Bharathrealestate

BHARATHREALESTATE · Yadadri Bhuvanagiri · RERA P02000001231

BHARATHREALESTATE is a Plotted Development in Husnabad, Bhongir mandal, Yadadri Bhuvanagiri district, developed by the registered promoter BHARATHREALESTATE. The TG-RERA land details state a total area of 26,392 sq. m; the supplied layout plan states 75 plots and a plot-size range of 133.78–520.07 sq. m (160–622 sq. yd). The TG-RERA registration number is P02000001231, and the promoter-filed proposed completion date is 30/12/2019.

01What we found

Period endedTG-RERA registration ran to 30 Dec 2019 - check its extension on TG-RERA
23documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Husnabad, Bhongir, Yadadri Bhuvanagiri · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameBHARATHREALESTATE RERA record
Project typePlotted Development RERA record RERA filing
Phase / registered portionPhase not separately stated. The registration certificate identifies Survey No. 193/PART; a supplied HMDA draft layout plan identifies Survey Nos. 197/P and 198/P.
TG-RERA registrationP02000001231
Registration validity05/10/2019 to 30/12/2019; the certificate says extension is subject to approval by the Authority.
Registered promoterBHARATHREALESTATE; the registration certificate names “Bharathrealestate.” RERA record
RERA statusCertificate issued under section 5. The supplied certificate says it is not extended; no current status verification is provided.

Land and geographic identity

FieldRecord
Locality / revenue villageHUSNABAD / Husnabad is the project-header location. The registration certificate gives locality Husnabad; supplied layout documents identify HUSSAINABAD VILLAGE or Hussainabad(V). RERA record
MandalBhongir RERA record
DistrictYadadri Bhuvanagiri RERA record
PIN508116 in the project header and certificate; the certificate’s promoter-office line separately prints 500040. RERA record
Project survey numbers and subdivisions in supplied records193/PART (registration certificate and one HMDA draft layout); 197/P and 198/P (layout drawing); 197/PART and 198/PART (HMDA 2021 draft layout letter).
RERA land detailsSurvey No. 193/PART; total area 26,392 sq. m; 250 sq. m affected in road widening/FTL of tanks/nala widening; net area 26,142.00 sq. m. RERA filing
Layout drawing extentAc.06 - 39.75 Gts./ 33850.09 Sq Yds / 28302.99 Sq Mts for the plan identifying Survey Nos. 197/P and 198/P.
BoundariesRERA land-details fields: East, West, North “NEIGHBOURSLAND”; South “NEIGHBURSLAND.” A supplied layout record separately states East, West and North OPEN LAND, and South EXISTING 100 WIDE ROAD. RERA filing Land records
Registered area / layout scopeThe project header lists survey identity 193/PART and 26,392 sq. m total site area; the separate plan records identify other survey numbers and layout extents as shown above. The relationship and scope of these records are not established in this overview. RERA record RERA filing

Development identity

FieldRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA) Approvals record
Principal approval on fileLP.NO.:000083/LO/Plg/HMDA/2019; the project record lists approval dated 20/04/2019. Approvals record
Additional HMDA draft layout record000030/LO/Plg/HMDA/2021, dated 12 January, 2021; draft open-plot layout proposal for Survey Nos. 197/PART and 198/PART. Approvals record
Approved built-up area14,925 sq. m in the project fields. This is not a home or plot sale-area schedule. RERA filing
Building / floor configurationNot applicable to the identified plotted-development offering; no residential building count or floor schedule is supplied. RERA record
Layout plot count75 plots stated in the Survey Nos. 197/P and 198/P layout plan.
ParkingNo sanctioned parking count or plot-wise parking allocation is supplied. RERA amenities

Offering and status

FieldRecord
Unit typePlots RERA record
Plot count75, as stated in the supplied layout plan.
Plot size rangeSoftware-measured from the layout drawing: 133.78–520.07 sq. m (160–622 sq. yd). Drawing-derived values should be verified against the plan. Layout record
Booked / availableNot disclosed in the supplied project data. RERA filing
Construction / development stageNo independently verified current site progress supplied. RERA record Document index
Completion datePromoter-filed proposed completion date: 30/12/2019. RERA record RERA filing
Occupancy / completion certificateNo occupancy or completion certificate is supplied. For a plotted layout, the available record describes layout permission and development conditions, not building OCs. Document index

