Lotus Avenue
TEIRRA GREEN LLP · Warangal · RERA P00400006319
LOTUS AVENUE is a plotted residential development at Rampur Revenue Village, GWMC Mandal, Warangal Rural. The registered promoter is TEIRRA GREEN LLP. The RERA-registered site area is 77,398.63 sq. m, and the principal layout approval records 167 plots; a separate approval records 23 plots in Sy. Nos. 618/A and 625/B, with plot sizes in the 2022 layout drawing ranging from 150–200 sq. yd to 500–1000 sq. yd. The project is registered with TG-RERA under P00400006319, and the later Form B declaration states a proposed completion date of 23-10-2026.
More from Teirra Green LLP · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | LOTUS AVENUE RERA record |
| Project type | Plotted development / residential layout RERA record RERA filing |
| Phase / registered portion | Not separately identified as a phase. The RERA certificate identifies the project by the survey numbers listed below; the layout approval also includes a separate 23-plot approval for Sy. Nos. 618/A and 625/B. |
| TG-RERA registration | P00400006319 |
| Registration validity | 07/07/2023–30/11/2025, as stated in the registration certificate; the supplied record does not show an extension. This is the registration period, not the completion deadline or an occupancy certificate. Approvals record |
| Registered promoter | TEIRRA GREEN LLP, an LLP RERA record Corporate record |
| RERA status | The project is recorded as a New Project. The supplied registration certificate records the validity above; it does not establish a current extended registration status. RERA filing |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Rampur / Rampur Revenue Village RERA record RERA filing |
| Mandal | GWMC Mandal in the layout approval; the RERA land record does not disclose the mandal. Land records |
| District | Warangal Rural in the project identity record; the layout approval describes Warangal(Urban) District. RERA record |
| PIN | 506001 RERA record |
| RERA-registered survey numbers | 627, 627/2, 628/A, 628/A/2, 630, 630/A/1/1, 634/B, 634/B/1, 635/A/1, 635/A/2, 636/A, 637, 637/A, 641/A, 641/A1/1, 641/A1/3, 641/B |
| Registered site extent | 77,398.63 sq. m total and net area; the RERA land record reports 0 area affected by road widening/FTL of tanks/nala widening. RERA filing Land records |
| Layout-approved extent | 19 Acer 5.01 Gts 92568 Sq. Yds for LP No. 0262/LO/3006/2022. |
| Boundaries | Not disclosed in the supplied land record. Land records |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | GWMC Municipality/Municipal Corporation Approvals record |
| Principal layout approval | Tentative Layout Plan 0262/LO/3006/2022, approved 30 November, 2022; application no. 009090/LO/DTCP/3006/0333/2022. Approvals record |
| Additional layout approval on file | Tentative Layout Plan 0392/LO/3006/2024, approved 23 October, 2024; application no. 009490/LO/DTCP/3006/0321/2023, covering Sy. Nos. 618/A and 625/B. Approvals record |
| Approved built-up area | 45,456.9 sq. m is recorded as approved built-up area in the RERA project fields. RERA filing |
| Development form / number of plots | The 2022 layout approval records 167 plots. The separate 2024 layout approval records 23 plots. |
| Buildings / floors / parking levels | Not applicable to the submitted plotted-layout record; no building-floor configuration or parking-level schedule is supplied. |
Offering and status
| Item | Record |
|---|---|
| Unit type | Residential plots; the RERA filing identifies the project as plotted development. RERA record RERA filing |
| Plot count and size information | The 2022 approved drawing is software-read as 167 plots; its plotted-area schedule is reported as complete in the layout data. Individual plot-size bands appear below. Layout record |
| Booked / available counts | Not supplied. RERA filing Layout record |
| Construction / development stage | The project completeness field reports 60%; this is a recorded project-data figure, not an independent site inspection. RERA record |
| Completion dates | The initial Form B declaration undertakes completion by 30-NOV-2025. A later Form B declaration states 23-10-2026. The supplied record does not establish an Authority-approved RERA extension. |
