Sai Surya Arcade
SRR CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200003192
SAI SURYA ARCADE is a residential apartment project in Kompally, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district, developed by the registered promoter SRR CONSTRUCTIONS. The registered site covers 735.68 sq. m. and has one building with 1 Stilt + 5 Upper floors; the RERA filing lists 20 2BHK units. It is registered under TG-RERA number P02200003192, granted 06/08/2021, and the promoter’s Form B declaration undertook completion by 31.03.2023.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | SAI SURYA ARCADE RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | No phase designation is disclosed. The RERA record identifies the registered site as Plots 509, 510, 529 and 530 in Survey No. 151. RERA record |
| TG-RERA registration | P02200003192, granted 06/08/2021; certificate states validity through 16/05/2026, unless extended by the Authority. The available record does not show an extension. RERA record |
| Registered promoter | SRR CONSTRUCTIONS; the RERA record identifies it as a partnership. RERA record RERA filing Corporate record |
| RERA status in supplied record | Registration certificate issued; the certificate’s stated validity ended 16/05/2026. Current registration status is not established by the supplied record. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue-village wording | Kompally; the RERA certificate records Kompally Shivalayam, while the land and approval records use Kompally Village or Kompalle Village. RERA record Land records |
| Mandal | Dundigal Gandimaisamma; approval record also renders this as Dundigal/Gandimaisamma Mandal. RERA record |
| District / PIN | Medchal-Malkajgiri; 500018. RERA record |
| Project survey number(s) | Survey No. 151. No subdivision is disclosed in the supplied project records. RERA record Land records |
| Project plots | 509, 510, 529 AND 530; Block No. 36, Jayabheri Park is stated in the promoter’s Form B declaration. RERA record |
| Registered/site extent | 735.68 sq. m.; approval record gives site and net area as 735.68 sq. m. Land records |
| Boundaries in RERA filing | North: Plot No. 531; South: Plot No. 511; East and West: 30FT ROAD. RERA filing |
Development identity
| Item | Record |
|---|---|
| Principal technical approval | HMDA technical approval 035313/MED/R1/U6/HMDA/13032020, dated 16/05/2020. Approvals record |
| Building permit | Kompally Municipality building permit 0019/2020, dated 20.10.2020; File No. 2135/2020. Approvals record |
| Approved building use and configuration | Residential building; 1 Stilt + 5 Upper floors. |
| Approved built-up area | Building-permit extraction records Built up Area (Sgm.) 2019.35 and Upper Floors (5) Built up Area (Sgm.) 10096.85. The HMDA technical approval extraction separately lists “Total Built up Area: 2423.22”; the supplied record does not explain that figure’s basis. |
| Building / tower count | RERA land details record 1 building unit; one block is recorded in the project data. RERA filing RERA unit table |
| Sanctioned floor configuration | 1 Stilt + 5 Upper floors. Basement, podium and floor-by-floor unit distribution are not disclosed in the supplied extracts. |
| Parking levels / count | Stilt is recorded in the approved configuration, and the approval conditions require the stilt/cellar approved for parking to be used exclusively for vehicle parking. A sanctioned space count is not available in the supplied extracts. |
| Units | RERA filing records 20 2BHK units. The supplied approval extracts do not state an approved unit count. RERA unit table RERA unit details |
Offering and status
| Item | Record |
|---|---|
| RERA-filed configuration | 2BHK, 20 units; RERA-filed saleable area 35.11 sq. m. per unit. RERA unit table RERA unit details |
| Booked / available | Portal-derived filing data records 0 booked and 20 available; the booking record has no as-of date, so these counts are indicative. RERA unit table RERA unit details |
| Construction stage | The supplied material does not establish actual site progress. RERA infrastructure items are each recorded at 0% in the supplied amenities data. RERA amenities |
| Completion dates | The RERA certificate was valid through 16/05/2026. The promoter’s Form B declaration undertook completion by 31.03.2023. A current revised completion date is not established in the supplied records. |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied records. The building permit makes occupancy subject to completion and obtaining an occupancy certificate. |
2. The project story
SAI SURYA ARCADE is registered as a residential apartment project on Plots 509, 510, 529 and 530 in Survey No. 151 at Kompally, Medchal-Malkajgiri district. Its site area is recorded as 735.68 sq. m.; the approved building form is one residential building with one stilt level and five upper floors. RERA record Land records
The RERA filing lists 20 two-bedroom apartments. Its unit inventory shows 0 booked and 20 available, but no as-of date is supplied for that portal-derived count. The evidence provided does not include a site inspection or independently verified construction-progress report; the project’s physical completion stage therefore cannot be confirmed from this record. RERA unit table RERA unit details RERA amenities
The registration certificate states validity through 16/05/2026. Separately, the promoter’s Form B affidavit-cum-declaration undertook completion by 31.03.2023. The supplied record does not establish a revised completion undertaking, an extension, or an occupancy certificate.
