RAJSHREE s VENKATESWARA PRIDE
RAJSHREE PROJECTS · Khammam · RERA P00800005203
RAJSHREE s VENKATESWARA PRIDE is a residential apartment project in Burhanpuram, Khammam (Urban) Mandal, Khammam district. It is being developed by registered promoter RAJSHREE PROJECTS, a partnership, on a site of 2021.4 m², with one building (one tower) of 1 Stilt + 5 upper floors and 45 homes: 25 2BHK and 20 3BHK apartments. The project is registered under TG-RERA registration P00800005203, and the promoter’s Form-B declaration gives 10/01/2025 as the project completion undertaking.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | RAJSHREE s VENKATESWARA PRIDE RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | The registration certificate identifies the project, but the supplied record does not separately name a phase or define a registered portion. One building is identified in the sanction. |
| TG-RERA registration | P00800005203 RERA record |
| Registration validity | 13 October 2022 to 10 January 2025; the supplied certificate records no extension. This is the registration period, separate from the completion undertaking and occupancy-certificate status. |
| Registered promoter | RAJSHREE PROJECTS, a partnership RERA filing Corporate record |
| RERA status | The project is recorded as “New Project.” The certificate grants registration; the available record does not establish a current registration extension. RERA filing |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Burhanpuram; the building approval describes Raparthi Nagar-2, Burhanpuram. RERA record |
| Revenue village | Burhanpuram (also rendered “BURAHNPURAM” in the building approval) RERA record |
| Mandal / district / PIN | Khammam (Urban) Mandal; Khammam district; PIN 507001 RERA record |
| Project survey numbers | 40, 42 and 47 Land records |
| Subdivisions | No survey subdivisions are stated in the supplied project filing. Land records |
| Site extent | 2021.4 m²; the approval separately records site area 2021.4 m², road-affected area 0 and net area 2021.4 m². |
| Plot / house identifiers | 20 PART, 24, 23, 20 PART AND 12 PART; H. No. 11-10-775/12 RERA filing |
| Boundaries as filed | East: other land; west: house in Plot No. 19 and 12 part; north: road width – 30; south: wide road – RERA filing |
| Registered land extent in the title instruments | 2417-60 sq. yards = 2021-42 sq. metres, as described in the supplied title-document summaries. |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Khammam Municipal Corporation |
| Principal building approval | 0055/BP/3018/2022, approved 10 January 2022; file no. 005421/BP/DTCP/3018/0097/2021 Approvals record |
| Building configuration | Building A (APP): 1 Stilt + 5 upper floors; sanctioned height 14.25 m |
| Approved built-up area | 6,333.66 m² as recorded in the project filing RERA filing |
| Buildings / towers | One building and one tower are recorded RERA filing RERA unit table |
| Parking levels | The approval identifies stilt parking; no separate basement or podium parking level is stated in the supplied extract. |
| Units | TG-RERA filing records 45 homes: 25 2BHK and 20 3BHK. The supplied approval extract does not state a separate sanctioned unit count. RERA unit table RERA unit details |
Offering and status
| Item | Project record |
|---|---|
| Configurations | 2BHK and 3BHK apartments RERA unit table |
| RERA-filed saleable areas | 2BHK: 123.74 m²; 3BHK: 155.33 m² RERA unit table |
| Portal-reported inventory | 45 total; 0 booked and 45 available at the last portal read. The record has no as-of date, so counts are indicative. RERA unit table |
| Construction stage | No independently verified or dated construction-progress evidence is supplied. The RERA amenities record shows 0% for its listed works; this is a recorded progress field, not a site inspection. RERA amenities |
| Completion date | Promoter’s Form-B declaration gives 10/01/2025 as the project completion undertaking. |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is included in the supplied documents; certificate status is therefore not established by this evidence. Document index |
2. The project story
RAJSHREE s VENKATESWARA PRIDE is a single-building residential apartment project registered in Burhanpuram, Khammam (Urban) Mandal, Khammam district, on the project land identified as Survey Nos. 40, 42 and 47. The building permission identifies Raparthi Nagar-2 and sanctions Building A as 1 Stilt + 5 upper floors. RERA record Land records
The RERA filing records 45 apartments—25 2BHK and 20 3BHK—with all 45 shown as available and none booked in the last-read portal inventory; the portal record does not provide an as-of date. The promoter’s Form-B declaration undertakes completion by 10/01/2025. The supplied evidence does not establish the current physical construction stage or that the building has received an occupancy or completion certificate. RERA unit table RERA unit details Document index
3. Master plan, architecture & building design
The building approval records a 2021.4 m² site and net area, no road-affected area, one residential building, 1 Stilt + 5 upper floors, and a sanctioned height of 14.25 m. It also records 5,158.25 m² under “Residential,” 1,129.77 m² under “Stilt,” and a 101.19 m² tot-lot. These are the approval’s stated categories; the supplied extract does not define them as FSI-counted area or reconcile them to another built-up-area measure.