2. The project story

BHARATHREALESTATE is registered as a plotted-development project, rather than an apartment or villa scheme. Its RERA certificate identifies Survey No. 193/PART, while the supplied layout plan showing 75 residential plots identifies Survey Nos. 197/P and 198/P; a later HMDA draft layout letter identifies 197/PART and 198/PART. These are the survey identities recorded in the supplied documents; the overview does not infer that they describe one identical parcel or phase.

The layout plan for Survey Nos. 197/P and 198/P states a total extent of Ac.06 - 39.75 Gts./ 33850.09 Sq Yds / 28302.99 Sq Mts and 75 plots. It shows land allocated to plots, roads, park, social infrastructure and utility use. The registration certificate gives a proposed completion date of 30/12/2019, but the supplied evidence does not establish current development progress or independently verify completion of layout works. RERA record

3. Master plan, architecture & building design

The available drawings concern open plotted layouts, not apartment buildings. The plan for Survey Nos. 197/P and 198/P states an overall extent of Ac.06 - 39.75 Gts./ 33850.09 Sq Yds / 28302.99 Sq Mts, with 75 plots. Its stated land-use split is 19892.57 Sq. yds proposed plotted area (58.77%), 10067.97 Sq. yds proposed road area (29.74%), 2539.61 Sq. yds proposed park area (07.50%), 847.21 Sq. yds social infrastructure (02.50%), and 502.73 Sq.mts utility area (01.49%).

That drawing labels 30' WIDE ROAD, 40' WIDE ROAD, 150' WIDE ZMP ROAD and 100' WIDE ROAD. It also identifies mortgage plots 31–39 and 74–75, with a stated extent of 3054.61 Sq.yds. The plan lists avenue plantations, sump, overhead water tank, transformer, septic tank, harvesting pits 4X4X4, dust bin, cycle track and manhole. These are drawing-record features; this does not establish their present condition or delivery.

A separate HMDA draft layout record dated 12 January, 2021 identifies Survey Nos. 197/PART and 198/PART and a site extent of 28303 Sq.m, with 16632.71 sq.m plotted area, 8418.11 sq.m layout roads, 2543.8 sq.m park, 708.38 sq.m open space, and 708.38 sq.m social infrastructure area. That document also states that roads, open space and social infrastructure are to be handed over to the local body by registered gift deed, and that final layout release and release of mortgaged plots depend on compliance with layout conditions.

No building count, building footprint, floor configuration, apartment mix, carpet area or FSI figure is supplied for this plotted development. The layout plan’s plot sizes are software-measured, not RERA-filed unit areas. Layout record Floor plans

4. Homes, configurations & floor plans

This is recorded as a plotted development, not a residential-building configuration. The supplied layout plan states 75 plots. Plot areas below are software-measured from the drawing and should be checked against the approved plan; they are not RERA-filed carpet or saleable-area figures. Layout record

Plot-size bandPlot countBasis
150–200 sq. yd (125–167 sq. m)4Software-measured from layout drawing Layout record
200–250 sq. yd (167–209 sq. m)48Software-measured from layout drawing Layout record
250–300 sq. yd (209–251 sq. m)12Software-measured from layout drawing Layout record
300–400 sq. yd (251–334 sq. m)7Software-measured from layout drawing Layout record
400–500 sq. yd (334–418 sq. m)3Software-measured from layout drawing Layout record
500–1000 sq. yd (418–836 sq. m)1Software-measured from layout drawing Layout record
Total stated in drawing75Plan-stated count

The measured plot-size range is 133.78–520.07 sq. m (160–622 sq. yd), with a median of 204.85 sq. m (245 sq. yd). No booked/available plot inventory or plot-wise allotment schedule is supplied. Layout record

