Bharathrealestate
BHARATHREALESTATE · Yadadri Bhuvanagiri · RERA P02000001231
BHARATHREALESTATE is a Plotted Development in Husnabad, Bhongir mandal, Yadadri Bhuvanagiri district, developed by the registered promoter BHARATHREALESTATE. The TG-RERA land details state a total area of 26,392 sq. m; the supplied layout plan states 75 plots and a plot-size range of 133.78–520.07 sq. m (160–622 sq. yd). The TG-RERA registration number is P02000001231, and the promoter-filed proposed completion date is 30/12/2019.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | BHARATHREALESTATE RERA record |
| Project type | Plotted Development RERA record RERA filing |
| Phase / registered portion | Phase not separately stated. The registration certificate identifies Survey No. 193/PART; a supplied HMDA draft layout plan identifies Survey Nos. 197/P and 198/P. |
| TG-RERA registration | P02000001231 |
| Registration validity | 05/10/2019 to 30/12/2019; the certificate says extension is subject to approval by the Authority. |
| Registered promoter | BHARATHREALESTATE; the registration certificate names “Bharathrealestate.” RERA record |
| RERA status | Certificate issued under section 5. The supplied certificate says it is not extended; no current status verification is provided. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | HUSNABAD / Husnabad is the project-header location. The registration certificate gives locality Husnabad; supplied layout documents identify HUSSAINABAD VILLAGE or Hussainabad(V). RERA record |
| Mandal | Bhongir RERA record |
| District | Yadadri Bhuvanagiri RERA record |
| PIN | 508116 in the project header and certificate; the certificate’s promoter-office line separately prints 500040. RERA record |
| Project survey numbers and subdivisions in supplied records | 193/PART (registration certificate and one HMDA draft layout); 197/P and 198/P (layout drawing); 197/PART and 198/PART (HMDA 2021 draft layout letter). |
| RERA land details | Survey No. 193/PART; total area 26,392 sq. m; 250 sq. m affected in road widening/FTL of tanks/nala widening; net area 26,142.00 sq. m. RERA filing |
| Layout drawing extent | Ac.06 - 39.75 Gts./ 33850.09 Sq Yds / 28302.99 Sq Mts for the plan identifying Survey Nos. 197/P and 198/P. |
| Boundaries | RERA land-details fields: East, West, North “NEIGHBOURSLAND”; South “NEIGHBURSLAND.” A supplied layout record separately states East, West and North OPEN LAND, and South EXISTING 100 WIDE ROAD. RERA filing Land records |
| Registered area / layout scope | The project header lists survey identity 193/PART and 26,392 sq. m total site area; the separate plan records identify other survey numbers and layout extents as shown above. The relationship and scope of these records are not established in this overview. RERA record RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal approval on file | LP.NO.:000083/LO/Plg/HMDA/2019; the project record lists approval dated 20/04/2019. Approvals record |
| Additional HMDA draft layout record | 000030/LO/Plg/HMDA/2021, dated 12 January, 2021; draft open-plot layout proposal for Survey Nos. 197/PART and 198/PART. Approvals record |
| Approved built-up area | 14,925 sq. m in the project fields. This is not a home or plot sale-area schedule. RERA filing |
| Building / floor configuration | Not applicable to the identified plotted-development offering; no residential building count or floor schedule is supplied. RERA record |
| Layout plot count | 75 plots stated in the Survey Nos. 197/P and 198/P layout plan. |
| Parking | No sanctioned parking count or plot-wise parking allocation is supplied. RERA amenities |
Offering and status
| Field | Record |
|---|---|
| Unit type | Plots RERA record |
| Plot count | 75, as stated in the supplied layout plan. |
| Plot size range | Software-measured from the layout drawing: 133.78–520.07 sq. m (160–622 sq. yd). Drawing-derived values should be verified against the plan. Layout record |
| Booked / available | Not disclosed in the supplied project data. RERA filing |
| Construction / development stage | No independently verified current site progress supplied. RERA record Document index |
| Completion date | Promoter-filed proposed completion date: 30/12/2019. RERA record RERA filing |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. For a plotted layout, the available record describes layout permission and development conditions, not building OCs. Document index |
2. The project story
BHARATHREALESTATE is registered as a plotted-development project, rather than an apartment or villa scheme. Its RERA certificate identifies Survey No. 193/PART, while the supplied layout plan showing 75 residential plots identifies Survey Nos. 197/P and 198/P; a later HMDA draft layout letter identifies 197/PART and 198/PART. These are the survey identities recorded in the supplied documents; the overview does not infer that they describe one identical parcel or phase.
