Sai Kpr Serene Homes
Pratap · Medchal-Malkajgiri · RERA P02200003144
SAI KPR SERENE HOMES is a plotted development in Ghanapur, Ghatkesar mandal, Medchal-Malkajgiri district. The registered promoter is Pratap Reddy Kommuri. The layout covers 65564.28 SQ.MT. and is a residential open-plot layout; the number of plots is not disclosed in the supplied RERA/layout data, and plot-size configurations are not provided. It is registered under TG-RERA number P02200003144, with a proposed completion date of 31/03/2023.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SAI KPR SERENE HOMES RERA record |
| Project type / registered portion | Plotted development; the registration record identifies a project, but a separately described phase or registered portion is not disclosed. RERA record RERA filing |
| TG-RERA registration | P02200003144 Approvals record |
| Registration validity | 24/07/2021–31/03/2023; the certificate states that extension is subject to Authority approval. |
| Registered promoter | The TG-RERA certificate names Pratap Reddy Kommuri; the project header lists Pratap. The promoter’s legal entity type is not disclosed. RERA record Corporate record |
| RERA status in supplied record | The certificate records the registration dates above; it does not establish a later extension. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Ghanapur; the layout documents identify the site as Edulabad-ORRGC, Outer Ring Road Growth Corridor. RERA record RERA filing |
| Revenue village | Edulabad RERA record Land records |
| Mandal / district / PIN | Ghatkesar / Medchal-Malkajgiri / 500088 RERA record RERA filing |
| Project survey numbers and subdivisions | 1121/P, 1137/P, 1138/P, 1139/P and 1140/P |
| Survey numbers in RERA land record | Not disclosed there; the numbers above are from the layout documents. Land records |
| Site extent | Layout drawing states 65564.28 SQ.MT. total plot/site area and 49742.00 net area; the HMDA draft-layout record likewise states total site area 65564.28 and net site area 49742. |
| Boundaries in RERA filing | East: Owners Land; West: Open plots; North: Neighbours Land; South: Open Plots. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal layout permit | 000075/LO/Plg/HMDA/2021, dated 29 January 2021; HMDA draft-layout letter describes technical approval and conditions, while the final layout release is recorded separately below. |
| Final layout release | HMDA Final Layout Letter dated 29 March 2023, for the residential open-plot layout. |
| Approved built-up area | RERA filing records 29015.36 sq. m as approved built-up area; the layout drawing labels the same figure as plotted area. No building count or building floor configuration is provided. RERA filing Layout record |
| Project organization | Open residential plotted layout; no towers, apartment blocks, floors or parking levels are identified in the supplied project documents. |
| Plot count | A vendor listing states 159 units, but the supplied TG-RERA/layout records do not provide a verified plot count; the layout extraction says plot details are incomplete. Promoter website Layout record |
| Authority-mortgaged plots | 18 plots, Nos. 1–8 and 11–20, extent 4440.77 Sq. Mtrs, recorded as mortgaged to HMDA in the draft-layout documents. RERA filing |
Offering and status
| Item | Project record |
|---|---|
| Offering | Residential plots; plot-size range, individual plot schedule and booked/available counts are not disclosed in the supplied structured data. RERA record Layout record |
| RERA saleable area / measured carpet area | Not provided; apartment-style saleable/carpet-area data is not applicable to the documented plotted offering. Layout record Floor plans |
| Promoter-declared completion undertaking | Form B, dated 03,d day of March 2021 as extracted, states a 2 (Two) Years completion period. |
| RERA completion date | 31/03/2023 RERA record |
| Occupancy / completion evidence | The project is a plotted layout, not a building phase. An architect’s Form 1A in the RERA file certifies overall project completion and records OC number 000075/LO/Plg/HMDA/2021, dated 29 March 2023; the separate HMDA record is a final layout release. |
| Construction stage / independent site verification | No current site inspection or independently verified physical-progress record is supplied. RERA record Document index |
2. The project story
SAI KPR SERENE HOMES is registered as a residential plotted development in Edulabad village, Ghatkesar mandal, Medchal-Malkajgiri district. The layout documents place it in the Outer Ring Road Growth Corridor and identify five survey subdivisions: 1121/P, 1137/P, 1138/P, 1139/P and 1140/P. RERA record
The layout records a total site area of 65564.28 SQ.MT. and a net layout area of 49742.00. Its land-use schedule identifies plotted area, roads, parks/open space and social infrastructure. HMDA’s record describes a draft layout permit with development conditions, followed by a final layout letter dated 29 March 2023. The registration certificate ran from 24 July 2021 to 31 March 2023.