5. Parking & vehicle circulation

No sanctioned number of car or two-wheeler spaces, visitor spaces, accessible spaces, parking areas, or plot-wise parking allocations is available in the supplied evidence. The vendor record lists “Open Parking,” but provides no count or allocation details. RERA amenities Promoter website

The layout drawing records internal road widths of 30' WIDE ROAD and 40' WIDE ROAD, and labels 150' WIDE ZMP ROAD and 100' WIDE ROAD. The separate HMDA 2021 draft-layout record refers to roads “18 mts and above” and “60 feet and above.” These are road-width descriptions in their respective records; no vehicle-entry, driveway, pedestrian-separation or parking-circulation plan is supplied.

6. Amenities, recreation & open spaces

The following items appear in the supplied layout or project amenity records. “Available” and percentage entries are as recorded in the project amenity schedule; they are not independent site verification. RERA amenities

Internal roads & footpaths
Description / sizeNo size supplied
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusYES; 100% recorded; not independently verified
Water supply
Description / sizeNo source or capacity supplied
Evidence sourceRERA amenity schedule RERA amenities; layout drawing
Declared progress / verified statusYES; 100% recorded; not independently verified
Sewerage / septic tank / STP
Description / sizeRERA schedule groups chamber, lines, septic tank, STP; no capacity supplied
Evidence sourceRERA amenity schedule RERA amenities; layout drawing
Declared progress / verified statusYES; 100% recorded for sewerage and treatment/disposal; not independently verified
Storm-water drains
Description / sizeNo extent supplied
Evidence sourceRERA amenity schedule RERA amenities; HMDA 2021 draft-layout conditions
Declared progress / verified status0% recorded in schedule; draft-layout document lists an underground storm-water drainage system
Park / green space
Description / size2539.61 Sq. yds proposed park area in the 75-plot drawing
Evidence sourceLayout drawing
Declared progress / verified statusSchedule records green strip/TOT LOT/park as YES, 0%; not independently verified
Open space
Description / size708.38 sq.m in the HMDA 2021 draft-layout record
Evidence sourceHMDA draft-layout letter
Declared progress / verified statusHandover condition stated; completion/handover not established
Social infrastructure
Description / size847.21 Sq. yds in the 75-plot layout drawing; 708.38 sq.m in the HMDA 2021 draft-layout record
Evidence sourceLayout drawing; HMDA draft-layout letter
Declared progress / verified statusDrawing/approval record only; completion not established
Avenue plantations / trees
Description / sizeNo quantity supplied
Evidence sourceLayout drawing; HMDA draft-layout letter
Declared progress / verified statusSpecified in layout records; planting not independently verified
Cycle track
Description / sizeNo length supplied
Evidence sourceLayout drawing; HMDA draft-layout letter
Declared progress / verified statusSpecified in layout records; completion not independently verified
Community buildings
Description / sizeNo description or size supplied
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusYES; 100% recorded; not independently verified
Water harvesting
Description / sizeDrawing specifies harvesting pits 4X4X4; amenity schedule records water conservation/rainwater harvesting at 0%
Evidence sourceLayout drawing; RERA amenity schedule RERA amenities
Declared progress / verified statusDrawing feature; completion not independently verified
Dust bin / garbage segregation
Description / sizeNo quantity or capacity supplied
Evidence sourceLayout drawing; HMDA draft-layout letter
Declared progress / verified statusDrawing/condition record only; implementation not independently verified

7. Utilities, building services & safety

The layout plan lists a sump, overhead water tank, transformer, septic tank, harvesting pits 4X4X4, dust bin, cycle track and manhole. The HMDA draft-layout letter also lists internal water-supply pipelines, an overhead tank, transformer, avenue planting, park development, rainwater-harvesting pits and an underground storm-water drainage system. These are plan or approval-record provisions, not confirmation of operational service, capacities or current completion.

