MY HIVE is a residential apartment project in Rekurthy, Karimnagar-II (Kothapally Rural) mandal, Karimnagar district, developed by registered promoter SHIVA SAI DEVELOPERS. It is on a 443.65 sq.mt. site and comprises one residential building, Building A, with 1 stilt + 5 upper floors; the TG-RERA unit record lists 9 3BHK apartments with a saleable area of 158.97 sq.m. per recorded unit. Its TG-RERA registration is P02700009899, and the RERA project record gives proposed and revised completion dates as 10/06/2028.

01What we found

RegisteredTG-RERA - valid till 10 Feb 2028
20documents on file - each fact links to its page
81court cases on this project's land (survey 14, Rekurthy)
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Rekurthy, Karimnagar Ii, Karimnagar · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameMY HIVE RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNo separate phase name is stated. The filed site and building records identify Open Plot Nos. 3 and 4 in Survey No. 14 and one residential building.
TG-RERA registrationP02700009899 RERA record
Registration validity10/02/2025–10/02/2028, unless extended by the Authority. This is the registration period, not the project completion deadline. Approvals record
Registered promoterSHIVA SAI DEVELOPERS; entity type recorded as partnership. RERA record RERA filing
RERA status“On-Going Project”; registration certificate filed. RERA record

Land and geographic identity

FieldRecord
LocalityREKURTHY RERA record RERA filing
Revenue villageRekurthy; the building-permit extraction specifies “Rekurthy(Part)”. RERA record
MandalKarimnagar-II (Kothapally Rural); the building-plan record also says Kothapally Mandal. RERA record
District / PINKarimnagar / 505001 RERA record
Project survey number(s) and subdivision(s)Survey No. 14; no subdivision is stated. The plan identifies Open Plot Nos. 3 and 4. Land records
Site area443.65 sq.mt.; the permit records total and net area as 443.65 m² and road-affected area as 0.
BoundariesNorth: 30-feet-wide road; South: land of others; East: Plot No. 2; West: Plot No. 5. RERA filing

Development identity

FieldRecord
Sanctioning authorityKarimnagar Municipal Corporation; the filed project record also identifies DTCP as authority. Approvals record
Principal building approvalApproval No. 0003/BP/3011/2025, dated 10 February 2025; file No. 000504/BP/KARI/3011/0007/2025. Approvals record
Building / floorsOne residential building, Building A: 1 stilt + 5 upper floors.
HeightPermit parameters record 14.99 m; the layout-plan extraction separately records a total height of 20.91 m and height excluding stilt of 14.99 m.
Built-up areaPermit records residential upper-floor area of 1,223.95 m², stilt area of 230.43 m², and total proposed built-up area including parking of 1,470.01 m². The layout-plan extraction labels 1,223.95 m² as excluding parking and 1,470.01 m² as including parking.
Parking area246.06 m² in the layout-plan extraction. The filed permit says approved stilt/parking areas are to be used exclusively for vehicle parking.
Unit countsBuilding approval: 10 dwelling units. TG-RERA unit record: 9 units. RERA unit table

Offering and status

FieldRecord
Unit type3BHK apartments RERA unit table
TG-RERA saleable area158.97 sq.m. per recorded unit RERA unit table
Booked / available0 booked / 9 available, as last read from the TG-RERA portal; no as-of date is supplied, so these counts are indicative. RERA unit table
Construction stageProject is recorded as “On-Going Project”; no independently verified site-progress percentage or construction-stage report is supplied. RERA record RERA amenities
Completion deadlineBuilding permit records completion before 10 February 2028; the RERA project record gives proposed and revised completion dates as 10/06/2028. These dates are reported as filed, not independently verified. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is evidenced in the supplied project documents; the building permit requires an occupancy certificate before occupation.

2. The project story

MY HIVE is recorded with TG-RERA as a residential apartment project in Rekurthy, Karimnagar district. Its filed land schedule identifies Survey No. 14, Open Plot Nos. 3 and 4, on a site of 443.65 m². The sanctioned building is one stilt-and-five-upper-floor residential block. RERA record Land records

The TG-RERA unit record lists nine 3BHK apartments, all shown as available in the portal snapshot, with no booking as-of date. The building-permit extraction records ten dwelling units. The supplied material does not establish which construction stage has been reached or independently verify completion of any building or facility. No occupancy certificate is supplied. RERA unit table RERA amenities

3. Master plan, architecture & building design

The filed building plan describes one residential building, Building A, with a stilt and five upper floors on a 443.65 m² site. The building permit records residential upper-floor area of 1,223.95 m², stilt area of 230.43 m² and cellar area of 0.00 m². The layout-plan extraction gives proposed built-up area as 1,223.95 m² excluding parking and 1,470.01 m² including parking, with a 246.06 m² parking area. These are document-labelled areas; no FSI-counted area is supplied.

