Oxygen Pearl
M/s IDREAM SRI SAI RK INFRA · Medchal-Malkajgiri · RERA P02200010584
OXYGEN PEARL is a residential apartment project in Gajularamaram, Qutballapur, Medchal-Malkajgiri. It is being developed by the registered promoter, M/s IDREAM SRI SAI RK INFRA, on a 4304.23 sq.m site, with one residential building comprising 1 Cellar + 1 Stilt + 5 Floors and 99 dwelling units. The RERA-filed configurations are 43 2BHK units of 69.08 sq.m saleable area each and 56 3BHK units of 77.48 sq.m saleable area each. The project is registered under TG-RERA number P02200010584, with proposed completion listed as 03/03/2029.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | OXYGEN PEARL RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Phase not separately identified; the registration and building-permit record cover the apartment project at the stated site RERA record |
| TG-RERA registration number | P02200010584 RERA record |
| Registration validity | 03/11/2025 to 03/11/2028 RERA record |
| Registered promoter | M/s IDREAM SRI SAI RK INFRA RERA record |
| RERA status | Registered; the supplied record gives the validity dates above. This is not evidence of an occupancy certificate. RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Gajularamaram; the building-permit plan also describes the site as Lalsabguda of Gajularamaram Village RERA record |
| Revenue village | Gajularamaram-1 in the TG-RERA record; Gajularamaram in the building-permit record RERA record |
| Mandal | Qutballapur / Quthbullapur RERA record |
| District | Medchal-Malkajgiri RERA record |
| PIN | 500055 RERA record |
| Project survey numbers | 344/1 and 344/6 RERA record Land records |
| Site extent | 4304.23 sq.m (gross plot area and net plot area as stated in the building-permit plan) |
| Boundaries | East: land belonging to Maisaiah; West: neighbours’ land; North: neighbours’ land; South: existing road RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Permit No. 1682/GHMC/SWBP/KPL1/2025, dated 03/11/2025; file No. 003460/GHMC/01844/SWBP/KPL1/2025 Approvals record |
| Approved built-up area | 10,621.65 sq.m excluding parking; 15,456.09 sq.m including parking, as shown in the filed plan. The same plan also lists “Gross BUA 16174.55 sq.m” and “Net BUA 10621.65 sq.m”; these are distinct labels in the supplied plan data. |
| Building count | One residential building RERA filing |
| Sanctioned floors | 1 Cellar + 1 Stilt + 5 Floors |
| Building height | Proposed total height 17.7 m in the filed plan parameters |
| Parking levels / approved provision | Cellar and stilt designated for parking; 121 car-parking spaces shown in the plan parameters. Parking area is 4834.44 sq.m. |
| Approved / RERA-declared homes | 99 dwelling units RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configurations | 2BHK: 43 units, saleable area 69.08 sq.m each; 3BHK: 56 units, saleable area 77.48 sq.m each RERA unit table |
| Portal booking snapshot | 0 booked and 99 available in the supplied portal reading; it has no as-of date and should be treated as indicative, not a current availability confirmation. RERA unit table |
| Construction stage | Not stated in the supplied evidence; the permit and RERA record establish approval/registration, not completed construction or independently verified site progress. RERA record |
| Completion dates | Promoter Form B declares completion by 03.11.2028. The building-permit order states construction is to be completed before 03/11/2028. The project header separately lists proposed completion as 03/03/2029; the supplied material does not explain that date. RERA record |
| Occupancy certificate (OC) | No OC or completion certificate is supplied; the building-permit extraction records completion as not certified. Scope: the single permitted building. |
2. The project story
OXYGEN PEARL is registered as a residential apartment project on land identified in the TG-RERA record as Survey Nos. 344/1 and 344/6, Gajularamaram-1, Qutballapur, Medchal-Malkajgiri. The GHMC building permit describes one residential building with 99 dwelling units on a 4304.23 sq.m site. The filed offering comprises 43 two-bedroom and 56 three-bedroom apartments. The sanctioned building form is a cellar, stilt and five floors; the plan provides for parking in the cellar and stilt. The supplied record does not establish construction progress through an independent site inspection, and no OC is included; accordingly, the project is described here as registered and sanctioned, with construction stage and completion on site unverified in the supplied evidence. RERA record Land records RERA unit table
3. Master plan, architecture & building design
The GHMC building-permit material describes one residential building, with no commercial upper-floor area recorded in the extracted plan. The sanctioned configuration is 1 Cellar + 1 Stilt + 5 Floors. The plan gives a proposed height of 17.7 m and site coverage area of 2485.64 sq.m (58.00%).
