Peddi Kondal Reddy Enclave
peddi Kondal Reddy · Medchal-Malkajgiri · RERA P02200010742
PEDDI KONDAL REDDY ENCLAVE is a plotted development in Devaryamjal, Shamirpet Mandal, Medchal-Malkajgiri District. The registered promoter is PEDDI KONDAL REDDY AND OTHERS. The layout covers 14568.62 sq.m and shows 51 plots, with drawing-derived plot sizes of 126.67–374.87 sq.m; building count and floors are not disclosed. Its TG-RERA registration is P02200010742, and the promoter-declared completion undertaking is 28.11.2028.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | PEDDI KONDAL REDDY ENCLAVE RERA record |
| Project type | Plotted development; the filed layout documents describe an open-plot layout RERA record |
| Phase / registered portion | New project; the registration identifies this project, with no separate phase name disclosed RERA record |
| TG-RERA registration | P02200010742 RERA record |
| Registration validity | 28/11/2025 to 28/11/2028. This is the registration period, not a statement of completion or occupancy status. RERA record |
| Registered promoter | PEDDI KONDAL REDDY AND OTHERS |
| Project status in registration record | New Project RERA record |
| Registration record captured | 10 September 2026 Approvals record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | Devaryamjal RERA record |
| Revenue village | Devaryamjal; the filed layout documents also spell it DEVERAYAMZAL and Devarayamjal. RERA record |
| Mandal | Shamirpet RERA record |
| District | Medchal-Malkajgiri RERA record |
| PIN | 500078 RERA record |
| Project survey numbers / subdivisions | 402P, 404, 406P; the filed layout documents also render these as 402P, 404 and 406p. RERA record |
| Total site / layout area | 14568.62 sq.m RERA filing |
| Road-widening affected area | 70.06 sq.m RERA filing |
| Net layout area | 14498.56 sq.m RERA filing |
| Boundaries | East, west, north and south are each recorded as “other land”; no adjoining-owner or feature names are supplied. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); the draft layout letter records delegation to Thumkunta Municipality. Approvals record |
| Principal application / file number | 003223/HMDA/00932/SWDL/MDL2/2025 Approvals record |
| Draft layout permit number | 1116/HMDA/SWDL/2025 |
| Draft layout letter date | 28/11/2025 |
| Final layout letter | 018401/HMDA/04562/SWFL/MDL2/2026, dated 04/07/2026 Approvals record |
| Layout / plot count | 51 plots; the drawing-derived plot schedule is software-read and should be checked against the drawing. Layout record |
| Approved built-up area | Not disclosed for this plotted layout. |
| Building count, floors and parking levels | Not disclosed; this is a plotted layout, not a building schedule. |
| Land-use areas shown in filed layout | Plotted area 8549.52 sq.m (58.97%); road area 4373.56 sq.m (30.17%); open-space area 1092.11 sq.m (7.53%); social-infrastructure area 363.94 sq.m (2.51%); utility area 119.42 sq.m (0.82%). |
Offering and status
| Item | Record |
|---|---|
| Offered property type | Plots; the project is registered as a plotted development. RERA record |
| Drawing-derived plot sizes | 126.67–374.87 sq.m (software-read from the layout drawing; plot schedule should be verified against the source drawing). Layout record |
| Booked / available counts | Not supplied in the available records. |
| Construction / development stage | The filed record includes a draft layout letter and a later final-layout letter. No independently verified site-progress percentage is supplied. |
| Promoter-declared completion undertaking | 28.11.2028 in Form B; this is distinct from registration validity and from the final-layout record. |
| Completion / occupancy record | An architect’s Form 1A dated 04.07.2026 certifies overall project completion; HMDA’s final layout letter is also dated 04/07/2026. The supplied documents do not establish a building-level occupancy certificate. |
2. The project story
- PEDDI KONDAL REDDY ENCLAVE is a plotted layout in the revenue village of Devaryamjal, Shamirpet Mandal, Medchal-Malkajgiri District, Telangana. Its registered land identity is survey numbers 402P, 404 and 406P, with a total site area of 14568.62 sq.m, including 70.06 sq.m affected by road widening and a stated net layout area of 14498.56 sq.m. RERA record RERA filing
- The filed layout drawing shows 51 plots arranged within a plan that allocates land to plots, internal roads, open space, social infrastructure and utilities. It does not identify apartment blocks, dwelling floors or a building configuration. Layout record
- The draft layout letter sets out infrastructure and development conditions; a later HMDA final layout letter and architect’s Form 1A certificate are included in the RERA-filed record. These documents evidence the approvals and certifications stated in them, but no independent site inspection or site-progress measurement is supplied here.
