YADADRI BRUNDAVANAM is a plotted development located at Raigiri Revenue Village, Bhongir Mandal, Yadadri Bhuvanagiri District. The registered promoter is BUSANELLI HIMABINDU. The project has a total site area of 23650.15 sq.mt and provides 90 plots, with drawing-derived sizes ranging from 66.77 sq.m to 361.03 sq.m; no towers or floors are stated. It is registered under TG-RERA number P02000010004, and the promoter’s Form B declaration gives a completion date of 30.07.2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | YADADRI BRUNDAVANAM RERA record |
| Project type | Plotted development / tentative plotted layout RERA record RERA filing |
| Phase / registered portion | No separate phase is identified; the registration concerns the plotted project on the listed survey parcels. RERA record |
| TG-RERA registration | P02000010004 RERA record |
| Registration validity | 30 July 2024 to 30 July 2026; this is the registration period, not the project completion deadline. RERA record |
| Registered promoter | BUSANELLI HIMABINDU RERA record |
| RERA status in supplied record | New Project; registration certificate recorded. No extension or later registration-status order is supplied. RERA record Approvals record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | YADADRI BHUVANAGIRI in the RERA project fields; RAIGIR / Raigiri Revenue Village in the layout and approval documents. RERA filing RERA filing |
| Mandal | Bhongir RERA record RERA filing |
| District | Yadadri Bhuvanagiri RERA record |
| PIN | 508116 RERA record RERA filing |
| Project survey numbers and subdivisions | 575/6, 575/7/1, 576/1, 576/5, 578/1/2, 579/2 RERA record |
| Site extent | 23650.15 sq.mt total site area; 21521.22 sq.m net layout area in the supplied area statement. RERA filing Layout record |
| Boundaries | East, West, North and South are each recorded as OTHERS LAND. RERA filing |
| Road-affected area | 2128.93 sq.m in the RERA land fields; the layout drawing states 2093.94 road-widening area plus 34.99 leftover owner’s land. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | TS-DTCP is identified on the layout plan; the tentative layout approval is issued by BHONGIR Municipality/Municipal Corporation. Approvals record |
| Principal layout approval | 0004/LO/3153/2024, approved 30 July, 2024 as a tentative layout plan. Approvals record |
| Other approval reference | File No. TS/020619/2024. Approvals record |
| Plots | 90 stated on the layout drawing and tentative approval. Layout record |
| Built-up area | RERA fields record 13201.03 sq.m approved built-up area; the layout plan states proposed built-up area 0.00, both excluding and including parking. These are the figures as recorded in their respective supplied records. RERA filing |
| Buildings / floors | Not applicable to the evidenced plotted-layout plan; no building count or floor configuration is supplied. |
| Parking | No common parking area is shown in the layout area statement (0.00); individual plot parking provision or allocation is not stated. |
Offering and status
| Item | Project record |
|---|---|
| Offered unit type | Plots. RERA record |
| Plot count and size range | 90 plots; software-read sizes range from 66.77 sq.m to 361.03 sq.m (approximately 79.9 sq.yd to 431.8 sq.yd). Drawing-derived figures should be checked against the layout schedule. Layout record |
| Booked / available | Not disclosed in the supplied project records. RERA filing |
| Construction stage | No independently verified site-progress record is supplied. The approval requires completion of layout infrastructure and amenities; progress percentages in the RERA amenities data are recorded as 0. RERA amenities |
| Completion timing | Promoter’s Form B declaration gives 30.07.2026; the tentative layout approval requires infrastructure and amenities within two years of approval, by 30 July, 2026. |
| Registration validity | 30 July 2024–30 July 2026; distinct from the completion timing above. |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied; the project is a plotted layout, and no phase/tower-specific certificate status is evidenced. Document index |
2. The project story
YADADRI BRUNDAVANAM is registered as a plotted-development project on land identified in the RERA record by surveys 575/6, 575/7/1, 576/1, 576/5, 578/1/2 and 579/2. The layout documents locate the land at Raigiri Revenue Village, Bhongir Mandal, Yadadri-Bhuvanagiri District. RERA record
The tentative layout approval provides for 90 plots, internal roads, park/open space, social-infrastructure land and utility land. The approval also reserves 16 identified plots as mortgage security for layout works. It requires the developer to complete infrastructure and amenities by 30 July, 2026; the supplied evidence does not establish the current physical completion of those works. Layout record
The RERA registration is valid through 30 July 2026, while the promoter’s Form B separately undertakes completion by 30.07.2026. These are different record fields with the same stated end date. No construction-stage verification, plot booking inventory or occupancy/completion certificate is included in the supplied material. RERA amenities
3. Master plan, architecture & building design
The filed development is a plotted layout, not a multi-storey residential building plan. The layout drawing states 90 plots and a total site area of 23650.15 sq.mt. Its area statement gives a net layout area of 21521.22 sq.m. The drawing allocates 13201.03 sq.m (61.34%) to plots, 5605.22 sq.m (26.05%) to roads, 1937.79 sq.m (9.00%) to organized open space/park, 560.39 sq.m (2.60%) to social infrastructure, and 216.72 sq.m (1.01%) to utilities. Layout record
The drawing identifies existing and proposed roads, including 9.00 mt. and 10.06 mt. internal roads, an 18.00mts wide master plan road, and other existing-road references. The layout also lists “Area for Social Infrastructure” and “Tot-lot.” The tentative approval describes roads of 18 mts and above in its road-width field.