The filed area schedule identifies 10,621.65 sq.m of proposed built-up area excluding parking and 15,456.09 sq.m including parking; it separately lists gross BUA as 16,174.55 sq.m. These labels are reported as recorded, not treated as interchangeable. The plan also records 4834.44 sq.m parking area, 1804.16 sq.m vacant plot area, and 4304.23 sq.m gross and net plot area.
The site plan identifies a 12.0 m existing and proposed road width, with multiple internal driveways and a vehicular ramp shown. It lists tot-lot areas totalling 431.14 sq.m by its two entries (293.89 sq.m and 137.25 sq.m), and three green strips of 78.23 sq.m, 241.9 sq.m and 72.67 sq.m. The GHMC permit extraction reports the tot-lot as 431.13 sq.m. The supplied plan data does not provide a verified floor-by-floor flat arrangement, lift count, stair count, building footprint drawing measurements or phase-wise building organization.
The plan includes a first-floor mortgaged built-up area of 1079.87 sq.m under Mortgage Deed No. 21177/2025. Further title and mortgage details are addressed in the title and approvals sections of the report.
4. Homes, configurations & floor plans
The TG-RERA filing lists two configurations and 99 units in total. Saleable area below is the filed figure; it is not the same measure as carpet area. Software measurements were made from the approved floor-plan drawing geometry and are not RERA disclosures; the drawing-derived measurements require review. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available* | RERA saleable area | Measured carpet area** | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 43 | 0 | 43 | 69.08 sq.m | Median 65.3 sq.m; range 55.6–67.9 sq.m | Not supplied |
| 3BHK | 56 | 0 | 56 | 77.48 sq.m | Median 77.2 sq.m; range 77.0–77.4 sq.m | Not supplied |
- The supplied TG-RERA portal snapshot has no as-of date; counts are indicative.
** Software-measured from filed floor-plan drawings, not RERA-filed carpet areas. RERA unit table Floor plans
For the measured 2BHK drawing example, the plan labels two bedrooms, living/dining, kitchen, toilets, wash area and a balcony; the balcony is excluded from the measured carpet area. For the measured 3BHK example, the plan labels three bedrooms, living, dining, kitchen, toilets and a balcony; the balcony is excluded from the measured carpet area. The supplied room-level extraction is partial, so it should not be treated as a complete room schedule for every apartment. Carpet area refers to the drawing-measured internal area represented in the software extraction. Saleable area is the RERA-filed figure and may include the apartment’s proportionate share of common areas; the supplied data does not give a loading calculation or a separate RERA-filed carpet figure. RERA unit details Floor plans RERA unit table
5. Parking & vehicle circulation
The filed building-permit plan shows 121 car-parking spaces and 4834.44 sq.m of parking area, with the cellar and stilt designated for vehicle parking. It also lists 366.81 sq.m of visitor parking area (11.51%) and a 5.75 m wide vehicular ramp in the plan data.
The RERA unit record marks both filed configurations as mortgaged, and the GHMC permit material identifies 1079.87 sq.m of first-floor built-up area as mortgaged under Deed No. 21177/2025. These records do not establish a buyer-specific parking allocation or exclusive ownership of any drawn parking bay. RERA unit table
The plan requires parking places to be provided with electric-vehicle charging infrastructure. The supplied material does not state the number of EV charging points, two-wheeler spaces, accessible spaces, or the detailed allocation of resident and visitor bays.