3. Master plan, architecture & building design
The registered site extent is 735.68 sq. m. The Kompally Municipality building permit records a residential building with 1 Stilt + 5 Upper floors, and built-up-area entries of 2019.35 sq. m. and 10096.85 sq. m. for the upper floors. These figures are reproduced as stated in the approval extraction; the supplied material does not clarify their area basis or relationship. The HMDA technical approval extraction also records “Total Built up Area: 2423.22.” Land records
The RERA filing records one building unit and one block. The supplied approval extracts do not provide a floor-by-floor apartment schedule, flats per floor, building footprint, lift or stair details, or a drawing-derived circulation plan. The floor-plan set has two drawings, but neither has been measured; carpet-area and room-layout measurements are therefore unavailable. RERA filing RERA unit table Floor plans
The building permit records setbacks of Front 3.00M; Rear 3.50M; Side -l 3.50M; Side - II 3.50M. It also includes a tot-lot entry, but the supplied extraction does not state its size or capacity.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 35.11 sq. m. | Not measured | Not supplied |
The configuration, unit count, booking figures and saleable area are from the RERA filing data; booked and available counts are portal-derived and have no supplied as-of date. The approved-floor-plan drawings have not been measured by software, so no drawing-based carpet area or room dimensions are available. RERA unit details RERA unit table Floor plans
Saleable area and carpet area are different measures: the supplied floor-plan note says saleable area also counts a home’s share of common areas, while carpet area is smaller. No project-specific carpet-area, balcony, utility, common-area-loading or unit-orientation measurements are established in the supplied records. Floor plans
5. Parking & vehicle circulation
The approved building configuration includes a stilt level. Approval conditions say the stilt/cellar approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. The supplied extracts do not establish a sanctioned parking-space count, visitor or accessible spaces, parking allocation to individual apartments, ramp or driveway arrangements, or EV charging provision.
The RERA unit data marks the 20 listed 2BHK units as mortgaged, but does not identify parking allocations. A parking bay shown or provided within the project would not, by itself, establish an exclusive legal allocation to a particular apartment. RERA unit table
6. Amenities, recreation & open spaces
The RERA amenities record lists the following project infrastructure items and records each at 0%. This is the status shown in the supplied filing data, not an independent site verification. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | Size not supplied | RERA amenities record RERA amenities | 0%; not independently verified |
| Water Supply | Details and capacity not supplied | RERA amenities record RERA amenities | 0%; not independently verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | System details and capacity not supplied | RERA amenities record RERA amenities | 0%; not independently verified |
| Storm Water Drains | Details not supplied | RERA amenities record RERA amenities | 0%; not independently verified |
| Green Strip/TOT LOT/Park | Area and facilities not supplied; building permit also includes a “Tot-lot (m)” entry without a size | RERA amenities record RERA amenities; building permit | 0% in RERA record; not independently verified |
| Street Lighting | Details not supplied | RERA amenities record RERA amenities | 0%; not independently verified |
| Community Buildings | Details and size not supplied | RERA amenities record RERA amenities | 0%; not independently verified |
| Treatment and disposal of sewage and sullage water | Details and capacity not supplied | RERA amenities record RERA amenities | 0%; not independently verified |
| Solid Waste Management and Disposal | Details and capacity not supplied | RERA amenities record RERA amenities | 0%; not independently verified |
| Water Conservation, Rain Water Harvesting | Building approval requires rainwater-harvesting structures/percolation pit; capacity not supplied | RERA amenities record RERA amenities | 0% in RERA record; not independently verified |
| Energy management | Details not supplied | RERA amenities record RERA amenities | 0%; not independently verified |
| Fire Protection and Fire Safety Requirements | Systems and specifications not supplied | RERA amenities record RERA amenities | 0%; not independently verified |
| Electrical Meter Room, Sub-Station, Receiving Station | Building approval requires space for a transformer; detailed provision not supplied | RERA amenities record RERA amenities | 0% in RERA record; not independently verified |
| Aggregate area of recreational Open Space | Area not supplied | RERA amenities record RERA amenities | 0%; not independently verified |
7. Utilities, building services & safety
- Water and sewerage: HMDA’s technical approval directs the local authority to ensure water-supply and sewerage arrangements and inspect compliance during construction. The building-permit conditions also address water and electricity connections, subject to production of an occupancy certificate. The supplied records do not specify water source, storage capacity, treatment plant, sewerage-treatment capacity or reuse arrangements.
