Sri Vastra Residency
PRAKRUTHI INFRASTRUCTURE DEVELOPERS · Rangareddy · RERA P02400000115
SRI VASTRA RESIDENCY is a residential apartment project in UPPARAPALLY, Rajendranagar mandal, Ranga Reddy district. It is being developed by the registered promoter PRAKRUTHI INFRASTRUCTURE DEVELOPERS. The project occupies a 610.67 sq.m. site and comprises one building with 1 Stilt + 5 upper floors and 10 homes: 9 2BHK units and 1 3BHK unit. Its TG-RERA registration is P02400000115, and its proposed completion date is 05.11.2024.
More from Prakruthi Infrastructure Developers · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SRI VASTRA RESIDENCY RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Not separately identified in the supplied record; the registration and approval describe one building. RERA record Approvals record |
| TG-RERA registration | P02400000115, issued 31/12/2018; the certificate states validity through 05/11/2024, unless extended by the Authority. |
| Registered promoter | PRAKRUTHI INFRASTRUCTURE DEVELOPERS; the RERA record identifies the organization type as Partnership. RERA record RERA filing |
| RERA project status | Listed as On-Going Project in the project record. The supplied certificate shows no extension (extended: false); a current registration status beyond its stated validity is not established by the supplied certificate. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Locality: UPPARAPALLY; revenue-village name in the project record: Upperpallys. RERA record RERA filing |
| Mandal / district / PIN | Rajendranagar / Ranga Reddy / 506112. RERA record RERA filing |
| Project survey numbers | 178/, 179/, 180/, 181/, 182/. Subdivisions are not supplied. RERA record |
| Plot | Plot No. 4. |
| Site area | 610.67 sq.m. recorded as plot/site area; 121.45 sq.m. road-affected area; 489.22 sq.m. net plot area in the filed plan. RERA filing |
| Boundaries filed with RERA | East: OTHERS - PARK; West: ROAD WIDTH 30; North: PLOT NO 5; South: PLOT NO 3 PART. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building-permit approval | 1/C11/17321/2018, dated 05 November, 2018 in the Building Permit Order; the filed plan also records this approval number and a date of 09-11-2018. Approvals record |
| Building arrangement / sanctioned floors | One proposed residential building, 1 Stilt + 5 upper floors; sanctioned building height is recorded as 15.00 MT. |
| Approved area figures | The filed plan records Net BUA Residential 1146.44 sq.m., BUILT UP AREA 1375.73 sq.m., and MORTGAGE AREA 118.79 sq.m. These are distinct plan labels; the plan also records Proposed Net Built up Area 1146.45 sq.mt. |
| Unit count | 10 units in the filed plan; the RERA unit record also totals 10. RERA unit table |
| Parking | The filed plan states Proposed Number of Parkings 6 and identifies stilt parking; the building-permit order says the approved stilt is to be used exclusively for vehicle parking. No unit-wise parking allocation is supplied. |
Offering and status
| Item | Project record |
|---|---|
| Configurations | 2BHK: 9 units; 3BHK: 1 unit. RERA unit table |
| RERA-filed saleable areas | 2BHK: 93.17 sq.m.; 3BHK: 95.16 sq.m. RERA unit table |
| Booking / availability | Portal-derived filing data records 0 booked and 9 available 2BHK units, and 0 booked and 1 available 3BHK unit. The record has no as-of date, so these counts are indicative rather than confirmed current inventory. RERA unit table |
| Construction stage | Described in the project record as On-Going Project; no independently verified construction-progress percentage or site inspection is supplied. RERA record RERA amenities |
| Completion deadline | Promoter’s Form B undertaking and the GHMC permit record 05.11.2024 as the project completion date. The RERA certificate validity end date is also 05/11/2024; registration validity and the completion deadline are separate records. |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents. The GHMC order requires an occupancy certificate before occupation. Document index |
2. The project story
SRI VASTRA RESIDENCY is a single-building residential apartment development on Plot No. 4 at Upperpally, Rajendranagar, in the Ranga Reddy district. The GHMC building-permit record identifies the project land as Survey Nos. 178/, 179/, 180/, 181/ and 182/ and describes a building of one stilt level and five upper floors. RERA record
The filed configuration is 10 homes: nine 2BHK apartments and one 3BHK apartment. The filing lists all 10 as available and none booked, but its booking record is undated and should be treated as indicative. The supplied evidence does not establish current physical construction progress or independently verify whether any part of the building is complete. RERA unit table RERA unit details
The promoter’s Form B undertaking states completion by 05.11.2024. The supplied project record identifies the project as ongoing, but includes no occupancy or completion certificate. The GHMC order states that an occupancy certificate is compulsory before occupation. RERA record Document index
3. Master plan, architecture & building design
The GHMC-filed plan describes one residential building, PROPOSED BLDG (NARASIMHA MURTHI), with 1 Stilt + 5 upper floors and a stated building height of 15.00 MT. The plan records a 610.67 sq.m. plot area, 121.45 sq.m. road-affected area and 489.22 sq.m. net plot area. It separately labels the building’s areas as Net BUA Residential 1146.44 sq.m., BUILT UP AREA 1375.73 sq.m., and MORTGAGE AREA 118.79 sq.m.; the approved drawing also records Proposed Net Built up Area 1146.45 sq.mt.