3. Master plan, architecture & building design
- The project is a plotted layout rather than a multi-storey building development. The filed layout states a total area of 14568.62 sq.m and net layout area of 14498.56 sq.m. The land-use statement allocates 8549.52 sq.m (58.97%) to plots, 4373.56 sq.m (30.17%) to roads, 1092.11 sq.m (7.53%) to open space, 363.94 sq.m (2.51%) to social infrastructure and 119.42 sq.m (0.82%) to utilities.
- The layout drawing lists 51 plots and shows road-width entries including 15.24m, 30.0m, 9.14m, 9.15m, 15.24m Existing Road Width, 30m Proposed Road Width and 9.14m Wide Main Road. These are drawing-extracted figures; the source drawing should be consulted for their precise location and relationship to individual road segments.
- The draft layout letter requires development works including road formation and surfacing, storm-water drainage, underground drainage and common septic tank/STP, internal water-supply lines and overhead tank, electrical lines, street lighting, transformer, avenue planting, park development and rainwater-harvesting pits. These are approval conditions, not confirmation that each facility has been completed.
4. Homes, configurations & floor plans
This is a plotted offering, not an apartment configuration schedule. No RERA-filed unit-type counts, booked/available inventory, plot-wise saleable areas or carpet-area measurements are supplied.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 51 shown in the layout drawing | Not supplied | Not supplied | Not supplied | Not applicable / not supplied | Not supplied |
The plot schedule is software-read from the layout drawing and lists sizes from 126.67 sq.m to 374.87 sq.m. The drawing-derived median is 149.26 sq.m. These are drawing measurements, not a RERA-filed plot-wise area schedule; individual plot dimensions and boundaries should be checked against the approved drawing and the relevant sale documents. Layout record
5. Parking & vehicle circulation
- The filed land-use statement records 0.00 sq.m (0%) as common parking area. The supplied documents do not state a number of visitor or resident parking spaces, individual plot parking allocations, or an EV-charging provision for this plotted layout.
- The layout approval conditions refer to vehicle access through the road network and to provision of EV-charging infrastructure in parking places in buildings. That condition does not establish that parking spaces or chargers are provided within this plotted layout.
6. Amenities, recreation & open spaces
The filed layout records open space, social-infrastructure and utility land areas. Its amenity checklist includes infrastructure headings but shows 0% progress for the listed items; this is not independent evidence of completion. The draft layout letter specifies development obligations for several facilities, with delivery to be confirmed from the completed works and handover records. RERA amenities
| Description / size | No clubhouse or indoor facility is identified in the supplied layout evidence. |
|---|---|
| Evidence source | Layout record |
| Declared progress / verified status | Not disclosed |
| Description / size | Cycling tracks are required by the draft layout conditions; no dimensions or completion status supplied. |
|---|---|
| Declared progress / verified status | Required by approval conditions; completion not independently verified |
| Description / size | Open-space area 1092.11 sq.m (7.53%); park development and avenue plantation are listed in the draft layout conditions. |
|---|---|
| Declared progress / verified status | Area shown in layout; works not independently verified |
| Description / size | Social-infrastructure area 363.94 sq.m (2.51%); a utility area of 119.42 sq.m (0.82%) is also shown. |
|---|---|
| Declared progress / verified status | Areas shown; specific completed facilities not established |
| Description / size | Draft conditions refer to solid-waste disposal space, source segregation and a bio-compost unit. |
|---|---|
| Declared progress / verified status | Required by approval conditions; completion not independently verified |
7. Utilities, building services & safety
- The draft layout letter specifies a protected water-supply system, internal supply lines, an overhead tank and sumps, with a potable-water connection to an approved trunk or connecting pipeline. It also specifies underground drainage and a common septic tank/STP, storm-water drainage, rainwater-harvesting pits, underground utility ducting, electrical supply lines, street lighting and a transformer/transformer yard. These are approval requirements; capacities, actual connections and completed status are not supplied.