The plan records front, rear and side setbacks of 3.00 m, 2.50 m, 2.50 m and 2.50 m, respectively, and identifies a 9.0 m wide road in the layout-plan extraction. No detailed evidence is supplied for building footprint, flats per floor, lift or stair arrangement, or internal circulation. The sanction also calls for a tot-lot and peripheral greenery, but does not give a tot-lot area in the supplied extraction.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK909158.97 sq.m.96.4–101.5 m²; median 99.3 m²38%

The TG-RERA filing supplies the unit count, booking count and saleable area. Carpet-area figures are software-measured from approved floor-plan drawing geometry, not RERA-filed measurements; four flat designs were measured and two require review. The stated median is also recorded as 1,068 sq.ft. RERA unit table Floor plans

The measured fourth-floor flat plan shows three bedrooms, a kitchen, living/dining area and three toilets. For the one illustrated flat, recorded room dimensions include living/dining 6.55 m × 6.99 m, kitchen 3.00 m × 2.81 m and bedroom dimensions of 3.19 m × 3.90 m, 3.00 m × 2.99 m and 2.68 m × 3.19 m. These are drawing-based measurements and should be checked against the plan. RERA unit details

Carpet area is the software-measured usable apartment area in the drawing; the RERA saleable area is a separate filed figure and includes the home’s share of common areas. No separately filed balcony, utility-area or unit-specific loading schedule is supplied. Floor plans RERA unit table

5. Parking & vehicle circulation

The building permit records a stilt area of 230.43 m² and states that approved stilt/parking areas are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The layout-plan extraction records 246.06 m² of parking area. No count of car, two-wheeler, visitor or accessible spaces, parking allocation by apartment, ramp details, or parking-level circulation plan is supplied.

The filed plan conditions require electric-vehicle charging infrastructure in parking places; the supplied material does not establish installation or completion. A drawn or sanctioned parking provision does not, by itself, evidence exclusive allocation to a particular apartment.

6. Amenities, recreation & open spaces

The amenity register lists facilities and shows 0% progress for each entry; these are portal declarations, not independent completion evidence. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot-lot / parkTot-lot and peripheral greenery required by the permit; no area suppliedRERA amenitiesRegister: 0%; completion not independently verified
Community buildingsListed; no size or description suppliedRERA amenitiesRegister: 0%; completion not independently verified
Aggregate recreational open spaceListed; no area suppliedRERA amenitiesRegister: 0%; completion not independently verified
Internal roads and footpathsListed; no dimensions suppliedRERA amenitiesRegister: 0%; completion not independently verified
Street lightingListed; no specification suppliedRERA amenitiesRegister: 0%; completion not independently verified

No clubhouse, indoor recreation or sports facility is evidenced in the supplied material.

7. Utilities, building services & safety

The project amenity register marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/substation/receiving station as “YES,” but records 0% progress for these entries. The building-plan extraction specifies four rainwater-harvesting structures and a transformer space; the permit also requires a garbage house within the premises. These are filed requirements or declarations, not evidence of completed installation. RERA amenities

The layout-plan extraction mentions ordinary-water capacity of 14,000.00 Ltrs. and a dual-piping system. The permit includes conditions concerning EV charging and digital-connectivity infrastructure and requires an occupancy certificate before occupation. No supplied record confirms water source or treatment, STP capacity or reuse, electrical backup, lift details, fire-system specifications, CCTV/access control or accessible circulation.

8. Location, access & connectivity

The registered location is Rekurthy, Karimnagar-II (Kothapally Rural) mandal, Karimnagar district, PIN 505001. The filed land record places the site in Survey No. 14 and describes its northern boundary as a 30-feet-wide road. The layout-plan extraction also identifies a 9.0 m wide road. RERA record Land records

The supplied location record gives the nearest sampled Outer Ring Road interchange as approximately 113.0 km away. No public-transport details, other landmark distances or verified travel times are supplied. Location record

9. Developer & development status

The registered promoter is SHIVA SAI DEVELOPERS, recorded as a partnership, with GSTIN 36AETFS9182C1ZF. The RERA certificate lists a promoter address at Theegalaguttapally, Karimnagar-I, Karimnagar, PIN 505001; the project filing separately gives an address in Rekurthy. The supplied record does not provide official contact details or an official website. RERA filing Corporate record RERA filing

The project is recorded as ongoing. The certificate is valid through 10/02/2028 unless extended; the completion dates are separately recorded in the project filing and building-permit extraction. No independent construction-progress evidence or occupancy certificate is supplied. RERA record Approvals record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for MY HIVE, registration P02700009899, valid 10/02/2025–10/02/2028 unless extended.
Building permitKarimnagar Municipal Corporation approval No. 0003/BP/3011/2025, dated 10 February 2025; file No. 000504/BP/KARI/3011/0007/2025.
Filed layout/building-plan recordTG-RERA-filed plan for proposed residential building on Open Plot Nos. 3 and 4, Survey No. 14, Rekurthy; extracted as layout plan.
Commencement / completion / occupancyBuilding-permit document supplied; no separate completion or occupancy certificate is supplied. The permit requires an occupancy certificate before occupation.
Promoter declarationForm B affidavit-cum-declaration filed under document ID 578103; it contains a completion undertaking and encumbrance declaration.
Project title-search documentAdvocate J. Venu Gopal Rao’s title scrutiny report, dated 14-05-2025, is included in the supplied document register. Detailed title matters are addressed in the Land & Title section.

The HMDA land-use lookup could not confidently assign a published sheet to this locality, and the public approved-layout lookup was unavailable in the supplied record. Those limitations do not establish whether an approval exists or was refused. HMDA

Frequently asked questions

Is MY HIVE registered with Telangana RERA?

Yes. MY HIVE is registered with the Telangana Real Estate Regulatory Authority as P02700009899; the registration status is On-Going Project.

Who is the developer of MY HIVE?

The promoter named in the RERA registration is SHIVA SAI DEVELOPERS.

Where is MY HIVE located?

MY HIVE is in REKURTHY, Karimnagar-II(Kothapally Rural), Karimnagar, Telangana (505001).

When will MY HIVE be completed?

The promoter's proposed date of completion filed with RERA is 10/06/2028. This is the promoter's declaration, not a guarantee.