Padmalaya Township

ERRAM · Medak · RERA P01000009175

PADMALAYA TOWNSHIP is a plotted development in RAMAYAMPET A, Ramayampet mandal, Medak district, developed by registered promoter Erram Nagalaxmi. The registered site extent is 16755.56 sq. m and the layout has 29 residential plots; individual dwelling designs and floors are not disclosed. The project is registered with TG-RERA as P01000009175, with a proposed completion date of 07/07/2025.

01What we found

Period endedTG-RERA registration ran to 7 Jul 2025 - check its extension on TG-RERA
14documents on file - each fact links to its page
1court case on this project's land (survey 1567, Ramayampet A)
11items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project namePADMALAYA TOWNSHIP RERA record
Project typePlotted development RERA record RERA filing
Registered phase / portionNew Project; the registration covers a 29-plot layout RERA record
TG-RERA registration numberP01000009175 RERA record
Registration validity07/07/2022 to 07/07/2025; certificate records no extension
Registered promoterErram Nagalaxmi; the filing also names “ERRAM” as promoter, but the promoter’s legal entity type is not disclosed Corporate record
RERA status in supplied recordRegistration certificate issued. The stated validity ended 07/07/2025; no extension is recorded in the supplied evidence Approvals record

Land and geographic identity

FieldRecord
LocalityRAMAYAMPET RERA filing
Revenue villageRAMAYAMPET A; approval documents also describe the site as Ramayampet Revenue Village RERA filing
Mandal / district / PINRAMAYAMPET / Medak / 502101 RERA filing
Project survey number and subdivision1567/P RERA filing
Registered site extent16755.56 sq. m RERA filing
Total / net area in RERA land detailsTotal area 16755.56 sq. m; net area 16755.56 sq. m; affected area 0 sq. m RERA filing
Boundaries as filedEast: ROAD; West, North and South: OTHERS LAND RERA filing

Development identity

FieldRecord
Sanctioning authorityRAMAYANPET Municipality/Municipal Corporation
Principal approvalTentative LP No. 0002/LO/3115/2022, approved 07/07/2022; application No. 006215/LO/DTCP/3115/0008/2022
Final layout approvalFinal LP No. 0007/FLT/3115/2025, approved 06 May, 2025
Approved layout count29 plots
Approved built-up area in RERA fields10177.92 sq. m; the filing does not identify this as plot saleable area or carpet area RERA filing
Building count / floor configurationNot disclosed; this is a plotted layout, and the supplied record does not specify individual dwelling designs or floors
ParkingFinal layout record lists “Common Parking Area”; no space count or allocation is supplied

Offering and status

FieldRecord
OfferingPlots for residential dwelling use; the final layout conditions specify detached dwelling use for a single family
Plot count / sizes29 plots; drawing-derived plot sizes range from 145.24 sq. m to 1336.65 sq. m, with a median of 252.95 sq. m Layout record
Booked / available plotsCounts not supplied RERA unit table
Project completion date declared to TG-RERA07/07/2025 RERA record
Construction stageRERA project completeness is recorded as 80%; this is a record-based progress figure, not an independent site inspection RERA record
Occupancy / completion recordA document labelled Form–1A in the filing set contains final layout approval No. 0007/FLT/3115/2025 and identifies proceedings/“Occupancy Certificate Number” 014575/FLT/RAMY/3115/0008/2024, dated 06-05-2025. The supplied evidence does not establish a separate building-level occupancy certificate or the scope of any such certificate Approvals record

2. The project story

PADMALAYA TOWNSHIP is registered with TG-RERA as a plotted development in the RAMAYAMPET A revenue village, Ramayampet mandal, Medak district. The registered land description identifies Survey No. 1567/P, with a site extent of 16755.56 sq. m. The layout provides for 29 residential plots, with roads and areas reserved for open space, social infrastructure and utilities. RERA record RERA filing

The supplied approval record documents a tentative layout approval followed by a final layout approval. The final layout conditions describe the plots as intended for detached, single-family dwelling use; individual house designs and building permissions are not included in the supplied records. The registration file records 80% completeness, but that figure is not an independent verification of current on-site work. The TG-RERA certificate’s stated registration validity and the project’s declared completion date are separate records; no RERA registration extension is supplied. RERA record

