Sign in

Devidi S Homes Block A

SRIJA PROJECTS · Rangareddy · RERA P02400005828

DEVIDI S HOMES BLOCK A is a residential apartment project in HANUMAN NAGAR, Abdullapurmet mandal, Ranga Reddy district, developed by registered promoter SRIJA PROJECTS, a partnership. The site area is 602.11 sq. m, with one proposed residential building of 1 Stilt + 5 upper floors and 10 proposed 3BHK units, each with a RERA saleable area of 175.0 sq. m. Its TG-RERA registration number is P02400005828, and the promoter-declared completion deadline is 27-AUGUST-2025.

More from Srija Projects · 7 projects →

01What we found

Period endedTG-RERA registration ran to 27 Aug 2025 - check its extension on TG-RERA
25documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from gharpe.comPhoto from gharpe.com
▦ View all 2 photos
Thatti Annaram, Abdullapurmet, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

ItemTG-RERA record
Registered project nameDEVIDI S HOMES BLOCK A
Project typeResidential apartment project RERA record
Registered portion / phaseBlock A; the registration certificate identifies the project name but does not separately describe a phase boundary.
TG-RERA registration numberP02400005828
Registration validity21 March 2023 to 27 August 2025; the supplied certificate records no extension. Registration validity is distinct from the completion deadline.
Registered promoterSRIJA PROJECTS, a partnership RERA filing
RERA status in supplied recordCertificate issued; the stated validity period has ended. No later extension or current registration status is established by the supplied material.

Land and geographic identity

ItemRERA-filed / documented identity
LocalityHANUMAN NAGAR RERA filing
Revenue villageThatti annaram; the certificate also renders this as “Thatti annaram.” [header; doc:REGCERT-42953 p1]
Mandal / district / PINAbdullapurmet / Ranga Reddy / 500095 [header; doc:REGCERT-42953 p1]
Project survey number(s)Survey No. 92; no project subdivision is specified in the registration certificate.
Registered plot portions33 – NORTHERN PART, 33 – SOUTHERN PART, 47 – SOUTHERN PART & 47 – NORTHEN PART
Site extentTotal area 602.11 sq. m; net area 595.80 sq. m; road-affected area 6.31 sq. m in the RERA land details. RERA filing
BoundariesEast, west and south: 30 WIDE ROAD; north: PLOT NOS 32 AND 48. RERA filing

Development identity

ItemApproval / RERA record
Principal sanctioning authorityPedda Amberpet Municipality / Municipal Corporation; the RERA filing identifies DTCP as the authority for plan approval. [approvals; doc:268237 p1]
Principal approval number / date0012/BP/3040/2022, approved 27 August 2022. [approvals; doc:268237 p1]
Approved built-up areaThe principal approval records residential upper-floor area of 1,422.80 sq. m and stilt area of 270.81 sq. m. These are shown separately in the approval parameters.
Main building configurationOne proposed residential building: 1 Stilt + 5 upper floors; approved height 14.9 m.
Parking levels / provisionThe principal approval says cellar and stilt approved for parking are to be used exclusively for vehicle parking; the extracted principal configuration identifies one stilt. A parking-space count is not supplied.
Building and unit countsThe RERA record lists one building and 10 proposed units; the approval extract identifies one proposed building. RERA filing

Offering and status

ItemRERA record / supplied evidence
Unit type3BHK RERA unit table
RERA saleable area175.0 sq. m RERA unit table
Booked / available0 booked / 10 available in the portal data supplied; the portal record has no as-of date, so counts are indicative rather than current confirmation. RERA unit table
Promoter-declared completion deadline27-AUGUST-2025 in Form B; the registration certificate also ends on 27 August 2025.
Construction stageNo independently verified construction-stage or site-progress evidence is supplied. The RERA amenities table records 0% for each listed item. RERA amenities
Occupancy / completion certificateNo occupancy or completion certificate is supplied for the registered Block A project. The principal sanction states an occupancy certificate is compulsory before occupation.

2. The project story

DEVIDI S HOMES BLOCK A is registered as a residential apartment project on Survey No. 92 in Hanuman Nagar, Thatti annaram village, Abdullapurmet mandal, Ranga Reddy district. The registered site comprises the listed portions of Plots 33 and 47, and the RERA record shows one building with 10 proposed 3BHK homes.

