VIJAY NIRMAAN S HORIZON is a residential apartment project in ADIKMET, Musheerabad mandal, Hyderabad district, developed by registered promoter VIJAY NIRMAAN DEVELOPERS. The project has a land area of 1228.02 sq. m and one residential building with 1 Cellar + 1 Stilt + 5 upper floors, comprising 20 apartments: 15 2BHK and 5 3BHK units. It is registered with TG-RERA under registration number P02500010979, with proposed completion by 31.07.2028.

More from Vijay Nirmaan Developers · 2 projects →

01What we found

RegisteredTG-RERA - valid till 31 Jul 2028
15documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Chikkadapally Ashok Nagar, Musheerabad, Hyderabad · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered project nameVIJAY NIRMAAN S HORIZON RERA record
Project type / statusResidential apartment; TG-RERA records the status as New Project RERA record RERA filing
Phase / registered portionNo separate phase name or phase number is disclosed; registration is for the project identified above RERA record
TG-RERA registrationP02500010979 RERA record
Registration validity31 July 2025 to 31 July 2028, unless extended by the Authority RERA record
Registered promoterVIJAY NIRMAAN DEVELOPERS RERA record
TG-RERA statusRegistered; the certificate states a three-year validity period. The supplied record does not state a later extension RERA record

Land and geographic identity

FieldProject record
Locality / site addressADIKMET; Plot No. of Site 1-9-812, Chikkadapally Ashok nagar RERA record RERA filing
Revenue villageChikkadapally Ashok nagar as recorded in the project identity and registration certificate. A separate revenue-village entry is not established in the supplied approval extraction RERA record
Mandal / district / PINMusheerabad / Hyderabad / 500044 RERA record
Project survey number(s) / subdivision(s)Survey No. 00000; no subdivision is disclosed RERA record RERA filing
Site area in TG-RERA project fieldsTotal area 1228.02 sq. m; road-widening/FTL/nala affected area 161.63 sq. m; net area 1066.39 sq. m RERA filing
Building-permit plan areasThe filed plan extraction also lists plot area 1228.02 sq. m, road-affected area 161.63 sq. m and net plot area 1066.39 sq. m
Boundaries recorded in project fieldsEast: RALIWAY TRACK; West: ROAD; North: HIUSE BELONGS TO RAMACHANDER; South: HOUSE BELONGS TO LAXMAIAH RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building-permit approvalApproval No. 1286/GHMC/SEC/2025-BP, dated 31 July, 2025; file No. 002513/GHMC/1087/SEC1/2025-BP Approvals record
Plan number filed with TG-RERA002513/GHMC/1087/SEC1/2025-BP Approvals record RERA record
Approved built-up areaThe plan extraction identifies 2,247.91 sq. m proposed built-up area excluding parking and 3,384.51 sq. m including parking. It separately records a total built-up-area figure of 2,248.20 sq. m
Building count and configurationOne residential building: 1 Cellar + 1 Stilt + 5 upper floors
Building height recorded in plan extraction14.49 MT.; the same extraction also lists 17.99 mt. from GL and 20.49mt. Total Ht.
Parking provision in plan extractionCellar and stilt are identified for parking; proposed parking area 1136.60 sq. m and 22 proposed cars are listed
Unit count20 units in the building-permit plan extraction and 20 units in the TG-RERA unit schedule: 15 2BHK and 5 3BHK RERA unit table

Offering and status

FieldProject record
2BHK15 units; filed saleable area 125.26 sq. m each. Portal counts show 0 booked and 15 available, but no as-of date is supplied RERA unit table RERA unit details
3BHK5 units; filed saleable area 150.5 sq. m each. Portal counts show 0 booked and 5 available, but no as-of date is supplied RERA unit table RERA unit details
Construction stageRERA progress fields report Water Supply as YES, 10%; the listed development items otherwise show 0%. These are portal progress entries, not independent site verification RERA amenities
Completion datesGHMC permit extraction records a completion deadline of 31 July, 2028; the Form-B declaration states completion by 31.07.2028. The TG-RERA registration remains valid to 31 July 2028 unless extended
Occupancy / completion certificateThe permit extraction says completion is not certified. No occupancy or completion certificate is supplied for the building

2. The project story

  • VIJAY NIRMAAN S HORIZON is registered with TG-RERA as a residential apartment project at Plot No. 1-9-812, Adikmet, Hyderabad. The project record identifies Survey No. 00000 and a single building; the GHMC building-permit record describes that building as 1 Cellar + 1 Stilt + 5 upper floors. The permit names the landowner as applicant and identifies Vijay Nirmaan Developers as developer/builder. RERA record RERA filing
  • The registered offering comprises 20 apartments: 15 2BHK units and 5 3BHK units. The portal’s available-unit figures are indicative because the supplied record carries no booking-count as-of date. No independent construction inspection or verified completion evidence is supplied. RERA progress entries show Water Supply at 10% and the other listed development items at 0%; these are reported progress fields, not confirmation of work completed on site. RERA unit table RERA amenities
  • The GHMC permit requires an occupancy certificate before occupation and states that possession must not be delivered before it is obtained. No occupancy certificate is included in the supplied project documents.

