Maytri Susheela Kuteer

MAYTRI CONSTRUCTIONS · Rangareddy · RERA P02400009866

MAYTRI SUSHEELA KUTEER is a residential apartment project in INJAPUR, Abdullapurmet Mandal, Ranga Reddy District, developed by registered promoter MAYTRI CONSTRUCTIONS. The RERA-filed net land area is 3435.78 sq m, and the project has one building with 1 Cellar + 2 Stilts + 9 upper floors and 81 homes: 45 2BHK, 9 2.5BHK and 27 3BHK. Its TG-RERA registration is P02400009866, and the project header records proposed completion as 12/07/2028.

More from Maytri Constructions · 4 projects →

01What we found

RegisteredTG-RERA - valid till 12 Mar 2028
15documents on file - each fact links to its page
1court case on this project's land (survey 6, Injapur)
11items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project photoProject photoProject photoProject photo
▦ View all 7 photos
Injapur, Abdullapurmet, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered project nameMAYTRI SUSHEELA KUTEER RERA record
Project type / phaseResidential apartment project; phase or separately identified registered portion is not stated in the supplied record. RERA record Approvals record
TG-RERA registrationP02400009866; registration valid 12 March 2025–12 March 2028. This is the registration validity period, not a completion or occupancy date. RERA record
Registered promoterMAYTRI CONSTRUCTIONS, a partnership. Corporate record RERA filing
RERA statusRegistered; registration status was captured from the TG-RERA record on 10 September 2026. Approvals record
Project stageNew project in the RERA project record. The supplied amenity progress entries are 0%; no independently verified site-construction stage is provided. RERA record RERA amenities

Land and geographic identity

ItemProject record
Locality / revenue villageINJAPUR; the building-permit extraction identifies Injapur Village. RERA record
Mandal / district / PINAbdullapurmet / Ranga Reddy / 500070. RERA record RERA filing
Project survey number and subdivision6/PART. The supplied project records do not identify any additional project survey subdivision. RERA record
RERA-filed site areaTotal area 3951.66 sq m; area affected by road widening/FTL of tanks/nala widening 515.88 sq m; net area 3435.78 sq m. RERA filing
Building-permit site extent3,435.78 Sq. Mt.
Boundaries recorded in the project filingEast: neighbours’ land; West: land in Survey No. 5; North: neighbours’ land; South: 100FT WIDE ZP ROAD FROM HAYATHNAGAR T O INJAPUR. RERA filing

Development identity

ItemProject record
Sanctioning authorityHMDA. The permit delegates specified functions to Turkayamjal Municipality / Municipal Corporation. Approvals record
Principal building approval011407/BP/HMDA/3017/GHT/2024, approved 12 March 2025. Approvals record
Building count / configurationOne building is recorded in the project filing; the permit describes 1 Cellar + 2 Stilts + 9 upper floors. RERA filing
Building height26.55 MT.
Approved-area figuresThe plan extraction separately records TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING 11831.22, TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING 16908.00, GROSS BUA 18226.09, NET BUA 17008.22, and PARKING AREA 5076.78. These are distinct figures as labelled in the extracted plan data.
Parking in plan extractionNo of Cars Proposed 87; cellar/stilt floors are designated for vehicle parking in the approval conditions.
Unit countsThe TG-RERA unit record lists 81 units: 45 2BHK, 27 3BHK and 9 2.5BHK. A separate plan extraction states “num_units: 72”; the project’s RERA unit schedule is reported here as the primary unit-count record. RERA unit table RERA unit details

Offering and status

ConfigurationTG-RERA unitsBooked / available*RERA saleable area
2BHK450 / 45131.0 sq m
3BHK270 / 27171.53 sq m
2.5BHK90 / 9149.72 sq m

\*Counts are as last read from the TG-RERA portal; the record supplies no as-of date, so they are indicative. RERA unit table RERA unit details

  • Promoter’s RERA completion undertaking: 12-03-2028.
  • Other completion date in project header: 12/07/2028, recorded as proposed completion. RERA record
  • Occupancy / completion certificate: No occupancy or completion certificate is recorded in the supplied material; the building permit requires an HMDA “Fit for Occupancy” certificate before occupation.

2. The project story

MAYTRI SUSHEELA KUTEER is a residential apartment development registered with TG-RERA on land identified as Survey No. 6/PART, Injapur Village, Abdullapurmet Mandal, Ranga Reddy District. The RERA record describes one building and an offering of 81 apartments across 2BHK, 2.5BHK and 3BHK configurations. RERA record RERA filing RERA unit table

HMDA’s building-permit order dated 12 March 2025 permits a residential building with one cellar, two stilt levels and nine upper floors. The permit makes occupation conditional on obtaining an Occupancy Certificate. The supplied evidence does not establish that construction is complete, that any portion is occupied, or that an Occupancy Certificate has been issued.