The RERA amenity schedule records water supply and sewerage/treatment facilities as YES at 100%, street lighting as YES at 100%, and solid-waste management, water conservation/rainwater harvesting, energy management, fire protection and electrical meter room/sub-station/receiving station at 0%. The schedule does not provide capacities or detailed system specifications, and those recorded percentages are not independently verified. RERA amenities

No project-specific fire-system design, fire clearance, electrical backup capacity, accessibility provisions, or security/CCTV details are supplied. The registration certificate’s general requirement to comply with applicable laws is not evidence of a specific clearance or completed installation.

8. Location, access & connectivity

The project record identifies Husnabad, Bhongir mandal, Yadadri Bhuvanagiri district, Telangana, PIN 508116. The supplied plan records identify the revenue village as HUSSAINABAD VILLAGE or Hussainabad(V). RERA record

The 75-plot layout drawing labels 30' WIDE ROAD, 40' WIDE ROAD, 150' WIDE ZMP ROAD and 100' WIDE ROAD; it also identifies 30' and 40' roads within the plan. A separate location record reports the Outer Ring Road (nearest sampled interchange, approximate) at 23.1 km. The supplied location record gives coordinates 17.5172789, 78.8863383 and labels the geocoded place “Bhongir, Bhongiri mandal, Yadadri Bhuvanagiri, Telangana, 508100, India”; it does not provide a verified project-site access route or travel time. Location record

9. Developer & development status

The registered promoter is BHARATHREALESTATE, recorded as a partnership. The supplied corporate identifier is GSTIN 36AAQFB8682B1ZC. The project record lists the promoter address as BHARATH REAL ESTATE, BHONGIRI, HUSNABAD, HUSNABAD, Bhongir, Yadadri Bhuvanagiri, 508116. No official website, telephone or email is supplied. RERA record RERA filing Corporate record Parties record

The project certificate ran from 05/10/2019 through 30/12/2019 and the project header records 30/12/2019 as the proposed completion date. No extension is recorded in the supplied certificate, and no current construction-progress verification or completion/occupancy certificate is supplied. RERA record

A Form-B affidavit by M.A. MAJeed declares that 70% of amounts realised from allottees will be deposited in a separate scheduled-bank account, that withdrawals will be certified and proportionate to completion, that accounts will be audited, and that pending approvals will be obtained. These are promoter declarations, not independent findings of performance.

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for BHARATHREALESTATE, registration P02000001231, issued 05/10/2019, valid through 30/12/2019.
HMDA layout planDraft layout plan LP.NO.:000083/LO/Plg/HMDA/2019 dated 20April,2019, identifying Survey No. 193/PART; the drawing records a proposed open plotted layout and development conditions.
HMDA layout drawingProposed residential layout plan identifying Survey Nos. 197/P and 198/P, 75 plots, layout extent and land-use areas.
HMDA 2021 draft layout letter000030/LO/Plg/HMDA/2021 dated 12 January, 2021 for Survey Nos. 197/PART and 198/PART; the letter describes draft approval/forwarding and conditions for development and final layout release.
Promoter declarationForm-B affidavit-cum-declaration by M.A. MAJeed concerning title basis, encumbrances, funds, audits, approvals and allottee treatment.
Municipal correspondenceBhongir Municipality Town Planning Section correspondence concerning a road inquiry and an application by G.Venkulu & Others; no confirmation outcome is stated in the supplied extraction.
Building plans / commencement certificatesNo building-plan schedule or building commencement certificate for a residential building is supplied; the available approval records concern plotted layouts. Document index
Completion / occupancy certificateNot supplied. Document index

Other registrations of Bharathrealestate

Frequently asked questions

Is BHARATHREALESTATE registered with Telangana RERA?

Yes. BHARATHREALESTATE is registered with the Telangana Real Estate Regulatory Authority as P02000001231; the registration status is New Project.

Who is the developer of BHARATHREALESTATE?

The promoter named in the RERA registration is BHARATHREALESTATE.

Where is BHARATHREALESTATE located?

BHARATHREALESTATE is in HUSNABAD, Bhongir, Yadadri Bhuvanagiri, Telangana (508116).

When will BHARATHREALESTATE be completed?

The promoter's proposed date of completion filed with RERA is 30/12/2019. This is the promoter's declaration, not a guarantee.