The layout plan for Survey Nos. 197/P and 198/P states a total extent of Ac.06 - 39.75 Gts./ 33850.09 Sq Yds / 28302.99 Sq Mts and 75 plots. It shows land allocated to plots, roads, park, social infrastructure and utility use. The registration certificate gives a proposed completion date of 30/12/2019, but the supplied evidence does not establish current development progress or independently verify completion of layout works. RERA record
3. Master plan, architecture & building design
The available drawings concern open plotted layouts, not apartment buildings. The plan for Survey Nos. 197/P and 198/P states an overall extent of Ac.06 - 39.75 Gts./ 33850.09 Sq Yds / 28302.99 Sq Mts, with 75 plots. Its stated land-use split is 19892.57 Sq. yds proposed plotted area (58.77%), 10067.97 Sq. yds proposed road area (29.74%), 2539.61 Sq. yds proposed park area (07.50%), 847.21 Sq. yds social infrastructure (02.50%), and 502.73 Sq.mts utility area (01.49%).
That drawing labels 30' WIDE ROAD, 40' WIDE ROAD, 150' WIDE ZMP ROAD and 100' WIDE ROAD. It also identifies mortgage plots 31–39 and 74–75, with a stated extent of 3054.61 Sq.yds. The plan lists avenue plantations, sump, overhead water tank, transformer, septic tank, harvesting pits 4X4X4, dust bin, cycle track and manhole. These are drawing-record features; this does not establish their present condition or delivery.
A separate HMDA draft layout record dated 12 January, 2021 identifies Survey Nos. 197/PART and 198/PART and a site extent of 28303 Sq.m, with 16632.71 sq.m plotted area, 8418.11 sq.m layout roads, 2543.8 sq.m park, 708.38 sq.m open space, and 708.38 sq.m social infrastructure area. That document also states that roads, open space and social infrastructure are to be handed over to the local body by registered gift deed, and that final layout release and release of mortgaged plots depend on compliance with layout conditions.
No building count, building footprint, floor configuration, apartment mix, carpet area or FSI figure is supplied for this plotted development. The layout plan’s plot sizes are software-measured, not RERA-filed unit areas. Layout record Floor plans
4. Homes, configurations & floor plans
This is recorded as a plotted development, not a residential-building configuration. The supplied layout plan states 75 plots. Plot areas below are software-measured from the drawing and should be checked against the approved plan; they are not RERA-filed carpet or saleable-area figures. Layout record
| Plot-size band | Plot count | Basis |
|---|---|---|
| 150–200 sq. yd (125–167 sq. m) | 4 | Software-measured from layout drawing Layout record |
| 200–250 sq. yd (167–209 sq. m) | 48 | Software-measured from layout drawing Layout record |
| 250–300 sq. yd (209–251 sq. m) | 12 | Software-measured from layout drawing Layout record |
| 300–400 sq. yd (251–334 sq. m) | 7 | Software-measured from layout drawing Layout record |
| 400–500 sq. yd (334–418 sq. m) | 3 | Software-measured from layout drawing Layout record |
| 500–1000 sq. yd (418–836 sq. m) | 1 | Software-measured from layout drawing Layout record |
| Total stated in drawing | 75 | Plan-stated count |
The measured plot-size range is 133.78–520.07 sq. m (160–622 sq. yd), with a median of 204.85 sq. m (245 sq. yd). No booked/available plot inventory or plot-wise allotment schedule is supplied. Layout record
5. Parking & vehicle circulation
No sanctioned number of car or two-wheeler spaces, visitor spaces, accessible spaces, parking areas, or plot-wise parking allocations is available in the supplied evidence. The vendor record lists “Open Parking,” but provides no count or allocation details. RERA amenities Promoter website
The layout drawing records internal road widths of 30' WIDE ROAD and 40' WIDE ROAD, and labels 150' WIDE ZMP ROAD and 100' WIDE ROAD. The separate HMDA 2021 draft-layout record refers to roads “18 mts and above” and “60 feet and above.” These are road-width descriptions in their respective records; no vehicle-entry, driveway, pedestrian-separation or parking-circulation plan is supplied.