The project filing separately reports an approved built-up area of 6,333.66 m². The supplied evidence does not provide enough drawing detail to describe the building footprint, flats per floor, lift or stair arrangement, entries, internal circulation, or residential/common-area distribution. RERA filing
The sanction requires construction to follow the sanctioned plan and records 11 rainwater-harvesting pits. Its conditions also identify the tot-lot as to be fenced and maintained as greenery, specify space for a transformer and a garbage house, and state that the stilt approved for parking is to be used exclusively for vehicle parking. These are approval conditions, not evidence that the works have been completed.
4. Homes, configurations & floor plans
RERA-filed unit counts and saleable areas are shown below. Carpet areas and loading figures are software measurements from the supplied floor-plan drawings, not RERA-filed disclosures; the drawing-based measurements require verification against the drawings. Saleable area and carpet area are different measures, and the supplied drawing review notes that saleable area includes a share of common areas. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 25 | 0 | 25 | 123.74 m² | 82.9–84.2 m²; median 83.4 m² | 33% |
| 3BHK | 20 | 0 | 20 | 155.33 m² | 106.1–106.7 m²; median 106.6 m² | 31% |
The measured 2BHK example drawing shows living/dining, two bedrooms, a living/kitchen area, two toilets and a balcony labelled 1.32 m wide. The measured 3BHK example shows three bedrooms, living and living/kitchen areas, three toilets and a balcony. These are drawing-based room descriptions; the supplied evidence does not establish that every apartment has the same arrangement.
5. Parking & vehicle circulation
The approval describes the stilt as a parking level and requires approved stilt parking to remain for vehicle parking. The supplied record does not give a sanctioned parking-space count, visitor or accessible-space provision, a two-wheeler count, ramp or driveway details, EV charging provision, or unit-specific parking allocations. A parking space shown or required in a plan does not, on this evidence, establish exclusive ownership or allocation to a particular apartment. Document index
6. Amenities, recreation & open spaces
The building approval identifies a tot-lot and provides a stated area of 101.19 m². The RERA amenities record lists proposed or tracked project works; its recorded progress is 0% for the listed items. “Available: YES” is a filing field and does not independently verify that the facility is installed or operational. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Approval records 101.19 m² tot-lot; condition requires fencing and maintenance as greenery. | Approval condition; completion not established. RERA amenities progress: 0%. RERA amenities | |
| Internal roads and footpaths | Listed; no dimensions supplied. | RERA amenities | 0%; completion not independently verified. |
| Street lighting | Listed; no quantity or specification supplied. | RERA amenities | 0%; completion not independently verified. |
| Community buildings | Listed; no building size or facility detail supplied. | RERA amenities | 0%; completion not independently verified. |
| Aggregate recreational open space | Listed; no separate area stated in the amenities record. | RERA amenities | 0%; completion not independently verified. |
No clubhouse or specific indoor or sports/recreation facilities are identified in the supplied evidence. RERA amenities Document index
7. Utilities, building services & safety
The RERA amenities record lists water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection, and an electrical meter room/substation/receiving station. Water supply, sewerage, rainwater harvesting and electrical meter room/substation/receiving station are marked “YES”; no capacities, sources, treatment specifications or operational evidence are supplied. Progress is recorded as 0% for the listed amenities. RERA amenities
The building approval requires 11 rainwater-harvesting pits, space for a transformer, and a garbage house with dry/wet waste segregation. It also assigns responsibility for structural and fire safety and states that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision. These are approval requirements and do not establish completed installations or statutory compliance. The supplied evidence does not specify lift count or capacity, backup power, STP capacity or reuse arrangements, fire-system details, accessible circulation, or CCTV/security systems.