- Storm water and waste: The approvals require rainwater-harvesting structures, including a percolation pit, and a garbage house within the premises. The RERA amenities record lists storm-water drains, sewage and sullage-water treatment, and solid-waste management, each at 0%; completion has not been independently verified. RERA amenities
- Electrical, lifts and fire safety: The technical approval requires provision for a transformer. The supplied approvals do not specify electrical supply capacity, backup power, lift number or capacity, fire-system design, or escape-stair arrangements. The RERA amenities record lists energy management and fire protection/fire safety at 0%; no completed or independently verified systems are established here. RERA amenities
- The approval conditions also address structural safety, safe distances from high- and low-tension electrical lines, pedestrian safety during construction, and maintenance of peripheral greenery and the tot-lot. These are approval conditions, not evidence that the specified works have been completed.
8. Location, access & connectivity
The project’s registered location is Kompally, in the Dundigal Gandimaisamma mandal of Medchal-Malkajgiri district, PIN 500018. The RERA records identify Survey No. 151 and Plots 509, 510, 529 and 530; the stated site boundaries include 30FT ROAD on the east and west. RERA record RERA filing
The supplied location dataset lists these approximate distances: Outer Ring Road (nearest sampled interchange, approx): 7.3 km; St Martins Engineering College: 1.7 km; Sanjeevani Thyroid Sugar and Hormones Clinic: 0.4 km; Bolarum railway station: 2.7 km; Krishnaveni Talent School: 0.2 km. It also lists an unnamed bank and unnamed park, each at 0.4 km. These are location-dataset distances; no measurement method or route is supplied. Location record
9. Developer & development status
The registered promoter is SRR CONSTRUCTIONS, identified in the RERA filing as a partnership. The project record names CHENNAMANENI AMARENDER RAO as authorized signatory and GRANDHI SURYA PRABHAKAR HUF as partner. The supplied project record does not provide a verified corporate registration number, complete registered-office address, official telephone, email address or website. RERA filing Parties record Corporate record
The registered site is developed under a development agreement-cum-general power of attorney arrangement between the landowners and SRR CONSTRUCTIONS as developer. The Form B declaration, dated 26.03.2021, states a completion undertaking of 31.03.2023. The evidence provided does not establish current construction progress, a revised completion date, or an occupancy certificate.
10. Approvals, official records & documents
| Record | What the supplied document establishes |
|---|---|
| TG-RERA registration certificate, P02200003192 | Form C registration for SAI SURYA ARCADE under section 5; issued 06/08/2021, with stated validity through 16/05/2026 unless extended. |
| HMDA technical approval, 035313/MED/R1/U6/HMDA/13032020 | Technical approval dated 16/05/2020 for the residential building; the letter directs the applicant to obtain local-authority sanction and records a mortgage of built-up area in favour of MC, HMDA. |
| Kompally Municipality building permit, 0019/2020, File No. 2135/2020 | Building permit dated 20.10.2020 for a residential building on Survey No. 151 and Plots 509, 510, 529 and 530; records 1 Stilt + 5 Upper floors and validity through 19.10.2026. |
| Form B declaration | Promoter declaration dated 26.03.2021, including the stated land, encumbrance and project-completion undertakings. |
| Legal title-search report | Advocate’s opinion dated 27-3-2021, covering Plots 529, 530, 509 and 510 in Block No. 36, Jayabheri Park, Survey No. 151, with stated extent 880 Sq. Yards or 735.68 Sq. Mtrs. |
| HMDA technical approval / commencement-certificate file | The supplied project document list includes the HMDA technical approval letter. |
| Occupancy / completion certificate | Not present in the supplied project documents. Document index |
The approval conditions require completion notice and an occupancy certificate before occupation; the supplied evidence does not include such a certificate. The public HMDA layout lookup was unavailable in the supplied evidence, so an approved-layout record is not established here. HMDA
1. Project at a glance
Project identity
Registered project name: SAI SURYA ARCADE
Project type: Residential apartment project
Phase / registered portion: No phase designation is disclosed. The RERA record identifies the registered site as Plots 509, 510, 529 and 530 in Survey No. 151.