The layout sheet states 0.00 proposed built-up area, both excluding and including parking. RERA project fields separately record approved built-up area of 13201.03 sq.m; the supplied records do not provide a building schedule or building-floor design. RERA filing
The layout plan identifies 16 plots as mortgage land, with a stated mortgage area of 2297.96 sq.m; plots are numbered 50, 65, 51, 64, 63, 52, 53, 62, 61, 54, 55, 60, 59, 56, 57 and 58.
4. Homes, configurations & floor plans
This is a plotted layout. The supplied layout schedule records 90 plots, with drawing-derived plot sizes as follows. The measurements were read by software from the approved layout drawing and are not RERA-filed saleable-area figures. Layout record
| Plot size band | Number of plots |
|---|---|
| 0–100 sq.yd (0–84 sq.m) | 1 |
| 100–150 sq.yd (84–125 sq.m) | 13 |
| 150–200 sq.yd (125–167 sq.m) | 57 |
| 200–250 sq.yd (167–209 sq.m) | 13 |
| 250–300 sq.yd (209–251 sq.m) | 4 |
| 300–400 sq.yd (251–334 sq.m) | 1 |
| 400–500 sq.yd (334–418 sq.m) | 1 |
The software-measured range is 66.77–361.03 sq.m (79.9–431.8 sq.yd), with a median of 135.15 sq.m (161.6 sq.yd). The most common recorded size is 135.15 sq.m (30 plots). These drawing-derived sizes should be verified against the layout schedule. No RERA-filed saleable-area schedule by plot, booked/available inventory, or individual plot allotment record is supplied. Layout record
The floor-plan review contains two layout sheets and no apartment floor plans; no carpet-area or room-configuration measurements are therefore available. A plot area is distinct from a building’s carpet area or a RERA saleable area, neither of which is established here. Floor plans Layout record
5. Parking & vehicle circulation
The layout area statement records 0.00 common parking area. The supplied material does not establish a sanctioned count of resident, visitor or accessible parking spaces, a plot-wise parking allocation, or any mechanical or covered parking provision.
The layout shows internal roads, including 9.00 mt. and 10.06 mt. internal-road references, as well as existing and proposed wider-road connections. The tentative approval requires roads to remain accessible to neighbouring sites and prohibits a compound wall or fencing around the site. No separate pedestrian route, ramp arrangement or EV-charging provision is evidenced.
6. Amenities, recreation & open spaces
| Facility | Organized open space / park |
|---|---|
| Description / size | 1937.79 sq.m (9.00%) of net layout area; the approval also identifies park development. |
| Declared progress / verified status | Amenity data records 0 progress; no independent completion verification supplied. RERA amenities |
| Facility | Tot-lot |
|---|---|
| Description / size | Listed on the layout plan; no size or equipment details supplied. |
| Declared progress / verified status | No completed-status evidence supplied. |
| Facility | Social infrastructure area |
|---|---|
| Description / size | 560.39 sq.m (2.60%). |
| Declared progress / verified status | No facility schedule or completed-status evidence supplied. |
| Facility | Utility area |
|---|---|
| Description / size | 216.72 sq.m (1.01%); utility land is identified separately from recreational/open space. |
| Declared progress / verified status | No completed-status evidence supplied. |
The tentative approval requires open space, utilities and roads to be handed over to the Municipality by registered gift deed before release of the final layout. The supplied record does not establish that this handover has occurred.