The filed architect’s Form 1A certifies overall completion and records an occupancy certificate number and date. This is a project-level certificate in the supplied record; no tower- or building-wise scope applies to the plotted layout. Current site condition and delivery of individual layout works have not been independently inspected for this report.
3. Master plan, architecture & building design
The supplied drawing is a proposed residential draft layout plan, not a building floor plan. It describes an open layout with residential plot use and records the following land-use schedule:
| Layout component | Area shown | Evidence |
|---|---|---|
| Total site / plot area | 65564.28 SQ.MT. | Layout drawing |
| Net area | 49742.00 | Layout drawing |
| Plotted area | 29015.36 | Layout drawing |
| Road area | 15502.04 | Layout drawing |
| Organized open space / park / utility area | 3973.53 | Layout drawing |
| Social infrastructure area | 1250.95 | Layout drawing |
| Separate utility figure shown in drawing extraction | 111.31 Sq.mtrs | Layout drawing |
| Plot utility figure shown in drawing extraction | 156.21 Sq.mtrs | Layout drawing |
The drawing lists road widths as 18.00 and 12; the HMDA draft-layout letter refers to roads of 18 mts and above and 60 feet and above roads. The HMDA conditions refer to road formation, storm-water drains, underground drainage and a common septic tank/STP, internal water-supply lines and overhead tank, electrical lines and street lights, avenue planting, park development and rainwater-harvesting pits.
The layout identifies 18 mortgage plots—Plots 1–8 and 11–20—with extent 4440.77 Sq. Mtrs. The supplied records do not provide plot-by-plot sizes, a complete plot schedule, building footprints, or apartment/tower plans. Layout record
4. Homes, configurations & floor plans
This is a plotted development. The supplied RERA and layout material does not provide a verified count of plots by size band, individual plot areas, or booked/available inventory. The vendor listing’s 159 units is not a TG-RERA-verified plot count. Layout record Promoter website
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | Not disclosed in the supplied RERA/layout data | Not disclosed | Not disclosed | Not provided | Not applicable | Not provided |
The floor-plan input contains two layout sheets and reports no flats; no software-measured carpet areas or room dimensions are supplied. Apartment carpet-area and common-area loading concepts therefore do not describe the available plot data. Floor plans
5. Parking & vehicle circulation
The supplied material does not establish a sanctioned parking count, visitor or accessible parking provision, parking levels, or plot-specific parking allocations. The HMDA draft-layout conditions require roads to remain open for access to neighbouring sites and prohibit a compound wall/fencing around the site; the final-layout letter requires roads to remain open for free public access.
A vendor listing mentions covered car parking and a dedicated bike parking lot, but these are vendor-reported amenities, not a confirmed sanctioned count or documented allocation to any plot. Promoter website
6. Amenities, recreation & open spaces
The layout drawing and HMDA draft-layout conditions describe layout infrastructure and open land. The supplied project material does not establish independent completion status for the listed works.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Roads | Road area 15502.04; drawing lists widths 18.00 and 12 | Shown in layout; physical completion not independently verified | |
| Parks / organized open space | 3973.53 | Shown in layout; maintenance/completion not independently verified | |
| Social infrastructure | 1250.95 | Shown in layout; facility specification and completion not supplied | |
| Community buildings | No size or facility details supplied | RERA amenities | No progress evidence supplied |
| Clubhouse, gym, swimming pool, children’s play area | Vendor-reported; no sizes or capacities supplied | Promoter website | Marketing/vendor listing only; not independently verified |
| Common garden | Vendor-reported; no size supplied | Promoter website | Marketing/vendor listing only; not independently verified |
7. Utilities, building services & safety
HMDA’s draft-layout conditions specify development works including internal water-supply lines, an overhead tank and assured water source; underground drainage and a common septic tank/STP; storm-water drainage; electrical supply lines, street lights and a transformer; rainwater-harvesting pits; and solid-waste disposal/dumping space. The final-layout letter also refers to water supply, sewerage and drainage disposal, street lighting and rainwater-harvesting structures. These are documentary descriptions or conditions, not independent confirmation that each service is operating.
