Silversand Cyberdyne 3

Silversand Infratech Private Limited · Rangareddy · RERA P02400000074

Silversand Cyberdyne 3 is a residential apartment project in HITEX, Serilingampally, Ranga Reddy, developed by the registered promoter Silversand Infratech Private Limited. The project occupies 519.76 m² and comprises one residential building, Building A, with a stilt and 5 floors. The TG-RERA inventory records 10 3BHK apartments, with a saleable area of 124.35 m². Its TG-RERA registration is P02400000074, and its proposed completion date is 26/03/2023.

More from Silversand Infratech Pvt Ltd · 2 projects →

01What we found

Period endedTG-RERA registration ran to 26 Mar 2023 - check its extension on TG-RERA
17documents on file - each fact links to its page
2court cases on this project's land (survey 41, Kannamet)
8items to check - 6 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameSilversand Cyberdyne 3 RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; the registration is for Silversand Cyberdyne 3
TG-RERA registrationP02400000074; registered from 13/12/2018 to 26/03/2023. The certificate states four years’ validity and does not record an extension
Registered promoterSilversand Infratech Private Limited
RERA statusPortal record labels the project “On-Going Project”; the registration’s stated validity ended 26/03/2023 RERA record

Land and geographic identity

ItemProject record
LocalityHITEX RERA record RERA filing
Revenue villageKannamet; the building-permit and title documents also spell it Khanammet/Khanamet RERA record
Mandal / district / PINSerilingampally / Ranga Reddy / 500084 RERA record
Project survey number(s) and subdivision(s)Survey No. 41/5; the RERA certificate describes the site as H.No. 2-41/5/A/1 (PART), ON PLOT Nos. 8 (PART) & 9. No further survey subdivision is stated in the project identity record
Site area519.76 m² total and 519.76 m² net; road-affected area recorded as 0 RERA filing
Boundaries recorded by RERAEast: 30 Feet Road; West, North and South: Neighbours Land RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building approvalApproval No. 1/C12/02715/2017, dated 26 March, 2017; the permit also identifies file No. 1/C12/05092/2016 Approvals record
Approved buildingBuilding A, residential; sanctioned configuration Stilt + 5 floors
Approved area figuresSanctioned parameters list 1,247.15 m² for five residential upper floors and 238.88 m² for the stilt. RERA records approved built-up area as 1,247.15 m²; these are differently labelled figures in the supplied records RERA filing
Building / block countOne building / block recorded RERA filing RERA unit table
Parking levels and provisionPermit says the cellar and stilt approved for parking are to be used exclusively for vehicle parking; a parking count is not supplied
Unit countGHMC permit says sanctioned units must not be increased without prior approval, but the permit extraction does not state a numerical count. RERA records 1 proposed building unit; the unit inventory records 10 apartments RERA filing RERA unit table

Offering and status

ItemProject record
RERA-filed configuration3BHK; 10 units, 9 booked and 1 available in the portal inventory. The portal record provides no inventory as-of date, so counts are indicative RERA unit table
RERA-filed saleable area124.35 m² RERA unit table
Construction stageRERA labels the project “On-Going Project” and records 90% completeness; this is a portal/declaration record, not independent site verification RERA record
Completion datesOriginal and revised proposed completion dates are both 26/03/2023 RERA record
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied project evidence. The building permit states an occupancy certificate is compulsory before occupation

2. The project story

Silversand Cyberdyne 3 is registered as a residential apartment development on Survey No. 41/5, at the recorded H.No. 2-41/5/A/1 (PART), Plot Nos. 8 (PART) and 9 site in Kannamet, Serilingampally, Ranga Reddy District. The RERA record identifies one building and a 3BHK offering; its unit inventory lists ten apartments, with nine booked and one available when last read, although no inventory as-of date is given. RERA record RERA unit table

GHMC’s building permit describes one residential Building A with a stilt and five upper floors. The RERA portal states 90% completeness and “On-Going Project,” while the promoter’s Form B declaration undertook completion by 26 March 2023. These are recorded statements, not an independent inspection of construction. No occupancy or completion certificate is present in the supplied evidence. RERA record