6. Amenities, recreation & open spaces
The following facilities are evidenced in the GHMC-permit plan. They are approved or required plan provisions, not evidence that they have been completed or independently inspected. The separate RERA amenities record reports 0% progress for the listed common infrastructure items. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lots | Two entries: 293.89 sq.m and 137.25 sq.m; the permit extraction also reports 431.13 sq.m total. | Plan provision; completion not verified. | |
| Green strips | Three entries: 78.23 sq.m, 241.9 sq.m and 72.67 sq.m. | Plan provisions; completion not verified. | |
| Greenery | Peripheral green strip and tree plantation are included in permit conditions. Permit extraction records 210 trees. | Required/proposed; planting and maintenance not verified. | |
| Garbage house | Shown as a site facility in the plan. | Plan provision; completion not verified. | |
| Community buildings / recreation open space | RERA amenities record includes community buildings and aggregate recreational open space, but gives no dimensions or progress above 0%. | RERA amenities | RERA-recorded; no completion verified. |
No project-specific TG-RERA evidence supplied here confirms a clubhouse, gym, sports courts, indoor games or other recreational facilities. Such features are not included as established project facilities in this overview.
7. Utilities, building services & safety
The GHMC plan identifies an STP for Phase 1 with a stated capacity of 90 KLD, along with tank and sump components. It also lists a septic tank, pump room and percolation pit. The permit requires rainwater-harvesting provisions; the permit extraction records five rainwater-harvesting pits. These are plan provisions, not confirmation of installation or operation.
| Evidence in the project record | Water supply is marked “YES” in the RERA amenities record. GHMC requires a Water Feasibility Certificate from HMWS&SB before OC. |
|---|---|
| Status / limitation | Source, storage capacity and certificate are not supplied; completion not verified. RERA amenities |
| Evidence in the project record | Plan lists a 90 KLD Phase 1 STP, septic tank, sump and pump room. RERA records sewerage and storm-water infrastructure at 0% progress. |
|---|---|
| Status / limitation | Planned facilities; construction and commissioning not verified. RERA amenities |
| Evidence in the project record | Five pits recorded in the permit extraction; percolation pit and rainwater harvesting appear in the plan. |
|---|---|
| Status / limitation | Required/proposed; installation not verified. |
| Evidence in the project record | Space for a transformer is identified. The RERA amenities record marks electrical meter room/sub-station/receiving station “YES.” |
|---|---|
| Status / limitation | Capacity and installed equipment are not supplied. RERA amenities |
| Evidence in the project record | GHMC permit conditions require an occupancy Fire NOC before OC and automatic sprinklers in the cellar as per NBC norms. |
|---|---|
| Status / limitation | Requirements recorded; no Fire NOC or completion evidence supplied. |
| Evidence in the project record | Garbage house is included in the plan; solid-waste management is marked “YES” in the RERA amenities record. |
|---|---|
| Status / limitation | Operating arrangements and completion not verified. RERA amenities |
| Evidence in the project record | The plan requires EV charging infrastructure in parking places. |
|---|---|
| Status / limitation | Number and installation status not supplied. |
| Evidence in the project record | The supplied project-specific sanction extraction does not give lift count/capacity, accessibility features or installed security systems. |
|---|---|
| Status / limitation | Not established by the supplied project-specific records. |
8. Location, access & connectivity
The registered location is Gajularamaram-1, Qutballapur, Medchal-Malkajgiri, PIN 500055, on Survey Nos. 344/1 and 344/6. The building-permit description places the site at Lalsabguda of Gajularamaram Village. The GHMC plan records a 12.0 m existing and proposed road width and shows internal driveways and a vehicular ramp. RERA record Land records
The supplied location record gives HITEC City at 10.7 km from the project’s cadastral parcel centroid. This is a supplied distance measure; no travel time is established. Location record
9. Developer & development status
The registered promoter is M/s IDREAM SRI SAI RK INFRA, identified as a partnership in the project record. Its GSTIN is 36AAKFI2264G1ZD. The RERA certificate lists a promoter address at Village Pragathi Nagar, Bachupally Mandal, Medchal-Malkajgiri, PIN 500090; the project filing separately gives an address at Aniela Prime, Plot No. 601, Survey Nos. 344/1 and 344/6, Gajula Ramaram. RERA record Corporate record
The project record names Pratap Reddy Sanapu as authorized signatory and lists Konda Reddy T C, Deepa Talapareddy and Radha Talapureddy as partners. The GHMC building-permit extraction names Sri Siddam Sainath as developer/builder; this is reported as the permit’s designation and does not change the registered promoter identity stated above. Parties record
The promoter’s Form B affidavit declares a completion period ending 03.11.2028. The supplied record does not establish construction progress or an OC for the building; the GHMC permit makes OC a prerequisite to occupation and records completion as not certified.