8. Location, access & connectivity
The registered location is Burhanpuram, Khammam (Urban) Mandal, Khammam district, Telangana, PIN 507001. The building approval describes the site as Raparthi Nagar-2, Burhanpuram. The approval’s stated boundaries include roads to the north and south. RERA record
The supplied location record gives a geocoded project point and one sampled connectivity distance: Outer Ring Road (nearest sampled interchange, approximate) at 156.3 km. No other measured distances, public-transport details or landmark access information are supplied. Location record
9. Developer & development status
The registered promoter is RAJSHREE PROJECTS, recorded as a partnership, with GSTIN 36ABEFR2331N1Z1. The RERA filing gives its address as B, Burhanpuram, Raparthi Nagar-2, W-58, Burhanpuram, Khammam (Urban) Mandal, Khammam, Telangana, 507001. Named partners or signatories in the supplied record include Kasturi Ramesh, Adapala Prabhakar Rao and Savali Venkateswar Rao. Corporate record RERA filing Parties record
The promoter’s Form-B declaration states that the project would be completed by 10/01/2025 and gives the separate-account undertaking. The available evidence does not independently verify construction progress or a later completion date, and does not include an occupancy or completion certificate. Document index
10. Approvals, official records & documents
| Record | Evidence available |
|---|---|
| TG-RERA registration | Form C for P00800005203, issued 13 October 2022, for RAJSHREE s VENKATESWARA PRIDE; validity through 10 January 2025, with no extension recorded on the certificate. |
| Building permission | Approval for building construction 0055/BP/3018/2022, issued by Khammam Municipal Corporation on 10 January 2022; file no. 005421/BP/DTCP/3018/0097/2021. It identifies Building A and the 1 Stilt + 5 upper-floor configuration. |
| Commencement/building approval document | Supplied under document ID 258317; the document record names it “Commencement Certificates for each building in each phase,” and its extracted content describes a building construction approval. |
| Promoter declaration | Form-B affidavit by authorized signatory Kasturi Ramesh, including the promoter’s title, encumbrance, completion and separate-account declarations. |
| Title-related filings | Sale deed summary, development agreement-cum-GPA summary, mortgage-related filing and advocate’s title-search report are in the supplied RERA documents. |
| Floor-plan document | Document 258315 is identified in the RERA filing as a floor-plan document; the supplied drawing review uses it for software-measured apartment areas and room examples. |
| Occupancy/completion certificate | Not present in the supplied document set. Document index |
| Encumbrance statement | Document 258601 contains only a title and no legible transaction details in the supplied extraction. Document index |
1. Project at a glance
Project identity
Registered project name: RAJSHREE s VENKATESWARA PRIDE
Project type: Residential apartment project
Phase / registered portion: The registration certificate identifies the project, but the supplied record does not separately name a phase or define a registered portion. One building is identified in the sanction.
TG-RERA registration: P00800005203
Registration validity: 13 October 2022 to 10 January 2025; the supplied certificate records no extension. This is the registration period, separate from the completion undertaking and occupancy-certificate status.
Registered promoter: RAJSHREE PROJECTS, a partnership
RERA status: The project is recorded as “New Project.” The certificate grants registration; the available record does not establish a current registration extension.
Land and geographic identity
Locality: Burhanpuram; the building approval describes Raparthi Nagar-2, Burhanpuram.
Revenue village: Burhanpuram (also rendered “BURAHNPURAM” in the building approval)
Mandal / district / PIN: Khammam (Urban) Mandal; Khammam district; PIN 507001
Project survey numbers: 40, 42 and 47
Subdivisions: No survey subdivisions are stated in the supplied project filing.
Site extent: 2021.4 m²; the approval separately records site area 2021.4 m², road-affected area 0 and net area 2021.4 m².
Plot / house identifiers: 20 PART, 24, 23, 20 PART AND 12 PART; H. No. 11-10-775/12
Boundaries as filed: East: other land; west: house in Plot No. 19 and 12 part; north: road width – 30; south: wide road –
Registered land extent in the title instruments: 2417-60 sq. yards = 2021-42 sq. metres, as described in the supplied title-document summaries.
Development identity
Sanctioning authority: Khammam Municipal Corporation
Principal building approval: 0055/BP/3018/2022, approved 10 January 2022; file no. 005421/BP/DTCP/3018/0097/2021
Building configuration: Building A (APP): 1 Stilt + 5 upper floors; sanctioned height 14.25 m
Approved built-up area: 6,333.66 m² as recorded in the project filing
Buildings / towers: One building and one tower are recorded
Parking levels: The approval identifies stilt parking; no separate basement or podium parking level is stated in the supplied extract.