TG-RERA registration: P02200003192, granted 06/08/2021; certificate states validity through 16/05/2026, unless extended by the Authority. The available record does not show an extension.
Registered promoter: SRR CONSTRUCTIONS; the RERA record identifies it as a partnership.
RERA status in supplied record: Registration certificate issued; the certificate’s stated validity ended 16/05/2026. Current registration status is not established by the supplied record.
Land and geographic identity
Locality / revenue-village wording: Kompally; the RERA certificate records Kompally Shivalayam, while the land and approval records use Kompally Village or Kompalle Village.
Mandal: Dundigal Gandimaisamma; approval record also renders this as Dundigal/Gandimaisamma Mandal.
District / PIN: Medchal-Malkajgiri; 500018.
Project survey number(s): Survey No. 151. No subdivision is disclosed in the supplied project records.
Project plots: 509, 510, 529 AND 530; Block No. 36, Jayabheri Park is stated in the promoter’s Form B declaration.
Registered/site extent: 735.68 sq. m.; approval record gives site and net area as 735.68 sq. m.
Boundaries in RERA filing: North: Plot No. 531; South: Plot No. 511; East and West: 30FT ROAD.
Development identity
Principal technical approval: HMDA technical approval 035313/MED/R1/U6/HMDA/13032020, dated 16/05/2020.
Building permit: Kompally Municipality building permit 0019/2020, dated 20.10.2020; File No. 2135/2020.
Approved building use and configuration: Residential building; 1 Stilt + 5 Upper floors.
Approved built-up area: Building-permit extraction records Built up Area (Sgm.) 2019.35 and Upper Floors (5) Built up Area (Sgm.) 10096.85. The HMDA technical approval extraction separately lists “Total Built up Area: 2423.22”; the supplied record does not explain that figure’s basis.
Building / tower count: RERA land details record 1 building unit; one block is recorded in the project data.
Sanctioned floor configuration: 1 Stilt + 5 Upper floors. Basement, podium and floor-by-floor unit distribution are not disclosed in the supplied extracts.
Parking levels / count: Stilt is recorded in the approved configuration, and the approval conditions require the stilt/cellar approved for parking to be used exclusively for vehicle parking. A sanctioned space count is not available in the supplied extracts.
Units: RERA filing records 20 2BHK units. The supplied approval extracts do not state an approved unit count.
Offering and status
RERA-filed configuration: 2BHK, 20 units; RERA-filed saleable area 35.11 sq. m. per unit.
Booked / available: Portal-derived filing data records 0 booked and 20 available; the booking record has no as-of date, so these counts are indicative.
Construction stage: The supplied material does not establish actual site progress. RERA infrastructure items are each recorded at 0% in the supplied amenities data.
Completion dates: The RERA certificate was valid through 16/05/2026. The promoter’s Form B declaration undertook completion by 31.03.2023. A current revised completion date is not established in the supplied records.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied records. The building permit makes occupancy subject to completion and obtaining an occupancy certificate.
2. The project story
SAI SURYA ARCADE is registered as a residential apartment project on Plots 509, 510, 529 and 530 in Survey No. 151 at Kompally, Medchal-Malkajgiri district. Its site area is recorded as 735.68 sq. m.; the approved building form is one residential building with one stilt level and five upper floors.
The RERA filing lists 20 two-bedroom apartments. Its unit inventory shows 0 booked and 20 available, but no as-of date is supplied for that portal-derived count. The evidence provided does not include a site inspection or independently verified construction-progress report; the project’s physical completion stage therefore cannot be confirmed from this record.
