Radha Devi Towers
GANGAVARAPU · Hanamkonda · RERA P00300010227
RADHA DEVI TOWERS is a residential apartment building in KAZIPET, HANAMKONDA, Hanamkonda mandal, Warangal Urban district, developed by registered promoter GANGAVARAPU SRI RAMA KRISHNA PRASAD. It has a registered site extent of 647.85 sq.m and comprises one building with 1 Stilt + 5 upper floors and 10 3BHK apartments, each with a RERA-filed saleable area of 199.04 sq.m. Its TG-RERA registration number is P00300010227, and the promoter’s Form B undertaking gives a completion date of 19 April 2028.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | RADHA DEVI TOWERS RERA record |
| Project type / phase | Residential apartment building; registered portion is not separately identified as a phase in the supplied record RERA record |
| TG-RERA registration | P00300010227; registration certificate states validity from 19/04/2025 to 19/04/2028 Approvals record |
| Registered promoter | GANGAVARAPU SRI RAMA KRISHNA PRASAD |
| RERA status | Registered. The certificate states a three-year registration period; no extension is shown in the supplied record. Registration validity is not the same as the completion deadline or an occupancy certificate Approvals record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / address | KAZIPET, HANAMKONDA; Siddartha Nagar, Road No. 3 – Kazipet RERA record RERA filing |
| Revenue village | GMH Hanmakonda in the RERA certificate and project record; the building-permit extraction also identifies Kazipet (J) |
| Mandal / district / PIN | Hanamkonda / Warangal Urban / 506003 RERA record |
| Project survey numbers and subdivisions | H NO 1-1-857; 1-1-857/1; 1-1-857/2; 1-1-858 (NEW); 1/2/23 (OLD); 1/2-5-1 (OLD) |
| Registered site extent | 647.85 sq.m RERA filing |
| Total / net area; road-affected area | Total area 647.85 sq.m; net area 647.85 sq.m; road-affected area recorded as 0 RERA filing |
| Boundaries | East: HOUSE OF HARIPRASAD; West: 9M WIDE EXISTING 9M WIDE PROPOSED ROAD; North: HOUSE OF SATYAVATHI DEVI; South: HOUSE OF SUGUNA DEVI RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority / principal approval | Greater Warangal Municipal Corporation (GWMC); building permission 0286/BP/3006/2025, approved 19 April 2025 Approvals record |
| Additional file number | 000482/BP/DTCP/3006/0018/2024 |
| Approved building count and configuration | One residential building; 1 Stilt + 5 upper floors (six floors as recorded). Permit extraction lists building height 14.99 m and total height 20.29 mt. |
| Approved area figures | Plot 647.85 sq.m; proposed built-up area excluding parking 1,606.50 sq.m; proposed built-up area including parking / total BUA 1,944.20 sq.m; parking area 337.70 sq.m; balcony area 162.60 sq.m |
| RERA-declared units | 10 approved-plan units; 10 proposed by agreement, as recorded in the project filing RERA filing RERA unit table |
| Parking levels | Stilt parking is shown in the permit; the extracted sanction parameters also give stilt-floor parking area 337.70 sq.m |
Offering and status
| Item | Project record |
|---|---|
| Unit type | 3BHK apartments RERA unit table |
| RERA-filed saleable area | 199.04 sq.m per unit RERA unit table |
| Booked / available | 0 booked; 10 available, as last read from the TG-RERA portal; the record supplies no as-of date, so counts are indicative RERA unit table |
| Construction stage | Not stated in the supplied evidence. RERA-filed amenity progress entries are recorded as 0%; these do not independently establish overall construction progress or site conditions RERA amenities |
| Completion dates | Promoter’s Form B undertaking: 19 April 2028. Building permit: construction to commence before 19 October 2025 and complete before 19 April 2028 |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project records; the permit requires an occupancy certificate before occupation |
2. The project story
RADHA DEVI TOWERS is registered as a residential apartment project at Siddartha Nagar, Kazipet, Hanamkonda, on the six listed survey numbers and subdivisions, with a registered site extent of 647.85 sq.m. The RERA and permit records describe a single building comprising stilt level and five upper residential floors. RERA record
The RERA filing lists ten 3BHK units, all shown as available in the portal snapshot, but without an as-of date. The promoter undertakes completion by 19 April 2028. The supplied records do not state an independently verified construction stage, nor do they include an occupancy or completion certificate. The project’s registered validity period, completion undertaking and eventual OC status are separate matters. RERA unit table
3. Master plan, architecture & building design
The approved building-permit extraction describes one residential building with 1 Stilt + 5 upper floors. It records 1,606.50 sq.m of proposed built-up area excluding parking and 1,944.20 sq.m including parking, with 337.70 sq.m of parking area and 162.60 sq.m of balcony area. These are separate figures from the RERA-filed 199.04 sq.m saleable area for a 3BHK unit. The supplied records do not state FSI-counted area or the building footprint. RERA unit table
The permit identifies the stilt for parking and lists a lift, staircase, parking driveway, watchman room, bore, sump, septic tank, rainwater harvesting and distribution transformer among the project features. The plan extract also records 10 as the “NO OF STACK” figure; its precise relationship to parking spaces is not clarified in the supplied data.