| Evidence in supplied record | Internal water-supply lines, overhead tank and assured source stated in HMDA conditions; RERA amenities record “Water Supply: YES.” RERA amenities |
|---|---|
| Status limitation | Source capacity, storage capacity and current operation not supplied |
| Evidence in supplied record | Common septic tank/STP, underground drainage and storm-water drains appear in HMDA conditions; RERA amenities record sewerage and storm-water drains as available. RERA amenities |
|---|---|
| Status limitation | Capacity, reuse arrangements and current operating status not supplied |
| Evidence in supplied record | Transformer, electrical supply lines and street lighting are stated in HMDA conditions; RERA amenities record street lighting as available. RERA amenities |
|---|---|
| Status limitation | Supply capacity and backup details not supplied |
| Evidence in supplied record | HMDA conditions and final-layout letter refer to rainwater-harvesting pits/structure; RERA amenities record water conservation/rainwater harvesting as available. RERA amenities |
|---|---|
| Status limitation | Quantity and current operating status not independently verified |
| Evidence in supplied record | HMDA draft-layout conditions refer to solid-waste disposal and dumping space. |
|---|---|
| Status limitation | Collection, treatment and operating details not supplied |
| Evidence in supplied record | No project-specific system, equipment, lift, ramp or accessible-circulation details supplied. RERA amenities Document index |
|---|---|
| Status limitation | Not established by the supplied record |
8. Location, access & connectivity
The registered location is Edulabad, Ghatkesar mandal, Medchal-Malkajgiri district, Telangana 500088; the layout documents describe the site as Edulabad-ORRGC, in the Outer Ring Road Growth Corridor. The RERA address also identifies “Near NTPC, Ghanpur.” RERA record RERA filing
The HMDA draft-layout conditions refer to forming a blacktop approach road before final layout release and keeping roads open for access to neighbouring sites. The final-layout letter requires roads to remain open for free public access.
Supplied location data lists the nearest sampled Outer Ring Road interchange at 4.8 km and Megha Institute Of Engineering And Technology For Women at 0.8 km. These are supplied distance records; no travel times are provided. A vendor listing mentions Malkajgiri as a nearby landmark and refers generally to schools, transport and other destinations without distances. Location record Promoter website
9. Developer & development status
The TG-RERA certificate identifies the promoter as Pratap Reddy Kommuri. The project header lists “Pratap,” while the Form B extraction names the declarant as K. Pralap Reddv. The supplied data does not identify the promoter’s legal entity type, corporate registration details, registered office or official project contact/site. RERA record Corporate record
Form B, dated as extracted 03,d day of March 2021, contains the promoter’s declaration of legal title, an assertion that the land is free from encumbrances, and an undertaking to complete within 2 (Two) Years. The TG-RERA certificate records validity through 31/03/2023. The architect’s Form 1A certifies overall completion and records OC number 000075/LO/Plg/HMDA/2021, dated 29 March 2023. No current independent site-progress assessment is supplied.
10. Approvals, official records & documents
| Reference and date | P02200003144, issued 24/07/2021, valid through 31/03/2023 |
|---|---|
| Scope / description | Form C registration for SAI KPR SERENE HOMES. |
| Reference and date | 000075/LO/Plg/HMDA/2021, 29 January 2021 |
|---|---|
| Scope / description | HMDA record for the proposed residential layout; includes development conditions and the 18-plot mortgage provision. |
| Reference and date | File 029242/GHT/LT/U6/HMDA/16102019 |
|---|---|
| Scope / description | Layout drawing for survey subdivisions 1121/P, 1137/P, 1138/P, 1139/P and 1140/P. |
| Reference and date | File 059237/LT/ZOB/FLT/U6/HMDA/27012023, 29 March 2023 |
|---|---|
| Scope / description | Final residential open-plot layout release; records gift deed 28/2023 dated 02/01/2023 and relinquishment deed 2012/2023 dated 27/03/2023. |
| Reference and date | OC number 000075/LO/Plg/HMDA/2021, dated 29 March 2023 |
|---|---|
| Scope / description | Architect’s certificate states overall completion of the registered project and identifies HMDA as competent authority. |
| Reference and date | Dated as extracted 03,d day of March 2021 |
|---|---|
| Scope / description | Promoter declarations and completion undertaking. |
| Reference and date | Dated 30.01.2021 |
|---|---|
| Scope / description | Advocate’s title opinion document filed with TG-RERA. |
No building-level commencement certificate or building-plan/floor configuration is identified in the supplied material; this is a plotted layout. The HMDA draft-layout record and final-layout letter concern the layout, while the Form 1A is the supplied architect’s completion/OC record.
