Sri Nandi Future City
SRI RAJITHA INFRASTRUCTURE · Rangareddy · RERA P02400011069
SRI NANDI FUTURE CITY is a plotted residential development at Nandiwanaparthy, Yacharam Mandal, Ranga Reddy District. It is being developed by registered promoter SRI RAJITHA INFRASTRUCTURE. The layout has a total site area of 29137.53 sq.m and identifies 92 numbered plots; tower or floor details are not disclosed. The project is registered under TG-RERA number P02400011069, and the promoter’s Form B states completion on or before 29.05.2029.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SRI NANDI FUTURE CITY RERA record |
| Project type | Plotted development / open-plot layout RERA record |
| Phase / registered portion | No separate phase is identified; the registration covers the plotted project as described in the filed certificate and layout documents. RERA record |
| TG-RERA registration number | P02400011069 RERA record |
| TG-RERA status and validity | Registration record states validity from 30/05/2026 to 29/05/2029, unless extended by the Authority. Approvals record |
| Registered promoter | SRI RAJITHA INFRASTRUCTURE, identified as a proprietorship concern; proprietor: KOMMINENI VENKATA RAO. Corporate record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Nandiwanaparthy (also rendered “NANDIWANAPARTHI” in a filed drawing extraction) RERA record |
| Mandal / district / PIN | Yacharam / Ranga Reddy / 501509 RERA record |
| Project survey numbers as filed | 498 PART, 500 PART; the layout drawing labels these 498/P and 500/P. RERA record |
| Total site / layout area | 29137.53 sq.m |
| Net layout area | 27092.26 sq.m |
| Boundaries in project record | East: Bolligutta Thanda to Nandiwanaparthy Road; west: NALA; north and south: Neighbours Property. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority / principal approval | Future City Development Authority (FCDA); layout file/approval number 007334/FCDA/00034/SWDL/YCH/2025. Approvals record |
| Approval date recorded in registration data | 30/05/2026 Approvals record |
| Filed approval-document record | Draft layout letter and related layout-plan documents are filed; the letter describes technical approval and forwarding to Nandiwanaparthy Gram Panchayat. |
| Approved built-up area | 16208 sq.m is stated in the project fields as “Approved Built up Area”; the development is a plotted layout, and no building-level floor schedule is supplied. RERA filing |
| Building / tower count and floor configuration | Not disclosed in the supplied project record; this is a plotted layout, not a tower/apartment scheme. RERA record Document index |
| Layout land-use areas shown in the filed plan | Plotted area 16208.00 sq.m (59.83%); road area 8074.89 sq.m (29.81%); open-space area 2032.87 sq.m (7.50%); social infrastructure 677.89 sq.m (2.50%); utility area 98.65 sq.m (0.36%). |
| Plot count | The filed plan extraction identifies 92 numbered plots; plot sizes and a complete plot schedule are not available in the supplied records. |
Offering and status
| Field | Record |
|---|---|
| Offering | Residential plots; plot-specific dimensions, prices, inventory and allotment status are not established by the supplied RERA record. |
| Construction / development stage | The record contains draft-layout approval documents and proposed development conditions; no independently verified site-progress assessment is supplied. |
| Promoter-declared completion undertaking | Form B states completion on or before 29.05.2029. |
| Completion deadline in project header | 29/09/2029 RERA record |
| Registration validity | 30/05/2026–29/05/2029, as stated in the registration certificate. This is the registration period, separate from the completion dates above. |
| Occupancy / completion certificate | No project occupancy or completion certificate is supplied. The available approval material describes a draft layout and sets out requirements relating to development and final layout release. |
2. The project story
SRI NANDI FUTURE CITY is registered as a plotted residential development at Nandiwanaparthy in Yacharam Mandal, Ranga Reddy District. The filed layout plan identifies land in Survey Nos. 498/P and 500/P, with a total layout area of 29137.53 sq.m and net layout area of 27092.26 sq.m. The layout extraction describes 92 numbered plots, but the supplied record does not provide a complete plot-by-plot size and availability schedule. RERA record
The filed FCDA material describes a draft layout and proposed infrastructure works, including roads, drainage, water supply arrangements, electricity facilities, park development and rainwater-harvesting pits. These are approval-document requirements or proposed works, not evidence that the works have been completed. No independent construction-progress or site-inspection evidence is supplied.
