Jpr Heights
SHANTA INFRA · Medchal-Malkajgiri · RERA P02200002832
JPR HEIGHTS is a residential apartment project in GAJULARAMARAM, Qutballapur, Medchal-Malkajgiri, developed by the registered promoter SHANTA INFRA. The registered site is 380.83 sq. m.; the GHMC permit describes one residential building, Building - A-1, with 1 Stilt + 5 upper floors. The RERA unit record lists 9 apartments: 4 2BHK and 5 3BHK, with saleable areas of 108.69 sq. m. and 152.36 sq. m., respectively. The project is registered under TG-RERA number P02200002832, and the promoter-declared completion date is 04/03/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
12 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | JPR HEIGHTS RERA record |
| Project type / registered portion | Residential apartment project; phase or other separately registered portion is not disclosed. RERA record RERA filing |
| TG-RERA registration | P02200002832; granted under section 5; captured from the TG-RERA record on 10 September 2026. Approvals record |
| Registration validity | Certificate states validity from 30/04/2021 to 04/04/2027; this is registration validity, not the construction completion deadline. Extension status in the certificate: not extended. Approvals record |
| Registered promoter | SHANTA INFRA, identified in the project record as a partnership. RERA filing Corporate record |
| RERA status | Registered; the supplied record does not establish whether the building is complete or has an occupancy certificate. Approvals record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | GAJULARAMARAM; revenue-village record: Gajula Ramaram-1. RERA record RERA filing Land records |
| Mandal / district / PIN | Qutballapur / Medchal-Malkajgiri / 500055. RERA record RERA filing |
| Project survey numbers | 247, 261, 262 and 277. No project subdivision is stated in the registered survey list. RERA record Land records |
| Registered plot / site extent | Plot 105; 380.83 sq. m. in the RERA land details and building-permit record. RERA filing |
| Total / net / affected area | Total 380.83 sq. m.; net 380.83 sq. m.; road-widening/FTL/nala affected area recorded as 0 sq. m. in the RERA filing. RERA filing |
| Boundaries filed with TG-RERA | North: ROAD; east, west and south: OTHERS LAND. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building approval | Permit 2/C26/03559/2021, dated 04 March, 2021; file no. 2/C26/00218/2021. Approvals record |
| Building and sanctioned floors | One residential building, Building - A-1; sanctioned configuration: 1 Stilt + 5 upper floors. |
| Approved area figures | GHMC permit extraction records residential upper-floor area 1,124.00 m2, stilt parking area 208.43 m2, and site area 380.83 m2. The permit extraction also contains area labels including “Proposed built up area 140,500.00” and “Proposed Covered builtup area 56,200.00”; those figures are reproduced as extracted and their units/meaning are not established by the supplied record. |
| Units | The RERA unit record lists 9 apartments: 4 2BHK and 5 3BHK. The building-permit condition says sanctioned unit numbers must not be increased without prior GHMC approval; the supplied permit extraction does not state a numerical sanctioned-unit count. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configurations | 2BHK and 3BHK. RERA unit table |
| RERA-filed saleable areas | 2BHK: 108.69 sq. m.; 3BHK: 152.36 sq. m. RERA unit table |
| Booked / available | Portal-derived counts show 0 booked, 4 available for 2BHK and 0 booked, 5 available for 3BHK. These counts are indicative: the supplied record has no booking-count as-of date. RERA unit table |
| Construction stage | No project-specific construction-progress percentage or independently verified site-stage record is supplied. The RERA filing’s 2021 Form-B declaration undertook completion by 04/03/2025; the registration certificate separately remains valid to 04/04/2027. |
| Original / revised completion dates | Promoter-declared date in Form B: 04/03/2025. No revised completion date is supplied. |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is supplied for the building. Document index |
The project story
JPR HEIGHTS is registered as a residential apartment project on Plot 105 in Gajularamaram, on the RERA-identified survey numbers 247, 261, 262 and 277. The filed site is 380.83 sq. m. and the GHMC permit record describes a single residential building, A-1, with one stilt level and five upper floors. RERA record Land records
The RERA unit schedule lists nine homes across two configurations: four 2BHK and five 3BHK. The supplied portal-derived booking figures show all nine as available, but are undated and should be treated as indicative rather than a current inventory confirmation. No construction-progress evidence establishes whether the building is proposed, under construction or complete on site; nor is an occupancy certificate included in the supplied documents. RERA unit table
The promoter’s Form-B affidavit-cum-declaration records a completion undertaking of 04/03/2025. Separately, the registration certificate records registration validity through 04/04/2027. These are different milestones: the latter does not itself establish that construction is complete or that an occupancy certificate has been issued.