The filed plan shows Proposed Coverage Area (46.87%) 229.29 sq.m., Vacant Plot Area 255.60 sq.m., and AccessoryUse Area 4.33 sq.m. It identifies a green strip, rainwater harvesting, a distribution transformer, a watchman room, a tot-lot and a garbage house. These are plan-recorded provisions, not evidence that the facilities are complete or operational.
The approved drawings specify 10 dwelling units. The available evidence does not establish a complete floor-by-floor arrangement, the number of homes per floor, lift or stair details, or the full dimensions and layout of internal circulation. The plan refers to road widths including 30.00M WIDE MAINROAD, 12.00M WIDE ROAD and 4.50M WIDE DRIVE WAY; no further surveyed circulation description is supplied.
4. Homes, configurations & floor plans
The TG-RERA unit record lists nine 2BHK homes and one 3BHK home. The RERA-filed figures below are saleable areas; measured carpet figures are software measurements taken from the approved floor-plan drawing geometry, not RERA disclosures, and are marked for review. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 9 | 0 | 9 | 93.17 sq.m. | 76.5–81.2 sq.m.; median 78.8 sq.m. (849 sq.ft. median) | 15% |
| 3BHK | 1 | 0 | 1 | 95.16 sq.m. | Not supplied | Not supplied |
The 2BHK carpet range comes from software measurement of four flat designs in the filed floor-plan drawing; the median is 78.8 sq.m. The drawing measurement identifies a bedroom, kitchen, living/dining area, toilets, balcony and utility in the measured example. One example gives a bedroom of 3.8 × 4.02 m, kitchen of 2.52 × 2.96 m, living/dining of 4.02 × 6.82 m, balcony of 1.5 × 4.4 m, and utility of 1.5 × 2.3 m. These are drawing-derived measurements, not RERA-filed unit specifications, and require verification against the drawing. RERA unit details Floor plans
Saleable area and carpet area are different measures in the supplied records. The measured carpet-area source notes that it is smaller than the RERA saleable area, which also includes the home’s share of common areas. The available material does not supply a separate RERA-filed carpet area or a 3BHK drawing measurement. Floor plans RERA unit table
5. Parking & vehicle circulation
The filed plan records Proposed Number of Parkings 6 and shows stilt parking provision. The GHMC building-permit order states that the stilt approved for parking is to be used exclusively for vehicles, without partition walls or rolling shutters. The plan also identifies a 4.50M WIDE DRIVE WAY.