3. Master plan, architecture & building design
The project is a plotted layout rather than a multi-storey residential building scheme. The filed layout plan gives a total layout area of 29137.53 sq.m and net layout area of 27092.26 sq.m. Its stated land-use allocation is:
| Layout component | Area | Share |
|---|---|---|
| Plotted area | 16208.00 sq.m | 59.83% |
| Road area | 8074.89 sq.m | 29.81% |
| Open-space area | 2032.87 sq.m | 7.50% |
| Social infrastructure area | 677.89 sq.m | 2.50% |
| Utility area | 98.65 sq.m | 0.36% |
The drawing extraction lists internal-road widths of 12.18m Main Internal Approach Road, 9.15m Other Internal Road, 9.13m Other Internal Road, and road widths of 9m Existing Road Width and 30m Proposed Road Width. It also records 483.6 sq.m as road-widening area and 1561.67 sq.m as nala-widening area.
The extracted layout count is 92 numbered plots, but no complete plot-size schedule or plot-by-plot drawing measurements are supplied. The record does not establish building footprints, floor configurations, or tower arrangements. Floor plans
4. Homes, configurations & floor plans
The RERA-filed offering is plots; no unit-type schedule with plot-wise areas, booking counts or availability is supplied. The filed allotment-letter template is incomplete, with plot number, allottee, price, booking amount and payment schedule left blank.
The layout extraction identifies 92 numbered plots, but does not provide a verified plot-size range or complete schedule. The floor-plan review reports two drawings, neither containing flats; no measured carpet areas are available. Carpet-area and apartment saleable-area comparisons therefore do not apply on the supplied evidence. Floor plans
The vendor data lists plot sizes of 1429 Sq. Ft. and 2910 Sq. Ft. These are vendor-listed figures, not established here as the RERA-filed plot schedule. Promoter website
5. Parking & vehicle circulation
The filed layout plan records 0.00 sq.m as common parking area. No count of parking spaces, plot-specific parking allocation, visitor parking provision or vehicle-space schedule is supplied.
The drawing extraction identifies internal roads and approach-road widths, but the supplied evidence does not establish parking bays, ramps, pedestrian separation or EV-charging installation. The filed approval conditions refer to parking requirements where applicable; that condition is not evidence of completed parking facilities.
6. Amenities, recreation & open spaces
The RERA-filed amenity records and approval documents describe proposed layout facilities and land allocations. No supplied record establishes that these facilities have been completed or independently verified.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | Open-space area 2032.87 sq.m (7.50%); approval conditions also refer to park development and a tot-lot. | Area and conditions appear in filed layout material; completion not evidenced. | |
| Social infrastructure | 677.89 sq.m (2.50%) | Land allocation recorded; specific facility and delivery status not supplied. | |
| Internal roads and footpaths | Road area 8074.89 sq.m (29.81%); approval material specifies road formation and footpath works. | Proposed/required works; completion not evidenced. | |
| Utility area | 98.65 sq.m (0.36%) | Site allocation recorded; delivery status not supplied. | |
| Tot-lot | Approval condition calls for a fenced tot-lot maintained as greenery. | Condition recorded; completion not evidenced. |
Vendor-listed amenities include a park and children’s play areas, but the supplied RERA material does not establish their delivery. Promoter website
7. Utilities, building services & safety
The filed layout approval material describes proposed infrastructure and conditions, rather than verified completed services:
| What the filed record says | Proposed internal water-supply pipelines, overhead tank, assured water-supply source, and connection arrangements to an approved trunk/connecting pipeline. |
|---|---|
| Status evidenced | Approval-document requirements; completion and capacity not evidenced. |
| What the filed record says | Proposed underground drainage, common septic tank / STP, storm-water drainage and nala channelisation. |