7. Utilities, building services & safety
The tentative layout approval lists a water reservoir, overhead tank, sump, septic tank, Sewerage Treatment Plant, electric transformer, solid waste management, street lights, rain water harvesting pits and park development as proposed layout infrastructure/amenities. These are approval-document descriptions; the supplied evidence does not verify installation, capacity or operation.
The amenities record lists water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, rainwater harvesting, energy management, and an electrical meter room/sub-station/receiving station. Each listed amenity has progress recorded as 0; no capacity figures or independent completion evidence are supplied. RERA amenities
No building-specific lift, fire-system, accessible-circulation or security design is evidenced for this plotted layout. The presence of an amenity entry or an approval-document proposal should not be read as confirmation that the service is complete or operational. RERA amenities
8. Location, access & connectivity
The RERA location fields identify YADADRI BHUVANAGIRI, Bhongir Mandal, Yadadri Bhuvanagiri District, PIN 508116. The layout and tentative approval identify Raigir/Raigiri Revenue Village. The supplied location record gives a cadastral parcel centroid of 17.41528, 78.35459. RERA record RERA filing Location record
The layout drawing identifies existing and proposed roads, including an 18.00mts wide master plan road, 18.00 MT WIDE EXISTING, 18.00 MT WIDE PROPOSED ROAD, 10.06 mt. Wide InternalRoad, 9.00 mt. Wide InternalRoad, and 10.06 MT WIDE EXISTING ROAD (Access Road). The approval requires roads to remain accessible to neighbouring sites.
No public-transport information or independently verified nearby-landmark distances are supplied. The location data lists Financial District (Nanakramguda) — 1.2 km as an anchor distance; no travel time is provided. Location record
9. Developer & development status
The registered promoter is BUSANELLI HIMABINDU, shown in the project record as an individual promoter with organization type “Others.” No company registration number, GST number, official website or contact details are supplied in the project evidence. RERA record RERA filing Parties record
The RERA-filed Form B affidavit, dated 14 AUG 2024, is made by BUSANELLI HIMABINDU for YADADRI BRUNDAVANAM. It declares legal title to the project land, declares the land free from encumbrances, and undertakes completion by 30.07.2026. These are promoter declarations in the filed document.
The tentative layout approval places responsibility for layout development on the applicant and requires infrastructure and amenities to be completed within two years of 30 July, 2024. No site inspection or independently verified construction-progress evidence is supplied. RERA amenities
10. Approvals, official records & documents
| Reference / date | P02000010004, valid 30/07/2024–30/07/2026 |
|---|---|
| What it documents | Form C registration for YADADRI BRUNDAVANAM and its listed project survey numbers and location. |
| Reference / date | TS/020619/2024 |
|---|---|
| What it documents | Layout drawing identifying the applicant, survey numbers, site-area statement, land-use allocation and 90 plots. |
| Reference / date | 0004/LO/3153/2024, 30 July, 2024 |
|---|---|
| What it documents | Approval issued by BHONGIR Municipality/Municipal Corporation for a tentative layout; includes infrastructure, handover and other conditions. |
| Reference / date | 009422/LO/DTCP/3153/0005/2023; application date 18/08/2023 |
|---|---|
| What it documents | Application reference recorded in the tentative-layout approval document. |
| Reference / date | Mortgage deed 5147/2024, dated 16 July, 2024 |
|---|---|
| What it documents | Approval record identifies 16 plots totalling 0 Acer 22.71 Gts 2748 Sq. Yds as mortgage land in favour of the Municipality/Municipal Corporation. |
| Reference / date | Form B dated 14 AUG 2024 |
|---|---|
| What it documents | Promoter’s title, encumbrance and completion declarations. |
| Reference / date | Filed template / partially completed form |
|---|---|
| What it documents | Sets out proposed sale and conveyance terms; it does not establish a completed conveyance. |
| Reference / date | RERA amenities data |
|---|---|
| What it documents | Lists 14 infrastructure/amenity items; progress entries are recorded as 0. RERA amenities |
The supplied evidence does not include an occupancy/completion certificate, a final-layout release record, or independent confirmation that the layout infrastructure and handover conditions have been completed. Document index
1. Project at a glance
Project identity
Registered name: YADADRI BRUNDAVANAM
Project type: Plotted development / tentative plotted layout
Phase / registered portion: No separate phase is identified; the registration concerns the plotted project on the listed survey parcels.