- The same letter requires waste-disposal arrangements, source segregation and a bio-compost unit. The supplied records do not establish installed security systems, CCTV, accessibility arrangements, building lifts or building-level fire systems. Those building-specific features cannot be confirmed from the plotted-layout materials.
8. Location, access & connectivity
- The registered location is Devaryamjal, Shamirpet Mandal, Medchal-Malkajgiri District, Telangana, PIN 500078. The project site is identified by survey numbers 402P, 404 and 406P. RERA record
- The layout materials list existing and proposed road-width figures, including 15.24m existing road width and 30.0m proposed road width, as well as entries of 9.14m and 9.15m. The drawing extraction does not provide a verified route description or identify a specific project entrance.
- The location data gives the nearest sampled Outer Ring Road interchange at 5.0 km. No travel time or public-transport details are supplied. Location record
9. Developer & development status
- The TG-RERA certificate identifies the promoter as PEDDI KONDAL REDDY AND OTHERS and gives an address for Peddi Kondal Reddy at House No. 14-106, Pochammagadda Village, Dundigal Gandimaisamma Mandal, Medchal-Malkajgiri District, PIN 501401, Telangana. The entity type, corporate registration identifiers, official project contacts and official website are not disclosed in the supplied records. Corporate record
- The Form B declaration, signed by Peddi Kondal Reddy as an authorised signatory, states that the project is to be completed by 28.11.2028 and records the promoter’s declarations concerning title, project funds, audits and approvals. The supplied RERA materials include the later final-layout letter and an architect’s Form 1A completion certificate dated 04.07.2026; no independently verified construction-progress assessment is provided.
10. Approvals, official records & documents
| Identifier / date | P02200010742; valid 28/11/2025–28/11/2028 |
|---|---|
| What the supplied record establishes | Form C registration certificate for PEDDI KONDAL REDDY ENCLAVE; identifies the promoter as PEDDI KONDAL REDDY AND OTHERS. |
| Identifier / date | 003223/HMDA/00932/SWDL/MDL2/2025; application dated 25/06/2025 |
|---|---|
| What the supplied record establishes | Filed layout application and layout drawing for the site and survey numbers. |
| Identifier / date | 1116/HMDA/SWDL/2025; dated 28/11/2025 |
|---|---|
| What the supplied record establishes | Draft layout letter for the plotted layout, with stated development and handover conditions. |
| Identifier / date | 018401/HMDA/04562/SWFL/MDL2/2026; dated 04/07/2026 |
|---|---|
| What the supplied record establishes | Final layout letter for the open-plot layout; the document states technical approval was forwarded to the Commissioner, Malkajgiri Municipal Corporation, for release of proceedings and plans. |
| Identifier / date | Dated 04.07.2026; Regulation 5 |
|---|---|
| What the supplied record establishes | Architect’s certificate states overall project completion and identifies the final layout letter. |
| Identifier / date | Dated 28 November 2025 |
|---|---|
| What the supplied record establishes | Promoter declaration, including the stated completion undertaking of 28.11.2028. |
| Identifier / date | File 003223/HMDA/00932/SWDL/MDL2/2025 |
|---|---|
| What the supplied record establishes | Drawing-derived layout and plot schedule; plot count and measured plot sizes are software-read. Layout record |
The supplied final layout letter does not itself state a building-level occupancy certificate. The reviewed materials establish the existence and stated contents of the records above; they do not include a separate site inspection verifying completed infrastructure.