|---|---|
| Status evidenced | Proposed/required works; no completion evidence or capacity supplied. RERA amenities |
| What the filed record says | Rainwater-harvesting pits/structure are included in the proposed works and conditions. |
|---|---|
| Status evidenced | Completion not evidenced. |
| What the filed record says | Proposed electrical supply lines, transformer/transformer yard and street lighting; two LT lines are recorded as passing through the site, with realignment along proposed road margins stated as a condition for final layout release. |
|---|---|
| Status evidenced | Approval-record content; installation or realignment not verified. |
| What the filed record says | Approval material calls for a solid-waste disposal area, bio-composting and source segregation. |
|---|---|
| Status evidenced | Proposed/required; completion not evidenced. |
| What the filed record says | Approval conditions address safe access, fire-safety requirements where applicable, and construction safety. |
|---|---|
| Status evidenced | Conditions only; no fire-clearance or completed safety-system evidence supplied. |
| What the filed record says | No project-specific accessible-route or facility schedule is supplied. |
|---|---|
| Status evidenced | Not disclosed. |
8. Location, access & connectivity
The registered location is Nandiwanaparthy Village, Yacharam Mandal, Ranga Reddy District, Telangana, PIN 501509. The project record gives the east boundary as Bolligutta Thanda to Nandiwanaparthy Road and the west boundary as NALA. RERA record RERA filing
A cadastral parcel-centroid location is recorded at 17.03108661344726, 78.62643180517838. The nearest sampled Outer Ring Road interchange is recorded at approximately 24.6 km. Cadastral map Location record
The filed layout drawing also identifies a 9m existing road width and a 30m proposed road width. No public-transport details, landmark distances or verified travel-time estimates are supplied.
9. Developer & development status
The registered promoter is SRI RAJITHA INFRASTRUCTURE, a proprietorship, represented by proprietor KOMMINENI VENKATA RAO. The supplied record identifies the promoter’s address as Nandiwanaparthy Village, Yacharam Mandal, Yacharam, Ranga Reddy, Telangana, PIN 501509. Corporate record
Form B is a promoter declaration dated 05 June 2026. It states that the project will be completed on or before 29.05.2029 and includes declarations about title, encumbrances, separate-account deposits and obtaining any pending approvals. These are the promoter’s filed statements, not independent findings.
No verified construction-progress report, plot inventory or occupancy/completion certificate is supplied. The project’s registration-validity period is stated separately in the registration certificate as 30/05/2026 to 29/05/2029.
10. Approvals, official records & documents
| Identifier / date | P02400011069; validity 30/05/2026–29/05/2029 |
|---|---|
| What is available | Form C registration certificate for SRI NANDI FUTURE CITY and promoter SRI RAJITHA INFRASTRUCTURE. |
| Identifier / date | 007334/FCDA/00034/SWDL/YCH/2025; document extraction records approval date 20/09/2025 |
|---|---|
| What is available | Draft layout letter for the plotted development, with development conditions and proposed infrastructure works. |
| Identifier / date | File number 007334/FCDA/00034/SWDL/YCH/2025; drawing date recorded as 30/05/2026 |
|---|---|
| What is available | Layout drawing and land-use schedule for Survey Nos. 498/P and 500/P. |
| Identifier / date | Same application number; 30/05/2026 recorded in extracted documents |
|---|---|
| What is available | Documents describe technical approval and forwarding to Nandiwanaparthy Gram Panchayat; the supplied material does not include evidence that final layout release has occurred. |
| Identifier / date | 05 June 2026 |
|---|---|
| What is available | Promoter affidavit and completion undertaking. |
| Identifier / date | Filed template; incomplete |
|---|---|
| What is available | Plot, allottee, price and payment particulars are blank. |
No occupancy/completion certificate or final layout-release document is included in the supplied evidence.
