SARK ENCLAVE is a residential open-plots layout in Miryalguda Municipality, Miryalguda Mandal, Nalgonda District. The registered promoter is SARK PROJECTS HOUSING LLP. The project covers a total land area of 48,085.86 sq.m and its tentative layout records 138 open residential plots, with drawing-derived plot sizes of 127.24–356.33 sq.m; buildings and floors are not applicable to the recorded layout. It is registered under TG-RERA number P01800010803, and the project header records proposed completion as 15/01/2028.

More from Sark Projects Housing LLP · 4 projects →

01What we found

RegisteredTG-RERA - valid till 15 Sep 2027
41documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Miryalguda, Miryalguda, Nalgonda · geocoded — approximate.

Project at a glance

Project identity

FieldProject record
Registered nameSARK ENCLAVE RERA record
Project typePlotted development / residential open-plots layout RERA record RERA filing
Phase / registered portionA single registered project is shown; no separately identified phase or phase-wise portion is disclosed. RERA record
TG-RERA registrationP01800010803; valid from 15/09/2025 to 15/09/2027. This is registration validity, not the project completion deadline. RERA record Approvals record
Registered promoterSARK PROJECTS HOUSING LLP, an LLP RERA record Corporate record
RERA statusNew Project; registration certificate on file. RERA record

Land and geographic identity

FieldProject record
LocalityMiryalguda Municipality; Miryalguda Bypass Road is stated in the filed project address. RERA record RERA filing
Revenue villageMiryalguda (also stated in filed documents as “MIRYALGUDA Revenue Village”). RERA record
Mandal / district / PINMiryalguda / Nalgonda / 508207 RERA record
Project survey numbers and subdivisions622/P, 628/P, 629/P, 631/P, 638/P RERA record Land records
Site extentTotal land area 48,085.86 sq.m; affected area 1,416.38 sq.m; net area 46,669.48 sq.m. RERA filing
Boundaries recorded in RERA project informationEast: neighbours’ land; west: neighbours’ land; north: road; south: neighbours’ land. RERA filing

Development identity

FieldProject record
Sanctioning authorityMiryalguda Municipality/Municipal Corporation; the RERA filing also identifies DTCP as authority for the layout-plan material. Approvals record
Principal layout approvalTentative Layout Plan 0012/LO/3047/2025, dated 15 September 2025; application 002379/LO/MIRY/3047/0004/2025. Approvals record
Layout size and plotsThe tentative approval records 138 plots over 11 Acer 35.3 Gts 57512 Sq. Yds.
Approved built-up areaThe layout-plan record states proposed built-up area 0.00, both excluding and including parking; no building programme is described in the supplied plan record.
Buildings / floors / parking levelsNot applicable to the recorded open-plots layout; no buildings, floor configuration or parking levels are disclosed.
Mortgage areaRERA project information records 3,968.12 sq.m; the tentative-layout documents identify specified plots mortgaged to the Municipality. RERA filing

Offering and status

FieldProject record
Unit type and countOpen residential plots; the tentative layout records 138 plots.
Plot-size rangeSoftware measurement from the layout drawing: 127.24–356.33 sq.m (approximately 152.2–426.2 sq.yd as supplied). These are drawing-derived measurements, not a RERA-filed unit schedule. Layout record
Booked / availableNot disclosed in the supplied evidence.
Construction stageNo independently verified site progress or completion status is supplied. The approval requires the owner/developer to complete layout infrastructure and amenities within the stated period.
Completion datesThe tentative layout approval requires infrastructure and amenities within two years from 15 September 2025, stated as 15 September 2027. The RERA Form B declaration also undertakes completion by 15th September 2027; project header records proposed completion as 15/01/2028. RERA record
Occupancy / completion certificateNot disclosed in the supplied evidence; this is a plotted layout, and no occupancy or completion certificate is provided.