The principal building approval describes a proposed building with one stilt and five upper floors. The promoter’s Form B declaration undertook completion by 27 August 2025. The supplied evidence does not establish how much construction has actually been completed or independently verify a site stage; the amenity progress figures in the RERA filing are recorded as 0%. No project occupancy certificate is included in the supplied documents.

3. Master plan, architecture & building design

The principal building-construction approval covers a site area of 602.11 sq. m and net area of 595.8 sq. m, and identifies one residential building with five upper floors over a stilt. Its stated height is 14.9 m. The approval separately lists 1,422.80 sq. m for residential upper floors and 270.81 sq. m for the stilt; the evidence does not identify these figures as carpet area, saleable area or FSI-counted area.

The RERA filing also includes a floor-plan document entry, 268234, but the drawing extraction is incomplete: two drawings are counted, one measured and one scan pending. The supplied information does not establish floor-by-floor home arrangement, flats per floor, building footprint, lifts, stairs, circulation, internal roads or landscaping plan. [documents; floor_plans]

4. Homes, configurations & floor plans

  • The RERA configuration record lists 10 3BHK units with a saleable area of 175.0 sq. m each. The booking counts are portal-record figures without an as-of date. [units; unit_details]
ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010175.0 sq. m112.8–118.6 sq. m; median 115.7 sq. m34%
  • The carpet-area range and median are software measurements from the floor-plan drawing, not RERA-filed measurements, and are marked as needing review. The drawing-based figure is distinct from RERA saleable area; the supplied floor-plan note says saleable area also includes the home’s share of common areas. One measured plan panel lists a 1.22 m wide balcony, which is excluded from the measured carpet area. [unit_details; floor_plans; doc:268234]
  • The supplied measured drawing identifies bedroom, kitchen, living/dining, drawing room, puja, wash and toilet spaces. The extraction provides room dimensions for one measured flat design, but does not provide a complete, verified room schedule for all homes. [unit_details; doc:268234]

5. Parking & vehicle circulation

  • The principal approval requires the approved cellar and stilt parking areas to be used exclusively for parking, without partition walls or rolling shutters. The extracted main-building parameters identify one stilt. No number of parking bays, visitor or accessible spaces, parking-allocation schedule, ramp arrangement, vehicle entry/exit details, pedestrian separation or EV charging provision is supplied.
  • The available information establishes a sanctioned parking-use condition, not exclusive parking ownership or allocation to any particular apartment.

6. Amenities, recreation & open spaces

The RERA amenities schedule lists the following items. Its supplied progress field is 0% for each entry; this is a recorded progress figure, not independent verification of site conditions. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsSize not suppliedRERA amenities schedule0%; completion not independently verified
Water SupplyAvailability recorded as YES; capacity and source not suppliedRERA amenities schedule0%; completion not independently verified
Sewerage (Chamber, Lines, Septic Tank, STP)Availability recorded as YES; system details not suppliedRERA amenities schedule0%; completion not independently verified
Storm Water DrainsDetails not suppliedRERA amenities schedule0%; completion not independently verified
Green Strip/TOT LOT/ParkDetails not suppliedRERA amenities schedule0%; completion not independently verified
Street LightingDetails not suppliedRERA amenities schedule0%; completion not independently verified
Community BuildingsDetails not suppliedRERA amenities schedule0%; completion not independently verified
Treatment and Disposal of Sewage and Sullage WaterDetails not suppliedRERA amenities schedule0%; completion not independently verified
Solid Waste Management and DisposalDetails not suppliedRERA amenities schedule0%; completion not independently verified
Water Conservation, Rain Water HarvestingAvailability recorded as YES; capacity not suppliedRERA amenities schedule; principal approval0%; completion not independently verified
Energy managementDetails not suppliedRERA amenities schedule0%; completion not independently verified
Fire Protection and Fire Safety RequirementsDetails not suppliedRERA amenities schedule0%; completion not independently verified
Electrical Meter Room, Sub-Station, Receiving StationDetails not suppliedRERA amenities schedule0%; completion not independently verified
Aggregate area of recreational Open SpaceArea not suppliedRERA amenities schedule0%; completion not independently verified
  • The principal approval specifically requires a rainwater-harvesting percolation pit, transformer space and a garbage house. It also requires a tot-lot to be fenced and maintained as greenery before issue of the occupancy certificate. These are approval conditions; the supplied evidence does not establish installation or completion.