The registration certificate states validity through 16/05/2026. Separately, the promoter’s Form B affidavit-cum-declaration undertook completion by 31.03.2023. The supplied record does not establish a revised completion undertaking, an extension, or an occupancy certificate.
3. Master plan, architecture & building design
The registered site extent is 735.68 sq. m. The Kompally Municipality building permit records a residential building with 1 Stilt + 5 Upper floors, and built-up-area entries of 2019.35 sq. m. and 10096.85 sq. m. for the upper floors. These figures are reproduced as stated in the approval extraction; the supplied material does not clarify their area basis or relationship. The HMDA technical approval extraction also records “Total Built up Area: 2423.22.”
The RERA filing records one building unit and one block. The supplied approval extracts do not provide a floor-by-floor apartment schedule, flats per floor, building footprint, lift or stair details, or a drawing-derived circulation plan. The floor-plan set has two drawings, but neither has been measured; carpet-area and room-layout measurements are therefore unavailable.
The building permit records setbacks of Front 3.00M; Rear 3.50M; Side -l 3.50M; Side - II 3.50M. It also includes a tot-lot entry, but the supplied extraction does not state its size or capacity.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 35.11 sq. m. | Not measured | Not supplied |
The configuration, unit count, booking figures and saleable area are from the RERA filing data; booked and available counts are portal-derived and have no supplied as-of date. The approved-floor-plan drawings have not been measured by software, so no drawing-based carpet area or room dimensions are available.
Saleable area and carpet area are different measures: the supplied floor-plan note says saleable area also counts a home’s share of common areas, while carpet area is smaller. No project-specific carpet-area, balcony, utility, common-area-loading or unit-orientation measurements are established in the supplied records.
5. Parking & vehicle circulation
The approved building configuration includes a stilt level. Approval conditions say the stilt/cellar approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. The supplied extracts do not establish a sanctioned parking-space count, visitor or accessible spaces, parking allocation to individual apartments, ramp or driveway arrangements, or EV charging provision.
The RERA unit data marks the 20 listed 2BHK units as mortgaged, but does not identify parking allocations. A parking bay shown or provided within the project would not, by itself, establish an exclusive legal allocation to a particular apartment.
6. Amenities, recreation & open spaces
The RERA amenities record lists the following project infrastructure items and records each at 0%. This is the status shown in the supplied filing data, not an independent site verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | Size not supplied | RERA amenities record | 0%; not independently verified |
| Water Supply | Details and capacity not supplied | RERA amenities record | 0%; not independently verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | System details and capacity not supplied | RERA amenities record | 0%; not independently verified |
| Storm Water Drains | Details not supplied | RERA amenities record | 0%; not independently verified |
| Green Strip/TOT LOT/Park | Area and facilities not supplied; building permit also includes a “Tot-lot (m)” entry without a size | RERA amenities record; building permit | 0% in RERA record; not independently verified |
| Street Lighting | Details not supplied | RERA amenities record | 0%; not independently verified |
| Community Buildings | Details and size not supplied | RERA amenities record | 0%; not independently verified |
| Treatment and disposal of sewage and sullage water | Details and capacity not supplied | RERA amenities record | 0%; not independently verified |
| Solid Waste Management and Disposal | Details and capacity not supplied | RERA amenities record | 0%; not independently verified |
| Water Conservation, Rain Water Harvesting | Building approval requires rainwater-harvesting structures/percolation pit; capacity not supplied | RERA amenities record | 0% in RERA record; not independently verified |
| Energy management | Details not supplied | RERA amenities record | 0%; not independently verified |
| Fire Protection and Fire Safety Requirements | Systems and specifications not supplied | RERA amenities record | 0%; not independently verified |
| Electrical Meter Room, Sub-Station, Receiving Station | Building approval requires space for a transformer; detailed provision not supplied | RERA amenities record | 0% in RERA record; not independently verified |
| Aggregate area of recreational Open Space | Area not supplied | RERA amenities record | 0%; not independently verified |
7. Utilities, building services & safety
- Water and sewerage: HMDA’s technical approval directs the local authority to ensure water-supply and sewerage arrangements and inspect compliance during construction. The building-permit conditions also address water and electricity connections, subject to production of an occupancy certificate. The supplied records do not specify water source, storage capacity, treatment plant, sewerage-treatment capacity or reuse arrangements.