TG-RERA registration: P02000010004
Registration validity: 30 July 2024 to 30 July 2026; this is the registration period, not the project completion deadline.
Registered promoter: BUSANELLI HIMABINDU
RERA status in supplied record: New Project; registration certificate recorded. No extension or later registration-status order is supplied.
Land and geographic identity
Locality / revenue village: YADADRI BHUVANAGIRI in the RERA project fields; RAIGIR / Raigiri Revenue Village in the layout and approval documents.
Mandal: Bhongir
District: Yadadri Bhuvanagiri
PIN: 508116
Project survey numbers and subdivisions: 575/6, 575/7/1, 576/1, 576/5, 578/1/2, 579/2
Site extent: 23650.15 sq.mt total site area; 21521.22 sq.m net layout area in the supplied area statement.
Boundaries: East, West, North and South are each recorded as OTHERS LAND.
Road-affected area: 2128.93 sq.m in the RERA land fields; the layout drawing states 2093.94 road-widening area plus 34.99 leftover owner’s land.
Development identity
Sanctioning authority: TS-DTCP is identified on the layout plan; the tentative layout approval is issued by BHONGIR Municipality/Municipal Corporation.
Principal layout approval: 0004/LO/3153/2024, approved 30 July, 2024 as a tentative layout plan.
Other approval reference: File No. TS/020619/2024.
Plots: 90 stated on the layout drawing and tentative approval.
Built-up area: RERA fields record 13201.03 sq.m approved built-up area; the layout plan states proposed built-up area 0.00, both excluding and including parking. These are the figures as recorded in their respective supplied records.
Buildings / floors: Not applicable to the evidenced plotted-layout plan; no building count or floor configuration is supplied.
Parking: No common parking area is shown in the layout area statement (0.00); individual plot parking provision or allocation is not stated.
Offering and status
Offered unit type: Plots.
Plot count and size range: 90 plots; software-read sizes range from 66.77 sq.m to 361.03 sq.m (approximately 79.9 sq.yd to 431.8 sq.yd). Drawing-derived figures should be checked against the layout schedule.
Booked / available: Not disclosed in the supplied project records.
Construction stage: No independently verified site-progress record is supplied. The approval requires completion of layout infrastructure and amenities; progress percentages in the RERA amenities data are recorded as 0.
Completion timing: Promoter’s Form B declaration gives 30.07.2026; the tentative layout approval requires infrastructure and amenities within two years of approval, by 30 July, 2026.
Registration validity: 30 July 2024–30 July 2026; distinct from the completion timing above.
Occupancy / completion certificate: No occupancy or completion certificate is supplied; the project is a plotted layout, and no phase/tower-specific certificate status is evidenced.
2. The project story
YADADRI BRUNDAVANAM is registered as a plotted-development project on land identified in the RERA record by surveys 575/6, 575/7/1, 576/1, 576/5, 578/1/2 and 579/2. The layout documents locate the land at Raigiri Revenue Village, Bhongir Mandal, Yadadri-Bhuvanagiri District.
The tentative layout approval provides for 90 plots, internal roads, park/open space, social-infrastructure land and utility land. The approval also reserves 16 identified plots as mortgage security for layout works. It requires the developer to complete infrastructure and amenities by 30 July, 2026; the supplied evidence does not establish the current physical completion of those works.
The RERA registration is valid through 30 July 2026, while the promoter’s Form B separately undertakes completion by 30.07.2026. These are different record fields with the same stated end date. No construction-stage verification, plot booking inventory or occupancy/completion certificate is included in the supplied material.
