SHILPA VALLEY 5 is a residential apartment project in Shilpa Valley, Kondapur mandal, Sangareddy district, developed by registered promoter Manju Infra Avenues. It covers 418 m² and comprises one building with 1 stilt + 5 upper floors and 10 apartments: five 2BHK units of 102.19 m² each and five 3BHK units of 148.64 m² each. The project is registered under TG-RERA number P01100002356, with a proposed completion date of 29 August 2026.

More from Manju Infra Avenues · 23 projects →

01What we found

Period endedTG-RERA registration ran to 29 Aug 2026 - check its extension on TG-RERA
13documents on file - each fact links to its page
22court cases on this project's land (survey 218, Shilpa Valley)
10items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameSHILPA VALLEY 5 RERA record
Project typeResidential apartment project RERA record Approvals record
Phase / registered portionRegistered project record is for SHILPA VALLEY 5; a phase designation is not separately disclosed.
TG-RERA registrationP01100002356
Registration validity20/11/2020 to 29/08/2026; the certificate says five years, subject to its terms and any extension by the Authority. The supplied certificate records no extension.
Registered promoterManju Infra Avenues, identified in the RERA record as a partnership. RERA record RERA filing Corporate record
RERA project status“New Project” in the project record; registration certificate issued under section 5. RERA filing

Land and geographic identity

ItemProject record
LocalityShilpa Valley RERA record RERA filing
Revenue villageKondapur Village in the title and project documents; the header also records “Shilpa Valley” as the village. The revenue-village identity should therefore be confirmed against land records. Land records
MandalKondapur in the project header and registration record; the OC extract identifies Serilingampally. RERA record
DistrictSangareddy in the project header and RERA record; the OC extract identifies Rangareddy. RERA record
PIN500084 RERA record
Project survey number(s)Survey No. 218/2 RERA record Land records
Plot / site identityPlot No. 104 Land records
Registered site extent418 m²; net area 418.00 m². RERA filing
Boundaries recorded in RERAEast: 12 m road; west: Plot No. 101; north: Plot No. 103; south: Plot No. 105. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approvalBuilding Permit No. 2/C20/09213/2020, approved 29 August 2020. The permit extract also lists file No. 2/C20/07886/2020. Approvals record
Approved buildingOne residential building: 1 stilt + 5 upper floors.
Approved built-up areaThe project filing records 1,361.19 m² as approved built-up area. The building-permit extract separately lists residential upper-floor area 1,122.80 m² and stilt parking area 212.91 m²; these are distinct recorded figures. RERA filing
Approved / RERA-declared units10 units in the RERA unit record; the project form also records 1 total building unit. RERA filing RERA unit table
Parking provisionStilt parking area of 212.91 m² appears in the permit extract. A parking-space count is not provided.

Offering and status

ItemProject record
Unit types2BHK: 5 units; 3BHK: 5 units. RERA unit table RERA unit details
RERA saleable area2BHK: 102.19 m² each; 3BHK: 148.64 m² each. RERA unit table RERA unit details
Booked / availablePortal-derived record shows 0 booked and 5 available for each configuration (10 available total). The record has no as-of date, so counts are indicative. RERA unit table
Construction / completionThe supplied GHMC Occupancy Certificate extract states building completion on 21 February 2023 and records that it was completed within the stipulated time.
Occupancy CertificateGHMC OC 1784/GHMC/SLP/2023-OC, dated 7 June 2023, for SHILPA VALLEY 5, Plot 104, Survey No. 218/2. The document describes the Stilt + 5 Upper Floor building.
Completion deadlineRERA/Form B records 29 August 2026 as the promoter’s completion undertaking; the OC extract also lists that date as the due date for completion. This is separate from the registration-validity period and the OC issuance.

