VEDANTA III is a plotted development in Balanagar Village, Balanagar Mandal, Mahabubnagar District, developed by registered promoter GIRIDHARI CONSTRUCTIONS. The registered site extent is 16,086.25 sq. m, and the draft layout approval describes 45 plots; no plot configurations are stated. The project is registered under TG-RERA number P01400002667, with a proposed completion date of 23/10/2022.

More from Giridhari Constructions · 8 projects →

01What we found

Period endedTG-RERA registration ran to 23 Oct 2022 - check its extension on TG-RERA
13documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameVEDANTA III RERA record
Project typePlotted development / plotted layout RERA record RERA filing
Phase / registered portionNot separately identified in the supplied record; the registration is for VEDANTA III
TG-RERA registration numberP01400002667 RERA record Approvals record
Registration validity06/03/2021 to 23/10/2022; the certificate records no extension
Registered promoterGIRIDHARI CONSTRUCTIONS RERA record Corporate record
RERA statusThe supplied certificate records registration through 23/10/2022. A current registration-status update is not provided.

Land and geographic identity

ItemProject record
Locality / revenue villageBalanagar Village; the draft layout approval identifies Balanagar Gram Panchayat RERA record RERA filing
MandalBalanagar RERA record
DistrictMahabubnagar RERA record
PIN509202 RERA record
Project survey numbers56, 57 and 60; no project subdivision is specified in the RERA identity RERA record Land records
Registered site extent16,086.25 sq. m in RERA land details RERA filing
Total / net areaRERA land details list total and net area as 16,086.25 sq. m RERA filing
BoundariesEast: Road; west, north and south: Others Land RERA filing

Development identity

ItemProject record
Sanctioning authorityDT&CP; the draft technical layout approval is delegated to Balanagar Gram Panchayat Approvals record
Principal approvalDraft Technical Layout Pattern TLP.No.1 39/2020/HRO/H1; approval date is transcribed as 23-.t0-2020 in the supplied extraction Approvals record
Layout scale45 plots in the draft layout approval
Area stated in draft approvalAc 3.975 Cents 19239.00 Sq. Yds.
Land-use areas stated in draft approvalOpen space: Ac.0.397 Cents 1924.00 Sq.Yds. (10.00%); road area: Ac.1.260 Cents 6103.00 Sq.Yds. (31.70.%); plotted area: 4c.2.216 Cents 10714.00 SqYds. (55.74%); “Area u/r Surplus & Buffer”: Ac.0.102 Cents 498.00 SqYds. (2.56%)
Approved built-up area / building configurationNot applicable to the filed plotted-development description; no building count or floor configuration is supplied. RERA filing
Mortgage area stated in RERA fields1430.61 sq. m RERA filing

Offering and status

ItemProject record
Offered unit typePlots; the draft approval identifies 45 plots. Plot-size schedule and plot-wise availability are not supplied.
Booked / available countsNot provided in the supplied project record.
Declared completion date23/10/2022 in RERA project information RERA filing
Construction / development stageRERA amenity data records progress percentages for selected layout infrastructure; these are promoter-declared progress fields, not independent site verification. RERA amenities
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The approval document is a draft technical layout approval and says final layout release is subject to completion of conditions.

2. The project story

VEDANTA III is registered as a plotted development in Balanagar Village, Balanagar Mandal, Mahabubnagar District. Its RERA identity lists survey numbers 56, 57 and 60, and the filed project information describes a site area of 16,086.25 sq. m. RERA record RERA filing

The DT&CP document describes a draft technical layout pattern for 45 plots. It allocates land to plots, roads, open space and a surplus/buffer area, and sets out development requirements including road formation, drains, water and sewerage provisions, street lighting and planting. The document expressly treats this as draft approval: it requires specified conditions to be completed before final layout release, including transfer of open-space and road areas to the Gram Panchayat by registered gift deed.