7. Utilities, building services & safety

  • The RERA amenities schedule records water supply, sewerage and water conservation/rainwater harvesting as available, but gives 0% progress and does not supply capacities, source details, treatment specifications or completion verification. The principal approval requires a rainwater-harvesting percolation pit, transformer space and a garbage house. [amenities; doc:268237 p1]
  • The schedule includes storm-water drains, sewage and sullage treatment, solid-waste management, energy management, fire protection and electrical meter room/sub-station/receiving station, but the supplied extracts do not describe their design, capacities or installation status. No lift details, backup-power arrangement, CCTV/security system, accessibility provisions or fire-system specifications are established by the RERA documents supplied here. The sanction requires an occupancy certificate before occupation and directs compliance with the sanctioned plan; these conditions alone do not establish that the systems have been completed or that the building has occupancy certification. [amenities; doc:268237 p1]

8. Location, access & connectivity

  • The registered location is HANUMAN NAGAR, Thatti annaram village, Abdullapurmet mandal, Ranga Reddy district, PIN 500095. The registered land record states that the site is bounded by 30-wide roads to the east, west and south, with Plots 32 and 48 to the north. [header; fields: Land Details]
  • The supplied location data lists Andhra Bank at 0.2 km, Government Junior College and Community Health Centre Rajendranagar at 0.5 km, Rural Technology Park and Government High School at 0.8 km, and Jungametta metro (under construction) at 7.7 km. These are supplied location-record distances; the material does not establish travel times or a verified route. Location record

9. Developer & development status

  • The registered promoter is SRIJA PROJECTS, recorded as a partnership, with GSTIN 36AEMFS2960K1ZH. The registration certificate lists the promoter office as Village Nagole, Mandal Uppal, District Medchal-Malkajgiri, PIN 500068. It names Srija Projects as promoter; the supplied material does not provide an official website or contact details. RERA filing
  • Form B, signed by Srinivasrao Ponugoti as promoter or authorised representative, declares a completion date of 27 August 2025 and records the promoter’s statements about title, encumbrances and project obligations. These are promoter declarations, not independent site or title verification. The supplied evidence does not establish current construction progress or a later completion extension.

10. Approvals, official records & documents

RecordSupplied evidence and scope
TG-RERA registrationForm C for DEVIDI S HOMES BLOCK A, registration P02400005828, issued 21 March 2023; validity stated through 27 August 2025.
Principal building approvalApproval for building construction 0012/BP/3040/2022, dated 27 August 2022, issued by Pedda Amberpet Municipality / Municipal Corporation; Survey No. 92; proposed building of 1 stilt + 5 upper floors.
Other building-permission documents filedDocuments include commencement/building-permission records 178577/PEDA/0984/2022, 184059/PEDA/1069/2022, and 186096/PEDA/1114/2022, concerning individual buildings on portions of Survey No. 92.
Occupancy / completion certificateNo project occupancy or completion certificate is included in the supplied documents. The principal sanction states that an occupancy certificate is compulsory before occupation.
Floor-plan recordRERA filing entry 268234 is identified for building floor-plan material; the supplied drawing extraction is incomplete, with one scan pending. [documents; floor_plans]
Promoter declarationForm B for SRIJA PROJECTS records promoter declarations and the 27 August 2025 completion undertaking.

Other registrations of Devidi S Homes

Frequently asked questions

Is DEVIDI S HOMES BLOCK A registered with Telangana RERA?

Yes. DEVIDI S HOMES BLOCK A is registered with the Telangana Real Estate Regulatory Authority as P02400005828; the registration status is New Project.

Who is the developer of DEVIDI S HOMES BLOCK A?

The promoter named in the RERA registration is SRIJA PROJECTS.

Where is DEVIDI S HOMES BLOCK A located?

DEVIDI S HOMES BLOCK A is in HANUMAN NAGAR, Thatti annaram, Abdullapurmet, Rangareddy, Telangana (500095).

When will DEVIDI S HOMES BLOCK A be completed?

The promoter's proposed date of completion filed with RERA is 27/08/2025. This is the promoter's declaration, not a guarantee.

More projects in Thatti Annaram