The site plan lists existing and proposed roads of 9.00 MT width and an existing 30'-0" C.C. ROAD. The permit includes a tot-lot and peripheral greenery conditions, but its extracted amenity entry gives “Tot-lot (m2) NA.” The available evidence does not establish a separate phase arrangement, landscaped-area measurement, flats per floor, lift capacity or internal circulation dimensions.
4. Homes, configurations & floor plans
The RERA filing lists ten 3BHK units with 199.04 sq.m saleable area each. Drawing-based measurements are software measurements from the submitted plan, not RERA-filed carpet-area disclosures; they should be checked against the drawing. Saleable area and carpet area are distinct: the supplied measurement note says saleable area includes the home’s share of common areas. RERA unit table Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 199.04 sq.m | Software-measured range: 121.2–127.5 sq.m; median 124.9 sq.m | 37% RERA unit details Floor plans |
The drawing record reports six measured 3BHK flat designs. A measured first-floor-plan example shows living, kitchen, dining, three bedrooms, three toilets and three balconies; the listed balcony widths are 1.20 m, 1.20 m and 1.31 m. The drawing-derived room figures are software measurements, not RERA disclosures. RERA unit details
5. Parking & vehicle circulation
The building permit identifies stilt-level parking and records 337.70 sq.m as the parking area. The layout-plan extraction lists a parking driveway. The permit also requires the cellar/stilt areas approved for parking to be used exclusively for vehicle parking without partition walls or rolling shutters; the supplied project records do not establish the number of sanctioned parking spaces, resident or visitor allocation, accessible bays, or unit-specific parking rights. A drawn or designated parking area alone does not establish exclusive ownership.
The permit requires electric-vehicle charging infrastructure in parking places. No EV charger count or installation status is supplied.
6. Amenities, recreation & open spaces
| Description / size | Listed in the layout-plan extraction; no capacity or detailed specification supplied |
|---|---|
| Declared progress / verified status | No completion status supplied |
| Description / size | Permit conditions require a fenced tot-lot maintained as greenery before OC, and peripheral greenery; extracted area is “NA” |
|---|---|
| Declared progress / verified status | No completion status supplied; RERA amenity progress entry is 0% RERA amenities |
| Description / size | Listed in the layout-plan extraction |
|---|---|
| Declared progress / verified status | No completion status supplied |
| Description / size | RERA amenity category; plan extraction identifies a parking driveway and adjoining road widths |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress entry is 0% RERA amenities |
| Description / size | Listed as RERA amenity categories; no facility details or area supplied |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress entries are 0% RERA amenities |
| Description / size | Plan lists rainwater harvesting; permit specifies rainwater-harvesting structures and records 3 RWHPs |
|---|---|
| Declared progress / verified status | No completion status supplied; RERA progress entry is 0% RERA amenities |
The supplied record does not identify a clubhouse, indoor recreation facility or sports facility. RERA-listed progress figures are filing entries, not independent verification of construction or delivery. RERA amenities
7. Utilities, building services & safety
The permit and plan list a bore, sump, water supply, septic tank, rainwater harvesting, distribution transformer and garbage house. The RERA amenity filing marks water supply, sewerage and an electrical meter room/sub-station/receiving station as available, but supplies no capacities or independent verification of operation. The permit also requires construction of a rainwater-harvesting structure and provision of space for a transformer. RERA amenities
The plan extraction includes a dual-piping-system note, but the supplied record does not establish whether the project’s specific plumbing arrangement implements dual piping. No STP, sewage-reuse capacity, backup power capacity, lift capacity, CCTV or detailed fire-system specifications are stated. The permit assigns structural-safety and fire-safety responsibility to the owner, builder/developer, architect and structural engineer; this does not establish that a particular safety installation has been completed or independently certified.
The permit requires EV charging infrastructure, construction-worker safety measures and construction insurance. It also makes an occupancy certificate compulsory before occupation and requires a completion notice after construction. These are permit requirements, not evidence of completed systems or OC issuance.