3. Master plan, architecture & building design

The filed project and permit identify a 519.76 m² site in Survey No. 41/5 and a single residential building, Building A. The permit specifies Stilt + 5 floors, a building height of 14.99 m, five residential upper floors totalling 1,247.15 m², and a stilt area of 238.88 m². The RERA filing labels 1,247.15 m² as approved built-up area. No floor-by-floor apartment count, building footprint, lift/stair arrangement, internal circulation plan, or project-wide residential/common-area schedule is available in the supplied drawing records. RERA filing RERA filing

The GHMC permit identifies a layout/subdivision reference LRS/765/NEW/CR-12/West Zone/GHMC/2013 and includes a condition for a fenced tot-lot maintained as greenery. The permit extraction states “Tot-lot (m2) 0” in its sanctioned parameters, so it does not establish a tot-lot area. No approved-layout drawing or detailed site plan is available here to describe landscaping, open-space distribution, or vehicle and pedestrian routes.

4. Homes, configurations & floor plans

The TG-RERA inventory records ten 3BHK apartments, nine booked and one available, with filed saleable area of 124.35 m². The booking counts have no supplied as-of date. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK1091124.35 m²Software-measured median 93.6 m²; range 91.0–97.2 m²25% RERA unit table RERA unit details Floor plans

The carpet-area figures are software measurements from drawing geometry, not RERA-filed areas, and the drawing review notes that they need review. The RERA-filed saleable area is a separate measure and includes the home’s share of common areas; the two figures should not be treated as interchangeable. RERA unit details Floor plans

One drawing sheet is measured and one is pending scanning. A measured typical-floor-plan example labels three bedrooms, living/dining, kitchen, two toilets and two utility areas. The cited room measurements are drawing-derived for that example, not RERA disclosures; utility areas are identified separately from the measured carpet area. Floor plans RERA unit details

5. Parking & vehicle circulation

The GHMC permit states that the cellar and stilt approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied permit extraction does not give a parking-space count, and the project records do not establish resident, visitor or accessible-space allocations, parking ownership/allotment by apartment, EV charging, ramp arrangements or pedestrian separation. A vendor record lists covered and open parking, but provides no quantities or unit-allocation documentation. Promoter website

6. Amenities, recreation & open spaces

The following progress figures are RERA-portal declarations; they are not independently verified completion findings. The portal records 14 infrastructure/amenity categories, but does not provide facility dimensions or capacities. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Water supplyNo source, storage capacity or facility size stated hereRERA amenity record RERA amenitiesYES; 100% declared
SewerageRecord groups chambers, lines, septic tank and STP; no component-specific details or capacity suppliedRERA amenity record RERA amenitiesYES; 100% declared
Treatment and disposal of sewage and sullage waterNo process or capacity suppliedRERA amenity record RERA amenitiesYES; 100% declared
Green strip / tot-lot / parkGHMC permit also conditions maintenance of a fenced tot-lot; no area establishedRERA amenity record RERA amenitiesYES; 100% declared
Solid waste management and disposalNo system details or capacity suppliedRERA amenity record RERA amenitiesYES; 100% declared
Water conservation / rainwater harvestingGHMC permit requires a rainwater-harvesting structure (percolation pit)RERA amenity record RERA amenitiesYES; 100% declared
Fire protection and fire-safety requirementsNo system specifications suppliedRERA amenity record RERA amenitiesYES; 100% declared
Electrical meter room, sub-station or receiving stationNo capacity or equipment details suppliedRERA amenity record RERA amenitiesYES; 100% declared
Internal roads and footpathsNo dimensions or layout details suppliedRERA amenity record RERA amenities0% recorded
Storm-water drainsNo dimensions or system details suppliedRERA amenity record RERA amenities0% recorded
Street lightingDetails not suppliedRERA amenity record RERA amenities0% recorded
Community buildingsDetails not suppliedRERA amenity record RERA amenities0% recorded
Energy managementDetails not suppliedRERA amenity record RERA amenities0% recorded
Aggregate recreational open spaceArea not suppliedRERA amenity record RERA amenities0% recorded

The GHMC permit extraction also identifies a requirement for 25 trees and refers to greenery around the site. The supplied records do not establish completion of that condition.