No supplied record establishes visitor or accessible parking counts, two-wheeler spaces, EV charging, parking allocation to particular apartments, or an exclusive ownership entitlement for any parking bay. The six spaces are therefore reported as a plan-proposed count, not as evidence of unit-wise allocation or delivery. RERA unit table
6. Amenities, recreation & open spaces
The GHMC-filed plan and RERA amenity record list proposed site facilities and services. The RERA amenity entries show 0% against each listed item; this records the supplied progress field and does not independently verify construction or operational status. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Tot-lot listed; the building-permit order records Tot-lot (m2) 0. Green strip and periphery greenery are also specified. | RERA amenity progress: 0%; completion not independently verified. | |
| Rainwater harvesting | Rain Water Harvesting Structure (percolation pit). | RERA amenity progress: 0%; completion not independently verified. | |
| Garbage house | A garbage house is listed in the filed plan. | RERA amenity progress: 0%; completion not independently verified. | |
| Watchman room | Listed in the filed plan. | No completion evidence supplied. | |
| Community buildings | Listed in the RERA amenity record; no specific building or size is supplied. | RERA amenities | RERA amenity progress: 0%; completion not independently verified. |
| Internal roads and footpaths | Listed in the RERA amenity record; no project-wide measured area is supplied. | RERA amenities | RERA amenity progress: 0%; completion not independently verified. |
| Street lighting | Listed in the RERA amenity record. | RERA amenities | RERA amenity progress: 0%; completion not independently verified. |
| Recreational open space | Listed in the RERA amenity record; no aggregate area is supplied. | RERA amenities | RERA amenity progress: 0%; completion not independently verified. |
7. Utilities, building services & safety
The RERA amenity record lists water supply; sewerage (chambers, lines, septic tank and STP); storm-water drains; treatment and disposal of sewage and sullage water; solid-waste management; rainwater harvesting; energy management; fire protection and fire-safety requirements; and an electrical meter room, sub-station or receiving station. It marks water supply, rainwater harvesting, energy management, fire safety and electrical facilities as available, but shows 0% progress for the listed amenity items. The supplied data does not establish capacities, operational status or independent completion verification. RERA amenities
The GHMC documents specify space for a transformer, a rainwater-harvesting structure and a garbage house, and require an occupancy certificate before occupation. The building-permit order also states that an effluent treatment plant is to be provided as per standard specification. These are approval conditions or plan-recorded provisions, not proof of installed or functioning systems.
The filed material does not establish lift numbers or capacities, backup-power capacity, water source or storage capacity, STP capacity, CCTV or access-control equipment, accessible routes or ramps, or the details of fire systems and escape arrangements. No statutory compliance conclusion is drawn from the listed facilities alone. RERA amenities Document index
8. Location, access & connectivity
The project’s filed location is UPPARAPALLY, revenue-village field Upperpallys, Rajendranagar mandal, Ranga Reddy district, PIN 506112. The filed boundary description identifies a 30-width road to the west, a park to the east, Plot No. 5 to the north and Plot No. 3 part to the south. RERA record RERA filing
The supplied location record gives Rajiv Gandhi Intl Airport: 8.9 km. This is a recorded distance; no travel time or route is supplied. The building-plan records also refer to a 30.00M WIDE MAINROAD, 12.00M WIDE ROAD and 4.50M WIDE DRIVE WAY, but do not provide a documented public-transport route or a measured distance to other landmarks. Location record
9. Developer & development status
- The registered promoter is PRAKRUTHI INFRASTRUCTURE DEVELOPERS, identified in the RERA project fields as a Partnership. The supplied project record names KUNWAR SAI VIJENDER SINGH and CHADA VIJAY GOPAL REDDY as partners and authorised signatories. The legal entity’s registration particulars and a separately verified official website or contact details are not supplied. RERA filing Parties record
- The project record identifies one landowner, A NARASIMHA MURTHI, under an AreaShare arrangement. The promoter’s Form B, signed through authorised signatory C Vijay Gopal Reddy, declares a completion deadline of 05.11.2024. This is a promoter declaration; the supplied material does not include independently verified construction progress or an occupancy/completion certificate. Parties record Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for SRI VASTRA RESIDENCY, registration P02400000115, issued 31/12/2018; stated validity through 05/11/2024 unless extended by the Authority. |
| GHMC building permit | Building Permit Order 1/C11/17321/2018, dated 05 November, 2018, for the proposed residential building on the filed survey numbers. |
| Filed building/layout plan | GHMC plan records Plot No. 4, one stilt plus five upper floors and 10 dwelling units. |
| Promoter declaration | Form B by PRAKRUTHI INFRASTRUCTURE DEVELOPERS, dated 27 November 2018, including its declared title and completion undertaking. |
| Occupancy/completion certificate | Not included in the supplied documents. The GHMC order states that an occupancy certificate is required before occupation. Document index |
The supplied material identifies the plan and registration records above but does not establish whether an extension was granted after the certificate’s stated validity period, or whether an occupancy/completion certificate has since been issued. Document index
1. Project at a glance
Project identity
Registered project name: SRI VASTRA RESIDENCY
Project type: Residential apartment project
Phase / registered portion: Not separately identified in the supplied record; the registration and approval describe one building.