3. Master plan, architecture & building design

The layout drawing is recorded as covering 16755.56 sq. m. Its area statement allocates 10177.92 sq. m to plots, 4458.91 sq. m to roads, 1509.51 sq. m to parks/open space, 168.01 sq. m to utilities and 440.99 sq. m to social infrastructure. These are drawing-derived area figures; the drawing record notes that plot count and sizes were read from the schedule and should be verified against the drawing. Layout record

The tentative approval identifies 29 plots and states that a 1% site area is reserved for utilities, 2.63% for social infrastructure, 9.01% for open space and 26.61% for roads. Its stated plotted-area allocation is 60.74%. The final layout record also lists 29 plots and gives the same land-use percentages.

The tentative approval states that the layout owner must provide infrastructure including an overhead tank/sump, septic tank as applicable, harvesting pits, storm-water drains, underground drainage lines, internal water-supply pipelines, street lights and avenue planting. It also names water reservoir, septic tank/sewerage treatment plant, electric transformer and solid-waste management among utility provisions. These are approval-record requirements or listed provisions, not confirmation that each facility is complete.

No tower, apartment-block, floor, podium or basement arrangement is applicable or disclosed for this plotted layout. The supplied records do not provide individual house plans, building footprints, building heights or dwelling-area configurations. Floor plans

4. Homes, configurations & floor plans

This is a plotted offering rather than an apartment configuration. RERA unit-type counts, booked/available counts and RERA-filed plot-size schedules are not supplied in the unit data. The layout drawing’s software-read schedule reports 29 plots; the recorded size range and bands below are drawing-derived and should be checked against the approved drawing. RERA unit table Layout record

Plot-size band (sq. yd)PlotsDrawing-derived equivalent band (sq. m)
150–2003125–167
200–2501167–209
250–3009209–251
300–4009251–334
400–5002334–418
500–10003418–836
1000+2836+

The drawing-derived smallest, median and largest plot areas are 145.24 sq. m, 252.95 sq. m and 1336.65 sq. m, respectively. Floor-plan review did not produce measured dwelling or carpet-area figures: the two supplied drawings are layout sheets, not home floor plans. Layout record Floor plans

5. Parking & vehicle circulation

The final layout approval lists a Common Parking Area, but no parking-space count, vehicle type, accessible or visitor-space provision, or plot-specific parking allocation is supplied. A listed common parking area does not establish an exclusive parking right for any individual plot.

Internal roads are included in the layout, and the tentative approval requires roads to remain open for access to neighbouring sites and prohibits enclosing the site with a compound wall or fencing. The approval also calls for road areas to be handed over to the Municipality by registered gift deed before release of the tentative layout. No driveway dimensions, road widths, pedestrian-separation details or vehicle-circulation drawing measurements are supplied here.

6. Amenities, recreation & open spaces

The layout record includes land reserved for parks/open space, social infrastructure and utilities. Progress percentages below are reported in the RERA amenities data and are not independent completion verification. Layout record RERA amenities

Park / open space
Description / size1509.51 sq. m in the software-read layout area statement; approval records 9.01% and 0 Acer 14.92 Gts 1805 Sq. Yds
Evidence sourceLayout record
Declared progress / verified statusGreen Strip/TOT LOT/Park: 90% in amenities data; independent completion not verified RERA amenities
Social infrastructure
Description / size440.99 sq. m in the software-read area statement; approval records 2.63%
Evidence sourceLayout record
Declared progress / verified statusNo completion status supplied
Internal roads and footpaths
Description / size4458.91 sq. m in the software-read area statement; approval records 26.61%
Evidence sourceLayout record
Declared progress / verified statusInternal Roads & Footpaths: 95% in amenities data; independent completion not verified RERA amenities
Common parking area
Description / sizeListed in final layout approval; size and space count not supplied
Declared progress / verified statusNo completion status supplied
Common buildings / clubhouse
Description / sizeNo facility or building identified in supplied layout records
Evidence sourceRERA amenities
Declared progress / verified statusCommunity Buildings: 0% recorded RERA amenities

No clubhouse, indoor recreation facility or sports facility is identified in the supplied evidence. The layout’s reserved social-infrastructure area is not described as a particular completed facility. Layout record

7. Utilities, building services & safety

The tentative layout approval lists water-supply and sewerage-related infrastructure, including an overhead tank/sump, water reservoir, septic tank or sewerage treatment plant, internal water-supply pipelines, underground drainage, storm-water drains, electric transformer, solid-waste management, street lights, avenue planting and rainwater-harvesting pits. The approval makes provision for these works part of the layout requirements; the supplied data does not verify installed capacity or completed operation.