The RERA filing gives a proposed completion date of 23/10/2022. The available amenity record reports partial progress for some infrastructure, but does not independently verify the site’s present condition or establish completion of the layout. No completion certificate or final layout-release evidence is included in the supplied material. RERA filing RERA amenities

3. Master plan, architecture & building design

This is a plotted layout, not a building project in the supplied RERA description. The draft technical layout approval identifies 45 plots across survey numbers 56, 57 and 60 in Balanagar and states a layout extent of Ac 3.975 Cents 19239.00 Sq. Yds. RERA filing

The same approval records the following land-use split:

Layout componentArea stated in approvalStated share
Open spaceAc.0.397 Cents 1924.00 Sq.Yds.10.00 %
Road areaAc.1.260 Cents 6103.00 Sq.Yds.31.70.%
Plotted area4c.2.216 Cents 10714.00 SqYds.55.74%
Area u/r Surplus & BufferAc.0.102 Cents 498.00 SqYds.2.56%

The supplied extraction does not provide plot dimensions, plot-by-plot arrangement, road widths, a drawing-derived layout measurement, or a final approved layout plan. The approval calls for ground demarcation in accordance with the enclosed draft layout plan and for roads to remain accessible to neighbouring sites.

4. Homes, configurations & floor plans

The offering recorded here is plots, rather than apartments or houses. The draft layout approval states 45 plots, but the supplied material does not include plot-size bands, individual plot numbers and areas, or booked and available plot counts.

No apartment floor plans or drawing-measured carpet areas are available. The supplied floor-plan record says two drawings are present, with both scans pending measurement; it does not provide a usable plot schedule. Floor plans

5. Parking & vehicle circulation

No sanctioned or allocated parking-space count, visitor or accessible parking provision, or parking arrangement is supplied. The vendor record lists “Open Parking,” but does not state its number, location or whether it is allocated to particular plots. Promoter website

The draft approval requires roads to be formed and opened for accessibility to neighbouring sites. It also describes a road-area allocation of Ac.1.260 Cents 6103.00 Sq.Yds. (31.70.%); road widths, entry/exit design and internal-driveway dimensions are not stated in the available extraction.

6. Amenities, recreation & open spaces

The RERA amenity record gives progress percentages for selected infrastructure. These are declared progress entries; no independent completion verification is supplied. The draft layout approval separately lists infrastructure and landscaping works to be provided. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot lot / parkRERA land-use record states open space of Ac.0.397 Cents 1924.00 Sq.Yds. and 10.00 %; no separate facility size or capacity is supplied.RERA amenities25% in RERA amenity data; not independently verified complete.
Aggregate recreational open spaceSeparate RERA amenity entry; no additional size stated.RERA amenities25% in RERA amenity data; not independently verified complete.
Avenue planting / greeneryApproval requires greenery, including avenue plantation in public open spaces.Required by draft approval; completion not verified.
Fencing of open spacesListed as a layout requirement.Completion not stated.
Community buildingsNo community-building facility or size is stated.RERA amenities0% in RERA amenity data.

7. Utilities, building services & safety

The draft layout approval lists utility and site-development requirements. The available material does not establish that these works have been completed or independently inspected.

Water supply
Supplied project evidenceApproval requires protected water supply; the RERA amenity record lists Water Supply. Source, storage and treatment capacity are not supplied.
Declared progress / verificationRERA amenity data: 30%; not independently verified complete. RERA amenities
Sewerage and sullage
Supplied project evidenceApproval requires a sewerage disposal system; RERA amenity entry refers to chambers, lines, septic tank and STP. Capacity and treatment/reuse details are not supplied.
Declared progress / verificationSewerage amenity data: 30%; separate treatment/disposal entry: 0%. Not independently verified. RERA amenities
Storm-water drainage
Supplied project evidenceApproval requires drains, nala channelization and storm-water run-off management.
Declared progress / verificationStorm Water Drains: 0% in RERA amenity data; completion not verified. RERA amenities
Rainwater harvesting
Supplied project evidenceApproval requires rainwater-harvesting pits.
Declared progress / verification25% in RERA amenity data; not independently verified complete. RERA amenities
Roads and footpaths
Supplied project evidenceApproval requires road formation, gradients, curbstones, carriageway and side drains; internal roads and footpaths are listed in RERA amenity data.
Declared progress / verificationInternal Roads & Footpaths: 30%; not independently verified complete. RERA amenities
Street lighting and electricity
Supplied project evidenceApproval lists street lighting and electricity facilities; the RERA record also lists an electrical meter room, sub-station or receiving station.
Declared progress / verificationStreet Lighting: 25%; electrical facility entry: 25%. Not independently verified complete. RERA amenities
Waste management
Supplied project evidenceNo project-specific waste-management system is described in the approval extraction.
Declared progress / verificationSolid Waste Management and Disposal: 0% in RERA amenity data. RERA amenities
Fire and life safety
Supplied project evidenceNo project-specific fire-safety system is described in the supplied plotted-layout records.
Declared progress / verificationFire Protection and Fire Safety Requirements: 0% in RERA amenity data. RERA amenities