10. Approvals, official records & documents
| Reference and scope | OXYGEN PEARL, P02200010584; Survey Nos. 344/1 and 344/6; registration validity 03/11/2025–03/11/2028. |
|---|---|
| Evidence available | Form C certificate |
| Reference and scope | Approval No. 1682/GHMC/SWBP/KPL1/2025; file No. 003460/GHMC/01844/SWBP/KPL1/2025; dated 03/11/2025. |
|---|---|
| Evidence available | Building Permit Order |
| Reference and scope | Residential building plan on Survey Nos. 344/1 and 344/6, Gajularamaram; includes site, area, parking, utility and amenity provisions. |
|---|---|
| Evidence available | Plan document filed as layout/building-plan material |
| Reference and scope | Permit conditions require a commencement notice before construction and completion notice and OC after completion. No separate OC or completion certificate is included. |
|---|---|
| Evidence available | Permit conditions and extracted status |
| Reference and scope | Form B affidavit declares title basis, encumbrance position, project fund obligations and completion by 03.11.2028. |
|---|---|
| Evidence available | Form B |
| Reference and scope | Advocate’s title report is listed in the supplied project documents; detailed title-chain review belongs in Land & Title. |
|---|---|
| Evidence available | Title report |
| Reference and scope | GHMC mortgage deed No. 21177/2025 is identified in the permit record; project-filed loan sanction material is also listed. |
|---|
| Reference and scope | Form C states that sale agreements and conveyance deeds are to be executed as prescribed; the supplied allotment-letter and agreement-for-sale materials are templates with blank allottee/unit details. |
|---|
The HMDA approved-layout lookup is unavailable in the supplied evidence; this is not evidence of refusal. The GHMC building-permit plan and order are the project-specific approval records identified above. HMDA
1. Project at a glance
Project identity
Registered project name: OXYGEN PEARL
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified; the registration and building-permit record cover the apartment project at the stated site
TG-RERA registration number: P02200010584
Registration validity: 03/11/2025 to 03/11/2028
Registered promoter: M/s IDREAM SRI SAI RK INFRA
RERA status: Registered; the supplied record gives the validity dates above. This is not evidence of an occupancy certificate.
Land and geographic identity
Locality: Gajularamaram; the building-permit plan also describes the site as Lalsabguda of Gajularamaram Village
Revenue village: Gajularamaram-1 in the TG-RERA record; Gajularamaram in the building-permit record
Mandal: Qutballapur / Quthbullapur
District: Medchal-Malkajgiri
PIN: 500055
Project survey numbers: 344/1 and 344/6
Site extent: 4304.23 sq.m (gross plot area and net plot area as stated in the building-permit plan)
Boundaries: East: land belonging to Maisaiah; West: neighbours’ land; North: neighbours’ land; South: existing road
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Permit No. 1682/GHMC/SWBP/KPL1/2025, dated 03/11/2025; file No. 003460/GHMC/01844/SWBP/KPL1/2025
Approved built-up area: 10,621.65 sq.m excluding parking; 15,456.09 sq.m including parking, as shown in the filed plan. The same plan also lists “Gross BUA 16174.55 sq.m” and “Net BUA 10621.65 sq.m”; these are distinct labels in the supplied plan data.
Building count: One residential building
Sanctioned floors: 1 Cellar + 1 Stilt + 5 Floors
Building height: Proposed total height 17.7 m in the filed plan parameters
Parking levels / approved provision: Cellar and stilt designated for parking; 121 car-parking spaces shown in the plan parameters. Parking area is 4834.44 sq.m.