1. Project at a glance
Project identity
Registered project name: SAI KPR SERENE HOMES
Project type / registered portion: Plotted development; the registration record identifies a project, but a separately described phase or registered portion is not disclosed.
TG-RERA registration: P02200003144
Registration validity: 24/07/2021–31/03/2023; the certificate states that extension is subject to Authority approval.
Registered promoter: The TG-RERA certificate names Pratap Reddy Kommuri; the project header lists Pratap. The promoter’s legal entity type is not disclosed.
RERA status in supplied record: The certificate records the registration dates above; it does not establish a later extension.
Land and geographic identity
Locality: Ghanapur; the layout documents identify the site as Edulabad-ORRGC, Outer Ring Road Growth Corridor.
Revenue village: Edulabad
Mandal / district / PIN: Ghatkesar / Medchal-Malkajgiri / 500088
Project survey numbers and subdivisions: 1121/P, 1137/P, 1138/P, 1139/P and 1140/P
Survey numbers in RERA land record: Not disclosed there; the numbers above are from the layout documents.
Site extent: Layout drawing states 65564.28 SQ.MT. total plot/site area and 49742.00 net area; the HMDA draft-layout record likewise states total site area 65564.28 and net site area 49742.
Boundaries in RERA filing: East: Owners Land; West: Open plots; North: Neighbours Land; South: Open Plots.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal layout permit: 000075/LO/Plg/HMDA/2021, dated 29 January 2021; HMDA draft-layout letter describes technical approval and conditions, while the final layout release is recorded separately below.
Final layout release: HMDA Final Layout Letter dated 29 March 2023, for the residential open-plot layout.
Approved built-up area: RERA filing records 29015.36 sq. m as approved built-up area; the layout drawing labels the same figure as plotted area. No building count or building floor configuration is provided.
Project organization: Open residential plotted layout; no towers, apartment blocks, floors or parking levels are identified in the supplied project documents.
Plot count: A vendor listing states 159 units, but the supplied TG-RERA/layout records do not provide a verified plot count; the layout extraction says plot details are incomplete.
Authority-mortgaged plots: 18 plots, Nos. 1–8 and 11–20, extent 4440.77 Sq. Mtrs, recorded as mortgaged to HMDA in the draft-layout documents.
Offering and status
Offering: Residential plots; plot-size range, individual plot schedule and booked/available counts are not disclosed in the supplied structured data.
RERA saleable area / measured carpet area: Not provided; apartment-style saleable/carpet-area data is not applicable to the documented plotted offering.
Promoter-declared completion undertaking: Form B, dated 03,d day of March 2021 as extracted, states a 2 (Two) Years completion period.
RERA completion date: 31/03/2023
Occupancy / completion evidence: The project is a plotted layout, not a building phase. An architect’s Form 1A in the RERA file certifies overall project completion and records OC number 000075/LO/Plg/HMDA/2021, dated 29 March 2023; the separate HMDA record is a final layout release.
Construction stage / independent site verification: No current site inspection or independently verified physical-progress record is supplied.
2. The project story
SAI KPR SERENE HOMES is registered as a residential plotted development in Edulabad village, Ghatkesar mandal, Medchal-Malkajgiri district. The layout documents place it in the Outer Ring Road Growth Corridor and identify five survey subdivisions: 1121/P, 1137/P, 1138/P, 1139/P and 1140/P.
The layout records a total site area of 65564.28 SQ.MT. and a net layout area of 49742.00. Its land-use schedule identifies plotted area, roads, parks/open space and social infrastructure. HMDA’s record describes a draft layout permit with development conditions, followed by a final layout letter dated 29 March 2023. The registration certificate ran from 24 July 2021 to 31 March 2023.
The filed architect’s Form 1A certifies overall completion and records an occupancy certificate number and date. This is a project-level certificate in the supplied record; no tower- or building-wise scope applies to the plotted layout. Current site condition and delivery of individual layout works have not been independently inspected for this report.
