SAHITHI-II is a plotted development in Lemoor, Kandukur mandal, Ranga Reddy district. It is being developed by Subha Gruha Infrastructures Private Limited on a total site area of 77193.41 sq.m, with the supplied records describing an open-plot layout and no building or floor configuration. The records identify residential plots but do not state the complete plot count or plot configurations. The TG-RERA registration is P02400001127, and the promoter’s Form-B declares completion by 11-01-2022.

More from Subha Gruha Infrastructures Pvt Ltd · 18 projects →

01What we found

Period endedTG-RERA registration ran to 14 May 2022 - check its extension on TG-RERA
12documents on file - each fact links to its page
0court cases on this project's land in the court records searched
11items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Lemoor, Kandukur, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameSAHITHI-II
Project typePlotted development / open-plot layout RERA record
Phase / registered portionThe registration covers the listed Lemoor survey numbers; a separate phase description is not disclosed.
TG-RERA registrationP02400001127
Registration validity08/08/2019–14/05/2022; the certificate records a two-year validity period. No extension is recorded in the supplied certificate. Registration validity is distinct from the completion undertaking and does not establish completion or occupancy status.
Registered promoterSubha Gruha Infrastructures Private Limited
RERA statusThe certificate records registration under section 5. The supplied record does not establish a current registration extension or a completion/occupancy certificate.

Land and geographic identity

ItemRecord
Locality / revenue villageLemoor (LEMOOR) RERA record
Mandal / district / PINKandukur / Ranga Reddy / 501359 RERA record
Project survey numbers and subdivisions347/A, 347/A/1/1, 347/A/1/2, 349/AA/1/1, 349/AA/1/2, 349/AA/3, 349/AA/4
Additional survey number shown in draft-layout letter155/e appears in the draft-layout letter’s survey list; it is not included in the registration certificate’s survey list.
Site extentTotal site area: 77193.41 sq.m; master-plan road-affected area: 460.66 sq.m; net site area: 76732.75 sq.m.
BoundariesNorth, south, east and west are each recorded as “NEIGHBOURS LAND” in the RERA filing. RERA filing

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA)
Principal layout approvalDraft layout letter 000115/LO/Plg/HMDA/2019, dated 14 May, 2019
Approved built-up area76732.75 sq.m is reported as “Approved Built up Area” in the RERA filing; the supplied material does not identify a building or apartment scheme. RERA filing
Layout composition recorded in draft letterPlotted area 48748.77 sq.m; organised open space 6296.84 sq.m (8.21%); social infrastructure 1931.60 sq.m (2.52%); and road area 19755.59 sq.m (25.75%).
Plots / configurationThe draft letter identifies plots 26 to 65 (40 plots) as mortgaged to HMDA; it does not establish the complete plot count or sale inventory.
Building / floor configurationNot applicable to the supplied plotted-layout description; no sanctioned building-floor schedule is provided.
ParkingNo parking count or parking arrangement is established in the supplied project records. Document index

Offering and status

ItemRecord
Unit typeResidential plots; the RERA-filed records supplied do not provide plot-wise dimensions, counts for the full layout, or booked/available inventory. RERA record
Construction / development stageNo independently verified site-progress information is supplied. The draft letter required developmental works to be completed within three years and specified conditions before final layout release.
Completion dateForm-B declares completion by 11-01-2022. This is a promoter undertaking, not proof that the project was completed.
Occupancy / completion certificateNo project completion certificate or occupancy certificate is supplied. The project is a plotted layout, and the supplied records do not establish final layout release. Document index

2. The project story

SAHITHI-II is registered as a residential plotted development at Lemoor village, Kandukur mandal, in Ranga Reddy district. The RERA registration identifies seven survey numbers and subdivisions, while HMDA’s 14 May 2019 document describes a draft open-plot layout and records an additional survey number, 155/e. RERA record

The draft letter allocates land among plotted area, roads, organised open space and social infrastructure. It also identifies 40 plots—Nos. 26 to 65—as mortgage security for HMDA. The letter states that roads and open space are to be handed over to the local body through registered gift deed before final layout release and directs completion of the specified development works within three years. These are approval-record conditions; the supplied evidence does not confirm their fulfilment or the layout’s final release.