1. Project at a glance
Project identity
Registered project name: PEDDI KONDAL REDDY ENCLAVE
Project type: Plotted development; the filed layout documents describe an open-plot layout
Phase / registered portion: New project; the registration identifies this project, with no separate phase name disclosed
TG-RERA registration: P02200010742
Registration validity: 28/11/2025 to 28/11/2028. This is the registration period, not a statement of completion or occupancy status.
Registered promoter: PEDDI KONDAL REDDY AND OTHERS
Project status in registration record: New Project
Registration record captured: 10 September 2026
Land and geographic identity
Locality: Devaryamjal
Revenue village: Devaryamjal; the filed layout documents also spell it DEVERAYAMZAL and Devarayamjal.
Mandal: Shamirpet
District: Medchal-Malkajgiri
PIN: 500078
Project survey numbers / subdivisions: 402P, 404, 406P; the filed layout documents also render these as 402P, 404 and 406p.
Total site / layout area: 14568.62 sq.m
Road-widening affected area: 70.06 sq.m
Net layout area: 14498.56 sq.m
Boundaries: East, west, north and south are each recorded as “other land”; no adjoining-owner or feature names are supplied.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); the draft layout letter records delegation to Thumkunta Municipality.
Principal application / file number: 003223/HMDA/00932/SWDL/MDL2/2025
Draft layout permit number: 1116/HMDA/SWDL/2025
Draft layout letter date: 28/11/2025
Final layout letter: 018401/HMDA/04562/SWFL/MDL2/2026, dated 04/07/2026
Layout / plot count: 51 plots; the drawing-derived plot schedule is software-read and should be checked against the drawing.
Approved built-up area: Not disclosed for this plotted layout.
Building count, floors and parking levels: Not disclosed; this is a plotted layout, not a building schedule.
Land-use areas shown in filed layout: Plotted area 8549.52 sq.m (58.97%); road area 4373.56 sq.m (30.17%); open-space area 1092.11 sq.m (7.53%); social-infrastructure area 363.94 sq.m (2.51%); utility area 119.42 sq.m (0.82%).
Offering and status
Offered property type: Plots; the project is registered as a plotted development.
Drawing-derived plot sizes: 126.67–374.87 sq.m (software-read from the layout drawing; plot schedule should be verified against the source drawing).
Booked / available counts: Not supplied in the available records.
Construction / development stage: The filed record includes a draft layout letter and a later final-layout letter. No independently verified site-progress percentage is supplied.
Promoter-declared completion undertaking: 28.11.2028 in Form B; this is distinct from registration validity and from the final-layout record.
Completion / occupancy record: An architect’s Form 1A dated 04.07.2026 certifies overall project completion; HMDA’s final layout letter is also dated 04/07/2026. The supplied documents do not establish a building-level occupancy certificate.
2. The project story
- PEDDI KONDAL REDDY ENCLAVE is a plotted layout in the revenue village of Devaryamjal, Shamirpet Mandal, Medchal-Malkajgiri District, Telangana. Its registered land identity is survey numbers 402P, 404 and 406P, with a total site area of 14568.62 sq.m, including 70.06 sq.m affected by road widening and a stated net layout area of 14498.56 sq.m.
- The filed layout drawing shows 51 plots arranged within a plan that allocates land to plots, internal roads, open space, social infrastructure and utilities. It does not identify apartment blocks, dwelling floors or a building configuration.
- The draft layout letter sets out infrastructure and development conditions; a later HMDA final layout letter and architect’s Form 1A certificate are included in the RERA-filed record. These documents evidence the approvals and certifications stated in them, but no independent site inspection or site-progress measurement is supplied here.