6. Amenities, recreation & open spaces
The following items appear in the supplied layout or project amenity records. “Available” and percentage entries are as recorded in the project amenity schedule; they are not independent site verification. RERA amenities
| Description / size | No size supplied |
|---|---|
| Evidence source | RERA amenity schedule RERA amenities |
| Declared progress / verified status | YES; 100% recorded; not independently verified |
| Description / size | No source or capacity supplied |
|---|---|
| Evidence source | RERA amenity schedule RERA amenities; layout drawing |
| Declared progress / verified status | YES; 100% recorded; not independently verified |
| Description / size | RERA schedule groups chamber, lines, septic tank, STP; no capacity supplied |
|---|---|
| Evidence source | RERA amenity schedule RERA amenities; layout drawing |
| Declared progress / verified status | YES; 100% recorded for sewerage and treatment/disposal; not independently verified |
| Description / size | No extent supplied |
|---|---|
| Evidence source | RERA amenity schedule RERA amenities; HMDA 2021 draft-layout conditions |
| Declared progress / verified status | 0% recorded in schedule; draft-layout document lists an underground storm-water drainage system |
| Description / size | 2539.61 Sq. yds proposed park area in the 75-plot drawing |
|---|---|
| Evidence source | Layout drawing |
| Declared progress / verified status | Schedule records green strip/TOT LOT/park as YES, 0%; not independently verified |
| Description / size | 708.38 sq.m in the HMDA 2021 draft-layout record |
|---|---|
| Evidence source | HMDA draft-layout letter |
| Declared progress / verified status | Handover condition stated; completion/handover not established |
| Description / size | 847.21 Sq. yds in the 75-plot layout drawing; 708.38 sq.m in the HMDA 2021 draft-layout record |
|---|---|
| Evidence source | Layout drawing; HMDA draft-layout letter |
| Declared progress / verified status | Drawing/approval record only; completion not established |
| Description / size | No quantity supplied |
|---|---|
| Evidence source | Layout drawing; HMDA draft-layout letter |
| Declared progress / verified status | Specified in layout records; planting not independently verified |
| Description / size | No length supplied |
|---|---|
| Evidence source | Layout drawing; HMDA draft-layout letter |
| Declared progress / verified status | Specified in layout records; completion not independently verified |
| Description / size | No description or size supplied |
|---|---|
| Evidence source | RERA amenity schedule RERA amenities |
| Declared progress / verified status | YES; 100% recorded; not independently verified |
| Description / size | Drawing specifies harvesting pits 4X4X4; amenity schedule records water conservation/rainwater harvesting at 0% |
|---|---|
| Evidence source | Layout drawing; RERA amenity schedule RERA amenities |
| Declared progress / verified status | Drawing feature; completion not independently verified |
| Description / size | No quantity or capacity supplied |
|---|---|
| Evidence source | Layout drawing; HMDA draft-layout letter |
| Declared progress / verified status | Drawing/condition record only; implementation not independently verified |
7. Utilities, building services & safety
The layout plan lists a sump, overhead water tank, transformer, septic tank, harvesting pits 4X4X4, dust bin, cycle track and manhole. The HMDA draft-layout letter also lists internal water-supply pipelines, an overhead tank, transformer, avenue planting, park development, rainwater-harvesting pits and an underground storm-water drainage system. These are plan or approval-record provisions, not confirmation of operational service, capacities or current completion.
The RERA amenity schedule records water supply and sewerage/treatment facilities as YES at 100%, street lighting as YES at 100%, and solid-waste management, water conservation/rainwater harvesting, energy management, fire protection and electrical meter room/sub-station/receiving station at 0%. The schedule does not provide capacities or detailed system specifications, and those recorded percentages are not independently verified. RERA amenities
No project-specific fire-system design, fire clearance, electrical backup capacity, accessibility provisions, or security/CCTV details are supplied. The registration certificate’s general requirement to comply with applicable laws is not evidence of a specific clearance or completed installation.
