Sign in

Neelima Towers Block A

GUNTURU VENKANNA · Nizamabad · RERA P03100010868

NEELIMA TOWERS BLOCK A is a residential apartment project in Borgaon (P), MOGUPAL (NEW), Nizamabad district, developed by registered promoter GUNTURU VENKANNA. It is on 565.62 sq.m and comprises one residential building with 1 Stilt + 5 Floors and 10 dwelling units, configured as 2BHK. The project is registered with TG-RERA as P03100010868, and its proposed completion date is 22/01/2029.

01What we found

RegisteredTG-RERA - valid till 22 Jan 2029
18documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered nameNEELIMA TOWERS BLOCK A RERA record
Project type / phaseResidential apartment project; registered portion is Block A. RERA record
TG-RERA registrationP03100010868; registered from 23 January 2026 to 22 January 2029. Registration validity is separate from the completion date. RERA record
Registered promoterGUNTURU VENKANNA; RERA record describes him as a proprietor. RERA record RERA filing
RERA status in supplied recordRegistered; the registration record was captured on 10 September 2026. Approvals record
Other project participants named in the filingLandowners: BHAVANTHI KOUSHIK and BHAVANTHI KARTHIKA. The filed development agreement identifies Neelima Builders & Developers as developer. Parties record

Land and geographic identity

FieldProject record
Locality / revenue villageBorgaon (P); the permit also renders this as BORGOAN (P). RERA record
Mandal / district / PINMOGUPAL (NEW) / Nizamabad / 503230. RERA record
Project survey identifier115(PART); the building-permit documents render this as 115 (PART). RERA record Land records
Registered site extent565.62 sq.m. The permit records both gross and net plot area as 565.62 sq.m, with recorded deductions of zero. RERA filing
BoundariesEast: NEIGHBOURS LAND; west: 12 M WIDE MAIN ROAD; north: NEIGHBOURS LAND; south: PROPOSED RESIDENTIAL APERTMENT BLOCK B. RERA filing
Area recorded for mortgageRERA land details list 138.56 sq.m; the building permit identifies the mortgaged area as the third and fourth floors. RERA filing

Development identity

FieldProject record
Sanctioning authority / principal approvalBuilding permission issued by Nizamabad Municipal Corporation, approval no. 0042/NIZA/SWBP/2026, dated 23/01/2026. The filed plan also carries file no. 006323/NIZA/00040/SWBP/2025 and identifies DTCP. Approvals record
Building and floorsOne residential building; sanctioned configuration 1 Stilt + 5 Floors.
Approved built-up area1666.35 sq.m including parking; the filed plan separately records 1379.7 sq.m excluding parking. These are distinct area figures as labelled in the plan.
Parking provision in sanction286.65 sq.m total parking area; 10.00 car parking spaces are stated in the plan’s sanctioned parameters.
Units10 dwelling units in the sanctioned plan and 10 units in the RERA unit record. RERA unit table

Offering and status

FieldProject record
RERA-filed configuration2BHK, 10 units; filed saleable area 144.09 sq.m per unit. RERA unit table RERA unit details
Booking / availabilityPortal record: 0 booked, 10 available; no as-of date is supplied, so counts are indicative. RERA unit table
Completion datesPromoter’s Form B declares completion by 22/01/2029. The registration validity ends 22/01/2029; these dates are not interchangeable with an occupancy certificate.
Construction stageThe project is registered as a new project. No independently verified site-progress measurement is supplied. RERA record RERA amenities
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project record. The permit requires an occupancy certificate before occupation. Document index

2. The project story

NEELIMA TOWERS BLOCK A is a registered residential apartment project on 565.62 sq.m in Survey No. 115(PART), Borgaon (P), Nizamabad district. The sanctioned scheme is a single building of 1 Stilt + 5 Floors, with 10 dwelling units. The south boundary is recorded as a proposed residential apartment block identified as Block B; the supplied evidence does not establish that Block B forms part of this registration. RERA record Land records

The RERA unit record lists ten 2BHK homes, none booked and ten available when the portal data was read; the portal record does not provide an as-of date. Although the project is identified as new, the supplied material does not establish construction progress through an independent site inspection. No occupancy certificate is supplied; the permit requires one before occupation. RERA unit table RERA record

3. Master plan, architecture & building design

The filed building-permission plan shows one residential building with 1 Stilt + 5 Floors on a 565.62 sq.m plot. It records 286.65 sq.m proposed coverage area (shown as 51%) and 267.29 sq.m vacant plot area. The plan separately states proposed built-up area of 1379.7 sq.m excluding parking and 1666.35 sq.m including parking; these are the plan’s labelled values, not carpet or saleable area.