| Occupancy / completion certificate | No occupancy or completion certificate for this plotted project is identified in the supplied documents. Document index |
2. The project story
LOTUS AVENUE is registered with TG-RERA as a plotted residential development at Rampur Revenue Village. The project record identifies 17 survey numbers/subdivisions, and the RERA land schedule states a total and net site area of 77,398.63 sq. m. The principal layout approval on file is a tentative approval for a 167-plot layout. A further tentative layout approval on file covers 23 plots in Sy. Nos. 618/A and 625/B; those survey numbers are not part of the survey list printed on the supplied LOTUS AVENUE registration certificate. RERA record RERA filing
The layout is intended for residential plots, with roads and land reserved for open space, social infrastructure and utilities. The approval conditions require the applicant to complete layout infrastructure and amenities and provide for later release of the final layout; they do not establish that the works have been completed. The project data reports 60% completeness, but the supplied material does not provide an independently verified site inspection or a detailed, dated work-progress breakdown. RERA record
3. Master plan, architecture & building design
The supplied sanctioned material is for plotted layouts, not apartment or building plans. The 2022 tentative layout approval records an extent of 19 Acer 5.01 Gts 92568 Sq. Yds and 167 plots. Its area statement lists 11 Acer 9.29 Gts 54366 Sq. Yds (59.64%) as plotted area, 5 Acer 9.76 Gts 25382 Sq. Yds (27.84%) as road area, 1 Acer 27.81 Gts 8205 Sq. Yds (9%) as open-space park, 0 Acer 18.87 Gts 2283 Sq. Yds (2.5%) for social infrastructure, and 0 Acer 7.54 Gts 913 Sq. Yds (1%) for utilities. The approval also records 0 Acer 69.55 Gts 8416 Sq. Yds as mortgage area, described as 15.43 % of plotted area.
Software measurement of the approved drawing reports plot sizes from 132.95 sq. m (159.0 sq. yd) to 574.68 sq. m (687.3 sq. yd), with a median of 244.72 sq. m (292.7 sq. yd). The recorded size bands are: 150–200 sq. yd: 2 plots; 200–250: 3; 250–300: 97; 300–400: 34; 400–500: 21; 500–1000: 10. These are drawing-derived measurements, not a substitute for checking an individual plot’s sanctioned schedule and dimensions. Layout record
The separate 2024 tentative layout approval records 2 Acer 33.51 Gts 13735 Sq. Yds and 23 plots in Sy. Nos. 618/A and 625/B. Its area statement assigns 1 Acer 22.52 Gts 7565 Sq. Yds (55.08%) to plotted area, 0 Acer 36.56 Gts 4424 Sq. Yds (32.21%) to roads, 0 Acer 10.3 Gts 1246 Sq. Yds (9.07%) to open space, 0 Acer 2.97 Gts 360 Sq. Yds (2.62%) to social infrastructure, and 0 Acer 1.16 Gts 140 Sq. Yds (1.02%) to utilities. It records 0 Acer 10.01 Gts 1211 Sq. Yds as mortgage area (15.9% of plotted area).
The RERA fields record 45,456.9 sq. m as approved built-up area and 7,036.84 sq. m as mortgage area; the supplied layout drawings do not provide a building schedule that explains the built-up-area figure. No tower count, floor configuration, building footprint, or apartment distribution is evidenced. RERA filing
4. Homes, configurations & floor plans
This is a plotted development; apartment configurations, RERA-filed saleable-area schedules, and booked/available plot counts are not supplied. The project layout data reports 167 plots for the 2022 approval and software-measured size bands from its drawing. RERA filing Layout record
| Plot-size band (sq. yd) | Plots |
|---|---|
| 150–200 | 2 |
| 200–250 | 3 |
| 250–300 | 97 |
| 300–400 | 34 |
| 400–500 | 21 |
| 500–1000 | 10 |
Software-measured sizes are 132.95–574.68 sq. m (159.0–687.3 sq. yd), with a median of 244.72 sq. m (292.7 sq. yd). These measurements are read from the approved drawing, not RERA-filed carpet or saleable areas. No home floor plans or measured room layouts are supplied. Layout record Floor plans
5. Parking & vehicle circulation
No project-wide vehicle-parking count, visitor or accessible parking allocation, parking levels, ramps, or plot-specific parking allocation is supplied. The layout approvals describe internal road formation and require roads to remain open for access to neighbouring sites; they do not provide a parking schedule. A separate approval records mortgaged plots, which should not be interpreted as parking provision.