3. Master plan, architecture & building design
- The project is a plotted layout rather than a multi-storey building development. The filed layout states a total area of 14568.62 sq.m and net layout area of 14498.56 sq.m. The land-use statement allocates 8549.52 sq.m (58.97%) to plots, 4373.56 sq.m (30.17%) to roads, 1092.11 sq.m (7.53%) to open space, 363.94 sq.m (2.51%) to social infrastructure and 119.42 sq.m (0.82%) to utilities.
- The layout drawing lists 51 plots and shows road-width entries including 15.24m, 30.0m, 9.14m, 9.15m, 15.24m Existing Road Width, 30m Proposed Road Width and 9.14m Wide Main Road. These are drawing-extracted figures; the source drawing should be consulted for their precise location and relationship to individual road segments.
- The draft layout letter requires development works including road formation and surfacing, storm-water drainage, underground drainage and common septic tank/STP, internal water-supply lines and overhead tank, electrical lines, street lighting, transformer, avenue planting, park development and rainwater-harvesting pits. These are approval conditions, not confirmation that each facility has been completed.
4. Homes, configurations & floor plans
This is a plotted offering, not an apartment configuration schedule. No RERA-filed unit-type counts, booked/available inventory, plot-wise saleable areas or carpet-area measurements are supplied.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 51 shown in the layout drawing | Not supplied | Not supplied | Not supplied | Not applicable / not supplied | Not supplied |
The plot schedule is software-read from the layout drawing and lists sizes from 126.67 sq.m to 374.87 sq.m. The drawing-derived median is 149.26 sq.m. These are drawing measurements, not a RERA-filed plot-wise area schedule; individual plot dimensions and boundaries should be checked against the approved drawing and the relevant sale documents.
5. Parking & vehicle circulation
- The filed land-use statement records 0.00 sq.m (0%) as common parking area. The supplied documents do not state a number of visitor or resident parking spaces, individual plot parking allocations, or an EV-charging provision for this plotted layout.
- The layout approval conditions refer to vehicle access through the road network and to provision of EV-charging infrastructure in parking places in buildings. That condition does not establish that parking spaces or chargers are provided within this plotted layout.
6. Amenities, recreation & open spaces
The filed layout records open space, social-infrastructure and utility land areas. Its amenity checklist includes infrastructure headings but shows 0% progress for the listed items; this is not independent evidence of completion. The draft layout letter specifies development obligations for several facilities, with delivery to be confirmed from the completed works and handover records.
| Description / size | No clubhouse or indoor facility is identified in the supplied layout evidence. |
|---|---|
| Declared progress / verified status | Not disclosed |
| Description / size | Cycling tracks are required by the draft layout conditions; no dimensions or completion status supplied. |
|---|---|
| Declared progress / verified status | Required by approval conditions; completion not independently verified |
| Description / size | Open-space area 1092.11 sq.m (7.53%); park development and avenue plantation are listed in the draft layout conditions. |
|---|---|
| Declared progress / verified status | Area shown in layout; works not independently verified |
| Description / size | Social-infrastructure area 363.94 sq.m (2.51%); a utility area of 119.42 sq.m (0.82%) is also shown. |
|---|---|
| Declared progress / verified status | Areas shown; specific completed facilities not established |
| Description / size | Draft conditions refer to solid-waste disposal space, source segregation and a bio-compost unit. |
|---|---|
| Declared progress / verified status | Required by approval conditions; completion not independently verified |
7. Utilities, building services & safety
- The draft layout letter specifies a protected water-supply system, internal supply lines, an overhead tank and sumps, with a potable-water connection to an approved trunk or connecting pipeline. It also specifies underground drainage and a common septic tank/STP, storm-water drainage, rainwater-harvesting pits, underground utility ducting, electrical supply lines, street lighting and a transformer/transformer yard. These are approval requirements; capacities, actual connections and completed status are not supplied.
- The same letter requires waste-disposal arrangements, source segregation and a bio-compost unit. The supplied records do not establish installed security systems, CCTV, accessibility arrangements, building lifts or building-level fire systems. Those building-specific features cannot be confirmed from the plotted-layout materials.