2. The project story

SHILPA VALLEY 5 is recorded as a residential apartment project on Plot No. 104, Survey No. 218/2, in the Shilpa Valley locality. Its RERA and GHMC records describe one building, with a stilt level and five upper floors, and 10 apartments: five 2BHK and five 3BHK units. RERA record Land records RERA unit table

The supplied GHMC document is an Occupancy Certificate for the project and records completion on 21 February 2023. This establishes the certificate’s stated scope—the named SHILPA VALLEY 5 building—not independent verification of present condition or of any facilities’ operational status.

The RERA portal’s unit availability figures are undated and should be treated as indicative rather than current inventory. The promoter’s Form B is a declaration and undertaking; it is not itself independent evidence of construction progress. RERA unit table

3. Master plan, architecture & building design

The RERA land record gives the site as 418 m², with net area 418.00 m². The GHMC building-permit extract identifies a single residential building, “Building - PROP-1 (MANJU INFRA),” arranged as 1 Stilt + 5 upper floors, with stated height 14.75 m. RERA filing

The filing records approved built-up area of 1,361.19 m². The permit extract separately states residential upper floors area of 1,122.80 m² and stilt parking area of 212.91 m². The OC extract records floor area of 1,122.8 m² as per sanctioned plan and 1,178.95 m² as per site building plan. These figures retain their respective source labels; they are not interchangeable area measures. RERA filing

The OC extract records site-building setbacks and deviations and notes compounding fees; it does not provide floor-by-floor apartment layouts, flats per floor, lift/stair arrangements, internal circulation plans or a detailed common-area schedule in the supplied extract. No software-measured floor-plan area is available: the supplied drawing record reports two drawings with no flats measured. Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK505102.19 m²Not measured in supplied drawing recordNot supplied
3BHK505148.64 m²Not measured in supplied drawing recordNot supplied

RERA unit table RERA unit details Floor plans

The saleable areas above are RERA-filed figures. Carpet area was not measured from the supplied drawings; therefore no drawing-based room dimensions, balcony or utility areas, or measured floor-plan comparison can be reported. Carpet area and saleable area are different measures; no loading figure is supplied. Portal booking and availability figures lack an as-of date. RERA unit details Floor plans RERA unit table

5. Parking & vehicle circulation

The GHMC permit extract records a 212.91 m² stilt parking area; the OC extract records the same sanctioned-plan parking area and a site-building-plan parking area of 224.14 m². The records supplied do not state the number of car or two-wheeler spaces, visitor or accessible provision, parking allocation by apartment, EV charging, ramps, or vehicle entry and exit arrangements. A parking area on a plan does not by itself establish exclusive allocation to a particular apartment.

6. Amenities, recreation & open spaces

The RERA amenity record lists 14 project infrastructure or facility categories. Its progress entries are 0% where a percentage is shown; “YES” entries are portal availability declarations, not independent confirmation that a facility is complete or operating. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot lot / parkPermit extract lists “Tot-lot”; area recorded as 0 m².RERA amenitiesRERA amenity progress 0%; no completion verification supplied.
Community buildingsListed in RERA amenities; no size or description supplied.RERA amenitiesProgress 0%; no completion verification supplied.
Aggregate recreational open spaceListed; no area supplied.RERA amenitiesProgress 0%; no completion verification supplied.
Internal roads and footpathsListed; no dimensions supplied.RERA amenitiesProgress 0%; no completion verification supplied.
Street lightingListed; no specification supplied.RERA amenitiesProgress 0%; no completion verification supplied.

No clubhouse or indoor recreation schedule is supplied. The permit extract lists 20 trees and space for a transformer, which are project-site provisions rather than evidence of delivered recreational amenities.

7. Utilities, building services & safety

The RERA amenity record marks water supply, sewerage, rainwater harvesting/water conservation, energy management, fire protection and fire safety, and electrical meter room/sub-station/receiving station as “YES.” It supplies no capacity or operating-status evidence; listed progress entries are 0%. RERA amenities

The GHMC permit extract calls for a rainwater-harvesting structure and records 1 RWHP, terrace and site-side piping, a garbage house and twin bins for each tenement. It also lists a transformer space. These are permit-record requirements or provisions, not independent evidence of installation or current operation.

