SAI S SAMHITHA is a residential apartment project in Gajularamaram, Qutballapur mandal, Medchal-Malkajgiri district, developed by registered promoter Avantika Sairam Projects. It covers a total land area of 1,981.61 m² and comprises one residential building, Building - A-1, with 1 Cellar + Stilt + 5 upper floors. The RERA filing lists 45 2BHK units, each with a saleable area of 118.44 m². It is registered with TG-RERA under P02200003243, and the promoter’s Form B undertaking states completion by 15t April 2027.

01What we found

RegisteredTG-RERA - valid till 15 Apr 2027
19documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

ItemRecord
Registered project nameSAI S SAMHITHA
Project typeResidential apartment project RERA record
Phase / registered portionThe record identifies the registered land as Survey No. 14/PART and plots 382, 383, 384, 385 and 386; a separately named phase is not disclosed.
TG-RERA registrationP02200003243; registered from 25/08/2021 to 15/04/2027. This is the registration validity period, not the project completion deadline.
Registered promoterAvantika Sairam Projects
RERA status in supplied certificateRegistration certificate issued under section 5; it states an end date of 15/04/2027 and is not marked as extended.

Land and geographic identity

ItemRecord
Locality / revenue villageGajularamaram / Gajula Ramaram-1; the building permit refers to GAJULARAMARAM. RERA record
Mandal / district / PINQutballapur / Medchal-Malkajgiri / 500055
Project survey number(s) and subdivision(s)14/PART
Plots identified in the registration certificate382, 383, 384, 385 and 386
Site area1,981.61 m² total; 1,798.39 m² net; 183.22 m² road-affected area. The permit records nala-affected area as 0 m².
BoundariesNorth: 60 Feet Wide Road; east, west and south: Neighbours Plot RERA filing

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building approvalBuilding permit 1/C26/05549/2021, approved 15 April 2021; associated file number 1/C26/16898/2020
Building and floorsOne residential building, Building - A-1: 1 Cellar + Stilt + 5 upper floors
Approved built-up area4,922.90 m² for 5 upper floors; the permit separately lists Cellar 1: 1,206.40 m² and Stilt 1: 1,030.60 m².
Approved height14.99 m
Units45 units in the RERA-filed 2BHK configuration; the permit requires that the sanctioned unit count not be increased without prior GHMC approval. The permit extract does not state a separate numerical total of sanctioned units. RERA unit table
Parking levelsCellar and stilt are approved for parking; the supplied permit extract does not give a parking-space count.

Offering and status

ItemRecord
RERA-filed configuration and saleable area2BHK, 45 units; 118.44 m² saleable area per unit RERA unit table
Booked / available0 booked / 45 available, as last read from the TG-RERA portal; no as-of date is supplied, so counts are indicative. RERA unit table
Construction stageThe supplied evidence does not establish a current construction-progress percentage or independently verified site status.
Completion deadlineThe promoter’s Form B undertaking states completion by 15t April 2027; the registration certificate gives 15/04/2027 as its validity end date. These are separate record entries; no extension is shown in the supplied certificate.
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. The permit requires an occupancy certificate before occupation.

The project story

  • SAI S SAMHITHA is registered as a residential apartment project on Survey No. 14/PART in Gajularamaram, Qutballapur mandal, Medchal-Malkajgiri district. The registration certificate also identifies plots 382–386. RERA record
  • The GHMC building permit describes one residential building, Building - A-1, with a cellar, stilt and five upper floors. The RERA filing lists 45 2BHK units, with 118.44 m² saleable area per unit. The current construction stage is not established by the supplied record; the unit availability figures are portal figures without an as-of date and should be treated as indicative. RERA unit table
  • The promoter’s Form B gives a completion undertaking of 15t April 2027. The registration certificate is valid through 15/04/2027. No occupancy or completion certificate is supplied, so the record does not establish that the building, or any portion of it, is occupancy-certified.

Master plan, architecture & building design

  • The GHMC permit describes a single residential building, Building - A-1, on a site of 1,981.61 m², with 1,798.39 m² net area and 183.22 m² affected by road widening. The approved configuration is 1 Cellar + Stilt + 5 upper floors, with a stated height of 14.99 m.
  • The permit records 4,922.90 m² for the five upper floors, 1,206.40 m² for the cellar and 1,030.60 m² for the stilt. These are the areas as described in the permit; they are not presented here as carpet area or saleable area. The permit also identifies a 93.05 m² tot-lot, 95 Trees, and a compound wall of 174.4 RM.
  • A drawing-based floor-plan measurement is not available: the supplied floor-plan record says there are two drawings, none measured, and no flats identified in those drawings. No building footprint, flats-per-floor count, lift or stair details, internal circulation plan, or phase-wise arrangement is established in the supplied material. Floor plans

Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK45045118.44 m²Not availableNot supplied
  • The unit counts and saleable area are RERA-filed. The booking and availability counts are portal figures with no supplied as-of date. RERA unit table
  • No software-measured carpet area or room-by-room floor-plan dimensions are available in the supplied drawing data. Floor plans Saleable area should not be read as carpet area: the supplied evidence does not provide a measured carpet-area figure or a loading figure for these homes.