Units: TG-RERA filing records 45 homes: 25 2BHK and 20 3BHK. The supplied approval extract does not state a separate sanctioned unit count.
Offering and status
Configurations: 2BHK and 3BHK apartments
RERA-filed saleable areas: 2BHK: 123.74 m²; 3BHK: 155.33 m²
Portal-reported inventory: 45 total; 0 booked and 45 available at the last portal read. The record has no as-of date, so counts are indicative.
Construction stage: No independently verified or dated construction-progress evidence is supplied. The RERA amenities record shows 0% for its listed works; this is a recorded progress field, not a site inspection.
Completion date: Promoter’s Form-B declaration gives 10/01/2025 as the project completion undertaking.
Occupancy / completion certificate: No occupancy certificate or completion certificate is included in the supplied documents; certificate status is therefore not established by this evidence.
2. The project story
RAJSHREE s VENKATESWARA PRIDE is a single-building residential apartment project registered in Burhanpuram, Khammam (Urban) Mandal, Khammam district, on the project land identified as Survey Nos. 40, 42 and 47. The building permission identifies Raparthi Nagar-2 and sanctions Building A as 1 Stilt + 5 upper floors.
The RERA filing records 45 apartments—25 2BHK and 20 3BHK—with all 45 shown as available and none booked in the last-read portal inventory; the portal record does not provide an as-of date. The promoter’s Form-B declaration undertakes completion by 10/01/2025. The supplied evidence does not establish the current physical construction stage or that the building has received an occupancy or completion certificate.
3. Master plan, architecture & building design
The building approval records a 2021.4 m² site and net area, no road-affected area, one residential building, 1 Stilt + 5 upper floors, and a sanctioned height of 14.25 m. It also records 5,158.25 m² under “Residential,” 1,129.77 m² under “Stilt,” and a 101.19 m² tot-lot. These are the approval’s stated categories; the supplied extract does not define them as FSI-counted area or reconcile them to another built-up-area measure.
The project filing separately reports an approved built-up area of 6,333.66 m². The supplied evidence does not provide enough drawing detail to describe the building footprint, flats per floor, lift or stair arrangement, entries, internal circulation, or residential/common-area distribution.
The sanction requires construction to follow the sanctioned plan and records 11 rainwater-harvesting pits. Its conditions also identify the tot-lot as to be fenced and maintained as greenery, specify space for a transformer and a garbage house, and state that the stilt approved for parking is to be used exclusively for vehicle parking. These are approval conditions, not evidence that the works have been completed.
4. Homes, configurations & floor plans
RERA-filed unit counts and saleable areas are shown below. Carpet areas and loading figures are software measurements from the supplied floor-plan drawings, not RERA-filed disclosures; the drawing-based measurements require verification against the drawings. Saleable area and carpet area are different measures, and the supplied drawing review notes that saleable area includes a share of common areas.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 25 | 0 | 25 | 123.74 m² | 82.9–84.2 m²; median 83.4 m² | 33% |
| 3BHK | 20 | 0 | 20 | 155.33 m² | 106.1–106.7 m²; median 106.6 m² | 31% |
The measured 2BHK example drawing shows living/dining, two bedrooms, a living/kitchen area, two toilets and a balcony labelled 1.32 m wide. The measured 3BHK example shows three bedrooms, living and living/kitchen areas, three toilets and a balcony. These are drawing-based room descriptions; the supplied evidence does not establish that every apartment has the same arrangement.
5. Parking & vehicle circulation
The approval describes the stilt as a parking level and requires approved stilt parking to remain for vehicle parking. The supplied record does not give a sanctioned parking-space count, visitor or accessible-space provision, a two-wheeler count, ramp or driveway details, EV charging provision, or unit-specific parking allocations. A parking space shown or required in a plan does not, on this evidence, establish exclusive ownership or allocation to a particular apartment.
6. Amenities, recreation & open spaces
The building approval identifies a tot-lot and provides a stated area of 101.19 m². The RERA amenities record lists proposed or tracked project works; its recorded progress is 0% for the listed items. “Available: YES” is a filing field and does not independently verify that the facility is installed or operational.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Approval records 101.19 m² tot-lot; condition requires fencing and maintenance as greenery. | Approval condition; completion not established. RERA amenities progress: 0%. | |
| Internal roads and footpaths | Listed; no dimensions supplied. | 0%; completion not independently verified. | |
| Street lighting | Listed; no quantity or specification supplied. | 0%; completion not independently verified. | |
| Community buildings | Listed; no building size or facility detail supplied. | 0%; completion not independently verified. | |
| Aggregate recreational open space | Listed; no separate area stated in the amenities record. | 0%; completion not independently verified. |
No clubhouse or specific indoor or sports/recreation facilities are identified in the supplied evidence.