Approved / RERA-declared homes: 99 dwelling units
Offering and status
RERA-filed configurations: 2BHK: 43 units, saleable area 69.08 sq.m each; 3BHK: 56 units, saleable area 77.48 sq.m each
Portal booking snapshot: 0 booked and 99 available in the supplied portal reading; it has no as-of date and should be treated as indicative, not a current availability confirmation.
Construction stage: Not stated in the supplied evidence; the permit and RERA record establish approval/registration, not completed construction or independently verified site progress.
Completion dates: Promoter Form B declares completion by 03.11.2028. The building-permit order states construction is to be completed before 03/11/2028. The project header separately lists proposed completion as 03/03/2029; the supplied material does not explain that date.
Occupancy certificate (OC): No OC or completion certificate is supplied; the building-permit extraction records completion as not certified. Scope: the single permitted building.
2. The project story
OXYGEN PEARL is registered as a residential apartment project on land identified in the TG-RERA record as Survey Nos. 344/1 and 344/6, Gajularamaram-1, Qutballapur, Medchal-Malkajgiri. The GHMC building permit describes one residential building with 99 dwelling units on a 4304.23 sq.m site. The filed offering comprises 43 two-bedroom and 56 three-bedroom apartments. The sanctioned building form is a cellar, stilt and five floors; the plan provides for parking in the cellar and stilt. The supplied record does not establish construction progress through an independent site inspection, and no OC is included; accordingly, the project is described here as registered and sanctioned, with construction stage and completion on site unverified in the supplied evidence.
3. Master plan, architecture & building design
The GHMC building-permit material describes one residential building, with no commercial upper-floor area recorded in the extracted plan. The sanctioned configuration is 1 Cellar + 1 Stilt + 5 Floors. The plan gives a proposed height of 17.7 m and site coverage area of 2485.64 sq.m (58.00%).
The filed area schedule identifies 10,621.65 sq.m of proposed built-up area excluding parking and 15,456.09 sq.m including parking; it separately lists gross BUA as 16,174.55 sq.m. These labels are reported as recorded, not treated as interchangeable. The plan also records 4834.44 sq.m parking area, 1804.16 sq.m vacant plot area, and 4304.23 sq.m gross and net plot area.
The site plan identifies a 12.0 m existing and proposed road width, with multiple internal driveways and a vehicular ramp shown. It lists tot-lot areas totalling 431.14 sq.m by its two entries (293.89 sq.m and 137.25 sq.m), and three green strips of 78.23 sq.m, 241.9 sq.m and 72.67 sq.m. The GHMC permit extraction reports the tot-lot as 431.13 sq.m. The supplied plan data does not provide a verified floor-by-floor flat arrangement, lift count, stair count, building footprint drawing measurements or phase-wise building organization.
The plan includes a first-floor mortgaged built-up area of 1079.87 sq.m under Mortgage Deed No. 21177/2025. Further title and mortgage details are addressed in the title and approvals sections of the report.
4. Homes, configurations & floor plans
The TG-RERA filing lists two configurations and 99 units in total. Saleable area below is the filed figure; it is not the same measure as carpet area. Software measurements were made from the approved floor-plan drawing geometry and are not RERA disclosures; the drawing-derived measurements require review.
| Configuration | Units | Booked | Available* | RERA saleable area | Measured carpet area** | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 43 | 0 | 43 | 69.08 sq.m | Median 65.3 sq.m; range 55.6–67.9 sq.m | Not supplied |
| 3BHK | 56 | 0 | 56 | 77.48 sq.m | Median 77.2 sq.m; range 77.0–77.4 sq.m | Not supplied |
- The supplied TG-RERA portal snapshot has no as-of date; counts are indicative.
** Software-measured from filed floor-plan drawings, not RERA-filed carpet areas.
For the measured 2BHK drawing example, the plan labels two bedrooms, living/dining, kitchen, toilets, wash area and a balcony; the balcony is excluded from the measured carpet area. For the measured 3BHK example, the plan labels three bedrooms, living, dining, kitchen, toilets and a balcony; the balcony is excluded from the measured carpet area. The supplied room-level extraction is partial, so it should not be treated as a complete room schedule for every apartment. Carpet area refers to the drawing-measured internal area represented in the software extraction. Saleable area is the RERA-filed figure and may include the apartment’s proportionate share of common areas; the supplied data does not give a loading calculation or a separate RERA-filed carpet figure.