3. Master plan, architecture & building design

  • The filed building-permit plan describes one residential building on a net plot area of 1066.39 sq. m, with 1 Cellar + 1 Stilt + 5 upper floors. It records 2,247.91 sq. m of proposed built-up area excluding parking and 3,384.51 sq. m including parking. Other plan-extracted area entries include total built-up area 2,248.20 sq. m, total built-up area 2,493.55 sq. m, and total BUA 3420.84; the supplied plan extraction does not establish a single common measurement basis for all these entries.
  • The plan extraction lists an “each floor slab area” of 498.71 sq. m, stilt floor area of 449.64 sq. m, cellar parking area of 563.21 sq. m, and parking area of 1136.60 sq. m. It records a building height of 14.49 MT. and also separately lists 17.99 mt. from GL and 20.49mt. Total Ht. No independent measurement is supplied.
  • The filed plan lists a 70.80 buffer area and an affected-under-buffer-zone figure of 122.47 Sq.yds. OR 102.44 Sq.mts. It also lists 555.99 as vacant plot area and 9.00 as accessory use area. No further drawing-derived description of the building footprint, floor-by-floor unit arrangement, lift/stair locations, common-area layout or landscaping plan is supplied here.
  • The approved-plan extract specifies tree planting around the site, a fenced tot-lot to be maintained as greenery, rainwater harvesting, a garbage house, transformer space, and separate cellar/stilt parking use. These are plan conditions or listed provisions; the supplied evidence does not establish their completion.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK15015125.26 sq. m80.7–102.4 sq. m; median 82.9 sq. m (software-measured from drawings)34%
3BHK505150.5 sq. m99.5 sq. m (software-measured from drawings)34%
  • RERA configuration counts, booking counts and saleable areas are from the TG-RERA unit record; booking figures have no stated as-of date and should be treated as indicative. Carpet-area estimates were measured by software from the filed floor-plan drawing and are not RERA disclosures; the supplied drawing-measurement record says these measurements need review. Saleable area is a different measure and includes the home’s share of common areas; it should not be treated as carpet area. RERA unit table RERA unit details Floor plans
  • The measured 2BHK example drawing labels two bedrooms, living/dining, kitchen, two toilets, a utility and a balcony. The measured 3BHK example labels three bedrooms, living/dining, kitchen, two toilets, a utility and a balcony. The 2BHK example is from the SECOND FLOOR PLAN; the 3BHK example is from the TYPICAL - 1, 3, 4& 5 FLOOR PLAN. Dimensions are drawing measurements, not RERA-filed room specifications. RERA unit details

5. Parking & vehicle circulation

  • The filed GHMC plan lists 22 proposed cars and 1136.60 sq. m of proposed parking area. It identifies the cellar and stilt as parking areas and requires them to be used exclusively for vehicle parking, without partition walls or rolling shutters. The plan extraction also lists 563.21 Sq.mts as cellar-floor parking area and a required parking area of 741.82.
  • The permit requires one entry and one exit with minimum width 4.5mts. and height clearance 5mts.; it also refers to the site abutting an 18 mt. road width and lists other road-width descriptions in the plan extraction. The supplied records do not specify an apartment-by-apartment parking allocation, visitor or accessible-parking counts, a mechanical-parking system, or a separate pedestrian circulation plan. A plan bay or total proposed count does not by itself establish exclusive allocation to a particular unit.
  • The plan conditions also call for parking places to have Electric Vehicle Charging Infrastructure; no capacity, installation progress or completed EV charging provision is documented.

6. Amenities, recreation & open spaces

The following are recorded in the filed plan or TG-RERA progress fields. The evidence does not independently verify completion.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / recreational greenTot Lot 58.95 in the building-permit extraction; the plan calls for a fenced tot-lot maintained as greeneryPermit-listed; no completion verification supplied
Green strip / tree plantingGreen strip and tree plantation around the site are listed in plan conditionsRequired/listed; no completion verification supplied
Water supplyRERA progress field marks YES, 10%RERA amenitiesPortal progress entry; not independently verified
Water conservation / rainwater harvestingOne rainwater-harvesting pit is listed in the permit extraction; the plan calls for a rainwater-harvesting structureListed; RERA progress field reports 0% for water conservation/rainwater harvesting
Septic tank / sewerageSeptic tank is listed in plan amenities/utilities; sewerage progress item includes chamber, lines, septic tank and STPRERA amenitiesListed; RERA progress field reports 0% for sewerage
Garbage houseListed in the filed plan and permit extractionListed; no completion verification supplied
Transformer spaceListed in the filed plan and permit extractionListed; no completion verification supplied
LiftListed in the plan’s amenities/utilitiesListed; no lift count, capacity or progress detail supplied
ParkingCellar/stilt parking; proposed parking area 1136.60 sq. m in the filed planProposed/sanctioned-plan provision; no completion verification supplied