1. Project at a glance
Project identity
Registered project name: SRI NANDI FUTURE CITY
Project type: Plotted development / open-plot layout
Phase / registered portion: No separate phase is identified; the registration covers the plotted project as described in the filed certificate and layout documents.
TG-RERA registration number: P02400011069
TG-RERA status and validity: Registration record states validity from 30/05/2026 to 29/05/2029, unless extended by the Authority.
Registered promoter: SRI RAJITHA INFRASTRUCTURE, identified as a proprietorship concern; proprietor: KOMMINENI VENKATA RAO.
Land and geographic identity
Locality / revenue village: Nandiwanaparthy (also rendered “NANDIWANAPARTHI” in a filed drawing extraction)
Mandal / district / PIN: Yacharam / Ranga Reddy / 501509
Project survey numbers as filed: 498 PART, 500 PART; the layout drawing labels these 498/P and 500/P.
Total site / layout area: 29137.53 sq.m
Net layout area: 27092.26 sq.m
Boundaries in project record: East: Bolligutta Thanda to Nandiwanaparthy Road; west: NALA; north and south: Neighbours Property.
Development identity
Sanctioning authority / principal approval: Future City Development Authority (FCDA); layout file/approval number 007334/FCDA/00034/SWDL/YCH/2025.
Approval date recorded in registration data: 30/05/2026
Filed approval-document record: Draft layout letter and related layout-plan documents are filed; the letter describes technical approval and forwarding to Nandiwanaparthy Gram Panchayat.
Approved built-up area: 16208 sq.m is stated in the project fields as “Approved Built up Area”; the development is a plotted layout, and no building-level floor schedule is supplied.
Building / tower count and floor configuration: Not disclosed in the supplied project record; this is a plotted layout, not a tower/apartment scheme.
Layout land-use areas shown in the filed plan: Plotted area 16208.00 sq.m (59.83%); road area 8074.89 sq.m (29.81%); open-space area 2032.87 sq.m (7.50%); social infrastructure 677.89 sq.m (2.50%); utility area 98.65 sq.m (0.36%).
Plot count: The filed plan extraction identifies 92 numbered plots; plot sizes and a complete plot schedule are not available in the supplied records.
Offering and status
Offering: Residential plots; plot-specific dimensions, prices, inventory and allotment status are not established by the supplied RERA record.
Construction / development stage: The record contains draft-layout approval documents and proposed development conditions; no independently verified site-progress assessment is supplied.
Promoter-declared completion undertaking: Form B states completion on or before 29.05.2029.
Completion deadline in project header: 29/09/2029
Registration validity: 30/05/2026–29/05/2029, as stated in the registration certificate. This is the registration period, separate from the completion dates above.
Occupancy / completion certificate: No project occupancy or completion certificate is supplied. The available approval material describes a draft layout and sets out requirements relating to development and final layout release.
2. The project story
SRI NANDI FUTURE CITY is registered as a plotted residential development at Nandiwanaparthy in Yacharam Mandal, Ranga Reddy District. The filed layout plan identifies land in Survey Nos. 498/P and 500/P, with a total layout area of 29137.53 sq.m and net layout area of 27092.26 sq.m. The layout extraction describes 92 numbered plots, but the supplied record does not provide a complete plot-by-plot size and availability schedule.
The filed FCDA material describes a draft layout and proposed infrastructure works, including roads, drainage, water supply arrangements, electricity facilities, park development and rainwater-harvesting pits. These are approval-document requirements or proposed works, not evidence that the works have been completed. No independent construction-progress or site-inspection evidence is supplied.