5. Parking & vehicle circulation
The filed building-permit plan shows 121 car-parking spaces and 4834.44 sq.m of parking area, with the cellar and stilt designated for vehicle parking. It also lists 366.81 sq.m of visitor parking area (11.51%) and a 5.75 m wide vehicular ramp in the plan data.
The RERA unit record marks both filed configurations as mortgaged, and the GHMC permit material identifies 1079.87 sq.m of first-floor built-up area as mortgaged under Deed No. 21177/2025. These records do not establish a buyer-specific parking allocation or exclusive ownership of any drawn parking bay.
The plan requires parking places to be provided with electric-vehicle charging infrastructure. The supplied material does not state the number of EV charging points, two-wheeler spaces, accessible spaces, or the detailed allocation of resident and visitor bays.
6. Amenities, recreation & open spaces
The following facilities are evidenced in the GHMC-permit plan. They are approved or required plan provisions, not evidence that they have been completed or independently inspected. The separate RERA amenities record reports 0% progress for the listed common infrastructure items.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lots | Two entries: 293.89 sq.m and 137.25 sq.m; the permit extraction also reports 431.13 sq.m total. | Plan provision; completion not verified. | |
| Green strips | Three entries: 78.23 sq.m, 241.9 sq.m and 72.67 sq.m. | Plan provisions; completion not verified. | |
| Greenery | Peripheral green strip and tree plantation are included in permit conditions. Permit extraction records 210 trees. | Required/proposed; planting and maintenance not verified. | |
| Garbage house | Shown as a site facility in the plan. | Plan provision; completion not verified. | |
| Community buildings / recreation open space | RERA amenities record includes community buildings and aggregate recreational open space, but gives no dimensions or progress above 0%. | RERA-recorded; no completion verified. |
No project-specific TG-RERA evidence supplied here confirms a clubhouse, gym, sports courts, indoor games or other recreational facilities. Such features are not included as established project facilities in this overview.
7. Utilities, building services & safety
The GHMC plan identifies an STP for Phase 1 with a stated capacity of 90 KLD, along with tank and sump components. It also lists a septic tank, pump room and percolation pit. The permit requires rainwater-harvesting provisions; the permit extraction records five rainwater-harvesting pits. These are plan provisions, not confirmation of installation or operation.
| Evidence in the project record | Water supply is marked “YES” in the RERA amenities record. GHMC requires a Water Feasibility Certificate from HMWS&SB before OC. |
|---|---|
| Status / limitation | Source, storage capacity and certificate are not supplied; completion not verified. |
| Evidence in the project record | Plan lists a 90 KLD Phase 1 STP, septic tank, sump and pump room. RERA records sewerage and storm-water infrastructure at 0% progress. |
|---|---|
| Status / limitation | Planned facilities; construction and commissioning not verified. |
| Evidence in the project record | Five pits recorded in the permit extraction; percolation pit and rainwater harvesting appear in the plan. |
|---|---|
| Status / limitation | Required/proposed; installation not verified. |
| Evidence in the project record | Space for a transformer is identified. The RERA amenities record marks electrical meter room/sub-station/receiving station “YES.” |
|---|---|
| Status / limitation | Capacity and installed equipment are not supplied. |
| Evidence in the project record | GHMC permit conditions require an occupancy Fire NOC before OC and automatic sprinklers in the cellar as per NBC norms. |
|---|---|
| Status / limitation | Requirements recorded; no Fire NOC or completion evidence supplied. |
| Evidence in the project record | Garbage house is included in the plan; solid-waste management is marked “YES” in the RERA amenities record. |
|---|---|
| Status / limitation | Operating arrangements and completion not verified. |
| Evidence in the project record | The plan requires EV charging infrastructure in parking places. |
|---|---|
| Status / limitation | Number and installation status not supplied. |
| Evidence in the project record | The supplied project-specific sanction extraction does not give lift count/capacity, accessibility features or installed security systems. |
|---|---|
| Status / limitation | Not established by the supplied project-specific records. |
8. Location, access & connectivity
The registered location is Gajularamaram-1, Qutballapur, Medchal-Malkajgiri, PIN 500055, on Survey Nos. 344/1 and 344/6. The building-permit description places the site at Lalsabguda of Gajularamaram Village. The GHMC plan records a 12.0 m existing and proposed road width and shows internal driveways and a vehicular ramp.