6. Amenities, recreation & open spaces
The tentative layout approvals describe infrastructure and reserved areas. The listed amenities are approval requirements or RERA-filed availability declarations; the supplied data reports 0% progress for each of the listed RERA amenity categories and does not independently verify completion. RERA amenities
| Facility | Park / recreational open space |
|---|---|
| Description / size | 2022 approval: 1 Acer 27.81 Gts 8205 Sq. Yds (9%). 2024 approval: 0 Acer 10.3 Gts 1246 Sq. Yds (9.07%). |
| Declared progress / verified status | Approval reservation; no completion verification supplied. RERA amenity record reports 0% progress. RERA amenities |
| Facility | Avenue plantation |
|---|---|
| Description / size | Included in the stated layout-development works. |
| Declared progress / verified status | Required work; completion not independently verified. |
| Facility | No specific sports facility identified |
|---|---|
| Description / size | Not disclosed. |
| Evidence source | RERA amenities |
| Declared progress / verified status | Not established in supplied records. |
| Facility | Social infrastructure land |
|---|---|
| Description / size | 2022 approval: 0 Acer 18.87 Gts 2283 Sq. Yds (2.5%). 2024 approval: 0 Acer 2.97 Gts 360 Sq. Yds (2.62%). |
| Declared progress / verified status | Reserved land; no facility detail or completion verification supplied. |
| Facility | Community buildings |
|---|---|
| Description / size | Listed in the RERA amenities record without size or description. |
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity progress recorded as 0%; no completion verification supplied. |
7. Utilities, building services & safety
The approvals describe the proposed layout infrastructure; the RERA amenity record marks water supply, sewerage, storm-water drains, solid-waste management, rainwater harvesting, energy management, fire protection and electrical metering/substation items as available, but shows 0% progress for each category. The supplied evidence does not establish completed installation, operational capacity, or statutory compliance. RERA amenities
| Service | Evidence in the project record |
|---|---|
| Water | The approvals list a water reservoir, overhead tank, internal water-supply pipelines and an assured water-supply source. No source, storage capacity or commissioning evidence is supplied. |
| Sewerage and drainage | The approvals list underground drainage, storm-water drains and a common septic tank/STP (the 2024 approval lists a septic tank and sewerage treatment plant). No capacity, treatment specification or completion record is supplied. |
| Rainwater | Rainwater-harvesting pits are listed in the proposed layout works. No quantity, capacity or completion status is supplied. |
| Electrical | Transformer, electrical supply lines and street lights are listed. No supply capacity, backup power or EV charging information is supplied. |
| Waste | Solid-waste management is listed; no process, capacity or operational evidence is supplied. |
| Fire and accessibility | The RERA amenity record lists fire protection and fire-safety requirements, but the supplied evidence gives no system specifications, accessibility design or completion verification. RERA amenities |
8. Location, access & connectivity
The project’s registered revenue location is Rampur, Warangal Rural, PIN 506001. The 2022 layout approval identifies Rampur Revenue Village and GWMC Mandal. The supplied cadastral-parcel-centroid record gives coordinates 17.41528, 78.35459. RERA record Location record
The approval calls for roads to be opened for access to neighbouring sites and describes road formation and internal layout works. No named approach road, public-transport connection, or verified local landmark distances are supplied. The location data lists Financial District (Nanakramguda), 1.2 km; the basis and route for that distance are not further described in the supplied record. Location record
