REAL VISIONS ROYAL COUNTY is a plotted development in BUVANAGIRI, Bhongir mandal, Yadadri Bhuvanagiri district. It is being developed by the registered promoter, REAL VISION INFRA PROJECTS PVT LTD, on a registered site extent of 44,919.77 sq.m; the supplied records do not disclose a complete plot count, floors, or plot configurations. The project is registered under TG-RERA number P02000002534. The promoter’s declared completion date is 20-08-2023.

More from Real Vision Infra Projects Pvt Ltd · 4 projects →

01What we found

Period endedTG-RERA registration ran to 20 Aug 2023 - check its extension on TG-RERA
12documents on file - each fact links to its page
0court cases on this project's land in the court records searched
11items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Hanumapur, Bhongir, Yadadri Bhuvanagiri · geocoded — approximate.

Project at a glance

Project identity

ItemRecord
Registered project nameREAL VISIONS ROYAL COUNTY RERA record
Project typePlotted development / draft open-plot layout RERA record
Phase or registered portionNot separately identified in the supplied registration record; the registration relates to survey 38/P
TG-RERA registrationP02000002534
Registration validity01/02/2021 to 20/08/2023; certificate states two years. No extension is recorded in the supplied certificate. Registration validity is distinct from the promoter’s completion undertaking.
Registered promoterREAL VISION INFRA PROJECTS PVT LTD RERA record
RERA status in supplied recordNew Project; certificate records the registration period above. A current portal status is not supplied. RERA record

Land and geographic identity

ItemRecord
LocalityBUVANAGIRI in the RERA filing; the certificate identifies Hanumapur. RERA record RERA filing
Revenue villageHanumapur (also rendered “Hanmapur” in the draft layout letter). RERA record
Mandal / district / PINBhongir / Yadadri Bhuvanagiri / 508117 RERA record
Project survey number38/P RERA record
Registered site extent44,919.77 sq.m RERA filing
Net area27,287.90 sq.m in RERA land details; the draft letter separately labels 44,919.77 sq.m as net site area. RERA filing
Area recorded as affected17,631.87 sq.m in the RERA land details. RERA filing
BoundariesEast: neighbours’ land; west: neighbours’ land; north: neighbours’ land; south: road leading from the main road. RERA filing

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA)
Principal approvalDraft layout letter 000090/LO/Plg/HMDA/2020, dated 20 August 2020 Approvals record
Approved built-up area27,287.90 sq.m appears in the RERA filing as approved built-up area; a building or floor schedule is not supplied. RERA filing
Buildings, floors and parking levelsNot disclosed in the supplied records. The approval concerns a plotted layout, not a tower schedule.
Plot countThe drawing-derived layout record does not establish a complete plot count; the draft approval identifies 28 plots as mortgaged to HMDA. Layout record

Offering and status

ItemRecord
OfferingPlots; plot-wise sizes, saleable-area bands and inventory counts are not available in the supplied data. RERA record Layout record
Booked / availableNot disclosed. RERA record
Construction stageNo independently verified site progress or completed-development status is supplied. The promoter’s Form B undertakes completion by 20-08-2023.
Original / revised completionPromoter-declared completion date: 20-08-2023. No revised date is supplied.
OC / completion certificateNo occupancy or completion certificate is supplied. For a plotted layout, the supplied approval instead refers to release of final layout plans subject to conditions.

The project story

REAL VISIONS ROYAL COUNTY is presented in the TG-RERA record as an open-plot development on survey 38/P, in Hanumapur village, Bhongir mandal, Yadadri Bhuvanagiri district. The RERA filing gives a registered site extent of 44,919.77 sq.m and describes a plotted project rather than an apartment or tower scheme. RERA record RERA filing RERA filing

The supplied HMDA document is a draft layout letter for the open-plot proposal, dated 20 August 2020. It describes the draft permission as subject to further action and release of plans by Hanumapur Gram Panchayat, and sets out development and handover conditions before release of final layout plans. The record does not establish that the final layout was released or that the layout works have been completed.