8. Location, access & connectivity
The registered location is GMH Hanmakonda, Hanamkonda, Warangal Urban, 506003, with the project locality recorded as KAZIPET, HANAMKONDA. The plan describes the site as Siddartha Nagar, Road No. 3 – Kazipet, and identifies a 9.00 MT existing road, a 9.00 MT proposed road and an existing 30'-0" C.C. ROAD. RERA record
The supplied location record gives one sampled connectivity distance: Outer Ring Road (nearest sampled interchange, approx) — 112.5 km. It supplies no public-transport routes, other landmark distances or travel times. Location record
9. Developer & development status
The TG-RERA registration certificate names GANGAVARAPU SRI RAMA KRISHNA PRASAD as the registered promoter and gives the address as House No.: 1-1-676/2, Hanamkonda, Warangal Urban, 506003, Telangana. The corporate record identifies GSTIN 36AAFHG7097C1Z7; the legal entity type is not disclosed in the supplied data. Corporate record
The promoter’s Form B declares a completion date of 19 April 2028. The registration certificate states validity through 19/04/2028, while the building permit separately states its commencement and completion deadlines. No project-specific construction-stage assessment or occupancy certificate is supplied.
10. Approvals, official records & documents
| Identifier / date | P00300010227; valid 19/04/2025–19/04/2028 |
|---|---|
| What the supplied record establishes | Registration of RADHA DEVI TOWERS and the named promoter |
| Identifier / date | 0286/BP/3006/2025; 19 April 2025 |
|---|---|
| What the supplied record establishes | GWMC approval for a residential building at Kazipet; sanctioned configuration and conditions are extracted in the permit record |
| Identifier / date | 000482/BP/DTCP/3006/0018/2024 |
|---|---|
| What the supplied record establishes | File identifier shown in the building-approval extraction |
| Identifier / date | Document 605418 |
|---|---|
| What the supplied record establishes | Plan extraction identifies the site, one building with stilt and five upper floors, area figures, features and permit conditions |
| Identifier / date | Form B, document 606166; date recorded as 2025, day unspecified |
|---|---|
| What the supplied record establishes | Promoter’s completion undertaking and RERA-related declarations |
| Identifier / date | Not present in supplied documents |
|---|---|
| What the supplied record establishes | The permit requires an OC before occupation; no issued certificate is evidenced in this record |
The supplied record does not include an issued occupancy or completion certificate. No separate approved-layout certificate is established by the available extracts.
1. Project at a glance
Project identity
Registered project name: RADHA DEVI TOWERS
Project type / phase: Residential apartment building; registered portion is not separately identified as a phase in the supplied record
TG-RERA registration: P00300010227; registration certificate states validity from 19/04/2025 to 19/04/2028
Registered promoter: GANGAVARAPU SRI RAMA KRISHNA PRASAD
RERA status: Registered. The certificate states a three-year registration period; no extension is shown in the supplied record. Registration validity is not the same as the completion deadline or an occupancy certificate
Land and geographic identity
Locality / address: KAZIPET, HANAMKONDA; Siddartha Nagar, Road No. 3 – Kazipet
Revenue village: GMH Hanmakonda in the RERA certificate and project record; the building-permit extraction also identifies Kazipet (J)
Mandal / district / PIN: Hanamkonda / Warangal Urban / 506003
Project survey numbers and subdivisions: H NO 1-1-857; 1-1-857/1; 1-1-857/2; 1-1-858 (NEW); 1/2/23 (OLD); 1/2-5-1 (OLD)
Registered site extent: 647.85 sq.m
Total / net area; road-affected area: Total area 647.85 sq.m; net area 647.85 sq.m; road-affected area recorded as 0
Boundaries: East: HOUSE OF HARIPRASAD; West: 9M WIDE EXISTING 9M WIDE PROPOSED ROAD; North: HOUSE OF SATYAVATHI DEVI; South: HOUSE OF SUGUNA DEVI
Development identity
Sanctioning authority / principal approval: Greater Warangal Municipal Corporation (GWMC); building permission 0286/BP/3006/2025, approved 19 April 2025
Additional file number: 000482/BP/DTCP/3006/0018/2024
Approved building count and configuration: One residential building; 1 Stilt + 5 upper floors (six floors as recorded). Permit extraction lists building height 14.99 m and total height 20.29 mt.