3. Master plan, architecture & building design
The filed development is a plotted layout, not a multi-storey residential building plan. The layout drawing states 90 plots and a total site area of 23650.15 sq.mt. Its area statement gives a net layout area of 21521.22 sq.m. The drawing allocates 13201.03 sq.m (61.34%) to plots, 5605.22 sq.m (26.05%) to roads, 1937.79 sq.m (9.00%) to organized open space/park, 560.39 sq.m (2.60%) to social infrastructure, and 216.72 sq.m (1.01%) to utilities.
The drawing identifies existing and proposed roads, including 9.00 mt. and 10.06 mt. internal roads, an 18.00mts wide master plan road, and other existing-road references. The layout also lists “Area for Social Infrastructure” and “Tot-lot.” The tentative approval describes roads of 18 mts and above in its road-width field.
The layout sheet states 0.00 proposed built-up area, both excluding and including parking. RERA project fields separately record approved built-up area of 13201.03 sq.m; the supplied records do not provide a building schedule or building-floor design.
The layout plan identifies 16 plots as mortgage land, with a stated mortgage area of 2297.96 sq.m; plots are numbered 50, 65, 51, 64, 63, 52, 53, 62, 61, 54, 55, 60, 59, 56, 57 and 58.
4. Homes, configurations & floor plans
This is a plotted layout. The supplied layout schedule records 90 plots, with drawing-derived plot sizes as follows. The measurements were read by software from the approved layout drawing and are not RERA-filed saleable-area figures.
0–100 sq.yd (0–84 sq.m): 1
100–150 sq.yd (84–125 sq.m): 13
150–200 sq.yd (125–167 sq.m): 57
200–250 sq.yd (167–209 sq.m): 13
250–300 sq.yd (209–251 sq.m): 4
300–400 sq.yd (251–334 sq.m): 1
400–500 sq.yd (334–418 sq.m): 1
The software-measured range is 66.77–361.03 sq.m (79.9–431.8 sq.yd), with a median of 135.15 sq.m (161.6 sq.yd). The most common recorded size is 135.15 sq.m (30 plots). These drawing-derived sizes should be verified against the layout schedule. No RERA-filed saleable-area schedule by plot, booked/available inventory, or individual plot allotment record is supplied.
The floor-plan review contains two layout sheets and no apartment floor plans; no carpet-area or room-configuration measurements are therefore available. A plot area is distinct from a building’s carpet area or a RERA saleable area, neither of which is established here.
5. Parking & vehicle circulation
The layout area statement records 0.00 common parking area. The supplied material does not establish a sanctioned count of resident, visitor or accessible parking spaces, a plot-wise parking allocation, or any mechanical or covered parking provision.
The layout shows internal roads, including 9.00 mt. and 10.06 mt. internal-road references, as well as existing and proposed wider-road connections. The tentative approval requires roads to remain accessible to neighbouring sites and prohibits a compound wall or fencing around the site. No separate pedestrian route, ramp arrangement or EV-charging provision is evidenced.
6. Amenities, recreation & open spaces
| Facility | Organized open space / park |
|---|---|
| Description / size | 1937.79 sq.m (9.00%) of net layout area; the approval also identifies park development. |
| Declared progress / verified status | Amenity data records 0 progress; no independent completion verification supplied. |
| Facility | Tot-lot |
|---|---|
| Description / size | Listed on the layout plan; no size or equipment details supplied. |
| Declared progress / verified status | No completed-status evidence supplied. |
| Facility | Social infrastructure area |
|---|---|
| Description / size | 560.39 sq.m (2.60%). |
| Declared progress / verified status | No facility schedule or completed-status evidence supplied. |
| Facility | Utility area |
|---|---|
| Description / size | 216.72 sq.m (1.01%); utility land is identified separately from recreational/open space. |
| Declared progress / verified status | No completed-status evidence supplied. |
The tentative approval requires open space, utilities and roads to be handed over to the Municipality by registered gift deed before release of the final layout. The supplied record does not establish that this handover has occurred.
7. Utilities, building services & safety
The tentative layout approval lists a water reservoir, overhead tank, sump, septic tank, Sewerage Treatment Plant, electric transformer, solid waste management, street lights, rain water harvesting pits and park development as proposed layout infrastructure/amenities. These are approval-document descriptions; the supplied evidence does not verify installation, capacity or operation.