TG-RERA registration: P02400000115, issued 31/12/2018; the certificate states validity through 05/11/2024, unless extended by the Authority.
Registered promoter: PRAKRUTHI INFRASTRUCTURE DEVELOPERS; the RERA record identifies the organization type as Partnership.
RERA project status: Listed as On-Going Project in the project record. The supplied certificate shows no extension (extended: false); a current registration status beyond its stated validity is not established by the supplied certificate.
Land and geographic identity
Locality / revenue village: Locality: UPPARAPALLY; revenue-village name in the project record: Upperpallys.
Mandal / district / PIN: Rajendranagar / Ranga Reddy / 506112.
Project survey numbers: 178/, 179/, 180/, 181/, 182/. Subdivisions are not supplied.
Plot: Plot No. 4.
Site area: 610.67 sq.m. recorded as plot/site area; 121.45 sq.m. road-affected area; 489.22 sq.m. net plot area in the filed plan.
Boundaries filed with RERA: East: OTHERS - PARK; West: ROAD WIDTH 30; North: PLOT NO 5; South: PLOT NO 3 PART.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building-permit approval: 1/C11/17321/2018, dated 05 November, 2018 in the Building Permit Order; the filed plan also records this approval number and a date of 09-11-2018.
Building arrangement / sanctioned floors: One proposed residential building, 1 Stilt + 5 upper floors; sanctioned building height is recorded as 15.00 MT.
Approved area figures: The filed plan records Net BUA Residential 1146.44 sq.m., BUILT UP AREA 1375.73 sq.m., and MORTGAGE AREA 118.79 sq.m. These are distinct plan labels; the plan also records Proposed Net Built up Area 1146.45 sq.mt.
Unit count: 10 units in the filed plan; the RERA unit record also totals 10.
Parking: The filed plan states Proposed Number of Parkings 6 and identifies stilt parking; the building-permit order says the approved stilt is to be used exclusively for vehicle parking. No unit-wise parking allocation is supplied.
Offering and status
Configurations: 2BHK: 9 units; 3BHK: 1 unit.
RERA-filed saleable areas: 2BHK: 93.17 sq.m.; 3BHK: 95.16 sq.m.
Booking / availability: Portal-derived filing data records 0 booked and 9 available 2BHK units, and 0 booked and 1 available 3BHK unit. The record has no as-of date, so these counts are indicative rather than confirmed current inventory.
Construction stage: Described in the project record as On-Going Project; no independently verified construction-progress percentage or site inspection is supplied.
Completion deadline: Promoter’s Form B undertaking and the GHMC permit record 05.11.2024 as the project completion date. The RERA certificate validity end date is also 05/11/2024; registration validity and the completion deadline are separate records.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents. The GHMC order requires an occupancy certificate before occupation.
2. The project story
SRI VASTRA RESIDENCY is a single-building residential apartment development on Plot No. 4 at Upperpally, Rajendranagar, in the Ranga Reddy district. The GHMC building-permit record identifies the project land as Survey Nos. 178/, 179/, 180/, 181/ and 182/ and describes a building of one stilt level and five upper floors.
The filed configuration is 10 homes: nine 2BHK apartments and one 3BHK apartment. The filing lists all 10 as available and none booked, but its booking record is undated and should be treated as indicative. The supplied evidence does not establish current physical construction progress or independently verify whether any part of the building is complete.
The promoter’s Form B undertaking states completion by 05.11.2024. The supplied project record identifies the project as ongoing, but includes no occupancy or completion certificate. The GHMC order states that an occupancy certificate is compulsory before occupation.