Approved area figures: Plot 647.85 sq.m; proposed built-up area excluding parking 1,606.50 sq.m; proposed built-up area including parking / total BUA 1,944.20 sq.m; parking area 337.70 sq.m; balcony area 162.60 sq.m
RERA-declared units: 10 approved-plan units; 10 proposed by agreement, as recorded in the project filing
Parking levels: Stilt parking is shown in the permit; the extracted sanction parameters also give stilt-floor parking area 337.70 sq.m
Offering and status
Unit type: 3BHK apartments
RERA-filed saleable area: 199.04 sq.m per unit
Booked / available: 0 booked; 10 available, as last read from the TG-RERA portal; the record supplies no as-of date, so counts are indicative
Construction stage: Not stated in the supplied evidence. RERA-filed amenity progress entries are recorded as 0%; these do not independently establish overall construction progress or site conditions
Completion dates: Promoter’s Form B undertaking: 19 April 2028. Building permit: construction to commence before 19 October 2025 and complete before 19 April 2028
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project records; the permit requires an occupancy certificate before occupation
2. The project story
RADHA DEVI TOWERS is registered as a residential apartment project at Siddartha Nagar, Kazipet, Hanamkonda, on the six listed survey numbers and subdivisions, with a registered site extent of 647.85 sq.m. The RERA and permit records describe a single building comprising stilt level and five upper residential floors.
The RERA filing lists ten 3BHK units, all shown as available in the portal snapshot, but without an as-of date. The promoter undertakes completion by 19 April 2028. The supplied records do not state an independently verified construction stage, nor do they include an occupancy or completion certificate. The project’s registered validity period, completion undertaking and eventual OC status are separate matters.
3. Master plan, architecture & building design
The approved building-permit extraction describes one residential building with 1 Stilt + 5 upper floors. It records 1,606.50 sq.m of proposed built-up area excluding parking and 1,944.20 sq.m including parking, with 337.70 sq.m of parking area and 162.60 sq.m of balcony area. These are separate figures from the RERA-filed 199.04 sq.m saleable area for a 3BHK unit. The supplied records do not state FSI-counted area or the building footprint.
The permit identifies the stilt for parking and lists a lift, staircase, parking driveway, watchman room, bore, sump, septic tank, rainwater harvesting and distribution transformer among the project features. The plan extract also records 10 as the “NO OF STACK” figure; its precise relationship to parking spaces is not clarified in the supplied data.
The site plan lists existing and proposed roads of 9.00 MT width and an existing 30'-0" C.C. ROAD. The permit includes a tot-lot and peripheral greenery conditions, but its extracted amenity entry gives “Tot-lot (m2) NA.” The available evidence does not establish a separate phase arrangement, landscaped-area measurement, flats per floor, lift capacity or internal circulation dimensions.
4. Homes, configurations & floor plans
The RERA filing lists ten 3BHK units with 199.04 sq.m saleable area each. Drawing-based measurements are software measurements from the submitted plan, not RERA-filed carpet-area disclosures; they should be checked against the drawing. Saleable area and carpet area are distinct: the supplied measurement note says saleable area includes the home’s share of common areas.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 199.04 sq.m | Software-measured range: 121.2–127.5 sq.m; median 124.9 sq.m | 37% |
The drawing record reports six measured 3BHK flat designs. A measured first-floor-plan example shows living, kitchen, dining, three bedrooms, three toilets and three balconies; the listed balcony widths are 1.20 m, 1.20 m and 1.31 m. The drawing-derived room figures are software measurements, not RERA disclosures.
5. Parking & vehicle circulation
The building permit identifies stilt-level parking and records 337.70 sq.m as the parking area. The layout-plan extraction lists a parking driveway. The permit also requires the cellar/stilt areas approved for parking to be used exclusively for vehicle parking without partition walls or rolling shutters; the supplied project records do not establish the number of sanctioned parking spaces, resident or visitor allocation, accessible bays, or unit-specific parking rights. A drawn or designated parking area alone does not establish exclusive ownership.
The permit requires electric-vehicle charging infrastructure in parking places. No EV charger count or installation status is supplied.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Lift and staircase | Listed in the layout-plan extraction; no capacity or detailed specification supplied | No completion status supplied | |
| Tot-lot / green area | Permit conditions require a fenced tot-lot maintained as greenery before OC, and peripheral greenery; extracted area is “NA” | No completion status supplied; RERA amenity progress entry is 0% | |
| Watchman room | Listed in the layout-plan extraction | No completion status supplied | |
| Internal roads and footpaths | RERA amenity category; plan extraction identifies a parking driveway and adjoining road widths | RERA progress entry is 0% | |
| Community buildings / recreational open space | Listed as RERA amenity categories; no facility details or area supplied | RERA progress entries are 0% | |
| Water conservation / rainwater harvesting | Plan lists rainwater harvesting; permit specifies rainwater-harvesting structures and records 3 RWHPs | No completion status supplied; RERA progress entry is 0% |
The supplied record does not identify a clubhouse, indoor recreation facility or sports facility. RERA-listed progress figures are filing entries, not independent verification of construction or delivery.