The project story

SARK ENCLAVE is registered as a residential plotted development in Miryalguda, Nalgonda district, covering revenue-village land in Survey Nos. 622/P, 628/P, 629/P, 631/P and 638/P. Its tentative layout approval provides for 138 individual plots, internal roads, park/open space, a utility area and a social-infrastructure area. RERA record

The approval is tentative, not a statement that layout works have been completed. It requires the applicant to carry out infrastructure and amenity works and to hand over specified open space, utilities and roads to the Municipality by registered gift deed before release of the tentative layout. The supplied material does not establish the current on-site completion of those works.

The promoter’s Form B declaration undertakes completion by 15 September 2027. The registration certificate is valid through 15 September 2027; registration validity and the project’s stated completion timeline are separate matters. No occupancy/completion certificate or independently verified construction-progress report is included in the supplied records.

Master plan, architecture & building design

This is a plotted layout rather than a building or apartment scheme. The drawing-derived land-use schedule reports a total layout area of 48,085.86 sq.m and net layout area of 46,669.48 sq.m. It allocates the net layout area as follows: Layout record

Layout useAreaShare
Plotted area25,410.99 sq.m54.45%
Roads15,147.10 sq.m32.46%
Organized open space / park4,236.91 sq.m9.08%
Social infrastructure1,179.01 sq.m2.53%
Utilities695.45 sq.m1.49%
Amenity area0.00 sq.m0.00%

The drawing lists internal road widths of 10.00 mt., 12.00 mt. and 45.00 MT WIDE; it also labels a 150' WIDE road in the plan extraction. These are drawing notations, not a description of current road completion.

The drawing-derived schedule gives 138 plots, with sizes from 127.24 sq.m to 356.33 sq.m and a median of 167.23 sq.m. The plot schedule is software-measured from the drawing and should be checked against the approved drawing and plot-specific documentation. No building footprint, building height, floors, apartment configuration or building parking is identified in the supplied layout plan. Layout record

Homes, configurations & floor plans

The offering is plots, not apartments. The tentative-layout approval records 138 plots. The layout drawing’s plot schedule is software-measured; it is not a RERA-filed plot-by-plot saleable-area schedule. Layout record

Plot informationSupplied value
Plot count in tentative-layout approval138
Smallest drawing-measured plot127.24 sq.m (152.2 sq.yd)
Median drawing-measured plot167.23 sq.m (200.0 sq.yd)
Largest drawing-measured plot356.33 sq.m (426.2 sq.yd)

The drawing-derived size bands are 28 plots in 150–200 sq.yd, 80 in 200–250 sq.yd, 18 in 250–300 sq.yd, 11 in 300–400 sq.yd and 1 in 400–500 sq.yd. These bands are software-measured from the layout drawing. Layout record

Apartment carpet area, balcony area, common-area loading and apartment saleable area do not apply to this plotted offering. The supplied RERA evidence does not provide booked/available counts or a complete RERA-filed plot-size schedule. RERA unit table Layout record

Parking & vehicle circulation

The supplied layout records 0.00 common parking area. It does not provide a count of resident, visitor or accessible parking spaces, nor parking allotment terms.

The tentative-layout material identifies internal roads and requires roads to remain open for access to neighbouring sites. The road network is shown on the layout drawing, but the evidence does not establish completed road works, pedestrian separation, EV charging or a plot-specific parking entitlement.

Amenities, recreation & open spaces

Category / facilityDescription / sizeEvidence sourceDeclared progress / verified status
Landscape / open space — park4,236.91 sq.m; 9.08% of net layout areaReserved in the layout; development and handover are required by the tentative approval. Completion is not independently verified.
Landscape / recreation — tot-lotListed in the drawing extraction; no size or capacity statedDrawing-listed; completion not verified.
Social infrastructure1,179.01 sq.m; 2.53%Area reserved in the layout; specific facility or delivered status is not disclosed.
Utilities land695.45 sq.m; 1.49%Area reserved; facilities are described in the tentative-layout conditions. Completion not verified.
Community buildingsListed in the RERA amenity extraction without a stated size or progress figureRERA amenitiesNo completion evidence supplied.