The supplied location record gives HITEC City at 10.7 km from the project’s cadastral parcel centroid. This is a supplied distance measure; no travel time is established.
9. Developer & development status
The registered promoter is M/s IDREAM SRI SAI RK INFRA, identified as a partnership in the project record. Its GSTIN is 36AAKFI2264G1ZD. The RERA certificate lists a promoter address at Village Pragathi Nagar, Bachupally Mandal, Medchal-Malkajgiri, PIN 500090; the project filing separately gives an address at Aniela Prime, Plot No. 601, Survey Nos. 344/1 and 344/6, Gajula Ramaram.
The project record names Pratap Reddy Sanapu as authorized signatory and lists Konda Reddy T C, Deepa Talapareddy and Radha Talapureddy as partners. The GHMC building-permit extraction names Sri Siddam Sainath as developer/builder; this is reported as the permit’s designation and does not change the registered promoter identity stated above.
The promoter’s Form B affidavit declares a completion period ending 03.11.2028. The supplied record does not establish construction progress or an OC for the building; the GHMC permit makes OC a prerequisite to occupation and records completion as not certified.
10. Approvals, official records & documents
| Reference and scope | OXYGEN PEARL, P02200010584; Survey Nos. 344/1 and 344/6; registration validity 03/11/2025–03/11/2028. |
|---|---|
| Evidence available | Form C certificate |
| Reference and scope | Approval No. 1682/GHMC/SWBP/KPL1/2025; file No. 003460/GHMC/01844/SWBP/KPL1/2025; dated 03/11/2025. |
|---|---|
| Evidence available | Building Permit Order |
| Reference and scope | Residential building plan on Survey Nos. 344/1 and 344/6, Gajularamaram; includes site, area, parking, utility and amenity provisions. |
|---|---|
| Evidence available | Plan document filed as layout/building-plan material |
| Reference and scope | Permit conditions require a commencement notice before construction and completion notice and OC after completion. No separate OC or completion certificate is included. |
|---|---|
| Evidence available | Permit conditions and extracted status |
| Reference and scope | Form B affidavit declares title basis, encumbrance position, project fund obligations and completion by 03.11.2028. |
|---|---|
| Evidence available | Form B |
| Reference and scope | Advocate’s title report is listed in the supplied project documents; detailed title-chain review belongs in Land & Title. |
|---|---|
| Evidence available | Title report |
| Reference and scope | GHMC mortgage deed No. 21177/2025 is identified in the permit record; project-filed loan sanction material is also listed. |
|---|
| Reference and scope | Form C states that sale agreements and conveyance deeds are to be executed as prescribed; the supplied allotment-letter and agreement-for-sale materials are templates with blank allottee/unit details. |
|---|
The HMDA approved-layout lookup is unavailable in the supplied evidence; this is not evidence of refusal. The GHMC building-permit plan and order are the project-specific approval records identified above.
Frequently asked questions
Is OXYGEN PEARL registered with Telangana RERA?
Yes. OXYGEN PEARL is registered with the Telangana Real Estate Regulatory Authority as P02200010584; the registration status is New Project.
Who is the developer of OXYGEN PEARL?
The promoter named in the RERA registration is M/s IDREAM SRI SAI RK INFRA.
Where is OXYGEN PEARL located?
OXYGEN PEARL is in GAJULA RAMARAM, Gajula Ramaram-1, Qutballapur, Medchal-Malkajgiri, Telangana (500055).
When will OXYGEN PEARL be completed?
The promoter's proposed date of completion filed with RERA is 03/03/2029. This is the promoter's declaration, not a guarantee.
More projects in Gajula Ramaram 1