The TG-RERA record indicates all 81 units as available and none booked, but does not provide an as-of date for that inventory snapshot. RERA amenity progress entries are shown as 0%; no independently verified site-progress report is included here. RERA unit table RERA amenities

3. Master plan, architecture & building design

The building-permit order identifies one residential building on a site extent of 3,435.78 Sq. Mt. The broader RERA land record reports a total area of 3951.66 sq m, including 515.88 sq m affected by road widening/FTL of tanks/nala widening, and a net area of 3435.78 sq m. RERA filing

The extracted building plan describes 1 Cellar + 2 Stilts + 9 upper floors, a building height of 26.55 MT., and records these area labels separately: proposed built-up area excluding parking 11831.22, proposed built-up area including parking 16908.00, gross BUA 18226.09, net BUA 17008.22, and parking area 5076.78. The supplied extraction does not explain the calculation or reconcile the distinct area labels; they should not be treated as interchangeable measures.

The plan extraction lists a 4.50M wide driveway and several road or passage dimensions, including 40'-0" WIDE ROAD, 100'-0" WIDE ROAD, 9.14M WIDE ROAD, 12.00 MT WIDE EXISTING, 30.00 MT WIDE PROPOSED ROAD, and 36.27 M. WIDE PASSAGE. The supplied data does not provide a complete circulation drawing interpretation.

The RERA-recorded building count is one. No verified floor-by-floor flat schedule, flat count per floor, lift or stair count, building-footprint measurement, or phase-wise arrangement is provided in the supplied evidence. The building permit prohibits construction or parking in setback areas and requires the proposed building to follow the technically approved plan. RERA filing

4. Homes, configurations & floor plans

TG-RERA reports 81 units in total, with the configurations and saleable areas shown below. The booking and availability counts are portal figures without a supplied as-of date. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK45045131.0 sq m70.0–124.8 sq m; median 82.1 sq m (software-measured)37% (software-measured)
3BHK27027171.53 sq m86.7–113.7 sq m; median 105.8 sq m (software-measured)38% (software-measured)
2.5BHK909149.72 sq mNot suppliedNot supplied

The 2BHK and 3BHK carpet-area measurements were produced by software from the extracted approved floor-plan drawing geometry, not disclosed as carpet areas in the RERA filing. The measurement record says review is needed; it reports 20 measured 2BHK designs and 16 measured 3BHK designs. One drawing remains unmeasured, and several measured plans are marked as needing review. Floor plans RERA unit details

For one illustrated 2BHK flat, the drawing extraction lists bedrooms, toilets, living/dining, kitchen and a utility area; the utility is marked excluded from the measured carpet area. For one illustrated 3BHK flat, it lists three bedrooms, three toilets, living/dining, kitchen and a 1.83 M. WIDE BALC; the balcony is marked excluded from carpet area. These are drawing-based examples, not a statement that every unit has the same layout. RERA unit details

Carpet area is a drawing-derived measurement of the internal area as interpreted by the measurement software. RERA saleable area is the filed unit area and is not identified in the supplied record as carpet area; the supplied material does not provide a separate common-area loading disclosure in the RERA unit schedule. Floor plans RERA unit details

5. Parking & vehicle circulation

The plan extraction records No of Cars Proposed 87, with proposed parking area 5076.78 and required parking area 2602.86. The building-permit conditions designate the cellar/stilt area for vehicle parking and state that the stilt/cellar must be used exclusively for parking, without partition walls or rolling shutters.

The supplied evidence does not establish resident-versus-visitor or accessible-space counts, two-wheeler spaces, mechanical parking, parking allocation by apartment, or exclusive ownership rights in any particular parking bay. The permit’s inclusion of a mortgage over part of the building is described in the approvals and title materials; this overview does not infer individual parking entitlement from the plan.

6. Amenities, recreation & open spaces

TG-RERA’s amenity record lists the following project facilities and reports 0% progress for each listed item. “YES” is the recorded availability entry where shown; it is not evidence of completed or independently verified delivery. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Community buildingsSize and specific facility details not suppliedTG-RERA amenities RERA amenities0%; not independently verified
Green Strip/TOT LOT/ParkSize not supplied; availability recorded as YESTG-RERA amenities RERA amenities0%; not independently verified
Aggregate area of recreational open spaceArea not suppliedTG-RERA amenities RERA amenities0%; not independently verified

The building permit also lists a garbage house, but supplies no size or completion status. Brochure and vendor material refers to additional recreational and community facilities; those are marketing/vendor claims and are not treated here as sanctioned or delivered project facilities.