The building-permit record lists a proposed height of 17.85 m from ground level, a permissible height of 15.00 m, and a proposed height excluding stilt of 14.95 m. It also records a 12.0 m existing and proposed road width and setbacks of front 3.0 m, rear 3.5 m, side I 3.5 m and side II 3.5 m.

The plan identifies a tot-lot and greenery conditions, but the permit data lists the tot-lot area as 0; no verified landscape-area measurement is supplied. No usable floor-by-floor schedule, number of flats per floor, lift or stair details, or building footprint drawing measurements are provided in the structured evidence.

4. Homes, configurations & floor plans

The RERA unit record lists one filed configuration: 2BHK, with 10 units, 0 booked and 10 available in the portal record (without an as-of date). Its filed saleable area is 144.09 sq.m per unit. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK10010144.09 sq.mNot suppliedNot supplied

The supplied drawing analysis reports software-measured carpet areas for a 3BHK configuration: median 91.6 sq.m, range 87.9–91.6 sq.m (median 986 sq.ft, range 946–986 sq.ft) across six measured flat designs. This is drawing-derived, not a RERA-filed configuration or RERA area disclosure; the measurements are marked as needing review. The supplied evidence gives no comparable drawing-derived carpet measurement for the filed 2BHK units. Carpet area and saleable area are different measures; the supplied evidence does not provide a loading figure. Floor plans RERA unit details

The drawing extraction includes room labels and some dimensions for one flat marked “02,” but it is associated with the drawing-derived 3BHK analysis and is not presented as a RERA-filed 2BHK floor-plan specification. RERA unit details

5. Parking & vehicle circulation

The building-permission plan records 286.65 sq.m of parking area and 10.00 car parking spaces. The sanctioned configuration includes one stilt level; the supplied documents do not specify parking by resident or visitor, accessible spaces, two-wheeler counts, a ramp arrangement, EV charging installations, or individual unit allocations. A drawn or sanctioned parking space does not by itself establish exclusive ownership or allotment to a particular flat.

The permit states that the stilt and any cellar approved for parking are to be used exclusively for vehicle parking and not partitioned or converted to another use. No cellar level is otherwise established in the supplied building configuration.

6. Amenities, recreation & open spaces

The table below reflects RERA-filed amenity status percentages where present; these are not independent completion checks. The permit also specifies certain facilities or conditions, which are identified separately. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Water supplyListed as availableRERA amenities100% declared; not independently verified RERA amenities
Sewerage / septic system“Sewerage (Chamber, Lines, Septic Tank, STP)” listedRERA amenities; permit lists a septic tank100% declared for the RERA item; permit identifies septic tank. No STP capacity or completion evidence supplied. RERA amenities
Storm-water drainsListedRERA amenities100% declared; not independently verified RERA amenities
Rainwater harvestingPermit lists RWH; municipal permit specifies 4 Rain Water Harvesting PitsRERA amenities; building permitRERA item at 80%; permit provision stated, completion not verified. RERA amenities
Tot-lot / green stripTot-lot and perimeter greenery are permit conditions; plan records tot-lot area as 0Building-permission planGreen strip/tot-lot/park listed at 0%; no completed facility verified. RERA amenities
TreesPermit specifies 20 TreesBuilding permitRequired/provided for in the permit record; planting not verified.
Community buildingsListed as an amenity categoryRERA amenities0%; no community building details supplied. RERA amenities
Street lightingListed as an amenity categoryRERA amenities0%; no completion evidence supplied. RERA amenities
Solid-waste managementListed as an amenity category; permit requires a garbage houseRERA amenities; building permitRERA item at 0%; garbage house is a permit requirement, not verified complete. RERA amenities

7. Utilities, building services & safety

The permit records a separate underground static water-storage tank of 25,000 L and a separate residential terrace tank of 25,000 litres. It also lists a sump and rainwater-harvesting provision. The source of incoming water, treatment arrangements, and operating status are not supplied.