RERA amenities data reports water supply at 85%, sewerage (chambers, lines, septic tank/STP) at 90%, street lighting at 80%, water conservation/rainwater harvesting at 90%, and electrical meter room/sub-station/receiving station at 100%. These are declared progress figures; no independent inspection evidence is supplied. Storm-water drains, sewage treatment/disposal, solid-waste management, energy management and fire-safety requirements are each recorded at 0% in the same amenities data. RERA amenities

The approval documents do not provide capacities for water storage or treatment, STP, electrical supply or backup, or solid-waste facilities. No lift, building-level fire system, escape-stair design, CCTV/security system or accessibility details are supplied; the project is a plotted layout, and individual dwelling designs are not part of this record. RERA amenities

8. Location, access & connectivity

The registered location is RAMAYAMPET A, Ramayampet mandal, Medak district, Telangana, PIN 502101. The RERA land form records the eastern boundary as a road; the other listed boundaries are “OTHERS LAND.” RERA filing RERA filing

A location record gives the nearest sampled Outer Ring Road interchange at 54.3 km (approx.). The supplied data does not identify public-transport routes, other approach roads, local landmarks or travel times. Location record

9. Developer & development status

The TG-RERA certificate names Erram Nagalaxmi as promoter. The Form-B declaration is made by Mrs. Erram Nagalaxmi as promoter or authorised signatory and states a completion undertaking of 07-07-2025. The registered legal entity type, corporate registration identifiers, registered office and official contact details are not disclosed in the supplied evidence. Corporate record

The RERA header records the project as a new project and records 80% completeness. No phase-wise construction schedule or independent site-progress verification is supplied. The available final-layout document is an approval record; it does not by itself establish the completion of individual dwellings. RERA record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm-C certificate for PADMALAYA TOWNSHIP, P01000009175, issued 23/12/2024; validity stated as 07/07/2022–07/07/2025
Tentative layout approvalRAMAYANPET Municipality/Municipal Corporation, Tentative LP No. 0002/LO/3115/2022, approved 07/07/2022; application No. 006215/LO/DTCP/3115/0008/2022
Tentative-layout extensionRamayampet Municipality record dated 06.12.2024; extension period stated as 08-07-2024 to 07.07.2025
Final layout approvalRAMAYANPET Municipality/Municipal Corporation, Final LP No. 0007/FLT/3115/2025, approved 06 May, 2025; proceedings No. 014575/FLT/RAMY/3115/0008/2024
Form-B declarationPromoter declaration dated 23-07-2024, including a completion undertaking of 07-07-2025
Layout/title and encumbrance documents in RERA fileTitle-related records include documents 473005, 473006, 473007 and advocate title report 473342; encumbrance statement 473009; municipal mortgage deed record 473008 Document index
Layout drawingDrawing record 472997; software-read layout area and plot data are summarised in Layout record

The supplied final-layout document is indexed in the filing as a “Form–1A Architects certificate Overall completion of registered project,” while its extracted contents describe final layout approval. This overview reports the approval identification and does not treat the document title alone as proof of a separate building-level occupancy certificate.

Frequently asked questions

Is PADMALAYA TOWNSHIP registered with Telangana RERA?

Yes. PADMALAYA TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P01000009175; the registration status is New Project.

Who is the developer of PADMALAYA TOWNSHIP?

The promoter named in the RERA registration is ERRAM.

Where is PADMALAYA TOWNSHIP located?

PADMALAYA TOWNSHIP is in RAMAYAMPET, RAMAYAMPET A, Medak, Telangana (502101).

When will PADMALAYA TOWNSHIP be completed?

The promoter's proposed date of completion filed with RERA is 07/07/2025. This is the promoter's declaration, not a guarantee.