Master plan, architecture & building design
The GHMC building-permit record describes Building - A-1, for residential use, with 1 Stilt + 5 upper floors and a site area of 380.83 m2. It records a building height of 14.95 m, residential upper-floor area of 1,124.00 m2, and stilt parking area of 208.43 m2. These figures are permit-extraction labels; the supplied material does not provide a complete area schedule distinguishing gross built-up area, FSI-counted area, saleable area and carpet area.
The RERA filing identifies one building and nine total units. No detailed architectural schedule is supplied for flats per floor, lift or stair arrangement, entrances/exits, building footprint, internal circulation, landscaping, or phase-wise organization. The permit extraction records 15 trees, 76.06 RM for “Compound Wall,” “Open area excluding coverage 19,504.00,” and “Tot-lot (m2) 0”; the units or interpretation of some of these extracted values are not established in the supplied record. RERA filing RERA unit table
A floor-plan drawing is available for measurement, but the supplied overview records no floor-by-floor building arrangement beyond the permit’s stilt-and-five-upper-floor description.
Homes, configurations & floor plans
The RERA filing lists nine units, with saleable area separately recorded by configuration. Software measurements from the approved floor-plan drawing are not RERA-filed carpet-area disclosures; the drawing geometry requires review. Saleable area includes the home’s share of common areas, whereas the software-measured carpet figure is a drawing-derived measurement. The supplied data does not provide a separate balcony-area schedule or a legally documented loading allocation. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 4 | 0 | 4 | 108.69 sq. m. | 69.1 sq. m. (software-measured) | 36% (software-derived) |
| 3BHK | 5 | 0 | 5 | 152.36 sq. m. | 99.8 sq. m. (software-measured) | 35% (software-derived) |
The 2BHK drawing measurement is for one measured design, flat 02 on the “FIRST FLOOR PLAN”; the extracted room labels include a master bedroom, bedroom, hall, dining, kitchen, toilet and utility. The utility is excluded from the measured carpet area. The 3BHK measurement is for one measured design, flat 01 on that plan; the extracted labels include three bedrooms, hall, dining, kitchen, toilets, a 1.50 M. WIDE BALC and utility. Balcony and utility are excluded from the measured carpet area. These are drawing-based software measurements, not RERA-filed room-area disclosures. RERA unit details Floor plans
Parking & vehicle circulation
The permit extraction records a stilt parking area of 208.43 m2. It does not provide a count of parking spaces, distinguish resident from visitor or accessible spaces, or specify a parking-allocation arrangement for individual apartments. No parking-level circulation details, ramp arrangement, EV charging provision or two-wheeler count are established by the supplied project documents. RERA unit table
Amenities, recreation & open spaces
The TG-RERA amenity record marks water supply, sewerage, water conservation/rainwater harvesting, an electrical meter room/sub-station/receiving station and aggregate recreational open space as available. Its listed amenity progress percentages are 0; the supplied record does not explain those percentages or independently verify completion. The GHMC permit separately requires a rainwater-harvesting percolation pit and a garbage house, and identifies space for a transformer. RERA amenities
| Description / size | Listed as available; no source, storage or capacity supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity entry; completion not independently verified. |
| Description / size | Sewerage listed as available; permit requires an ETP. No capacity or operating status supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity entry / permit condition; completion not independently verified. |
| Description / size | RERA filing lists water conservation/rainwater harvesting as available; GHMC permit requires a percolation pit. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity entry and sanctioned condition; completion not independently verified. |
| Description / size | Listed as available; permit identifies space for a transformer. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity entry and sanctioned condition; equipment or commissioning status not supplied. |
| Description / size | Listed as available; no verified size or facility description supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity entry; completion not independently verified. |
| Description / size | Required by the GHMC permit. |
|---|---|
| Declared progress / verified status | Sanctioned condition; completion not independently verified. |
Utilities, building services & safety
The RERA amenity record lists water supply and sewerage as available, but does not identify the water source, storage capacity, treatment process, sewage-treatment capacity or reuse arrangement. The GHMC permit requires an ETP, a rainwater-harvesting structure and transformer space; these are approval conditions, not evidence that the facilities have been installed or commissioned. RERA amenities
The permit also requires a garbage house, fire occupancy NOC from the Director (EV&DM) before issue of the occupancy certificate, and observance of specified clearances from high- and low-tension electrical lines. The supplied documents do not establish that the fire NOC has been obtained or that any occupancy certificate has been issued. No capacities or verified status are supplied for lifts, backup power, CCTV, security, waste segregation, accessibility or emergency circulation.