3. Master plan, architecture & building design
The GHMC-filed plan describes one residential building, PROPOSED BLDG (NARASIMHA MURTHI), with 1 Stilt + 5 upper floors and a stated building height of 15.00 MT. The plan records a 610.67 sq.m. plot area, 121.45 sq.m. road-affected area and 489.22 sq.m. net plot area. It separately labels the building’s areas as Net BUA Residential 1146.44 sq.m., BUILT UP AREA 1375.73 sq.m., and MORTGAGE AREA 118.79 sq.m.; the approved drawing also records Proposed Net Built up Area 1146.45 sq.mt.
The filed plan shows Proposed Coverage Area (46.87%) 229.29 sq.m., Vacant Plot Area 255.60 sq.m., and AccessoryUse Area 4.33 sq.m. It identifies a green strip, rainwater harvesting, a distribution transformer, a watchman room, a tot-lot and a garbage house. These are plan-recorded provisions, not evidence that the facilities are complete or operational.
The approved drawings specify 10 dwelling units. The available evidence does not establish a complete floor-by-floor arrangement, the number of homes per floor, lift or stair details, or the full dimensions and layout of internal circulation. The plan refers to road widths including 30.00M WIDE MAINROAD, 12.00M WIDE ROAD and 4.50M WIDE DRIVE WAY; no further surveyed circulation description is supplied.
4. Homes, configurations & floor plans
The TG-RERA unit record lists nine 2BHK homes and one 3BHK home. The RERA-filed figures below are saleable areas; measured carpet figures are software measurements taken from the approved floor-plan drawing geometry, not RERA disclosures, and are marked for review.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 9 | 0 | 9 | 93.17 sq.m. | 76.5–81.2 sq.m.; median 78.8 sq.m. (849 sq.ft. median) | 15% |
| 3BHK | 1 | 0 | 1 | 95.16 sq.m. | Not supplied | Not supplied |
The 2BHK carpet range comes from software measurement of four flat designs in the filed floor-plan drawing; the median is 78.8 sq.m. The drawing measurement identifies a bedroom, kitchen, living/dining area, toilets, balcony and utility in the measured example. One example gives a bedroom of 3.8 × 4.02 m, kitchen of 2.52 × 2.96 m, living/dining of 4.02 × 6.82 m, balcony of 1.5 × 4.4 m, and utility of 1.5 × 2.3 m. These are drawing-derived measurements, not RERA-filed unit specifications, and require verification against the drawing.
Saleable area and carpet area are different measures in the supplied records. The measured carpet-area source notes that it is smaller than the RERA saleable area, which also includes the home’s share of common areas. The available material does not supply a separate RERA-filed carpet area or a 3BHK drawing measurement.
5. Parking & vehicle circulation
The filed plan records Proposed Number of Parkings 6 and shows stilt parking provision. The GHMC building-permit order states that the stilt approved for parking is to be used exclusively for vehicles, without partition walls or rolling shutters. The plan also identifies a 4.50M WIDE DRIVE WAY.
No supplied record establishes visitor or accessible parking counts, two-wheeler spaces, EV charging, parking allocation to particular apartments, or an exclusive ownership entitlement for any parking bay. The six spaces are therefore reported as a plan-proposed count, not as evidence of unit-wise allocation or delivery.
6. Amenities, recreation & open spaces
The GHMC-filed plan and RERA amenity record list proposed site facilities and services. The RERA amenity entries show 0% against each listed item; this records the supplied progress field and does not independently verify construction or operational status.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Tot-lot listed; the building-permit order records Tot-lot (m2) 0. Green strip and periphery greenery are also specified. | RERA amenity progress: 0%; completion not independently verified. | |
| Rainwater harvesting | Rain Water Harvesting Structure (percolation pit). | RERA amenity progress: 0%; completion not independently verified. | |
| Garbage house | A garbage house is listed in the filed plan. | RERA amenity progress: 0%; completion not independently verified. | |
| Watchman room | Listed in the filed plan. | No completion evidence supplied. | |
| Community buildings | Listed in the RERA amenity record; no specific building or size is supplied. | RERA amenity progress: 0%; completion not independently verified. | |
| Internal roads and footpaths | Listed in the RERA amenity record; no project-wide measured area is supplied. | RERA amenity progress: 0%; completion not independently verified. | |
| Street lighting | Listed in the RERA amenity record. | RERA amenity progress: 0%; completion not independently verified. | |
| Recreational open space | Listed in the RERA amenity record; no aggregate area is supplied. | RERA amenity progress: 0%; completion not independently verified. |
7. Utilities, building services & safety
The RERA amenity record lists water supply; sewerage (chambers, lines, septic tank and STP); storm-water drains; treatment and disposal of sewage and sullage water; solid-waste management; rainwater harvesting; energy management; fire protection and fire-safety requirements; and an electrical meter room, sub-station or receiving station. It marks water supply, rainwater harvesting, energy management, fire safety and electrical facilities as available, but shows 0% progress for the listed amenity items. The supplied data does not establish capacities, operational status or independent completion verification.