8. Location, access & connectivity
The project record identifies Husnabad, Bhongir mandal, Yadadri Bhuvanagiri district, Telangana, PIN 508116. The supplied plan records identify the revenue village as HUSSAINABAD VILLAGE or Hussainabad(V). RERA record
The 75-plot layout drawing labels 30' WIDE ROAD, 40' WIDE ROAD, 150' WIDE ZMP ROAD and 100' WIDE ROAD; it also identifies 30' and 40' roads within the plan. A separate location record reports the Outer Ring Road (nearest sampled interchange, approximate) at 23.1 km. The supplied location record gives coordinates 17.5172789, 78.8863383 and labels the geocoded place “Bhongir, Bhongiri mandal, Yadadri Bhuvanagiri, Telangana, 508100, India”; it does not provide a verified project-site access route or travel time. Location record
9. Developer & development status
The registered promoter is BHARATHREALESTATE, recorded as a partnership. The supplied corporate identifier is GSTIN 36AAQFB8682B1ZC. The project record lists the promoter address as BHARATH REAL ESTATE, BHONGIRI, HUSNABAD, HUSNABAD, Bhongir, Yadadri Bhuvanagiri, 508116. No official website, telephone or email is supplied. RERA record RERA filing Corporate record Parties record
The project certificate ran from 05/10/2019 through 30/12/2019 and the project header records 30/12/2019 as the proposed completion date. No extension is recorded in the supplied certificate, and no current construction-progress verification or completion/occupancy certificate is supplied. RERA record
A Form-B affidavit by M.A. MAJeed declares that 70% of amounts realised from allottees will be deposited in a separate scheduled-bank account, that withdrawals will be certified and proportionate to completion, that accounts will be audited, and that pending approvals will be obtained. These are promoter declarations, not independent findings of performance.
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for BHARATHREALESTATE, registration P02000001231, issued 05/10/2019, valid through 30/12/2019. |
| HMDA layout plan | Draft layout plan LP.NO.:000083/LO/Plg/HMDA/2019 dated 20April,2019, identifying Survey No. 193/PART; the drawing records a proposed open plotted layout and development conditions. |
| HMDA layout drawing | Proposed residential layout plan identifying Survey Nos. 197/P and 198/P, 75 plots, layout extent and land-use areas. |
| HMDA 2021 draft layout letter | 000030/LO/Plg/HMDA/2021 dated 12 January, 2021 for Survey Nos. 197/PART and 198/PART; the letter describes draft approval/forwarding and conditions for development and final layout release. |
| Promoter declaration | Form-B affidavit-cum-declaration by M.A. MAJeed concerning title basis, encumbrances, funds, audits, approvals and allottee treatment. |
| Municipal correspondence | Bhongir Municipality Town Planning Section correspondence concerning a road inquiry and an application by G.Venkulu & Others; no confirmation outcome is stated in the supplied extraction. |
| Building plans / commencement certificates | No building-plan schedule or building commencement certificate for a residential building is supplied; the available approval records concern plotted layouts. Document index |
| Completion / occupancy certificate | Not supplied. Document index |
1. Project at a glance
Project identity
Registered project name: BHARATHREALESTATE
Project type: Plotted Development
Phase / registered portion: Phase not separately stated. The registration certificate identifies Survey No. 193/PART; a supplied HMDA draft layout plan identifies Survey Nos. 197/P and 198/P.
TG-RERA registration: P02000001231
Registration validity: 05/10/2019 to 30/12/2019; the certificate says extension is subject to approval by the Authority.
Registered promoter: BHARATHREALESTATE; the registration certificate names “Bharathrealestate.”
RERA status: Certificate issued under section 5. The supplied certificate says it is not extended; no current status verification is provided.
Land and geographic identity
Locality / revenue village: HUSNABAD / Husnabad is the project-header location. The registration certificate gives locality Husnabad; supplied layout documents identify HUSSAINABAD VILLAGE or Hussainabad(V).
Mandal: Bhongir
District: Yadadri Bhuvanagiri
PIN: 508116 in the project header and certificate; the certificate’s promoter-office line separately prints 500040.
Project survey numbers and subdivisions in supplied records: 193/PART (registration certificate and one HMDA draft layout); 197/P and 198/P (layout drawing); 197/PART and 198/PART (HMDA 2021 draft layout letter).
RERA land details: Survey No. 193/PART; total area 26,392 sq. m; 250 sq. m affected in road widening/FTL of tanks/nala widening; net area 26,142.00 sq. m.
Layout drawing extent: Ac.06 - 39.75 Gts./ 33850.09 Sq Yds / 28302.99 Sq Mts for the plan identifying Survey Nos. 197/P and 198/P.
Boundaries: RERA land-details fields: East, West, North “NEIGHBOURSLAND”; South “NEIGHBURSLAND.” A supplied layout record separately states East, West and North OPEN LAND, and South EXISTING 100 WIDE ROAD.