The layout approval requires the promoter to develop the park and related layout works and to hand over the open space, utilities and roads to the Municipality by registered gift deed before release of the tentative layout.

Utilities, building services & safety

The tentative-layout conditions specify proposed layout infrastructure including a water reservoir, overhead tank/sump, internal water-supply pipelines and an assured water-supply source; storm-water drains; underground drainage lines and a common septic tank/STP; electrical supply lines, transformer and street lights; solid-waste management; avenue planting; and rainwater-harvesting pits.

These are approval requirements or listed provisions, not evidence that the facilities are installed, operational or independently inspected. The supplied records do not state water-source capacity, tank or STP capacity, electrical load, backup-power provision, waste-processing capacity, security systems, accessibility features or fire-protection arrangements. RERA amenities

Location, access & connectivity

The registered project location is Miryalguda Municipality, Miryalguda Mandal, Nalgonda District, Telangana 508207, in Miryalguda revenue village and the five project survey numbers listed above. The filed address refers to Miryalguda Bypass Road. RERA record RERA filing

The tentative-layout documents show the MIRYALYALGUDA BY PASS 150' WIDE ROAD and road access within the layout. The supplied location data also gives a distance of 1.2 km to Financial District (Nanakramguda), based on a cadastral-parcel centroid. No project-specific public-transport details or independently verified route distances are supplied. Location record

Developer & development status

The registered promoter is SARK PROJECTS HOUSING LLP, an LLP. Its supplied corporate identifier is GSTIN 36AENFS2493G1ZL. The registration certificate lists the promoter office as Village: Kondapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500032. Corporate record

The RERA record names 15 landowners and identifies an area-sharing development arrangement. The tentative layout material describes a 65% landowner / 35% developer share; plot allocations are recorded in separate documents. Parties record

The Form B affidavit is a promoter declaration undertaking project completion by 15th September 2027. No independently verified site-progress figure is supplied. The registration certificate is valid to 15/09/2027, and the supplied evidence does not include an occupancy or completion certificate.

Approvals, official records & documents

RecordWhat the supplied document establishes
TG-RERA registration certificateForm C for SARK ENCLAVE, registration P01800010803, valid 15/09/2025–15/09/2027.
Tentative layout approvalMiryalguda Municipality/Municipal Corporation approval 0012/LO/3047/2025, dated 15 September 2025, application 002379/LO/MIRY/3047/0004/2025; records 138 plots and conditions for infrastructure, mortgage and handover.
Layout drawingTwo-sheet layout drawing for the project survey numbers, showing plot arrangement, land-use schedule and road network; its extraction identifies TS-DTCP and includes file reference TS/019391/2025.
Draft layout-plan recordDrawing extraction records the survey numbers, land-use split and proposed built-up area of 0.00; it does not provide a separately populated approval number or date in that extraction.
Promoter declarationForm B affidavit by the authorized signatory, declaring the land free from encumbrances and undertaking completion by 15 September 2027.
Completion / occupancy certificateNot included in the supplied documents.

The approved built-up area, building configuration and building-specific commencement or occupancy certificates are not disclosed in the supplied evidence for this plotted layout.

Frequently asked questions

Is SARK ENCLAVE registered with Telangana RERA?

Yes. SARK ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P01800010803; the registration status is New Project.

Who is the developer of SARK ENCLAVE?

The promoter named in the RERA registration is SARK PROJECTS HOUSING LLP.

Where is SARK ENCLAVE located?

SARK ENCLAVE is in Miryalguda Municipality, Miryalguda, Nalgonda, Telangana (508207).

When will SARK ENCLAVE be completed?

The promoter's proposed date of completion filed with RERA is 15/01/2028. This is the promoter's declaration, not a guarantee.