The promoter’s Form-B declares completion by 11-01-2022. No site inspection, construction-progress certificate or completion/occupancy certificate is supplied to verify the present development stage. Document index

3. Master plan, architecture & building design

The supplied HMDA record describes an open-plot layout rather than a building development. It records a total site area of 77193.41 sq.m, a 460.66 sq.m master-plan road-affected area and a 76732.75 sq.m net site area. The filed “Approved Built up Area” is also 76732.75 sq.m; the records supplied do not provide a separate building-area schedule or define that figure as a building floor area. RERA filing

The draft letter’s land-use breakdown records 48748.77 sq.m of plotted area, 19755.59 sq.m (25.75%) of road area, 6296.84 sq.m (8.21%) of organised open space and 1931.60 sq.m (2.52%) of social infrastructure. It also lists a park area of 1931.6; the supplied extraction does not explain its relationship to the social-infrastructure figure. The letter requires the road, open-space and social-infrastructure areas to be gifted to the local body before release of final layout plans.

The draft layout letter specifies road widths of 18 mts and 60 feet and above. It also states that roads are to be opened for neighbouring-site access and that no compound wall or fencing is to be constructed around the site. The supplied material does not include a readable layout drawing from which plot arrangement, road geometry or individual plot dimensions can be described.

4. Homes, configurations & floor plans

The registered project is a plotted development. The supplied RERA records do not provide a complete plot schedule, plot-wise areas, or booked and available plot counts. No apartment configurations or apartment floor plans are established. RERA record Document index

The approved floor-plan drawings record supplied for this review comprise two drawings; neither has been measured, and both are scans pending. The software-measured carpet-area field is therefore unavailable and is not applicable to the plotted offering. Floor plans

The promoter’s website material lists “Residential Plot” as “plot 200 square yards, facing east” and gives a “saleable 1173 - 5630 sq.ft.” range. These are promoter-marketed details, not plot-wise RERA-filed inventory in the supplied documents. Promoter website

5. Parking & vehicle circulation

No sanctioned parking-space count, visitor or accessible parking provision, parking-allotment terms, or parking layout is established by the supplied records. The HMDA draft-layout letter addresses layout roads and access, but does not provide a parking schedule. Document index

6. Amenities, recreation & open spaces

The following facilities appear in the HMDA draft-layout letter or the RERA amenity record. A listed facility or percentage is not, by itself, evidence that it has been completed or independently inspected. The RERA amenity record shows percentages, but does not identify the date or method of progress verification. RERA amenities

Landscape / open space
FacilityOrganised open space
Description / size6296.84 sq.m (8.21%)
Evidence sourceHMDA draft-layout letter
Declared progress / verified statusRequired to be handed over to the local body before final layout release; completion not verified.
Landscape / open space
FacilityPark
Description / size1931.6 (unit not stated in the extraction)
Evidence sourceHMDA draft-layout letter
Declared progress / verified statusDevelopment listed; completion not verified.
Landscape / open space
FacilityGreen Strip/TOT LOT/Park
Description / sizeNo size supplied
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified status0% recorded.
Landscape / open space
FacilityAvenue plantation
Description / sizeNo size supplied
Evidence sourceHMDA draft-layout letter
Declared progress / verified statusListed as a required development feature; completion not verified.
Sports / recreation
FacilityCycling tracks
Description / sizeNo size supplied
Evidence sourceHMDA draft-layout letter
Declared progress / verified statusListed; completion not verified.
Convenience / community
FacilitySocial infrastructure
Description / size1931.60 sq.m (2.52%)
Evidence sourceHMDA draft-layout letter
Declared progress / verified statusRequired to be handed over to the local body before final layout release; completion not verified.
Convenience / community
FacilityCommunity buildings
Description / sizeNo size supplied
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified status0% recorded.

Promoter-marketed material also names a children’s play area, fitness centres, indoor games and clubhouse facilities; these are not established as sanctioned or delivered facilities by the supplied RERA project records. Promoter website

7. Utilities, building services & safety

The HMDA draft-layout letter lists common septic tank/STP, internal water-supply pipelines, an overhead tank, transformer, rainwater-harvesting pits, solid-waste and bio-compost facilities, park development and avenue plantation. These are listed development features; their installation or operation is not independently verified in the supplied evidence.