Location, access & connectivity
The registered project location is Gajula Ramaram-1, Qutballapur Mandal, Medchal-Malkajgiri District, PIN 500055. The RERA filing describes the land as Plot 105, with a road boundary to the north; the supplied record does not identify the road by name or establish public-transport routes or local approach-road details. RERA record RERA filing RERA filing
The supplied location record identifies HITEC City — 10.7 km as a connectivity point. The project’s geocode is recorded as a cadastral parcel centroid at 17.52909, 78.42234; this is a location record, not a surveyed entrance coordinate. Location record
Developer & development status
The registered promoter is SHANTA INFRA, identified in the project filing as a partnership, with GSTIN 36AEJFS1670M1ZJ. The supplied record names VELURI TIRUPATHI REDDY as authorized signatory and CHILUKALA LAXMAIAH as partner. RERA filing Corporate record Parties record
The promoter’s Form-B declaration, dated 03d day of April 2021, undertakes completion by 04/03/2025. No project-specific progress percentage, revised completion undertaking or independently verified completion status is supplied. The TG-RERA certificate records registration validity to 04/04/2027; no occupancy certificate is included. Document index
Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C records JPR HEIGHTS, registration P02200002832, granted under section 5; validity 30/04/2021–04/04/2027. |
| GHMC building permit | Building Permit Order dated 04 March, 2021; permit no. 2/C26/03559/2021, file no. 2/C26/00218/2021; one residential building, A-1, with 1 Stilt + 5 upper floors. |
| RERA layout-plan filing | Drawing document 161760 is listed as the layout-plan document; the supplied record does not provide a separately verified layout-approval lookup result. |
| Promoter declaration | Form-B affidavit-cum-declaration for SHANTA INFRA, dated 03d day of April 2021, including the promoter’s completion undertaking. |
| Occupancy / completion certificate | Not present in the supplied documents. Document index |
Project at a glance
Project identity
Registered project name: JPR HEIGHTS
Project type / registered portion: Residential apartment project; phase or other separately registered portion is not disclosed.
TG-RERA registration: P02200002832; granted under section 5; captured from the TG-RERA record on 10 September 2026.
Registration validity: Certificate states validity from 30/04/2021 to 04/04/2027; this is registration validity, not the construction completion deadline. Extension status in the certificate: not extended.
Registered promoter: SHANTA INFRA, identified in the project record as a partnership.
RERA status: Registered; the supplied record does not establish whether the building is complete or has an occupancy certificate.
Land and geographic identity
Locality / revenue village: GAJULARAMARAM; revenue-village record: Gajula Ramaram-1.
Mandal / district / PIN: Qutballapur / Medchal-Malkajgiri / 500055.
Project survey numbers: 247, 261, 262 and 277. No project subdivision is stated in the registered survey list.
Registered plot / site extent: Plot 105; 380.83 sq. m. in the RERA land details and building-permit record.
Total / net / affected area: Total 380.83 sq. m.; net 380.83 sq. m.; road-widening/FTL/nala affected area recorded as 0 sq. m. in the RERA filing.
Boundaries filed with TG-RERA: North: ROAD; east, west and south: OTHERS LAND.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building approval: Permit 2/C26/03559/2021, dated 04 March, 2021; file no. 2/C26/00218/2021.
Building and sanctioned floors: One residential building, Building - A-1; sanctioned configuration: 1 Stilt + 5 upper floors.
Approved area figures: GHMC permit extraction records residential upper-floor area 1,124.00 m2, stilt parking area 208.43 m2, and site area 380.83 m2. The permit extraction also contains area labels including “Proposed built up area 140,500.00” and “Proposed Covered builtup area 56,200.00”; those figures are reproduced as extracted and their units/meaning are not established by the supplied record.
Units: The RERA unit record lists 9 apartments: 4 2BHK and 5 3BHK. The building-permit condition says sanctioned unit numbers must not be increased without prior GHMC approval; the supplied permit extraction does not state a numerical sanctioned-unit count.
Offering and status
RERA-filed configurations: 2BHK and 3BHK.