The amenities record lists water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, rainwater harvesting, energy management, and an electrical meter room/sub-station/receiving station. Each listed amenity has progress recorded as 0; no capacity figures or independent completion evidence are supplied.
No building-specific lift, fire-system, accessible-circulation or security design is evidenced for this plotted layout. The presence of an amenity entry or an approval-document proposal should not be read as confirmation that the service is complete or operational.
8. Location, access & connectivity
The RERA location fields identify YADADRI BHUVANAGIRI, Bhongir Mandal, Yadadri Bhuvanagiri District, PIN 508116. The layout and tentative approval identify Raigir/Raigiri Revenue Village. The supplied location record gives a cadastral parcel centroid of 17.41528, 78.35459.
The layout drawing identifies existing and proposed roads, including an 18.00mts wide master plan road, 18.00 MT WIDE EXISTING, 18.00 MT WIDE PROPOSED ROAD, 10.06 mt. Wide InternalRoad, 9.00 mt. Wide InternalRoad, and 10.06 MT WIDE EXISTING ROAD (Access Road). The approval requires roads to remain accessible to neighbouring sites.
No public-transport information or independently verified nearby-landmark distances are supplied. The location data lists Financial District (Nanakramguda) — 1.2 km as an anchor distance; no travel time is provided.
9. Developer & development status
The registered promoter is BUSANELLI HIMABINDU, shown in the project record as an individual promoter with organization type “Others.” No company registration number, GST number, official website or contact details are supplied in the project evidence.
The RERA-filed Form B affidavit, dated 14 AUG 2024, is made by BUSANELLI HIMABINDU for YADADRI BRUNDAVANAM. It declares legal title to the project land, declares the land free from encumbrances, and undertakes completion by 30.07.2026. These are promoter declarations in the filed document.
The tentative layout approval places responsibility for layout development on the applicant and requires infrastructure and amenities to be completed within two years of 30 July, 2024. No site inspection or independently verified construction-progress evidence is supplied.
10. Approvals, official records & documents
| Reference / date | P02000010004, valid 30/07/2024–30/07/2026 |
|---|---|
| What it documents | Form C registration for YADADRI BRUNDAVANAM and its listed project survey numbers and location. |
| Reference / date | TS/020619/2024 |
|---|---|
| What it documents | Layout drawing identifying the applicant, survey numbers, site-area statement, land-use allocation and 90 plots. |
| Reference / date | 0004/LO/3153/2024, 30 July, 2024 |
|---|---|
| What it documents | Approval issued by BHONGIR Municipality/Municipal Corporation for a tentative layout; includes infrastructure, handover and other conditions. |
| Reference / date | 009422/LO/DTCP/3153/0005/2023; application date 18/08/2023 |
|---|---|
| What it documents | Application reference recorded in the tentative-layout approval document. |
| Reference / date | Mortgage deed 5147/2024, dated 16 July, 2024 |
|---|---|
| What it documents | Approval record identifies 16 plots totalling 0 Acer 22.71 Gts 2748 Sq. Yds as mortgage land in favour of the Municipality/Municipal Corporation. |
| Reference / date | Form B dated 14 AUG 2024 |
|---|---|
| What it documents | Promoter’s title, encumbrance and completion declarations. |
| Reference / date | Filed template / partially completed form |
|---|---|
| What it documents | Sets out proposed sale and conveyance terms; it does not establish a completed conveyance. |
| Reference / date | RERA amenities data |
|---|---|
| What it documents | Lists 14 infrastructure/amenity items; progress entries are recorded as 0. |
The supplied evidence does not include an occupancy/completion certificate, a final-layout release record, or independent confirmation that the layout infrastructure and handover conditions have been completed.
Frequently asked questions
Is YADADRI BRUNDAVANAM registered with Telangana RERA?
Yes. YADADRI BRUNDAVANAM is registered with the Telangana Real Estate Regulatory Authority as P02000010004; the registration status is New Project.
Who is the developer of YADADRI BRUNDAVANAM?
The promoter named in the RERA registration is BUSANELLI HIMABINDU.
Where is YADADRI BRUNDAVANAM located?
YADADRI BRUNDAVANAM is in YADADRI BHUVANAGIRI, Bhongir, Telangana (508116).
When will YADADRI BRUNDAVANAM be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.