8. Location, access & connectivity

The registered location is Balanagar Village, Balanagar Mandal, Mahabubnagar District, PIN 509202. The project site is identified in the RERA filing by survey numbers 56, 57 and 60. RERA record

The RERA land-details record gives the east boundary as Road and the west, north and south boundaries as Others Land. The draft approval requires layout roads to be opened for access to neighbouring sites. The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 39.4 km; no other measured distances or public-transport information is supplied. RERA filing Location record

9. Developer & development status

The registered promoter is GIRIDHARI CONSTRUCTIONS. RERA filing data identifies the organisation as a partnership; the registration certificate names Giridhari Constructions and lists a promoter office as “Village: Mandal: District: Hyderabad, Pin: 500033,” without a more complete registered-office address. RERA record Corporate record

The supplied RERA record identifies SAMPATH RAGHUPATHI REDDY as an authorized signatory. A Form-B declaration by him includes an undertaking to have project accounts audited annually and to verify that project collections were used for the project and withdrawals corresponded to completion progress. Parties record

The project record sets 23/10/2022 as the proposed completion date. The supplied materials do not establish a current site-completion percentage, a final layout release, or a completion certificate. RERA amenity progress entries are declarations and should not be read as independent verification of completed works. RERA filing RERA amenities

10. Approvals, official records & documents

RecordSupplied evidence and scope
TG-RERA registrationForm ‘C’ certificate for VEDANTA III, registration P01400002667, valid from 06/03/2021 to 23/10/2022; identifies survey numbers 56, 57 and 60.
Principal layout approvalDT&CP draft technical layout approval, TLP.No.1 39/2020/HRO/H1, for a 45-plot layout in survey numbers 56, 57 and 60 at Balanagar. The extracted approval date reads 23-.t0-2020.
Approval-stage limitationThe document describes a draft layout and makes final layout release conditional on completing stated requirements, including registered gift deeds for open-space and road areas. No final layout-release record is supplied.
Title / land documentsThe RERA-filed material includes a sale deed extraction for survey numbers 56 and 57 and a development-agreement extraction concerning survey number 60; these are listed here only as supplied documents, not as a complete title-chain review.
Completion / occupancy recordNo completion certificate, occupancy certificate or final layout-release document is supplied. Document index
Other project documentsA Form-B declaration and a partially completed proposed agreement-for-sale document are included; the latter does not supply identifiable allottee, plot or price particulars.

Frequently asked questions

Is VEDANTA III registered with Telangana RERA?

Yes. VEDANTA III is registered with the Telangana Real Estate Regulatory Authority as P01400002667; the registration status is New Project.

Who is the developer of VEDANTA III?

The promoter named in the RERA registration is GIRIDHARI CONSTRUCTIONS.

Where is VEDANTA III located?

VEDANTA III is in BALANAGAR VILLAGE, Balanagar, Mahabubnagar, Telangana (509202).

When will VEDANTA III be completed?

The promoter's proposed date of completion filed with RERA is 23/10/2022. This is the promoter's declaration, not a guarantee.