Sign in

Lahari Advaitha

LAHARI HOLIDAY HOMES LIMITED · Sangareddy · RERA P01100002632

LAHARI ADVAITHA is a plotted development in BHANUR, PATANCHERU Mandal, Sangareddy District. The registered promoter is LAHARI HOLIDAY HOMES LIMITED. The project has a registered site area of 31,512.50 sq. m. and an approved residential open layout with 101 plots; plot configurations are not stated in the supplied RERA unit data. It is registered under TG-RERA number P01100002632, and the promoter’s Form B states completion by 31 December 2023.

More from Lahari Holiday Homes Ltd · 3 projects →

01What we found

Period endedTG-RERA registration ran to 31 Dec 2023 - check its extension on TG-RERA
19documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameLAHARI ADVAITHA RERA record
Project typePlotted development / residential open layout RERA record RERA filing
Phase or registered portionNo separate phase identified in the supplied record; the registration and layout identify the surveyed land listed below. RERA record
TG-RERA registration numberP01100002632 RERA record
Registration validity03/03/2021 to 31/12/2023; the certificate says “2 years.” No extension is recorded in the supplied certificate. Registration validity is distinct from the completion undertaking and from occupancy/completion certification. RERA record
Registered promoterLAHARI HOLIDAY HOMES LIMITED RERA record
RERA status in supplied recordRegistration certificate supplied; the stated validity ended 31/12/2023. Current registration status is not independently verified here.

Land and geographic identity

ItemRecord
Locality / revenue villageBHANUR (the layout documents spell it “Bhanoor”); one revenue village is identified. RERA record RERA filing
MandalPATANCHERU in the RERA certificate; approval documents state Patancheruvu / Patancheru. RERA record
DistrictSangareddy (approval documents also render it “Sanga Reddy”). RERA record
PIN502305 RERA record
Project survey numbers / subdivisions253/P, 256/P, 257/P, 259/P and 265/P RERA record Land records
Registered site extent31,512.50 sq. m. RERA filing
Net / total areaBoth are stated as 31,512.50; the draft layout records total site area 31512.5, master-plan road-affected area 0, and net site area 31512.5.
Boundaries filed with RERAEast: ROAD WIDTH 18; West: SY NO 259 264; North: SY NO 257 259; South: SY NO 252 259 265. RERA filing

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA) Approvals record
Principal layout approval000073/LO/Plg/HMDA/2021, final-layout letter dated 02 December, 2021. Approvals record
Earlier draft layout letter033915/SKP/LT/U6/HMDA/10022020, dated 29 January, 2021.
Approved built-up areaNot disclosed in the supplied layout records; this is a plotted layout, not a building-floor approval. Approvals record
Buildings / floors / parking levelsNo building count, floor configuration or project parking-level schedule is established by the supplied layout approval and RERA filing. Approvals record
Plot count101 plots, as shown by the plotted-layout drawing extraction.
Residential-use designationThe final layout is identified as a residential open layout; the final approval states building sites are for residential dwelling-house use.

Offering and status

ItemRecord
Offered unit typePlots; individual plot inventory and RERA-filed plot-size schedule are not supplied in the available structured records. RERA record RERA filing
RERA-filed saleable size rangeNot available in the supplied RERA unit data.
Booked / available countsNot available in the supplied RERA unit data. The drawing extraction identifies 101 plot numbers, but does not provide booked or available counts.
Construction / development stageNo independently verified current site-progress assessment is supplied. The registration filing records a completion undertaking, not verified completion.
Completion undertakingPromoter’s Form B states completion by 31 December 2023.
Occupancy / completion certificateNo project occupancy or completion certificate is supplied. This is a plotted-layout project; the supplied approval record is a final layout letter.

2. The project story

LAHARI ADVAITHA is registered as a plotted development at Bhanu(r), in Patancheru Mandal, Sangareddy District. The RERA filing identifies the project land as Survey Nos. 253/P, 256/P, 257/P, 259/P and 265/P, with a registered site area of 31,512.50 sq. m. RERA record RERA filing

HMDA’s supplied final-layout material describes a residential open layout and records 101 plots. The final layout letter is dated 02 December, 2021.