7. Utilities, building services & safety

GHMC’s permit requires a rainwater-harvesting percolation pit, a garbage house within the premises, space for a transformer, and an ETP in accordance with standard specifications. It also states that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision. These are permit conditions; the supplied material does not provide capacities, detailed system designs, or independent confirmation of installation.

The RERA amenity record declares water supply, sewerage, sewage/sullage treatment, solid-waste management, rainwater harvesting, fire-safety requirements and an electrical meter room/sub-station/receiving station at 100%. It does not specify water sources or storage, STP/ETP capacity, reuse, storm-water arrangements, power backup, lift count or capacity, fire equipment, CCTV, security, or accessible circulation. A vendor record advertises separate municipal and bore-well water tanks, a six-passenger lift, 100% generator backup and CCTV/security, but these are vendor claims, not project-specific completion evidence. RERA amenities Promoter website

The building permit makes an occupancy certificate compulsory before occupation and says public water and electricity connections will be provided only on production of an occupancy certificate. See the occupancy-certificate status above.

8. Location, access & connectivity

The registered project location is HITEX, Kannamet, Serilingampally, Ranga Reddy District, Telangana 500084. The site record gives a 30 Feet Road boundary to the east. RERA record RERA filing

The supplied location record lists these mapped distances: medical clinic and school, 0.1 km each; unnamed park, 0.3 km; HITEC City railway station, 0.7 km; Andhra Bank, 0.8 km; Divyasree Omega, 1.2 km; KLH University GBS, 1.3 km; Night Bazar, 1.5 km; Kondapur Bus Depot, 1.6 km; and HITEC City metro, 2.1 km. These are supplied location-record distances; no travel times are provided. Location record

9. Developer & development status

The registered promoter is Silversand Infratech Private Limited, a company. The corporate identifier in the supplied entity record is U45200TG2008 PTC060892. The recorded promoter address is Silversand Cyberdyne 1, Flat No. 102, H.No. 2-41/5/A/3, Plot Nos. 5 & 6, HITEX/Khanamet, Serilingampally, Ranga Reddy, Telangana 500084. Corporate record Parties record

The promoter’s Form B affidavit, dated 21 November 2018, was made by Managing Director Mr. R. Srinivasa Reddy and undertook completion by 26 March 2023. The project record shows the same original and revised proposed completion date, labels the project ongoing, and records 90% completeness; no independent construction-progress inspection or occupancy/completion certificate is supplied. RERA record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for Silversand Cyberdyne 3, registration P02400000074, issued 13/12/2018, valid through 26/03/2023; certificate states no extension
GHMC building permitBuilding Permit Order dated 26 March, 2017, approval No. 1/C12/02715/2017, file No. 1/C12/05092/2016, for Building A, Stilt + 5 floors, Survey No. 41/5
Layout / subdivision referenceLRS/765/NEW/CR-12/West Zone/GHMC/2013, quoted in the building permit; the supplied evidence does not include a separate approved-layout drawing
Promoter declarationForm B affidavit dated 21 November 2018, including the promoter’s completion undertaking and other registration declarations
Agreement materialFiled agreement text refers to a permit and sanctioned plan, but that extracted text does not identify the approval number or include the approval instrument
Occupancy/completion certificateNot identified in the supplied project documents Document index

The permit lists conditions concerning commencement and completion notices, parking use, rainwater harvesting, greenery, transformer space, garbage storage, ETP, fire and structural safety, and the requirement to obtain an occupancy certificate before occupation.

Frequently asked questions

Is Silversand Cyberdyne 3 registered with Telangana RERA?

Yes. Silversand Cyberdyne 3 is registered with the Telangana Real Estate Regulatory Authority as P02400000074; the registration status is On-Going Project.

Who is the developer of Silversand Cyberdyne 3?

The promoter named in the RERA registration is Silversand Infratech Private Limited.

Where is Silversand Cyberdyne 3 located?

Silversand Cyberdyne 3 is in HITEX, Kannamet, Serilingampally, Rangareddy, Telangana (500084).

When will Silversand Cyberdyne 3 be completed?

The promoter's proposed date of completion filed with RERA is 26/03/2023. This is the promoter's declaration, not a guarantee.