- Storm water and waste: The approvals require rainwater-harvesting structures, including a percolation pit, and a garbage house within the premises. The RERA amenities record lists storm-water drains, sewage and sullage-water treatment, and solid-waste management, each at 0%; completion has not been independently verified.
- Electrical, lifts and fire safety: The technical approval requires provision for a transformer. The supplied approvals do not specify electrical supply capacity, backup power, lift number or capacity, fire-system design, or escape-stair arrangements. The RERA amenities record lists energy management and fire protection/fire safety at 0%; no completed or independently verified systems are established here.
- The approval conditions also address structural safety, safe distances from high- and low-tension electrical lines, pedestrian safety during construction, and maintenance of peripheral greenery and the tot-lot. These are approval conditions, not evidence that the specified works have been completed.
8. Location, access & connectivity
The project’s registered location is Kompally, in the Dundigal Gandimaisamma mandal of Medchal-Malkajgiri district, PIN 500018. The RERA records identify Survey No. 151 and Plots 509, 510, 529 and 530; the stated site boundaries include 30FT ROAD on the east and west.
The supplied location dataset lists these approximate distances: Outer Ring Road (nearest sampled interchange, approx): 7.3 km; St Martins Engineering College: 1.7 km; Sanjeevani Thyroid Sugar and Hormones Clinic: 0.4 km; Bolarum railway station: 2.7 km; Krishnaveni Talent School: 0.2 km. It also lists an unnamed bank and unnamed park, each at 0.4 km. These are location-dataset distances; no measurement method or route is supplied.
9. Developer & development status
The registered promoter is SRR CONSTRUCTIONS, identified in the RERA filing as a partnership. The project record names CHENNAMANENI AMARENDER RAO as authorized signatory and GRANDHI SURYA PRABHAKAR HUF as partner. The supplied project record does not provide a verified corporate registration number, complete registered-office address, official telephone, email address or website.
The registered site is developed under a development agreement-cum-general power of attorney arrangement between the landowners and SRR CONSTRUCTIONS as developer. The Form B declaration, dated 26.03.2021, states a completion undertaking of 31.03.2023. The evidence provided does not establish current construction progress, a revised completion date, or an occupancy certificate.
10. Approvals, official records & documents
TG-RERA registration certificate, P02200003192: Form C registration for SAI SURYA ARCADE under section 5; issued 06/08/2021, with stated validity through 16/05/2026 unless extended.
HMDA technical approval, 035313/MED/R1/U6/HMDA/13032020: Technical approval dated 16/05/2020 for the residential building; the letter directs the applicant to obtain local-authority sanction and records a mortgage of built-up area in favour of MC, HMDA.
Kompally Municipality building permit, 0019/2020, File No. 2135/2020: Building permit dated 20.10.2020 for a residential building on Survey No. 151 and Plots 509, 510, 529 and 530; records 1 Stilt + 5 Upper floors and validity through 19.10.2026.
Form B declaration: Promoter declaration dated 26.03.2021, including the stated land, encumbrance and project-completion undertakings.
Legal title-search report: Advocate’s opinion dated 27-3-2021, covering Plots 529, 530, 509 and 510 in Block No. 36, Jayabheri Park, Survey No. 151, with stated extent 880 Sq. Yards or 735.68 Sq. Mtrs.
HMDA technical approval / commencement-certificate file: The supplied project document list includes the HMDA technical approval letter.
Occupancy / completion certificate: Not present in the supplied project documents.
The approval conditions require completion notice and an occupancy certificate before occupation; the supplied evidence does not include such a certificate. The public HMDA layout lookup was unavailable in the supplied evidence, so an approved-layout record is not established here.
Frequently asked questions
Is SAI SURYA ARCADE registered with Telangana RERA?
Yes. SAI SURYA ARCADE is registered with the Telangana Real Estate Regulatory Authority as P02200003192; the registration status is New Project.
Who is the developer of SAI SURYA ARCADE?
The promoter named in the RERA registration is SRR CONSTRUCTIONS.
Where is SAI SURYA ARCADE located?
SAI SURYA ARCADE is in KOMPALLY, Kompally -Shivalayam, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500018).
When will SAI SURYA ARCADE be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.
More projects in Kompally Shivalayam