The promoter’s Form B separately undertakes completion by 31 December 2023; that undertaking does not establish that the works were completed by that date. No current, independently verified construction progress or occupancy/completion certificate is provided. The sanctioned layout materials provide for roads, open spaces and social-infrastructure land, and identify site utilities and infrastructure conditions. The material does not establish the present completion or operational status of those works.

3. Master plan, architecture & building design

This is a plotted layout rather than a multi-storey building project in the supplied approval record. The final layout identifies a site area of 31,512.50 Sqm and 101 plots. The drawing-derived land-use figures are: Plotted Area 21378.84, Road Area 6663.71, Organized open space/park Area/Uitility Area 2680.62, and Social Infrastructure Area 789.30. These are the areas stated in the layout drawing extraction; no separate building design, building count, floor schedule or apartment configuration is evidenced.

The draft layout letter also lists Utility 314.71 Sq. Mts. and identifies a SEPTIC TANK. These are drawing/document-extraction details, not a statement of current completion.

The final-layout plan extraction identifies residential use and lists road widths including 18.29, 18.29M, EXISTING 60'-0" WIDE ROAD, EXISTING 40'-0" WIDE ROAD, and EXISTING 40' ROAD. The supplied material does not provide a complete plot-by-plot size schedule; software extraction records plot numbers 1 to 101 but no plot sizes. Layout record

4. Homes, configurations & floor plans

The RERA filing and supplied project records identify plots as the offering. No unit-type inventory table with RERA-filed saleable areas, booked counts or available counts is present. Accordingly, plot sizes and sales status cannot be summarized from the supplied RERA unit data. RERA record RERA filing

The layout drawing extraction identifies 101 numbered plots. It is software-read from the drawing and should not be treated as a verified plot-size or availability schedule. The supplied floor-plan review records four layout sheets, with 0 measured and no apartment floor plans; no measured carpet area is available. Layout record Floor plans

5. Parking & vehicle circulation

The available project-specific layout evidence does not establish a parking-space count, visitor or accessible parking provision, parking allocation by plot, or a parking-level arrangement. The plan identifies internal layout roads, but the supplied data does not detail vehicle ramps, gates, pedestrian separation or EV charging. RERA amenities

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Plots21378.84 (drawing’s plotted-area figure)HMDA final-layout drawing extractionApproved layout land-use figure; current delivery/status not independently verified
Roads6663.71 (drawing’s road-area figure)HMDA final-layout drawing extractionApproved layout land-use figure; current completion not independently verified
Organized open space / park / utility area2680.62HMDA final-layout drawing extractionApproved layout land-use figure; development status not independently verified
Social infrastructure area789.30HMDA final-layout drawing extractionApproved layout land-use figure; facility type and delivery status not established
Utility314.71 Sq. Mts.HMDA draft layout planShown in the draft-plan extraction; present status not verified
Septic tankSize/capacity not suppliedHMDA draft layout planListed in the plan extraction; current installation or operation not verified

The final layout approval also records roads and open spaces as having been taken over by the Local Authority under registered gift deed 15914/2021, dated 6/4/2021, and refers to a relinquishment deed concerning mortgaged plots, 33425/2021, dated 8/9/2021.

7. Utilities, building services & safety

The HMDA final-layout record lists water supply, sewerage, drainage disposal systems, street lighting and rainwater-harvesting structure among the layout infrastructure. The draft-plan extraction identifies a septic tank; the final-layout drawing extraction also lists a transformer, harvesting pits 4X4X6, overhead tank and bore point. These are plan/approval disclosures; the supplied record does not verify present installation, capacity or operation.

HMDA’s draft layout conditions refer to protected water supply including an overhead tank and sumps, an independent sewerage-disposal system, drainage/channelization of nalas for storm-water runoff, underground ducting of utilities, street lighting and electricity facilities including transformers, and rainwater-harvesting pits. These are recorded conditions or plan disclosures, not proof of current completion or statutory compliance.