The supplied records do not specify water source or storage capacity, STP capacity or treated-water reuse, storm-water system details, electrical backup, lift count or capacity, fire-system equipment, accessible routes, CCTV or security arrangements. No operating or safety-performance verification is supplied. RERA amenities

8. Location, access & connectivity

The project record places SHILPA VALLEY 5 in the Shilpa Valley locality, Plot No. 104, Survey No. 218/2, PIN 500084. The project’s recorded east boundary is a 12 m road; the other boundaries are Plots 101, 103 and 105. RERA record RERA filing Land records

The supplied location data records the Financial District (Nanakramguda) at 1.2 km from the project’s cadastral parcel-centroid reference. No route, travel time, public transport service or additional road-connectivity measurements are supplied. Location record

9. Developer & development status

The registered promoter is Manju Infra Avenues, recorded as a partnership, with GSTIN 36AAWFM4454C1Z1. The project record names PRADEEP P as authorized signatory and PRAVEEN P, SUNDARI P, MANASA P and SESHIAH P as partners. RERA filing Corporate record Parties record

The registration certificate lists the promoter office as Ameerpet, Hyderabad, PIN 500016; the supplied record does not provide a verified official phone number, email address or website.

The project record identifies landowners M. Venkat Ram Reddy and K. Vijaya and a revenue-share arrangement. The project’s Form B is the promoter’s declaration, including an undertaking to complete by 29 August 2026. The GHMC OC extract separately states completion on 21 February 2023 and identifies the project building covered by that certificate. Parties record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01100002356, issued 20 November 2020
What the supplied record establishesForm C registration for SHILPA VALLEY 5; valid through 29 August 2026 unless extended by the Authority.
GHMC building permit
Identifier / date2/C20/09213/2020, approved 29 August 2020; permit extract also lists file No. 2/C20/07886/2020
What the supplied record establishesSanction for a stilt + 5 upper-floor residential building on Survey No. 218/2, site extent 418 m². Approvals record
GHMC Occupancy Certificate
Identifier / date1784/GHMC/SLP/2023-OC, dated 7 June 2023
What the supplied record establishesOC extract for SHILPA VALLEY 5, Plot 104, Survey No. 218/2; records building completion on 21 February 2023.
Layout / subdivision reference
Identifier / dateLRS/4527/G/CR-11/WEST ZONE/GHMC/2008
What the supplied record establishesListed in the GHMC permit extract; a separate approved-layout document is not established by the supplied extract.
Promoter declaration
Identifier / dateForm B dated 29 August 2026
What the supplied record establishesPromoter’s declarations on title, encumbrances, funds, approvals and completion undertaking.
Title and development documents
Identifier / dateTitle report and underlying title/development instruments are indexed in the project records.
What the supplied record establishesRelevant source documents include title report, settlement/gift material, and development agreement cum GPA.

The HMDA approved-layout lookup is recorded as unavailable through the public portal in the supplied evidence. This is an access limitation, not evidence that approval was refused. HMDA

Frequently asked questions

Is SHILPA VALLEY 5 registered with Telangana RERA?

Yes. SHILPA VALLEY 5 is registered with the Telangana Real Estate Regulatory Authority as P01100002356; the registration status is New Project.

Who is the developer of SHILPA VALLEY 5?

The promoter named in the RERA registration is MANJU INFRA AVENUES.

Where is SHILPA VALLEY 5 located?

SHILPA VALLEY 5 is in SHILPA VALLEY, KONDAPUR, Sangareddy, Telangana (500084).

When will SHILPA VALLEY 5 be completed?

The promoter's proposed date of completion filed with RERA is 29/08/2026. This is the promoter's declaration, not a guarantee.

More projects in Kondapur