3. Master plan, architecture & building design
The project is a plotted layout rather than a multi-storey residential building scheme. The filed layout plan gives a total layout area of 29137.53 sq.m and net layout area of 27092.26 sq.m. Its stated land-use allocation is:
| Layout component | Area | Share |
|---|---|---|
| Plotted area | 16208.00 sq.m | 59.83% |
| Road area | 8074.89 sq.m | 29.81% |
| Open-space area | 2032.87 sq.m | 7.50% |
| Social infrastructure area | 677.89 sq.m | 2.50% |
| Utility area | 98.65 sq.m | 0.36% |
The drawing extraction lists internal-road widths of 12.18m Main Internal Approach Road, 9.15m Other Internal Road, 9.13m Other Internal Road, and road widths of 9m Existing Road Width and 30m Proposed Road Width. It also records 483.6 sq.m as road-widening area and 1561.67 sq.m as nala-widening area.
The extracted layout count is 92 numbered plots, but no complete plot-size schedule or plot-by-plot drawing measurements are supplied. The record does not establish building footprints, floor configurations, or tower arrangements.
4. Homes, configurations & floor plans
The RERA-filed offering is plots; no unit-type schedule with plot-wise areas, booking counts or availability is supplied. The filed allotment-letter template is incomplete, with plot number, allottee, price, booking amount and payment schedule left blank.
The layout extraction identifies 92 numbered plots, but does not provide a verified plot-size range or complete schedule. The floor-plan review reports two drawings, neither containing flats; no measured carpet areas are available. Carpet-area and apartment saleable-area comparisons therefore do not apply on the supplied evidence.
The vendor data lists plot sizes of 1429 Sq. Ft. and 2910 Sq. Ft. These are vendor-listed figures, not established here as the RERA-filed plot schedule.
5. Parking & vehicle circulation
The filed layout plan records 0.00 sq.m as common parking area. No count of parking spaces, plot-specific parking allocation, visitor parking provision or vehicle-space schedule is supplied.
The drawing extraction identifies internal roads and approach-road widths, but the supplied evidence does not establish parking bays, ramps, pedestrian separation or EV-charging installation. The filed approval conditions refer to parking requirements where applicable; that condition is not evidence of completed parking facilities.
6. Amenities, recreation & open spaces
The RERA-filed amenity records and approval documents describe proposed layout facilities and land allocations. No supplied record establishes that these facilities have been completed or independently verified.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | Open-space area 2032.87 sq.m (7.50%); approval conditions also refer to park development and a tot-lot. | Area and conditions appear in filed layout material; completion not evidenced. | |
| Social infrastructure | 677.89 sq.m (2.50%) | Land allocation recorded; specific facility and delivery status not supplied. | |
| Internal roads and footpaths | Road area 8074.89 sq.m (29.81%); approval material specifies road formation and footpath works. | Proposed/required works; completion not evidenced. | |
| Utility area | 98.65 sq.m (0.36%) | Site allocation recorded; delivery status not supplied. | |
| Tot-lot | Approval condition calls for a fenced tot-lot maintained as greenery. | Condition recorded; completion not evidenced. |
Vendor-listed amenities include a park and children’s play areas, but the supplied RERA material does not establish their delivery.
7. Utilities, building services & safety
The filed layout approval material describes proposed infrastructure and conditions, rather than verified completed services:
| What the filed record says | Proposed internal water-supply pipelines, overhead tank, assured water-supply source, and connection arrangements to an approved trunk/connecting pipeline. |
|---|---|
| Status evidenced | Approval-document requirements; completion and capacity not evidenced. |
| What the filed record says | Proposed underground drainage, common septic tank / STP, storm-water drainage and nala channelisation. |
|---|---|
| Status evidenced | Proposed/required works; no completion evidence or capacity supplied. |
| What the filed record says | Rainwater-harvesting pits/structure are included in the proposed works and conditions. |
|---|---|
| Status evidenced | Completion not evidenced. |
| What the filed record says | Proposed electrical supply lines, transformer/transformer yard and street lighting; two LT lines are recorded as passing through the site, with realignment along proposed road margins stated as a condition for final layout release. |
|---|---|
| Status evidenced | Approval-record content; installation or realignment not verified. |
| What the filed record says | Approval material calls for a solid-waste disposal area, bio-composting and source segregation. |
|---|---|
| Status evidenced | Proposed/required; completion not evidenced. |
| What the filed record says | Approval conditions address safe access, fire-safety requirements where applicable, and construction safety. |
|---|---|
| Status evidenced | Conditions only; no fire-clearance or completed safety-system evidence supplied. |
| What the filed record says | No project-specific accessible-route or facility schedule is supplied. |
|---|---|
| Status evidenced | Not disclosed. |
8. Location, access & connectivity
The registered location is Nandiwanaparthy Village, Yacharam Mandal, Ranga Reddy District, Telangana, PIN 501509. The project record gives the east boundary as Bolligutta Thanda to Nandiwanaparthy Road and the west boundary as NALA.