RERA-filed saleable areas: 2BHK: 108.69 sq. m.; 3BHK: 152.36 sq. m.
Booked / available: Portal-derived counts show 0 booked, 4 available for 2BHK and 0 booked, 5 available for 3BHK. These counts are indicative: the supplied record has no booking-count as-of date.
Construction stage: No project-specific construction-progress percentage or independently verified site-stage record is supplied. The RERA filing’s 2021 Form-B declaration undertook completion by 04/03/2025; the registration certificate separately remains valid to 04/04/2027.
Original / revised completion dates: Promoter-declared date in Form B: 04/03/2025. No revised completion date is supplied.
Occupancy / completion certificate: No occupancy certificate or completion certificate is supplied for the building.
The project story
JPR HEIGHTS is registered as a residential apartment project on Plot 105 in Gajularamaram, on the RERA-identified survey numbers 247, 261, 262 and 277. The filed site is 380.83 sq. m. and the GHMC permit record describes a single residential building, A-1, with one stilt level and five upper floors.
The RERA unit schedule lists nine homes across two configurations: four 2BHK and five 3BHK. The supplied portal-derived booking figures show all nine as available, but are undated and should be treated as indicative rather than a current inventory confirmation. No construction-progress evidence establishes whether the building is proposed, under construction or complete on site; nor is an occupancy certificate included in the supplied documents.
The promoter’s Form-B affidavit-cum-declaration records a completion undertaking of 04/03/2025. Separately, the registration certificate records registration validity through 04/04/2027. These are different milestones: the latter does not itself establish that construction is complete or that an occupancy certificate has been issued.
Master plan, architecture & building design
The GHMC building-permit record describes Building - A-1, for residential use, with 1 Stilt + 5 upper floors and a site area of 380.83 m2. It records a building height of 14.95 m, residential upper-floor area of 1,124.00 m2, and stilt parking area of 208.43 m2. These figures are permit-extraction labels; the supplied material does not provide a complete area schedule distinguishing gross built-up area, FSI-counted area, saleable area and carpet area.
The RERA filing identifies one building and nine total units. No detailed architectural schedule is supplied for flats per floor, lift or stair arrangement, entrances/exits, building footprint, internal circulation, landscaping, or phase-wise organization. The permit extraction records 15 trees, 76.06 RM for “Compound Wall,” “Open area excluding coverage 19,504.00,” and “Tot-lot (m2) 0”; the units or interpretation of some of these extracted values are not established in the supplied record.
A floor-plan drawing is available for measurement, but the supplied overview records no floor-by-floor building arrangement beyond the permit’s stilt-and-five-upper-floor description.
Homes, configurations & floor plans
The RERA filing lists nine units, with saleable area separately recorded by configuration. Software measurements from the approved floor-plan drawing are not RERA-filed carpet-area disclosures; the drawing geometry requires review. Saleable area includes the home’s share of common areas, whereas the software-measured carpet figure is a drawing-derived measurement. The supplied data does not provide a separate balcony-area schedule or a legally documented loading allocation.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 4 | 0 | 4 | 108.69 sq. m. | 69.1 sq. m. (software-measured) | 36% (software-derived) |
| 3BHK | 5 | 0 | 5 | 152.36 sq. m. | 99.8 sq. m. (software-measured) | 35% (software-derived) |
The 2BHK drawing measurement is for one measured design, flat 02 on the “FIRST FLOOR PLAN”; the extracted room labels include a master bedroom, bedroom, hall, dining, kitchen, toilet and utility. The utility is excluded from the measured carpet area. The 3BHK measurement is for one measured design, flat 01 on that plan; the extracted labels include three bedrooms, hall, dining, kitchen, toilets, a 1.50 M. WIDE BALC and utility. Balcony and utility are excluded from the measured carpet area. These are drawing-based software measurements, not RERA-filed room-area disclosures.
Parking & vehicle circulation
The permit extraction records a stilt parking area of 208.43 m2. It does not provide a count of parking spaces, distinguish resident from visitor or accessible spaces, or specify a parking-allocation arrangement for individual apartments. No parking-level circulation details, ramp arrangement, EV charging provision or two-wheeler count are established by the supplied project documents.