The promoter’s Form B declares a completion undertaking of 20-08-2023. That is a promoter declaration, not independent evidence of completion. No site-inspection record, completed-works confirmation or occupancy/completion certificate is supplied here.

Master plan, architecture & building design

The project is a plotted layout, so the available design evidence concerns land allocation and layout infrastructure rather than apartment plans or building elevations. The drawing-derived layout record gives a total site area of 44,919.77 sq.m and a net layout area of 44,919.77 sq.m. Its area statement allocates 27,287.90 sq.m to plots, 12,607.76 sq.m to roads, 3,879.03 sq.m to parks/open space, and 1,145.06 sq.m to social infrastructure; it records 0.00 sq.m for amenities. These are layout-drawing-derived figures. Layout record

The HMDA draft letter describes the proposal as a “Draft Layout Open Plot” and identifies the site as earmarked for Peri-Urban Use Zone. It specifies road widths of 18 mts and above and 60 feet and above, and lists residential plot controls of maximum 25% ground coverage and maximum height 15 Mtrs and below. These are approval-document statements; they do not establish that buildings have been constructed.

No building count, floor configuration, building footprint, apartment schedule or completed phase-wise layout is established in the supplied materials. The software-measured drawing record has two layout sheets and no measured floor plans. Floor plans Layout record

Homes, configurations & floor plans

This is a plotted development. The supplied data does not include a plot-wise RERA inventory, plot-size bands, booked/available counts or measured plot dimensions. No apartment configurations or apartment floor plans are provided. RERA record Layout record Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
PlotsNot disclosedNot disclosedNot disclosedNot disclosedNot applicableNot disclosed

The drawing record says its software-measured floor-plan set contains two layout sheets but no measured floor plans. It therefore provides no software-measured home or plot dimensions. Floor plans

Parking & vehicle circulation

The HMDA draft letter identifies layout roads of 12,607.76 sq.m, states that roads must be opened for access to neighbouring sites, and requires formation of a BT approach road before release of the final layout. The approval also identifies 28 plots—plots 67–72 and 77–98—as mortgaged to HMDA.

No parking-space count, visitor or accessible parking provision, vehicle-entry arrangement, driveway plan, EV provision or plot-specific parking allocation is established in the supplied records. A plot-level parking entitlement should not be inferred from the layout-road or mortgage information. Layout record

Amenities, recreation & open spaces

The HMDA draft approval lists layout-level infrastructure and open-space provisions. The RERA amenity record marks several facilities as available in the filing, but shows 0% progress for the listed entries; those values are not independent confirmation of delivery. RERA amenities

Landscape / open space
FacilityPark and open space, including utility area
Description / size3,879.03 sq.m; the approval states 8.64%.
Evidence sourceLayout record
Declared progress / verified statusRERA amenity record marks the green strip/tot lot/park and aggregate recreational open space “YES,” at 0% progress; completion is not independently verified. RERA amenities
Convenience / community
FacilitySocial infrastructure area
Description / size1,145.06 sq.m; the approval states 2.55%.
Evidence sourceLayout record
Declared progress / verified statusArea shown in the draft approval; delivery or use is not verified.
Sports / recreation
FacilityNo specific sports facility disclosed
Description / sizeNot supplied.
Evidence sourceRERA amenities
Declared progress / verified statusNot established.
Clubhouse / indoor
FacilityNo clubhouse or indoor facility disclosed
Description / sizeNot supplied.
Evidence sourceRERA amenities
Declared progress / verified statusNot established.

Utilities, building services & safety

The HMDA draft approval lists proposed layout infrastructure including storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, an overhead tank, a transformer, rainwater-harvesting pits, solid-waste provision and a bio-compost unit. These are approval-document provisions; the supplied record does not verify installation, operation or capacity.