A cadastral parcel-centroid location is recorded at 17.03108661344726, 78.62643180517838. The nearest sampled Outer Ring Road interchange is recorded at approximately 24.6 km.
The filed layout drawing also identifies a 9m existing road width and a 30m proposed road width. No public-transport details, landmark distances or verified travel-time estimates are supplied.
9. Developer & development status
The registered promoter is SRI RAJITHA INFRASTRUCTURE, a proprietorship, represented by proprietor KOMMINENI VENKATA RAO. The supplied record identifies the promoter’s address as Nandiwanaparthy Village, Yacharam Mandal, Yacharam, Ranga Reddy, Telangana, PIN 501509.
Form B is a promoter declaration dated 05 June 2026. It states that the project will be completed on or before 29.05.2029 and includes declarations about title, encumbrances, separate-account deposits and obtaining any pending approvals. These are the promoter’s filed statements, not independent findings.
No verified construction-progress report, plot inventory or occupancy/completion certificate is supplied. The project’s registration-validity period is stated separately in the registration certificate as 30/05/2026 to 29/05/2029.
10. Approvals, official records & documents
| Identifier / date | P02400011069; validity 30/05/2026–29/05/2029 |
|---|---|
| What is available | Form C registration certificate for SRI NANDI FUTURE CITY and promoter SRI RAJITHA INFRASTRUCTURE. |
| Identifier / date | 007334/FCDA/00034/SWDL/YCH/2025; document extraction records approval date 20/09/2025 |
|---|---|
| What is available | Draft layout letter for the plotted development, with development conditions and proposed infrastructure works. |
| Identifier / date | File number 007334/FCDA/00034/SWDL/YCH/2025; drawing date recorded as 30/05/2026 |
|---|---|
| What is available | Layout drawing and land-use schedule for Survey Nos. 498/P and 500/P. |
| Identifier / date | Same application number; 30/05/2026 recorded in extracted documents |
|---|---|
| What is available | Documents describe technical approval and forwarding to Nandiwanaparthy Gram Panchayat; the supplied material does not include evidence that final layout release has occurred. |
| Identifier / date | 05 June 2026 |
|---|---|
| What is available | Promoter affidavit and completion undertaking. |
| Identifier / date | Filed template; incomplete |
|---|---|
| What is available | Plot, allottee, price and payment particulars are blank. |
No occupancy/completion certificate or final layout-release document is included in the supplied evidence.
Frequently asked questions
Is SRI NANDI FUTURE CITY registered with Telangana RERA?
Yes. SRI NANDI FUTURE CITY is registered with the Telangana Real Estate Regulatory Authority as P02400011069; the registration status is New Project.
Who is the developer of SRI NANDI FUTURE CITY?
The promoter named in the RERA registration is SRI RAJITHA INFRASTRUCTURE.
Where is SRI NANDI FUTURE CITY located?
SRI NANDI FUTURE CITY is in Yacharam Mandal, Nandiwanaparthy, Yacharam, Rangareddy, Telangana (501509).
When will SRI NANDI FUTURE CITY be completed?
The promoter's proposed date of completion filed with RERA is 29/09/2029. This is the promoter's declaration, not a guarantee.