Amenities, recreation & open spaces
The TG-RERA amenity record marks water supply, sewerage, water conservation/rainwater harvesting, an electrical meter room/sub-station/receiving station and aggregate recreational open space as available. Its listed amenity progress percentages are 0; the supplied record does not explain those percentages or independently verify completion. The GHMC permit separately requires a rainwater-harvesting percolation pit and a garbage house, and identifies space for a transformer.
| Description / size | Listed as available; no source, storage or capacity supplied. |
|---|---|
| Declared progress / verified status | RERA amenity entry; completion not independently verified. |
| Description / size | Sewerage listed as available; permit requires an ETP. No capacity or operating status supplied. |
|---|---|
| Declared progress / verified status | RERA amenity entry / permit condition; completion not independently verified. |
| Description / size | RERA filing lists water conservation/rainwater harvesting as available; GHMC permit requires a percolation pit. |
|---|---|
| Declared progress / verified status | RERA amenity entry and sanctioned condition; completion not independently verified. |
| Description / size | Listed as available; permit identifies space for a transformer. |
|---|---|
| Declared progress / verified status | RERA amenity entry and sanctioned condition; equipment or commissioning status not supplied. |
| Description / size | Listed as available; no verified size or facility description supplied. |
|---|---|
| Declared progress / verified status | RERA amenity entry; completion not independently verified. |
| Description / size | Required by the GHMC permit. |
|---|---|
| Declared progress / verified status | Sanctioned condition; completion not independently verified. |
Utilities, building services & safety
The RERA amenity record lists water supply and sewerage as available, but does not identify the water source, storage capacity, treatment process, sewage-treatment capacity or reuse arrangement. The GHMC permit requires an ETP, a rainwater-harvesting structure and transformer space; these are approval conditions, not evidence that the facilities have been installed or commissioned.
The permit also requires a garbage house, fire occupancy NOC from the Director (EV&DM) before issue of the occupancy certificate, and observance of specified clearances from high- and low-tension electrical lines. The supplied documents do not establish that the fire NOC has been obtained or that any occupancy certificate has been issued. No capacities or verified status are supplied for lifts, backup power, CCTV, security, waste segregation, accessibility or emergency circulation.
Location, access & connectivity
The registered project location is Gajula Ramaram-1, Qutballapur Mandal, Medchal-Malkajgiri District, PIN 500055. The RERA filing describes the land as Plot 105, with a road boundary to the north; the supplied record does not identify the road by name or establish public-transport routes or local approach-road details.
The supplied location record identifies HITEC City — 10.7 km as a connectivity point. The project’s geocode is recorded as a cadastral parcel centroid at 17.52909, 78.42234; this is a location record, not a surveyed entrance coordinate.
Developer & development status
The registered promoter is SHANTA INFRA, identified in the project filing as a partnership, with GSTIN 36AEJFS1670M1ZJ. The supplied record names VELURI TIRUPATHI REDDY as authorized signatory and CHILUKALA LAXMAIAH as partner.
The promoter’s Form-B declaration, dated 03d day of April 2021, undertakes completion by 04/03/2025. No project-specific progress percentage, revised completion undertaking or independently verified completion status is supplied. The TG-RERA certificate records registration validity to 04/04/2027; no occupancy certificate is included.
Approvals, official records & documents
TG-RERA registration: Form C records JPR HEIGHTS, registration P02200002832, granted under section 5; validity 30/04/2021–04/04/2027.
GHMC building permit: Building Permit Order dated 04 March, 2021; permit no. 2/C26/03559/2021, file no. 2/C26/00218/2021; one residential building, A-1, with 1 Stilt + 5 upper floors.
RERA layout-plan filing: Drawing document 161760 is listed as the layout-plan document; the supplied record does not provide a separately verified layout-approval lookup result.
Promoter declaration: Form-B affidavit-cum-declaration for SHANTA INFRA, dated 03d day of April 2021, including the promoter’s completion undertaking.
Occupancy / completion certificate: Not present in the supplied documents.
Frequently asked questions
Is JPR HEIGHTS registered with Telangana RERA?
Yes. JPR HEIGHTS is registered with the Telangana Real Estate Regulatory Authority as P02200002832; the registration status is New Project.
Who is the developer of JPR HEIGHTS?
The promoter named in the RERA registration is SHANTA INFRA.
Where is JPR HEIGHTS located?
JPR HEIGHTS is in GAJULARAMARAM, Gajula Ramaram-1, Qutballapur, Medchal-Malkajgiri, Telangana (500055).
When will JPR HEIGHTS be completed?
The promoter's proposed date of completion filed with RERA is 04/08/2027. This is the promoter's declaration, not a guarantee.
More projects in Gajula Ramaram 1