7. Utilities, building services & safety
The RERA amenities record lists water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection, and an electrical meter room/substation/receiving station. Water supply, sewerage, rainwater harvesting and electrical meter room/substation/receiving station are marked “YES”; no capacities, sources, treatment specifications or operational evidence are supplied. Progress is recorded as 0% for the listed amenities.
The building approval requires 11 rainwater-harvesting pits, space for a transformer, and a garbage house with dry/wet waste segregation. It also assigns responsibility for structural and fire safety and states that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision. These are approval requirements and do not establish completed installations or statutory compliance. The supplied evidence does not specify lift count or capacity, backup power, STP capacity or reuse arrangements, fire-system details, accessible circulation, or CCTV/security systems.
8. Location, access & connectivity
The registered location is Burhanpuram, Khammam (Urban) Mandal, Khammam district, Telangana, PIN 507001. The building approval describes the site as Raparthi Nagar-2, Burhanpuram. The approval’s stated boundaries include roads to the north and south.
The supplied location record gives a geocoded project point and one sampled connectivity distance: Outer Ring Road (nearest sampled interchange, approximate) at 156.3 km. No other measured distances, public-transport details or landmark access information are supplied.
9. Developer & development status
The registered promoter is RAJSHREE PROJECTS, recorded as a partnership, with GSTIN 36ABEFR2331N1Z1. The RERA filing gives its address as B, Burhanpuram, Raparthi Nagar-2, W-58, Burhanpuram, Khammam (Urban) Mandal, Khammam, Telangana, 507001. Named partners or signatories in the supplied record include Kasturi Ramesh, Adapala Prabhakar Rao and Savali Venkateswar Rao.
The promoter’s Form-B declaration states that the project would be completed by 10/01/2025 and gives the separate-account undertaking. The available evidence does not independently verify construction progress or a later completion date, and does not include an occupancy or completion certificate.
10. Approvals, official records & documents
TG-RERA registration: Form C for P00800005203, issued 13 October 2022, for RAJSHREE s VENKATESWARA PRIDE; validity through 10 January 2025, with no extension recorded on the certificate.
Building permission: Approval for building construction 0055/BP/3018/2022, issued by Khammam Municipal Corporation on 10 January 2022; file no. 005421/BP/DTCP/3018/0097/2021. It identifies Building A and the 1 Stilt + 5 upper-floor configuration.
Commencement/building approval document: Supplied under document ID 258317; the document record names it “Commencement Certificates for each building in each phase,” and its extracted content describes a building construction approval.
Promoter declaration: Form-B affidavit by authorized signatory Kasturi Ramesh, including the promoter’s title, encumbrance, completion and separate-account declarations.
Title-related filings: Sale deed summary, development agreement-cum-GPA summary, mortgage-related filing and advocate’s title-search report are in the supplied RERA documents.
Floor-plan document: Document 258315 is identified in the RERA filing as a floor-plan document; the supplied drawing review uses it for software-measured apartment areas and room examples.
Occupancy/completion certificate: Not present in the supplied document set.
Encumbrance statement: Document 258601 contains only a title and no legible transaction details in the supplied extraction.
Frequently asked questions
Is RAJSHREE s VENKATESWARA PRIDE registered with Telangana RERA?
Yes. RAJSHREE s VENKATESWARA PRIDE is registered with the Telangana Real Estate Regulatory Authority as P00800005203; the registration status is New Project.
Who is the developer of RAJSHREE s VENKATESWARA PRIDE?
The promoter named in the RERA registration is RAJSHREE PROJECTS.
Where is RAJSHREE s VENKATESWARA PRIDE located?
RAJSHREE s VENKATESWARA PRIDE is in BURHANPURAM, Khammam (Urban) Mandal, Khammam, Telangana (507001).
When will RAJSHREE s VENKATESWARA PRIDE be completed?
The promoter's proposed date of completion filed with RERA is 10/01/2025. This is the promoter's declaration, not a guarantee.
More projects in Burhanpuram