Water
Supplied project recordInternal water-supply pipelines and overhead tank are listed in the draft letter.
Declared progress / verified statusNo capacity, source, storage volume or completion verification supplied.
Sewerage / drainage
Supplied project recordCommon septic tank / STP is listed in the draft letter; the RERA amenity record lists sewerage (chamber, lines, septic tank, STP) at 100%.
Declared progress / verified statusThe percentage is a RERA-recorded declaration; independent operational verification is not supplied. RERA amenities
Storm-water / water conservation
Supplied project recordRainwater-harvesting pits are listed; the RERA amenity record lists water conservation/rainwater harvesting at 100% and storm-water drains at 0%.
Declared progress / verified statusDeclared percentages only; no capacity or independent verification supplied. RERA amenities
Electrical
Supplied project recordTransformer is listed in the draft letter; the RERA amenity record lists electrical meter room/sub-station/receiving station at 100%.
Declared progress / verified statusNo capacity, backup-power provision or independent verification supplied. RERA amenities
Solid waste
Supplied project recordSolid-waste and bio-compost facilities are listed in the draft letter; RERA records solid-waste management and disposal at 0%.
Declared progress / verified statusListed facility is not evidence of completion; RERA progress record shows 0%. RERA amenities
Street lighting
Supplied project recordRERA amenity record shows 100%.
Declared progress / verified statusDeclared percentage; independent verification not supplied. RERA amenities
Fire / life safety
Supplied project recordRERA amenity record shows fire protection and fire-safety requirements at 0%.
Declared progress / verified statusNo fire-safety certificate or completed provision supplied. RERA amenities
Security / accessibility
Supplied project recordNo project-specific evidence of CCTV, access-control arrangements, accessible circulation or ramps is supplied.
Declared progress / verified statusNot established. Document index

8. Location, access & connectivity

The registered location is LEMOOR, Kandukur mandal, Ranga Reddy district, Telangana, PIN 501359. RERA record

The supplied location data gives an approximate distance of 11.5 km to the nearest sampled Outer Ring Road interchange. The project records supplied do not identify an approach-road route or provide measured distances to other landmarks or public transport. Location record

9. Developer & development status

The registered promoter is Subha Gruha Infrastructures Private Limited, identified as a company. Its GSTIN is 36AATCS5048N1ZH. The supplied promoter address is Pavani Prestige, Ameerpet Main Road, Lemoor, Lemoor, Kandukur, Ranga Reddy, 501359. The RERA certificate separately records the promoter office as “Village: Mandal: AMEERPET, District: Hyderabad, Pin: 500016.” Corporate record Parties record

The RERA filing identifies NAMBURU KALYAN CHAKRAVARTHY as an authorized signatory and JAVVADI SRINIVAS and NAMBURU VEERA VASANTHA KUMARI as directors. Form-B is a promoter declaration by J. SRINIVAS, identified there as a director, and undertakes completion by 11-01-2022. It is a self-declaration, not evidence of completed works. Parties record

The project registration certificate was valid from 08/08/2019 to 14/05/2022, and is not marked as extended in the supplied certificate. No completion certificate, final layout release, or independently verified progress update is supplied. Document index

10. Approvals, official records & documents

RecordSupplied evidence and scope
TG-RERA registrationForm C for SAHITHI-II, registration P02400001127, issued 08/08/2019, valid to 14/05/2022; records the project survey numbers and separate-account condition.
HMDA draft layoutDraft layout letter 000115/LO/Plg/HMDA/2019, dated 14 May, 2019, for Lemoor village, Kandukur mandal; application reference 020287/SMD/LT/U6/HMDA/12022019.
Layout status / conditionsThe letter describes a draft open-plot layout and specifies conditions for final layout release, including development works and transfer of road, open-space and social-infrastructure areas. Final release is not established in the supplied evidence.
Form-B promoter declarationForm-B affidavit dated 28-01-2019, declaring title and no encumbrances and undertaking completion by 11-01-2022.
Layout-plan documentA RERA filing entry requests a layout plan or an equivalent approval document; the supplied entry is not an extracted, readable approved layout plan. Document index
Completion / occupancy evidenceNo project completion certificate or occupancy certificate is included in the supplied records. Document index
Other filed documentDocument 651766 is extracted as a blank Form-7 annual-audit template, with no project-specific audit or completion information filled in.

The draft-layout letter records HMDA mortgage security over plots 26 to 65 (40 plots) and refers to mortgage instruments 115711/2019 and 8620/2019, a rectification document 11571/2019, and gift deed 8619/2019. The letter states that the mortgage plots are not to be sold and that the layout permission is not proof of land title.

Frequently asked questions

Is SAHITHI-II registered with Telangana RERA?

Yes. SAHITHI-II is registered with the Telangana Real Estate Regulatory Authority as P02400001127; the registration status is New Project.

Who is the developer of SAHITHI-II?

The promoter named in the RERA registration is SUBHA GRUHA INFRASTRUCTURES PRIVATE LIMITED.

Where is SAHITHI-II located?

SAHITHI-II is in LEMOOR, Kandukur, Rangareddy, Telangana (501359).

When will SAHITHI-II be completed?

The promoter's proposed date of completion filed with RERA is 14/05/2022. This is the promoter's declaration, not a guarantee.

More projects in Lemoor