9. Developer & development status
The registered promoter is TEIRRA GREEN LLP, an LLP. The RERA record gives GSTIN 36AAQFT1972J1ZK. The registration certificate lists the promoter office as Village: Nizampet, Mandal: Bachupally, District: Medchal-Malkajgiri, Pin: 500090. The project record names BIYYALA DAYAKAR RAO as authorized signatory and BIYYALA YAMINI RAO and BIYYALA YASHWANTH RAO as partners. Corporate record RERA filing Parties record
The project data reports 60% completeness, without an independently verified progress inspection. The promoter’s Form B declarations state completion dates of 30-NOV-2025 and, in a later declaration, 23-10-2026. The supplied record does not establish an approved RERA extension or completion/occupancy certificate. RERA record Document index
10. Approvals, official records & documents
| Identifier / date | P00400006319, issued 07/07/2023; valid through 30/11/2025 as printed on the certificate |
|---|---|
| Scope and record | Registration for LOTUS AVENUE; certificate includes a separate-account condition. |
| Identifier / date | 0262/LO/3006/2022, approved 30 November, 2022; application 009090/LO/DTCP/3006/0333/2022 |
|---|---|
| Scope and record | GWMC Municipality/Municipal Corporation approval for 167 plots in the project’s registered survey list. |
| Identifier / date | 0392/LO/3006/2024, approved 23 October, 2024; application 009490/LO/DTCP/3006/0321/2023 |
|---|---|
| Scope and record | GWMC Municipality/Municipal Corporation approval for 23 plots in Sy. Nos. 618/A and 625/B; stated validity through 23 October, 2026. |
| Identifier / date | 30-NOV-2025 completion undertaking |
|---|---|
| Scope and record | Declaration by BIYYALA DAYAKAR RAO for TEIRRA GREEN LLP. |
| Identifier / date | 23-10-2026 completion undertaking |
|---|---|
| Scope and record | Declaration by BIYYALA DAYAKAR RAO for TEIRRA GREEN LLP, with advocate attestation recorded in the extraction. |
| Identifier / date | Not identified in supplied documents |
|---|---|
| Scope and record | No certificate establishing completion or occupancy is available in the evidence supplied for this overview. Document index |
1. Project at a glance
Project identity
Registered project name: LOTUS AVENUE
Project type: Plotted development / residential layout
Phase / registered portion: Not separately identified as a phase. The RERA certificate identifies the project by the survey numbers listed below; the layout approval also includes a separate 23-plot approval for Sy. Nos. 618/A and 625/B.
TG-RERA registration: P00400006319
Registration validity: 07/07/2023–30/11/2025, as stated in the registration certificate; the supplied record does not show an extension. This is the registration period, not the completion deadline or an occupancy certificate.
Registered promoter: TEIRRA GREEN LLP, an LLP
RERA status: The project is recorded as a New Project. The supplied registration certificate records the validity above; it does not establish a current extended registration status.
Land and geographic identity
Locality / revenue village: Rampur / Rampur Revenue Village
Mandal: GWMC Mandal in the layout approval; the RERA land record does not disclose the mandal.
District: Warangal Rural in the project identity record; the layout approval describes Warangal(Urban) District.
PIN: 506001
RERA-registered survey numbers: 627, 627/2, 628/A, 628/A/2, 630, 630/A/1/1, 634/B, 634/B/1, 635/A/1, 635/A/2, 636/A, 637, 637/A, 641/A, 641/A1/1, 641/A1/3, 641/B
Registered site extent: 77,398.63 sq. m total and net area; the RERA land record reports 0 area affected by road widening/FTL of tanks/nala widening.