The RERA amenity record marks water supply, storm-water drains, water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station as “YES,” with 0% progress recorded. It lists sewerage, sewage and sullage treatment, solid-waste management, energy management and fire protection/safety, but supplies no capacities or completion evidence. RERA amenities

No quantified water source or storage capacity, STP capacity, reuse arrangement, electrical load or backup, fire-system specification, security system, accessibility provision or lift information is supplied. RERA amenities

Location, access & connectivity

The registered location is Hanumapur village, Bhongir mandal, Yadadri Bhuvanagiri district, PIN 508117. The land-record boundary description identifies the south side as a road leading from the main road. RERA record RERA filing

The HMDA draft approval requires a BT approach road before release of the final layout and states that layout roads should be opened for access to neighbouring sites. A supplied location record lists the nearest sampled Outer Ring Road interchange at approximately 20.6 km; this is a recorded approximate distance, not a travel-time estimate. Location record

Developer & development status

The registered promoter is REAL VISION INFRA PROJECTS PVT LTD, a private limited company. The supplied corporate identifier is GSTIN 36AAJCR8854R1ZW. The promoter address in the RERA filing is 1-4-56, Street No 8, BUVANAGIRI, Hanumapur, Bhongir, Yadadri Bhuvanagiri, Telangana, 508117. Corporate record RERA filing

The RERA filing names BALAJI JAKKA as authorized signatory and identifies YELLA GOWRIPATHI RAO, YELLA KRISHNA, BUDDIGA SATISH and DHARAVATH SRINIVAS as directors. The promoter’s website is listed as rvgindia.com; no project-specific contact details are supplied. Parties record Promoter website

The Form B declaration, dated 23rdNov, 2020, undertakes completion by 20-08-2023. This is a promoter declaration. The supplied evidence does not establish current construction progress, a revised completion date, final-layout release or completed works.

Approvals, official records & documents

RecordSupplied evidence and scope
TG-RERA registrationForm C records project P02000002534, registered to REAL VISIONS ROYAL COUNTY, for survey 38/P, valid from 01/02/2021 to 20/08/2023.
HMDA layout approvalDraft layout letter 000090/LO/Plg/HMDA/2020, approved 20 August, 2020, for a plotted layout on 44,919.77 sq.m in survey 38/P. The letter refers to further action and release of plans by Hanumapur Gram Panchayat and conditions before final layout-plan release.
Layout drawingTwo layout sheets are identified in the drawing-derived record; the available software extraction provides land-use figures but does not establish complete plot-wise sizes or inventory. Layout record
Promoter declarationForm B affidavit-cum-declaration dated 23rdNov, 2020, including the promoter’s completion undertaking of 20-08-2023.
Commencement / occupancy / completion certificatesNo separately verified commencement certificate or occupancy/completion certificate is supplied. The document labelled “Commencement Certificates for each building in each phase” is extracted as an HMDA draft layout letter. Document index
HMDA public lookupThe approved-layout lookup is recorded as unavailable through the public HMDA DPMS portal in the supplied evidence; this does not establish the outcome of an authority-held lookup. HMDA

Frequently asked questions

Is REAL VISIONS ROYAL COUNTY registered with Telangana RERA?

Yes. REAL VISIONS ROYAL COUNTY is registered with the Telangana Real Estate Regulatory Authority as P02000002534; the registration status is New Project.

Who is the developer of REAL VISIONS ROYAL COUNTY?

The promoter named in the RERA registration is REAL VISION INFRA PROJECTS PVT LTD.

Where is REAL VISIONS ROYAL COUNTY located?

REAL VISIONS ROYAL COUNTY is in BUVANAGIRI, Hanumapur, Bhongir, Yadadri Bhuvanagiri, Telangana (508117).

When will REAL VISIONS ROYAL COUNTY be completed?

The promoter's proposed date of completion filed with RERA is 20/08/2023. This is the promoter's declaration, not a guarantee.

More projects in Hanumapur