The GHMC documents specify space for a transformer, a rainwater-harvesting structure and a garbage house, and require an occupancy certificate before occupation. The building-permit order also states that an effluent treatment plant is to be provided as per standard specification. These are approval conditions or plan-recorded provisions, not proof of installed or functioning systems.
The filed material does not establish lift numbers or capacities, backup-power capacity, water source or storage capacity, STP capacity, CCTV or access-control equipment, accessible routes or ramps, or the details of fire systems and escape arrangements. No statutory compliance conclusion is drawn from the listed facilities alone.
8. Location, access & connectivity
The project’s filed location is UPPARAPALLY, revenue-village field Upperpallys, Rajendranagar mandal, Ranga Reddy district, PIN 506112. The filed boundary description identifies a 30-width road to the west, a park to the east, Plot No. 5 to the north and Plot No. 3 part to the south.
The supplied location record gives Rajiv Gandhi Intl Airport: 8.9 km. This is a recorded distance; no travel time or route is supplied. The building-plan records also refer to a 30.00M WIDE MAINROAD, 12.00M WIDE ROAD and 4.50M WIDE DRIVE WAY, but do not provide a documented public-transport route or a measured distance to other landmarks.
9. Developer & development status
- The registered promoter is PRAKRUTHI INFRASTRUCTURE DEVELOPERS, identified in the RERA project fields as a Partnership. The supplied project record names KUNWAR SAI VIJENDER SINGH and CHADA VIJAY GOPAL REDDY as partners and authorised signatories. The legal entity’s registration particulars and a separately verified official website or contact details are not supplied.
- The project record identifies one landowner, A NARASIMHA MURTHI, under an AreaShare arrangement. The promoter’s Form B, signed through authorised signatory C Vijay Gopal Reddy, declares a completion deadline of 05.11.2024. This is a promoter declaration; the supplied material does not include independently verified construction progress or an occupancy/completion certificate.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for SRI VASTRA RESIDENCY, registration P02400000115, issued 31/12/2018; stated validity through 05/11/2024 unless extended by the Authority.
GHMC building permit: Building Permit Order 1/C11/17321/2018, dated 05 November, 2018, for the proposed residential building on the filed survey numbers.
Filed building/layout plan: GHMC plan records Plot No. 4, one stilt plus five upper floors and 10 dwelling units.
Promoter declaration: Form B by PRAKRUTHI INFRASTRUCTURE DEVELOPERS, dated 27 November 2018, including its declared title and completion undertaking.
Occupancy/completion certificate: Not included in the supplied documents. The GHMC order states that an occupancy certificate is required before occupation.
The supplied material identifies the plan and registration records above but does not establish whether an extension was granted after the certificate’s stated validity period, or whether an occupancy/completion certificate has since been issued.
Frequently asked questions
Is SRI VASTRA RESIDENCY registered with Telangana RERA?
Yes. SRI VASTRA RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02400000115; the registration status is On-Going Project.
Who is the developer of SRI VASTRA RESIDENCY?
The promoter named in the RERA registration is PRAKRUTHI INFRASTRUCTURE DEVELOPERS.
Where is SRI VASTRA RESIDENCY located?
SRI VASTRA RESIDENCY is in UPPARAPALLY, Upperpallys, Rajendranagar, Rangareddy, Telangana (506112).
When will SRI VASTRA RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 05/11/2024. This is the promoter's declaration, not a guarantee.
More projects in Upperpallys