Registered area / layout scope: The project header lists survey identity 193/PART and 26,392 sq. m total site area; the separate plan records identify other survey numbers and layout extents as shown above. The relationship and scope of these records are not established in this overview.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal approval on file: LP.NO.:000083/LO/Plg/HMDA/2019; the project record lists approval dated 20/04/2019.
Additional HMDA draft layout record: 000030/LO/Plg/HMDA/2021, dated 12 January, 2021; draft open-plot layout proposal for Survey Nos. 197/PART and 198/PART.
Approved built-up area: 14,925 sq. m in the project fields. This is not a home or plot sale-area schedule.
Building / floor configuration: Not applicable to the identified plotted-development offering; no residential building count or floor schedule is supplied.
Layout plot count: 75 plots stated in the Survey Nos. 197/P and 198/P layout plan.
Parking: No sanctioned parking count or plot-wise parking allocation is supplied.
Offering and status
Unit type: Plots
Plot count: 75, as stated in the supplied layout plan.
Plot size range: Software-measured from the layout drawing: 133.78–520.07 sq. m (160–622 sq. yd). Drawing-derived values should be verified against the plan.
Booked / available: Not disclosed in the supplied project data.
Construction / development stage: No independently verified current site progress supplied.
Completion date: Promoter-filed proposed completion date: 30/12/2019.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. For a plotted layout, the available record describes layout permission and development conditions, not building OCs.
2. The project story
BHARATHREALESTATE is registered as a plotted-development project, rather than an apartment or villa scheme. Its RERA certificate identifies Survey No. 193/PART, while the supplied layout plan showing 75 residential plots identifies Survey Nos. 197/P and 198/P; a later HMDA draft layout letter identifies 197/PART and 198/PART. These are the survey identities recorded in the supplied documents; the overview does not infer that they describe one identical parcel or phase.
The layout plan for Survey Nos. 197/P and 198/P states a total extent of Ac.06 - 39.75 Gts./ 33850.09 Sq Yds / 28302.99 Sq Mts and 75 plots. It shows land allocated to plots, roads, park, social infrastructure and utility use. The registration certificate gives a proposed completion date of 30/12/2019, but the supplied evidence does not establish current development progress or independently verify completion of layout works.
3. Master plan, architecture & building design
The available drawings concern open plotted layouts, not apartment buildings. The plan for Survey Nos. 197/P and 198/P states an overall extent of Ac.06 - 39.75 Gts./ 33850.09 Sq Yds / 28302.99 Sq Mts, with 75 plots. Its stated land-use split is 19892.57 Sq. yds proposed plotted area (58.77%), 10067.97 Sq. yds proposed road area (29.74%), 2539.61 Sq. yds proposed park area (07.50%), 847.21 Sq. yds social infrastructure (02.50%), and 502.73 Sq.mts utility area (01.49%).
That drawing labels 30' WIDE ROAD, 40' WIDE ROAD, 150' WIDE ZMP ROAD and 100' WIDE ROAD. It also identifies mortgage plots 31–39 and 74–75, with a stated extent of 3054.61 Sq.yds. The plan lists avenue plantations, sump, overhead water tank, transformer, septic tank, harvesting pits 4X4X4, dust bin, cycle track and manhole. These are drawing-record features; this does not establish their present condition or delivery.
A separate HMDA draft layout record dated 12 January, 2021 identifies Survey Nos. 197/PART and 198/PART and a site extent of 28303 Sq.m, with 16632.71 sq.m plotted area, 8418.11 sq.m layout roads, 2543.8 sq.m park, 708.38 sq.m open space, and 708.38 sq.m social infrastructure area. That document also states that roads, open space and social infrastructure are to be handed over to the local body by registered gift deed, and that final layout release and release of mortgaged plots depend on compliance with layout conditions.
No building count, building footprint, floor configuration, apartment mix, carpet area or FSI figure is supplied for this plotted development. The layout plan’s plot sizes are software-measured, not RERA-filed unit areas.