3. Master plan, architecture & building design
The supplied drawing is a proposed residential draft layout plan, not a building floor plan. It describes an open layout with residential plot use and records the following land-use schedule:
| Layout component | Area shown | Evidence |
|---|---|---|
| Total site / plot area | 65564.28 SQ.MT. | Layout drawing |
| Net area | 49742.00 | Layout drawing |
| Plotted area | 29015.36 | Layout drawing |
| Road area | 15502.04 | Layout drawing |
| Organized open space / park / utility area | 3973.53 | Layout drawing |
| Social infrastructure area | 1250.95 | Layout drawing |
| Separate utility figure shown in drawing extraction | 111.31 Sq.mtrs | Layout drawing |
| Plot utility figure shown in drawing extraction | 156.21 Sq.mtrs | Layout drawing |
The drawing lists road widths as 18.00 and 12; the HMDA draft-layout letter refers to roads of 18 mts and above and 60 feet and above roads. The HMDA conditions refer to road formation, storm-water drains, underground drainage and a common septic tank/STP, internal water-supply lines and overhead tank, electrical lines and street lights, avenue planting, park development and rainwater-harvesting pits.
The layout identifies 18 mortgage plots—Plots 1–8 and 11–20—with extent 4440.77 Sq. Mtrs. The supplied records do not provide plot-by-plot sizes, a complete plot schedule, building footprints, or apartment/tower plans.
4. Homes, configurations & floor plans
This is a plotted development. The supplied RERA and layout material does not provide a verified count of plots by size band, individual plot areas, or booked/available inventory. The vendor listing’s 159 units is not a TG-RERA-verified plot count.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | Not disclosed in the supplied RERA/layout data | Not disclosed | Not disclosed | Not provided | Not applicable | Not provided |
The floor-plan input contains two layout sheets and reports no flats; no software-measured carpet areas or room dimensions are supplied. Apartment carpet-area and common-area loading concepts therefore do not describe the available plot data.
5. Parking & vehicle circulation
The supplied material does not establish a sanctioned parking count, visitor or accessible parking provision, parking levels, or plot-specific parking allocations. The HMDA draft-layout conditions require roads to remain open for access to neighbouring sites and prohibit a compound wall/fencing around the site; the final-layout letter requires roads to remain open for free public access.
A vendor listing mentions covered car parking and a dedicated bike parking lot, but these are vendor-reported amenities, not a confirmed sanctioned count or documented allocation to any plot.
6. Amenities, recreation & open spaces
The layout drawing and HMDA draft-layout conditions describe layout infrastructure and open land. The supplied project material does not establish independent completion status for the listed works.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Roads | Road area 15502.04; drawing lists widths 18.00 and 12 | Shown in layout; physical completion not independently verified | |
| Parks / organized open space | 3973.53 | Shown in layout; maintenance/completion not independently verified | |
| Social infrastructure | 1250.95 | Shown in layout; facility specification and completion not supplied | |
| Community buildings | No size or facility details supplied | No progress evidence supplied | |
| Clubhouse, gym, swimming pool, children’s play area | Vendor-reported; no sizes or capacities supplied | Marketing/vendor listing only; not independently verified | |
| Common garden | Vendor-reported; no size supplied | Marketing/vendor listing only; not independently verified |
7. Utilities, building services & safety
HMDA’s draft-layout conditions specify development works including internal water-supply lines, an overhead tank and assured water source; underground drainage and a common septic tank/STP; storm-water drainage; electrical supply lines, street lights and a transformer; rainwater-harvesting pits; and solid-waste disposal/dumping space. The final-layout letter also refers to water supply, sewerage and drainage disposal, street lighting and rainwater-harvesting structures. These are documentary descriptions or conditions, not independent confirmation that each service is operating.
| Evidence in supplied record | Internal water-supply lines, overhead tank and assured source stated in HMDA conditions; RERA amenities record “Water Supply: YES.” |
|---|---|
| Status limitation | Source capacity, storage capacity and current operation not supplied |
| Evidence in supplied record | Common septic tank/STP, underground drainage and storm-water drains appear in HMDA conditions; RERA amenities record sewerage and storm-water drains as available. |
|---|---|
| Status limitation | Capacity, reuse arrangements and current operating status not supplied |
| Evidence in supplied record | Transformer, electrical supply lines and street lighting are stated in HMDA conditions; RERA amenities record street lighting as available. |
|---|---|
| Status limitation | Supply capacity and backup details not supplied |
| Evidence in supplied record | HMDA conditions and final-layout letter refer to rainwater-harvesting pits/structure; RERA amenities record water conservation/rainwater harvesting as available. |
|---|---|
| Status limitation | Quantity and current operating status not independently verified |
| Evidence in supplied record | HMDA draft-layout conditions refer to solid-waste disposal and dumping space. |
|---|---|
| Status limitation | Collection, treatment and operating details not supplied |
| Evidence in supplied record | No project-specific system, equipment, lift, ramp or accessible-circulation details supplied. |
|---|---|
| Status limitation | Not established by the supplied record |
8. Location, access & connectivity
The registered location is Edulabad, Ghatkesar mandal, Medchal-Malkajgiri district, Telangana 500088; the layout documents describe the site as Edulabad-ORRGC, in the Outer Ring Road Growth Corridor. The RERA address also identifies “Near NTPC, Ghanpur.”
