When will GAUTHAM SAI INFRASTRUCTURES be completed?
The promoter's proposed date of completion filed with RERA is 26/03/2025. This is the promoter's declaration, not a guarantee.