4. Homes, configurations & floor plans
This is recorded as a plotted development, not a residential-building configuration. The supplied layout plan states 75 plots. Plot areas below are software-measured from the drawing and should be checked against the approved plan; they are not RERA-filed carpet or saleable-area figures.
| Plot-size band | Plot count | Basis |
|---|---|---|
| 150–200 sq. yd (125–167 sq. m) | 4 | Software-measured from layout drawing |
| 200–250 sq. yd (167–209 sq. m) | 48 | Software-measured from layout drawing |
| 250–300 sq. yd (209–251 sq. m) | 12 | Software-measured from layout drawing |
| 300–400 sq. yd (251–334 sq. m) | 7 | Software-measured from layout drawing |
| 400–500 sq. yd (334–418 sq. m) | 3 | Software-measured from layout drawing |
| 500–1000 sq. yd (418–836 sq. m) | 1 | Software-measured from layout drawing |
| Total stated in drawing | 75 | Plan-stated count |
The measured plot-size range is 133.78–520.07 sq. m (160–622 sq. yd), with a median of 204.85 sq. m (245 sq. yd). No booked/available plot inventory or plot-wise allotment schedule is supplied.
5. Parking & vehicle circulation
No sanctioned number of car or two-wheeler spaces, visitor spaces, accessible spaces, parking areas, or plot-wise parking allocations is available in the supplied evidence. The vendor record lists “Open Parking,” but provides no count or allocation details.
The layout drawing records internal road widths of 30' WIDE ROAD and 40' WIDE ROAD, and labels 150' WIDE ZMP ROAD and 100' WIDE ROAD. The separate HMDA 2021 draft-layout record refers to roads “18 mts and above” and “60 feet and above.” These are road-width descriptions in their respective records; no vehicle-entry, driveway, pedestrian-separation or parking-circulation plan is supplied.
6. Amenities, recreation & open spaces
The following items appear in the supplied layout or project amenity records. “Available” and percentage entries are as recorded in the project amenity schedule; they are not independent site verification.
| Description / size | No size supplied |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | YES; 100% recorded; not independently verified |
| Description / size | No source or capacity supplied |
|---|---|
| Evidence source | RERA amenity schedule; layout drawing |
| Declared progress / verified status | YES; 100% recorded; not independently verified |
| Description / size | RERA schedule groups chamber, lines, septic tank, STP; no capacity supplied |
|---|---|
| Evidence source | RERA amenity schedule; layout drawing |
| Declared progress / verified status | YES; 100% recorded for sewerage and treatment/disposal; not independently verified |
| Description / size | No extent supplied |
|---|---|
| Evidence source | RERA amenity schedule; HMDA 2021 draft-layout conditions |
| Declared progress / verified status | 0% recorded in schedule; draft-layout document lists an underground storm-water drainage system |
| Description / size | 2539.61 Sq. yds proposed park area in the 75-plot drawing |
|---|---|
| Evidence source | Layout drawing |
| Declared progress / verified status | Schedule records green strip/TOT LOT/park as YES, 0%; not independently verified |
| Description / size | 708.38 sq.m in the HMDA 2021 draft-layout record |
|---|---|
| Evidence source | HMDA draft-layout letter |
| Declared progress / verified status | Handover condition stated; completion/handover not established |
| Description / size | 847.21 Sq. yds in the 75-plot layout drawing; 708.38 sq.m in the HMDA 2021 draft-layout record |
|---|---|
| Evidence source | Layout drawing; HMDA draft-layout letter |
| Declared progress / verified status | Drawing/approval record only; completion not established |
| Description / size | No quantity supplied |
|---|---|
| Evidence source | Layout drawing; HMDA draft-layout letter |
| Declared progress / verified status | Specified in layout records; planting not independently verified |
| Description / size | No length supplied |
|---|---|
| Evidence source | Layout drawing; HMDA draft-layout letter |
| Declared progress / verified status | Specified in layout records; completion not independently verified |
| Description / size | No description or size supplied |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | YES; 100% recorded; not independently verified |
| Description / size | Drawing specifies harvesting pits 4X4X4; amenity schedule records water conservation/rainwater harvesting at 0% |
|---|---|
| Evidence source | Layout drawing; RERA amenity schedule |
| Declared progress / verified status | Drawing feature; completion not independently verified |
| Description / size | No quantity or capacity supplied |
|---|---|
| Evidence source | Layout drawing; HMDA draft-layout letter |
| Declared progress / verified status | Drawing/condition record only; implementation not independently verified |
7. Utilities, building services & safety
The layout plan lists a sump, overhead water tank, transformer, septic tank, harvesting pits 4X4X4, dust bin, cycle track and manhole. The HMDA draft-layout letter also lists internal water-supply pipelines, an overhead tank, transformer, avenue planting, park development, rainwater-harvesting pits and an underground storm-water drainage system. These are plan or approval-record provisions, not confirmation of operational service, capacities or current completion.