No project-specific evidence supplied establishes lift systems, building fire-protection systems, emergency access arrangements, waste-management facilities, CCTV/security systems, backup power or accessible circulation. The RERA amenity extraction records the fire-safety and solid-waste-management categories at 0%; it does not document a completed facility. RERA amenities

8. Location, access & connectivity

The registered project location is BHANUR, Patancheru Mandal, Sangareddy District, PIN 502305. The cadastral parcel centroid supplied for the project location is 17.472523547245302, 78.17208463081573. RERA record Location record

The layout records an abutting road width of 18.29 and identifies existing roads of 60'-0" and 40'-0" among the road-width labels. The available location data gives the nearest sampled Outer Ring Road interchange at approximately 11.3 km; this is a sampled-distance record, not a travel-time claim. Location record

The supplied evidence does not identify a project-specific public-transport stop, landmark route, or measured distance to schools, hospitals or other services.

9. Developer & development status

The registered legal promoter is LAHARI HOLIDAY HOMES LIMITED, an entity recorded as a company/public limited company. Its supplied GSTIN is 36AAACL8925C1ZM. Corporate record RERA filing

The RERA registration certificate lists the promoter office as Village: Mandal: Shaikpet, District: Hyderabad, Pin: 500033. The project filing separately gives the address LAHARI, ROAD NO.34, BHANUR, BHANUR, PATANCHERU, Sangareddy, 502305. The supplied records do not provide an official website or contact number. RERA filing

The promoter’s Form B declares that it holds legal title, that the land is free from encumbrances, and that the project would be completed by 31 December 2023. These are promoter declarations; no current site-progress certification or completion certificate is supplied. The supplied registration certificate states validity through 31/12/2023 and does not record an extension.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01100002632; issued 03/03/2021
What the supplied material establishesForm C registers LAHARI ADVAITHA from 03/03/2021 through 31/12/2023.
HMDA draft layout letter
Identifier / date000073/LO/Plg/HMDA/2021; 29 January, 2021; file 033915/SKP/LT/U6/HMDA/10022020
What the supplied material establishesDraft residential open-layout approval record for the project survey numbers and site extent.
HMDA final layout letter
Identifier / date000073/LO/Plg/HMDA/2021; 02 December, 2021; file 047704/LT/SKP/FLT/U6/HMDA/30072021
What the supplied material establishesFinal residential open-layout approval record for 31,512.50 Sqm.
HMDA final-layout drawing
Identifier / datePermit 000073/LO/Plg/HMDA/2021; dated 02-12-2021
What the supplied material establishesDrawing extraction identifies 101 plots, residential use and the recorded land-use areas.
Form B promoter declaration
Identifier / date09-09-20201 as extracted
What the supplied material establishesPromoter declaration of title, no encumbrances, RERA obligations and completion undertaking by 31 December 2023.
Layout infrastructure conditions
Identifier / dateHMDA draft and final layout records
What the supplied material establishesRecords conditions/disclosures concerning water, sewerage, drainage, street lighting, rainwater harvesting and other layout works.
Completion / occupancy certificate
Identifier / dateNot supplied
What the supplied material establishesNo project completion or occupancy certificate appears in the supplied documents.

Frequently asked questions

Is LAHARI ADVAITHA registered with Telangana RERA?

Yes. LAHARI ADVAITHA is registered with the Telangana Real Estate Regulatory Authority as P01100002632; the registration status is New Project.

Who is the developer of LAHARI ADVAITHA?

The promoter named in the RERA registration is LAHARI HOLIDAY HOMES LIMITED.

Where is LAHARI ADVAITHA located?

LAHARI ADVAITHA is in BHANUR, PATANCHERU, Sangareddy, Telangana (502305).

When will LAHARI ADVAITHA be completed?

The promoter's proposed date of completion filed with RERA is 31/12/2023. This is the promoter's declaration, not a guarantee.

More projects in Bhanur