7. Utilities, building services & safety
The permit and plan list a bore, sump, water supply, septic tank, rainwater harvesting, distribution transformer and garbage house. The RERA amenity filing marks water supply, sewerage and an electrical meter room/sub-station/receiving station as available, but supplies no capacities or independent verification of operation. The permit also requires construction of a rainwater-harvesting structure and provision of space for a transformer.
The plan extraction includes a dual-piping-system note, but the supplied record does not establish whether the project’s specific plumbing arrangement implements dual piping. No STP, sewage-reuse capacity, backup power capacity, lift capacity, CCTV or detailed fire-system specifications are stated. The permit assigns structural-safety and fire-safety responsibility to the owner, builder/developer, architect and structural engineer; this does not establish that a particular safety installation has been completed or independently certified.
The permit requires EV charging infrastructure, construction-worker safety measures and construction insurance. It also makes an occupancy certificate compulsory before occupation and requires a completion notice after construction. These are permit requirements, not evidence of completed systems or OC issuance.
8. Location, access & connectivity
The registered location is GMH Hanmakonda, Hanamkonda, Warangal Urban, 506003, with the project locality recorded as KAZIPET, HANAMKONDA. The plan describes the site as Siddartha Nagar, Road No. 3 – Kazipet, and identifies a 9.00 MT existing road, a 9.00 MT proposed road and an existing 30'-0" C.C. ROAD.
The supplied location record gives one sampled connectivity distance: Outer Ring Road (nearest sampled interchange, approx) — 112.5 km. It supplies no public-transport routes, other landmark distances or travel times.
9. Developer & development status
The TG-RERA registration certificate names GANGAVARAPU SRI RAMA KRISHNA PRASAD as the registered promoter and gives the address as House No.: 1-1-676/2, Hanamkonda, Warangal Urban, 506003, Telangana. The corporate record identifies GSTIN 36AAFHG7097C1Z7; the legal entity type is not disclosed in the supplied data.
The promoter’s Form B declares a completion date of 19 April 2028. The registration certificate states validity through 19/04/2028, while the building permit separately states its commencement and completion deadlines. No project-specific construction-stage assessment or occupancy certificate is supplied.
10. Approvals, official records & documents
| Identifier / date | P00300010227; valid 19/04/2025–19/04/2028 |
|---|---|
| What the supplied record establishes | Registration of RADHA DEVI TOWERS and the named promoter |
| Identifier / date | 0286/BP/3006/2025; 19 April 2025 |
|---|---|
| What the supplied record establishes | GWMC approval for a residential building at Kazipet; sanctioned configuration and conditions are extracted in the permit record |
| Identifier / date | 000482/BP/DTCP/3006/0018/2024 |
|---|---|
| What the supplied record establishes | File identifier shown in the building-approval extraction |
| Identifier / date | Document 605418 |
|---|---|
| What the supplied record establishes | Plan extraction identifies the site, one building with stilt and five upper floors, area figures, features and permit conditions |
| Identifier / date | Form B, document 606166; date recorded as 2025, day unspecified |
|---|---|
| What the supplied record establishes | Promoter’s completion undertaking and RERA-related declarations |
| Identifier / date | Not present in supplied documents |
|---|---|
| What the supplied record establishes | The permit requires an OC before occupation; no issued certificate is evidenced in this record |
The supplied record does not include an issued occupancy or completion certificate. No separate approved-layout certificate is established by the available extracts.
Frequently asked questions
Is RADHA DEVI TOWERS registered with Telangana RERA?
Yes. RADHA DEVI TOWERS is registered with the Telangana Real Estate Regulatory Authority as P00300010227; the registration status is New Project.
Who is the developer of RADHA DEVI TOWERS?
The promoter named in the RERA registration is GANGAVARAPU.
Where is RADHA DEVI TOWERS located?
RADHA DEVI TOWERS is in KAZIPET, HANAMKONDA, GMH Hanmakonda, Hanamkonda, Telangana (506003).
When will RADHA DEVI TOWERS be completed?
The promoter's proposed date of completion filed with RERA is 19/08/2028. This is the promoter's declaration, not a guarantee.
More projects in Gmh Hanmakonda