Layout-approved extent: 19 Acer 5.01 Gts 92568 Sq. Yds for LP No. 0262/LO/3006/2022.
Boundaries: Not disclosed in the supplied land record.
Development identity
Sanctioning authority: GWMC Municipality/Municipal Corporation
Principal layout approval: Tentative Layout Plan 0262/LO/3006/2022, approved 30 November, 2022; application no. 009090/LO/DTCP/3006/0333/2022.
Additional layout approval on file: Tentative Layout Plan 0392/LO/3006/2024, approved 23 October, 2024; application no. 009490/LO/DTCP/3006/0321/2023, covering Sy. Nos. 618/A and 625/B.
Approved built-up area: 45,456.9 sq. m is recorded as approved built-up area in the RERA project fields.
Development form / number of plots: The 2022 layout approval records 167 plots. The separate 2024 layout approval records 23 plots.
Buildings / floors / parking levels: Not applicable to the submitted plotted-layout record; no building-floor configuration or parking-level schedule is supplied.
Offering and status
Unit type: Residential plots; the RERA filing identifies the project as plotted development.
Plot count and size information: The 2022 approved drawing is software-read as 167 plots; its plotted-area schedule is reported as complete in the layout data. Individual plot-size bands appear below.
Booked / available counts: Not supplied.
Construction / development stage: The project completeness field reports 60%; this is a recorded project-data figure, not an independent site inspection.
Completion dates: The initial Form B declaration undertakes completion by 30-NOV-2025. A later Form B declaration states 23-10-2026. The supplied record does not establish an Authority-approved RERA extension.
Occupancy / completion certificate: No occupancy or completion certificate for this plotted project is identified in the supplied documents.
2. The project story
LOTUS AVENUE is registered with TG-RERA as a plotted residential development at Rampur Revenue Village. The project record identifies 17 survey numbers/subdivisions, and the RERA land schedule states a total and net site area of 77,398.63 sq. m. The principal layout approval on file is a tentative approval for a 167-plot layout. A further tentative layout approval on file covers 23 plots in Sy. Nos. 618/A and 625/B; those survey numbers are not part of the survey list printed on the supplied LOTUS AVENUE registration certificate.
The layout is intended for residential plots, with roads and land reserved for open space, social infrastructure and utilities. The approval conditions require the applicant to complete layout infrastructure and amenities and provide for later release of the final layout; they do not establish that the works have been completed. The project data reports 60% completeness, but the supplied material does not provide an independently verified site inspection or a detailed, dated work-progress breakdown.
3. Master plan, architecture & building design
The supplied sanctioned material is for plotted layouts, not apartment or building plans. The 2022 tentative layout approval records an extent of 19 Acer 5.01 Gts 92568 Sq. Yds and 167 plots. Its area statement lists 11 Acer 9.29 Gts 54366 Sq. Yds (59.64%) as plotted area, 5 Acer 9.76 Gts 25382 Sq. Yds (27.84%) as road area, 1 Acer 27.81 Gts 8205 Sq. Yds (9%) as open-space park, 0 Acer 18.87 Gts 2283 Sq. Yds (2.5%) for social infrastructure, and 0 Acer 7.54 Gts 913 Sq. Yds (1%) for utilities. The approval also records 0 Acer 69.55 Gts 8416 Sq. Yds as mortgage area, described as 15.43 % of plotted area.
Software measurement of the approved drawing reports plot sizes from 132.95 sq. m (159.0 sq. yd) to 574.68 sq. m (687.3 sq. yd), with a median of 244.72 sq. m (292.7 sq. yd). The recorded size bands are: 150–200 sq. yd: 2 plots; 200–250: 3; 250–300: 97; 300–400: 34; 400–500: 21; 500–1000: 10. These are drawing-derived measurements, not a substitute for checking an individual plot’s sanctioned schedule and dimensions.