The permit lists a septic tank and requires a garbage house. Although the RERA amenities record lists sewerage, chambers, lines, septic tank and STP as available, it provides no STP capacity or independent commissioning evidence. Storm-water drains are listed at 100% declared in the RERA record; completion is not independently verified. RERA amenities

The building permit identifies space for a transformer and requires fire-safety measures, means of escape and an occupancy Fire NOC before issue of an occupancy certificate. These are permit conditions, not evidence that the systems or NOC have been completed or obtained. The permit also requires parking places to provide EV-charging infrastructure; installation status is not supplied. No lift count, lift capacity, backup-power arrangement, CCTV, access-control or accessibility details are supplied.

8. Location, access & connectivity

The registered project location is Borgaon (P), MOGUPAL (NEW), Nizamabad, Telangana 503230, in Survey No. 115(PART). The west boundary is recorded as a 12 M WIDE MAIN ROAD. The building-permission documents also record a 12.0 m existing and proposed road width. RERA record Land records

The supplied project record does not provide verified distances to public transport, schools, hospitals or other landmarks, nor measured travel times. No project-specific approach-road route or public-transport service information is established in the supplied evidence. Location record RERA record

9. Developer & development status

TG-RERA names GUNTURU VENKANNA as the registered promoter and the project record describes the promoter’s organization type as Proprietorship. His address in the project filing is NEELIMA, KASBAGALLY, BORGAON(P) VILLAGE, NIZAMABAD, MOGUPAL (NEW), Nizamabad, 503230. A registration-certificate address also lists Nizamabad PIN 503001; no official contact number, email or website is supplied. RERA record Corporate record Parties record

The filing identifies BHAVANTHI KOUSHIK and BHAVANTHI KARTHIKA as landowners and includes a development agreement with Neelima Builders & Developers. The promoter’s Form B declares completion by 22/01/2029; the registration certificate is valid through 22/01/2029. These are declared/project-registration dates, not evidence of construction completion. No independently verified construction-progress percentage or occupancy certificate is supplied. Parties record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for NEELIMA TOWERS BLOCK A, registration P03100010868, promoter GUNTURU VENKANNA, valid 23/01/2026–22/01/2029.
Building permissionNizamabad Municipal Corporation Building Permit Order, approval no. 0042/NIZA/SWBP/2026, dated 23/01/2026; covers a residential building of 1 Stilt + 5 Floors and 10 dwelling units on Survey No. 115 (PART).
Filed plan / file numberDTCP plan with file no. 006323/NIZA/00040/SWBP/2025, dated 23/01/2026, for 565.62 sq.m and 10 units.
Zoning-related government memoGovernment of Telangana Municipal Administration Department memo 10658/Plg.II/2023, dated 16.07.2025, concerning permission for residential activity in the commercial land-use zone under the revised Nizamabad master-plan context.
Promoter declarationForm B by GUNTURU VENKANNA, dated 30/01/2026, declaring title basis, encumbrance position, project-fund obligations and completion by 22/01/2029.
Development agreementRegistered Development Agreement-cum-General Power of Attorney concerning 678.07 square yards in Survey No. 115/G, Borgaon(P) Village Shivar, filed in the RERA record.
Mortgage recordMortgage Deed 9349/2025, dated 04/11/2025, covering 138.56 sq.m described in the building permit as the third and fourth floors.
Occupancy/completion certificateNone supplied. The building permit states that an occupancy certificate is compulsory before occupation.

Other registrations of Neelima Towers

Frequently asked questions

Is NEELIMA TOWERS BLOCK A registered with Telangana RERA?

Yes. NEELIMA TOWERS BLOCK A is registered with the Telangana Real Estate Regulatory Authority as P03100010868; the registration status is New Project.

Who is the developer of NEELIMA TOWERS BLOCK A?

The promoter named in the RERA registration is GUNTURU VENKANNA.

Where is NEELIMA TOWERS BLOCK A located?

NEELIMA TOWERS BLOCK A is in NIZAMABAD, Borgaon (P), MOGUPAL (NEW), Telangana (503230).

When will NEELIMA TOWERS BLOCK A be completed?

The promoter's proposed date of completion filed with RERA is 22/05/2029. This is the promoter's declaration, not a guarantee.

More projects in Borgaon