7. Utilities, building services & safety

  • The filed plan lists a sump, a separate underground static water-storage tank with capacity 25, 000 lits., and a separate terrace tank with capacity 25,000lits for residential buildings. It also lists rainwater harvesting, a septic tank and a distribution transformer. The plan and RERA progress record do not establish the water source, treatment capacity, sewage-treatment plant, reuse arrangements or completed utility connections. RERA amenities
  • The plan lists a lift, generator as an alternate electricity source, emergency lighting in corridors/common passages and staircases, and a garbage house. It requires services including sanitation, plumbing, fire safety, lifts and electrical installations to be executed under qualified technical supervision. The supplied documents do not provide lift capacity, generator capacity, fire-system specifications or evidence of completed installation.
  • The GHMC permit states that a Fire NOC is to be obtained from the Director (EV&DM) before issue of an occupancy certificate. No Fire NOC or occupancy certificate is supplied. The plan also includes conditions relating to structural and fire safety, and calls for a minimum safe distance from electrical lines. These plan conditions are not, by themselves, evidence that all requirements have been completed or independently verified.

8. Location, access & connectivity

  • The registered project location is Plot No. 1-9-812, at Chikkadapally Ashok nagar, Musheerabad, Hyderabad, Telangana, PIN 500044; the project fields identify the locality as ADIKMET. The filed building-permit extraction describes the site as Adikmet, Musheerabad, Hyderabad. RERA record
  • The GHMC plan extraction refers to an 18 mt. road width, an EX. 67' (20.42M) WIDE ROAD; PRO. 100' (30.0M) MAIN ROAD, and other listed road-width descriptions. A precise site approach route or public-transport access assessment is not supplied in the official project records.
  • The location data supplies HITEC City at 14.9 km as an anchor point. Vendor-provided material separately lists Vidya Nagar Railway Station (0.4 Km), Vidya Nagar Bus Stop (0.4 Km) and Ramnagar Gundu Bus Stop (0.3 Km); these are vendor claims rather than measurements established by the supplied TG-RERA record. Location record Promoter website

9. Developer & development status

  • The registered promoter is VIJAY NIRMAAN DEVELOPERS, recorded as a Partnership in the project fields. Its GSTIN is 36AAQFV4986Q1ZS. The supplied project record lists an address at Goutham Nagar, Adikmet, Musheerabad, Hyderabad, PIN 500044; the registration certificate gives a different promoter-address entry, and no official contact number, email address or website is established in the supplied records. RERA record RERA filing Parties record
  • The project declaration names 31.07.2028 as the completion period. GHMC’s permit extraction records a completion deadline of 31 July, 2028. The project is not shown as completion-certified, and no occupancy certificate is supplied. The available progress fields report Water Supply at 10% and the other listed development items at 0%; these are filed progress entries, not independent verification of construction progress. RERA amenities

10. Approvals, official records & documents

TG-RERA registration
Supplied evidenceForm C certificate, Registration No. P02500010979
Scope / noteProject registration and validity: 31/07/2025–31/07/2028, unless extended
GHMC building permit
Supplied evidencePermit No. 1286/GHMC/SEC/2025-BP; file No. 002513/GHMC/1087/SEC1/2025-BP; dated 31 July, 2025
Scope / noteResidential building, 1 Cellar + 1 Stilt + 5 upper floors
Filed plan
Supplied evidenceLayout/building-plan document
Scope / noteContains site-area, building, parking, utility and plan-condition entries
Form-B declaration
Supplied evidencePromoter declaration dated 13.03.2026
Scope / noteDeclares land free from encumbrances and completion by 31.07.2028
Supplementary development-agreement undertaking
Supplied evidenceDeclaration dated 30 day of May, 2026
Scope / noteUndertakes to register and submit a supplementary development-agreement deed within thirty days; the supplied extraction does not state that the deed was subsequently registered
Occupancy / completion certificate
Supplied evidenceNot supplied; permit extraction records completion as not certified
Scope / noteNo occupancy or completion certificate for the building is evidenced in the supplied documents

Frequently asked questions

Is VIJAY NIRMAAN S HORIZON registered with Telangana RERA?

Yes. VIJAY NIRMAAN S HORIZON is registered with the Telangana Real Estate Regulatory Authority as P02500010979; the registration status is New Project.

Who is the developer of VIJAY NIRMAAN S HORIZON?

The promoter named in the RERA registration is VIJAY NIRMAAN DEVELOPERS.

Where is VIJAY NIRMAAN S HORIZON located?

VIJAY NIRMAAN S HORIZON is in ADIKMET, Chikkadapally Ashok nagar, Musheerabad, Hyderabad, Telangana (500044).

When will VIJAY NIRMAAN S HORIZON be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2028. This is the promoter's declaration, not a guarantee.