The separate 2024 tentative layout approval records 2 Acer 33.51 Gts 13735 Sq. Yds and 23 plots in Sy. Nos. 618/A and 625/B. Its area statement assigns 1 Acer 22.52 Gts 7565 Sq. Yds (55.08%) to plotted area, 0 Acer 36.56 Gts 4424 Sq. Yds (32.21%) to roads, 0 Acer 10.3 Gts 1246 Sq. Yds (9.07%) to open space, 0 Acer 2.97 Gts 360 Sq. Yds (2.62%) to social infrastructure, and 0 Acer 1.16 Gts 140 Sq. Yds (1.02%) to utilities. It records 0 Acer 10.01 Gts 1211 Sq. Yds as mortgage area (15.9% of plotted area).
The RERA fields record 45,456.9 sq. m as approved built-up area and 7,036.84 sq. m as mortgage area; the supplied layout drawings do not provide a building schedule that explains the built-up-area figure. No tower count, floor configuration, building footprint, or apartment distribution is evidenced.
4. Homes, configurations & floor plans
This is a plotted development; apartment configurations, RERA-filed saleable-area schedules, and booked/available plot counts are not supplied. The project layout data reports 167 plots for the 2022 approval and software-measured size bands from its drawing.
150–200: 2
200–250: 3
250–300: 97
300–400: 34
400–500: 21
500–1000: 10
Software-measured sizes are 132.95–574.68 sq. m (159.0–687.3 sq. yd), with a median of 244.72 sq. m (292.7 sq. yd). These measurements are read from the approved drawing, not RERA-filed carpet or saleable areas. No home floor plans or measured room layouts are supplied.
5. Parking & vehicle circulation
No project-wide vehicle-parking count, visitor or accessible parking allocation, parking levels, ramps, or plot-specific parking allocation is supplied. The layout approvals describe internal road formation and require roads to remain open for access to neighbouring sites; they do not provide a parking schedule. A separate approval records mortgaged plots, which should not be interpreted as parking provision.
6. Amenities, recreation & open spaces
The tentative layout approvals describe infrastructure and reserved areas. The listed amenities are approval requirements or RERA-filed availability declarations; the supplied data reports 0% progress for each of the listed RERA amenity categories and does not independently verify completion.
| Facility | Park / recreational open space |
|---|---|
| Description / size | 2022 approval: 1 Acer 27.81 Gts 8205 Sq. Yds (9%). 2024 approval: 0 Acer 10.3 Gts 1246 Sq. Yds (9.07%). |
| Declared progress / verified status | Approval reservation; no completion verification supplied. RERA amenity record reports 0% progress. |
| Facility | Avenue plantation |
|---|---|
| Description / size | Included in the stated layout-development works. |
| Declared progress / verified status | Required work; completion not independently verified. |
| Facility | No specific sports facility identified |
|---|---|
| Description / size | Not disclosed. |
| Declared progress / verified status | Not established in supplied records. |
| Facility | Social infrastructure land |
|---|---|
| Description / size | 2022 approval: 0 Acer 18.87 Gts 2283 Sq. Yds (2.5%). 2024 approval: 0 Acer 2.97 Gts 360 Sq. Yds (2.62%). |
| Declared progress / verified status | Reserved land; no facility detail or completion verification supplied. |
| Facility | Community buildings |
|---|---|
| Description / size | Listed in the RERA amenities record without size or description. |
| Declared progress / verified status | RERA amenity progress recorded as 0%; no completion verification supplied. |
7. Utilities, building services & safety
The approvals describe the proposed layout infrastructure; the RERA amenity record marks water supply, sewerage, storm-water drains, solid-waste management, rainwater harvesting, energy management, fire protection and electrical metering/substation items as available, but shows 0% progress for each category. The supplied evidence does not establish completed installation, operational capacity, or statutory compliance.
Water: The approvals list a water reservoir, overhead tank, internal water-supply pipelines and an assured water-supply source. No source, storage capacity or commissioning evidence is supplied.