The HMDA draft-layout conditions refer to forming a blacktop approach road before final layout release and keeping roads open for access to neighbouring sites. The final-layout letter requires roads to remain open for free public access.
Supplied location data lists the nearest sampled Outer Ring Road interchange at 4.8 km and Megha Institute Of Engineering And Technology For Women at 0.8 km. These are supplied distance records; no travel times are provided. A vendor listing mentions Malkajgiri as a nearby landmark and refers generally to schools, transport and other destinations without distances.
9. Developer & development status
The TG-RERA certificate identifies the promoter as Pratap Reddy Kommuri. The project header lists “Pratap,” while the Form B extraction names the declarant as K. Pralap Reddv. The supplied data does not identify the promoter’s legal entity type, corporate registration details, registered office or official project contact/site.
Form B, dated as extracted 03,d day of March 2021, contains the promoter’s declaration of legal title, an assertion that the land is free from encumbrances, and an undertaking to complete within 2 (Two) Years. The TG-RERA certificate records validity through 31/03/2023. The architect’s Form 1A certifies overall completion and records OC number 000075/LO/Plg/HMDA/2021, dated 29 March 2023. No current independent site-progress assessment is supplied.
10. Approvals, official records & documents
| Reference and date | P02200003144, issued 24/07/2021, valid through 31/03/2023 |
|---|---|
| Scope / description | Form C registration for SAI KPR SERENE HOMES. |
| Reference and date | 000075/LO/Plg/HMDA/2021, 29 January 2021 |
|---|---|
| Scope / description | HMDA record for the proposed residential layout; includes development conditions and the 18-plot mortgage provision. |
| Reference and date | File 029242/GHT/LT/U6/HMDA/16102019 |
|---|---|
| Scope / description | Layout drawing for survey subdivisions 1121/P, 1137/P, 1138/P, 1139/P and 1140/P. |
| Reference and date | File 059237/LT/ZOB/FLT/U6/HMDA/27012023, 29 March 2023 |
|---|---|
| Scope / description | Final residential open-plot layout release; records gift deed 28/2023 dated 02/01/2023 and relinquishment deed 2012/2023 dated 27/03/2023. |
| Reference and date | OC number 000075/LO/Plg/HMDA/2021, dated 29 March 2023 |
|---|---|
| Scope / description | Architect’s certificate states overall completion of the registered project and identifies HMDA as competent authority. |
| Reference and date | Dated as extracted 03,d day of March 2021 |
|---|---|
| Scope / description | Promoter declarations and completion undertaking. |
| Reference and date | Dated 30.01.2021 |
|---|---|
| Scope / description | Advocate’s title opinion document filed with TG-RERA. |
No building-level commencement certificate or building-plan/floor configuration is identified in the supplied material; this is a plotted layout. The HMDA draft-layout record and final-layout letter concern the layout, while the Form 1A is the supplied architect’s completion/OC record.
Frequently asked questions
Is SAI KPR SERENE HOMES registered with Telangana RERA?
Yes. SAI KPR SERENE HOMES is registered with the Telangana Real Estate Regulatory Authority as P02200003144; the registration status is New Project.
Who is the developer of SAI KPR SERENE HOMES?
The promoter named in the RERA registration is Pratap.
Where is SAI KPR SERENE HOMES located?
SAI KPR SERENE HOMES is in Ghanapur, Edulabad, Ghatkesar, Medchal-Malkajgiri, Telangana (500088).
When will SAI KPR SERENE HOMES be completed?
The promoter's proposed date of completion filed with RERA is 31/03/2023. This is the promoter's declaration, not a guarantee.