7. Utilities, building services & safety

Water
Supplied project evidenceTG-RERA marks Water Supply available “YES.” The building-plan extraction lists a sump; the permit lists a transformer and STP but does not state water source, storage capacity or treatment capacity. RERA amenities
Status / limitationRERA amenity progress is 0%; completion is not independently verified.
Sewerage and drainage
Supplied project evidenceRERA lists sewerage (chamber, lines, septic tank, STP) and treatment/disposal of sewage and sullage water. The plan extraction lists a septic tank, sewage treatment plant, waste-water recycling and underground drainage. RERA amenities
Status / limitationListed in records; no capacity, operating status or completion evidence supplied.
Storm water / rainwater
Supplied project evidenceRERA marks water conservation/rainwater harvesting “YES”; the plan extraction and permit list rainwater harvesting structures. RERA also lists storm-water drains. RERA amenities
Status / limitationRERA amenity progress is 0%; completion is not independently verified.
Electrical
Supplied project evidencePlan extraction lists a distribution transformer and generator room; RERA lists an electrical meter room/sub-station/receiving station as available “YES.” RERA amenities
Status / limitationSupply capacity and backup capacity are not supplied in the project approval extraction.
Fire and life safety
Supplied project evidenceRERA marks fire protection and fire-safety requirements “YES.” The plan extraction includes an automatic sprinkler condition where basement area exceeds 200 Sq. Mtrs and fire-safety requirements. The permit assigns structural-safety responsibility to the applicant. RERA amenities
Status / limitationThese are record entries/conditions, not proof of completed systems or statutory clearance.
Solid waste
Supplied project evidenceRERA lists solid waste management and disposal; the building permit lists a garbage house. RERA amenities
Status / limitationProgress is reported as 0%; no operational details supplied.
Vertical circulation / accessibility
Supplied project evidenceNo lift count, lift capacity, accessible route, ramp details or accessible-space count is provided in the supplied project approval extraction.
Status / limitationNot established by the supplied evidence.
EV / digital infrastructure
Supplied project evidenceThe extracted plan includes EV-charging infrastructure and broadband/digital connectivity requirements.
Status / limitationNo installation or completion evidence supplied.

8. Location, access & connectivity

The registered project location is INJAPUR VILLAGE, ABDULLAPURMET MANDAL, Ranga Reddy District, PIN 500070, on Survey No. 6/PART. The project filing records the southern boundary as a 100FT WIDE ZP ROAD FROM HAYATHNAGAR T O INJAPUR; HMDA’s permit extraction also requires development and maintenance of the approach road shown in the plan, including a stated minimum width of 4.5mts. RERA record RERA filing

A location record identifies the nearest sampled Outer Ring Road interchange at approximately 4.3 km. This is a supplied mapped-distance estimate; no public-transport service, route schedule or independently verified travel-time information is provided. Location record

9. Developer & development status

The registered legal promoter is MAYTRI CONSTRUCTIONS, identified in the project record as a partnership. The supplied corporate identifiers include GSTIN 36AAVFM5333R1ZB. PRAVEEN REDDY VANGATI is listed as an authorized signatory and SANTOSH REDDY VANGATI as a partner. Corporate record Parties record RERA filing

The project record gives the promoter address as BESIDE ANDHRA BANK, HAYATH NAGAR MAIN ROAD, INJPAUR, INJAPUR, Abdullapurmet, Ranga Reddy, 500070. The supplied project evidence does not provide a verified official contact telephone number. Parties record RERA filing

The promoter’s Form B declaration undertakes completion by 12-03-2028. The project header separately records proposed completion as 12/07/2028. Neither date establishes actual completion. No independent construction-progress assessment or occupancy certificate is supplied. RERA record

10. Approvals, official records & documents

RecordWhat it establishes in the supplied evidence
TG-RERA registration certificate, P02400009866Form C registration for MAYTRI SUSHEELA KUTEER, including promoter, project location and registration validity of 12/03/2025–12/03/2028.
HMDA Building Permit Order 011407/BP/HMDA/3017/GHT/2024, dated 12 March 2025Building permission for a residential building at Survey No. 6/PART, Injapur Village; the permit states that an Occupancy Certificate is compulsory before occupation.
HMDA plan extractionExtracted plan information includes building configuration, areas, proposed car parking, road/passage labels and utility/safety provisions.
HMDA location sketchA location sketch identifies Survey No. 6 and is marked “HMDA Purpose Only”; it is not an extracted approved-layout plan.
Form B declarationPromoter declaration for the project, including a completion undertaking and statements concerning title, encumbrances and project-account obligations.
Title and mortgage-related filingsThe project evidence includes a title search report and records for Sale Deed 9661/2022, Development Agreement cum GPA 9660/2022, and HMDA simple mortgage 1466/2025; full title and encumbrance analysis is addressed separately. Document index

No occupancy or completion certificate is present in the supplied documents. The project evidence also does not include an independently verified site-progress report.

Frequently asked questions

Is MAYTRI SUSHEELA KUTEER registered with Telangana RERA?

Yes. MAYTRI SUSHEELA KUTEER is registered with the Telangana Real Estate Regulatory Authority as P02400009866; the registration status is New Project.

Who is the developer of MAYTRI SUSHEELA KUTEER?

The promoter named in the RERA registration is MAYTRI CONSTRUCTIONS.

Where is MAYTRI SUSHEELA KUTEER located?

MAYTRI SUSHEELA KUTEER is in INJAPUR, Abdullapurmet, Rangareddy, Telangana (500070).

When will MAYTRI SUSHEELA KUTEER be completed?

The promoter's proposed date of completion filed with RERA is 12/07/2028. This is the promoter's declaration, not a guarantee.