Parking & vehicle circulation

  • The GHMC permit approves the cellar and stilt for vehicle parking and states they are to be used exclusively for parking, without partition walls or rolling shutters, and not converted to another use. The permit extract does not provide the number of car or two-wheeler spaces, visitor or accessible spaces, or parking-allocation details for individual units.
  • The supplied material also does not establish ramp design, separate vehicle entries and exits, pedestrian separation, mechanical parking, or EV charging.

Amenities, recreation & open spaces

Tot-lot / green area
Description / size93.05 m²; permit condition says it is to be fenced and maintained as greenery before issue of the occupancy certificate.
Evidence sourceGHMC building permit
Declared progress / verified statusSanctioned provision; completion not established.
Trees
Description / size95 Trees
Evidence sourceGHMC building permit
Declared progress / verified statusListed in permit; planting or current condition not independently verified.
Community buildings and recreational open space
Description / sizeRERA amenity register has entries for both; no size or quantity is supplied in the record. RERA amenities
Evidence sourceTG-RERA amenity register
Declared progress / verified statusProgress shown as 0% in the supplied register.
  • The RERA amenity register also lists internal roads and footpaths, water supply, sewerage, storm-water drains, street lighting, sewage and sullage treatment/disposal, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection, electrical meter room/sub-station/receiving station, and aggregate recreational open space. Several entries are marked “YES” as available in the register, while progress is shown as 0%; the record does not establish these facilities as completed or independently verified. RERA amenities

Utilities, building services & safety

  • The building permit requires a rainwater-harvesting percolation pit and records 2 RWHPs. It also requires space for a transformer, a garbage house within the premises, and a mud sump for storm-water disposal. These are permit requirements or recorded provisions, not evidence of completed installations.
  • The permit requires an occupancy fire NOC before issue of the occupancy certificate and specifies automatic sprinklers in the cellar, with other fire-safety systems as per Table 7 of Part 4 of the National Building Code of India, 2016. It also states that an occupancy certificate is compulsory before occupation. No fire NOC, occupancy certificate, system capacity, lift specification, water source or storage capacity, sewage-treatment capacity, backup-power details, CCTV or access-control specification, or accessibility details are supplied.

Location, access & connectivity

  • The registered location is Gajula Ramaram-1, Qutballapur mandal, Medchal-Malkajgiri district, PIN 500055. The permit identifies the site locality as Gajularamaram and records an 18 mt. road width; the site boundary information identifies a 60 Feet Wide Road to the north. RERA filing
  • The supplied location data gives these distances to listed nearby points: New Era The Lead School 0.2 km; an unnamed park 0.5 km; Store World 1.1 km; Usha Mullapudi Cardiac Centre 1.2 km; Union Bank of India 1.6 km; Auto Stand 2.0 km; Sri Chaitanya Junior College 2.9 km; and KPHB Colony Metro 4.5 km. Location record These are supplied location-record distances; the evidence does not specify travel times or routes.

Developer & development status

  • The registered promoter is Avantika Sairam Projects, identified in the project record as a partnership. Its GSTIN is 36ABRFA7592D1Z1. The supplied promoter address is H No 7-2-1813/5/A/1/1, Czech Colony, Gajularamaram, Qutballapur, Medchal-Malkajgiri, 500055. Parties record Corporate record
  • The Form B affidavit was made by Madhusudhan Rao and Chunduri Ramaiah as authorized signatories for the promoter. It identifies eight landowners and refers to Development Agreement-cum-GPA documents 1405/2021, 1406/2021, 1407/2021, 2581/2021 and 3929/2021 as the development basis. These are promoter-filed declarations.
  • The promoter’s Form B states a completion undertaking of 15t April 2027. The supplied evidence does not establish current construction progress or a completed or occupancy-certified portion.

Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C for SAI S SAMHITHA, registration P02200003243, issued 25/08/2021; validity through 15/04/2027.
GHMC building permitBuilding Permit Order 1/C26/05549/2021, approved 15 April 2021, associated file 1/C26/16898/2020; covers a residential building on Survey No. 14/PART.
Promoter declarationForm B affidavit-cum-declaration for the project, dated 7 JUN 2021, including the promoter’s stated completion date and development-agreement references.
Occupancy / completion recordNo occupancy or completion certificate is included in the supplied documents. The building permit specifies that an occupancy certificate is required before occupation.
Layout approval recordThe supplied record lists a layout-plan document request, but the layout document is not extracted as an approved plan in the evidence provided. Document index
  • The building permit lists technical personnel including architect POPURI RAJESH (licence CA/2012/55044) and structural engineer LOKANATH GIDDALUR (licence 360/Strl/Engineer/TP10/GHMC).

Frequently asked questions

Is SAI S SAMHITHA registered with Telangana RERA?

Yes. SAI S SAMHITHA is registered with the Telangana Real Estate Regulatory Authority as P02200003243; the registration status is New Project.

Who is the developer of SAI S SAMHITHA?

The promoter named in the RERA registration is AVANTIKA SAIRAM PROJECTS.

Where is SAI S SAMHITHA located?

SAI S SAMHITHA is in Gajularamaram, Gajula Ramaram-1, Qutballapur, Medchal-Malkajgiri, Telangana (500055).

When will SAI S SAMHITHA be completed?

The promoter's proposed date of completion filed with RERA is 15/08/2027. This is the promoter's declaration, not a guarantee.