The RERA amenity schedule records water supply and sewerage/treatment facilities as YES at 100%, street lighting as YES at 100%, and solid-waste management, water conservation/rainwater harvesting, energy management, fire protection and electrical meter room/sub-station/receiving station at 0%. The schedule does not provide capacities or detailed system specifications, and those recorded percentages are not independently verified.
No project-specific fire-system design, fire clearance, electrical backup capacity, accessibility provisions, or security/CCTV details are supplied. The registration certificate’s general requirement to comply with applicable laws is not evidence of a specific clearance or completed installation.
8. Location, access & connectivity
The project record identifies Husnabad, Bhongir mandal, Yadadri Bhuvanagiri district, Telangana, PIN 508116. The supplied plan records identify the revenue village as HUSSAINABAD VILLAGE or Hussainabad(V).
The 75-plot layout drawing labels 30' WIDE ROAD, 40' WIDE ROAD, 150' WIDE ZMP ROAD and 100' WIDE ROAD; it also identifies 30' and 40' roads within the plan. A separate location record reports the Outer Ring Road (nearest sampled interchange, approximate) at 23.1 km. The supplied location record gives coordinates 17.5172789, 78.8863383 and labels the geocoded place “Bhongir, Bhongiri mandal, Yadadri Bhuvanagiri, Telangana, 508100, India”; it does not provide a verified project-site access route or travel time.
9. Developer & development status
The registered promoter is BHARATHREALESTATE, recorded as a partnership. The supplied corporate identifier is GSTIN 36AAQFB8682B1ZC. The project record lists the promoter address as BHARATH REAL ESTATE, BHONGIRI, HUSNABAD, HUSNABAD, Bhongir, Yadadri Bhuvanagiri, 508116. No official website, telephone or email is supplied.
The project certificate ran from 05/10/2019 through 30/12/2019 and the project header records 30/12/2019 as the proposed completion date. No extension is recorded in the supplied certificate, and no current construction-progress verification or completion/occupancy certificate is supplied.
A Form-B affidavit by M.A. MAJeed declares that 70% of amounts realised from allottees will be deposited in a separate scheduled-bank account, that withdrawals will be certified and proportionate to completion, that accounts will be audited, and that pending approvals will be obtained. These are promoter declarations, not independent findings of performance.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for BHARATHREALESTATE, registration P02000001231, issued 05/10/2019, valid through 30/12/2019.
HMDA layout plan: Draft layout plan LP.NO.:000083/LO/Plg/HMDA/2019 dated 20April,2019, identifying Survey No. 193/PART; the drawing records a proposed open plotted layout and development conditions.
HMDA layout drawing: Proposed residential layout plan identifying Survey Nos. 197/P and 198/P, 75 plots, layout extent and land-use areas.
HMDA 2021 draft layout letter: 000030/LO/Plg/HMDA/2021 dated 12 January, 2021 for Survey Nos. 197/PART and 198/PART; the letter describes draft approval/forwarding and conditions for development and final layout release.
Promoter declaration: Form-B affidavit-cum-declaration by M.A. MAJeed concerning title basis, encumbrances, funds, audits, approvals and allottee treatment.
Municipal correspondence: Bhongir Municipality Town Planning Section correspondence concerning a road inquiry and an application by G.Venkulu & Others; no confirmation outcome is stated in the supplied extraction.
Building plans / commencement certificates: No building-plan schedule or building commencement certificate for a residential building is supplied; the available approval records concern plotted layouts.
Completion / occupancy certificate: Not supplied.
Other registrations of Bharathrealestate
Frequently asked questions
Is BHARATHREALESTATE registered with Telangana RERA?
Yes. BHARATHREALESTATE is registered with the Telangana Real Estate Regulatory Authority as P02000001231; the registration status is New Project.
Who is the developer of BHARATHREALESTATE?
The promoter named in the RERA registration is BHARATHREALESTATE.
Where is BHARATHREALESTATE located?
BHARATHREALESTATE is in HUSNABAD, Bhongir, Yadadri Bhuvanagiri, Telangana (508116).
When will BHARATHREALESTATE be completed?
The promoter's proposed date of completion filed with RERA is 30/12/2019. This is the promoter's declaration, not a guarantee.