Sewerage and drainage: The approvals list underground drainage, storm-water drains and a common septic tank/STP (the 2024 approval lists a septic tank and sewerage treatment plant). No capacity, treatment specification or completion record is supplied.
Rainwater: Rainwater-harvesting pits are listed in the proposed layout works. No quantity, capacity or completion status is supplied.
Electrical: Transformer, electrical supply lines and street lights are listed. No supply capacity, backup power or EV charging information is supplied.
Waste: Solid-waste management is listed; no process, capacity or operational evidence is supplied.
Fire and accessibility: The RERA amenity record lists fire protection and fire-safety requirements, but the supplied evidence gives no system specifications, accessibility design or completion verification.
8. Location, access & connectivity
The project’s registered revenue location is Rampur, Warangal Rural, PIN 506001. The 2022 layout approval identifies Rampur Revenue Village and GWMC Mandal. The supplied cadastral-parcel-centroid record gives coordinates 17.41528, 78.35459.
The approval calls for roads to be opened for access to neighbouring sites and describes road formation and internal layout works. No named approach road, public-transport connection, or verified local landmark distances are supplied. The location data lists Financial District (Nanakramguda), 1.2 km; the basis and route for that distance are not further described in the supplied record.
9. Developer & development status
The registered promoter is TEIRRA GREEN LLP, an LLP. The RERA record gives GSTIN 36AAQFT1972J1ZK. The registration certificate lists the promoter office as Village: Nizampet, Mandal: Bachupally, District: Medchal-Malkajgiri, Pin: 500090. The project record names BIYYALA DAYAKAR RAO as authorized signatory and BIYYALA YAMINI RAO and BIYYALA YASHWANTH RAO as partners.
The project data reports 60% completeness, without an independently verified progress inspection. The promoter’s Form B declarations state completion dates of 30-NOV-2025 and, in a later declaration, 23-10-2026. The supplied record does not establish an approved RERA extension or completion/occupancy certificate.
10. Approvals, official records & documents
| Identifier / date | P00400006319, issued 07/07/2023; valid through 30/11/2025 as printed on the certificate |
|---|---|
| Scope and record | Registration for LOTUS AVENUE; certificate includes a separate-account condition. |
| Identifier / date | 0262/LO/3006/2022, approved 30 November, 2022; application 009090/LO/DTCP/3006/0333/2022 |
|---|---|
| Scope and record | GWMC Municipality/Municipal Corporation approval for 167 plots in the project’s registered survey list. |
| Identifier / date | 0392/LO/3006/2024, approved 23 October, 2024; application 009490/LO/DTCP/3006/0321/2023 |
|---|---|
| Scope and record | GWMC Municipality/Municipal Corporation approval for 23 plots in Sy. Nos. 618/A and 625/B; stated validity through 23 October, 2026. |
| Identifier / date | 30-NOV-2025 completion undertaking |
|---|---|
| Scope and record | Declaration by BIYYALA DAYAKAR RAO for TEIRRA GREEN LLP. |
| Identifier / date | 23-10-2026 completion undertaking |
|---|---|
| Scope and record | Declaration by BIYYALA DAYAKAR RAO for TEIRRA GREEN LLP, with advocate attestation recorded in the extraction. |
| Identifier / date | Not identified in supplied documents |
|---|---|
| Scope and record | No certificate establishing completion or occupancy is available in the evidence supplied for this overview. |
Frequently asked questions
Is LOTUS AVENUE registered with Telangana RERA?
Yes. LOTUS AVENUE is registered with the Telangana Real Estate Regulatory Authority as P00400006319; the registration status is New Project.
Who is the developer of LOTUS AVENUE?
The promoter named in the RERA registration is TEIRRA GREEN LLP.
Where is LOTUS AVENUE located?
LOTUS AVENUE is in RAMPUR, Warangal, Telangana (506001).
When will LOTUS AVENUE be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2025. This is the promoter's declaration, not a guarantee.