8. Location, access & connectivity
- The registered location is Devaryamjal, Shamirpet Mandal, Medchal-Malkajgiri District, Telangana, PIN 500078. The project site is identified by survey numbers 402P, 404 and 406P.
- The layout materials list existing and proposed road-width figures, including 15.24m existing road width and 30.0m proposed road width, as well as entries of 9.14m and 9.15m. The drawing extraction does not provide a verified route description or identify a specific project entrance.
- The location data gives the nearest sampled Outer Ring Road interchange at 5.0 km. No travel time or public-transport details are supplied.
9. Developer & development status
- The TG-RERA certificate identifies the promoter as PEDDI KONDAL REDDY AND OTHERS and gives an address for Peddi Kondal Reddy at House No. 14-106, Pochammagadda Village, Dundigal Gandimaisamma Mandal, Medchal-Malkajgiri District, PIN 501401, Telangana. The entity type, corporate registration identifiers, official project contacts and official website are not disclosed in the supplied records.
- The Form B declaration, signed by Peddi Kondal Reddy as an authorised signatory, states that the project is to be completed by 28.11.2028 and records the promoter’s declarations concerning title, project funds, audits and approvals. The supplied RERA materials include the later final-layout letter and an architect’s Form 1A completion certificate dated 04.07.2026; no independently verified construction-progress assessment is provided.
10. Approvals, official records & documents
| Identifier / date | P02200010742; valid 28/11/2025–28/11/2028 |
|---|---|
| What the supplied record establishes | Form C registration certificate for PEDDI KONDAL REDDY ENCLAVE; identifies the promoter as PEDDI KONDAL REDDY AND OTHERS. |
| Identifier / date | 003223/HMDA/00932/SWDL/MDL2/2025; application dated 25/06/2025 |
|---|---|
| What the supplied record establishes | Filed layout application and layout drawing for the site and survey numbers. |
| Identifier / date | 1116/HMDA/SWDL/2025; dated 28/11/2025 |
|---|---|
| What the supplied record establishes | Draft layout letter for the plotted layout, with stated development and handover conditions. |
| Identifier / date | 018401/HMDA/04562/SWFL/MDL2/2026; dated 04/07/2026 |
|---|---|
| What the supplied record establishes | Final layout letter for the open-plot layout; the document states technical approval was forwarded to the Commissioner, Malkajgiri Municipal Corporation, for release of proceedings and plans. |
| Identifier / date | Dated 04.07.2026; Regulation 5 |
|---|---|
| What the supplied record establishes | Architect’s certificate states overall project completion and identifies the final layout letter. |
| Identifier / date | Dated 28 November 2025 |
|---|---|
| What the supplied record establishes | Promoter declaration, including the stated completion undertaking of 28.11.2028. |
| Identifier / date | File 003223/HMDA/00932/SWDL/MDL2/2025 |
|---|---|
| What the supplied record establishes | Drawing-derived layout and plot schedule; plot count and measured plot sizes are software-read. |
The supplied final layout letter does not itself state a building-level occupancy certificate. The reviewed materials establish the existence and stated contents of the records above; they do not include a separate site inspection verifying completed infrastructure.
Frequently asked questions
Is PEDDI KONDAL REDDY ENCLAVE registered with Telangana RERA?
Yes. PEDDI KONDAL REDDY ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P02200010742; the registration status is New Project.
Who is the developer of PEDDI KONDAL REDDY ENCLAVE?
The promoter named in the RERA registration is peddi Kondal Reddy.
Where is PEDDI KONDAL REDDY ENCLAVE located?
PEDDI KONDAL REDDY ENCLAVE is in Devaryamjal, Shamirpet, Medchal-Malkajgiri, Telangana (500078).
When will PEDDI KONDAL REDDY ENCLAVE be completed?
The promoter's proposed date of completion filed with RERA is 28/11/2028. This is the promoter's declaration, not a guarantee.
More projects in Devaryamjal