Sign in

Ybr Infras Avasa South

YBR INFRA DEVELOPERS · Rangareddy · RERA P02400002962

YBR INFRAS AVASA SOUTH is a plotted development / residential open-plot layout in ADIBATLA, Ibrahimpatnam mandal, Ranga Reddy district. Registered promoter YBR INFRA DEVELOPERS is developing the project on 24,115.92 Sqm; it is a plotted layout, and the supplied records do not state a plot count or individual plot configurations. The project is registered with TG-RERA as P02400002962, issued 20/05/2021, with a promoter-declared completion date of 18 July 2022.

More from Ybr Infra Developers · 4 projects →

01What we found

Period endedTG-RERA registration ran to 18 Jul 2022 - check its extension on TG-RERA
20documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Ramdaspalli, Ibrahimpatnam, Ranga Reddy · geocoded — approximate.

Project at a glance

Project identity

ItemRecord
Registered project nameYBR INFRAS AVASA SOUTH RERA record
Project typePlotted development / residential open-plot layout RERA record
Phase or registered portionNot separately named; TG-RERA registration covers the project identified in the certificate
TG-RERA registrationP02400002962; granted under section 5; issued 20/05/2021
Registration validity20/05/2021 to 18/07/2022; certificate records no extension
Registered promoterYBR INFRA DEVELOPERS; certificate renders the name as “Ybr Infra Developers” RERA record
RERA statusNew Project in the project record. The stated registration validity has ended; the supplied evidence does not show a subsequent extension. RERA record

Land and geographic identity

ItemRecord
LocalityADIBATLA RERA record
Revenue villageRamdaspalli; approval documents also render it as Ramdaspalle or Ramadaspally RERA record
MandalIbrahimpatnam RERA record
DistrictRanga Reddy RERA record
PIN501510 RERA record
Project survey identitySurvey No. 46/1 PART; the Adibatla Municipality proceedings also show “46/1 Pait - i” and “46/1 Part” RERA record
Registered site extent24,115.92 Sqm RERA filing
Net/total area in RERA fieldsTotal area 24115.92 sqmts; net area 24115.92 sqmts RERA filing
Boundaries in RERA fieldsEast: NEIGHBOURS LAND; West: LAND OF YBR INFRA DEVELOPERS; North: 30 FEET WIDE ROAD; South: LAND OF K ANJAIAJ AND OTHERS RERA filing

Development identity

ItemRecord
Principal sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the local-authority proceedings are by Adibatla Municipality
Principal approvalFinal Layout Permit No. 000221/LO/Plg/HMDA/2019; final layout letter dated 20 January, 2021
Draft layout approvalHMDA Draft Layout Letter No. 000221/LO/Plg/HMDA/2019, dated 18 July, 2019
Approved built-up areaNot disclosed for this plotted development in the supplied project fields; no building count or floor configuration is established. RERA filing
Layout area scheduleDraft layout record lists Total Site area 24115.92, Net Site Area 14313.4, Plotted area 2477.88, Open space (i) Park 603.74, Open space (ii) Social Infrastructure 6720.54, Layout Road Area 0 and Amenities area 0; units are shown in the source as area figures, with Sq.m stated for the site extent.
Buildings/floors/parking levelsNot applicable as a building configuration is not provided for this plotted-layout project. The approval record refers to individual building permission being considered separately.

Offering and status

ItemRecord
Purchasable productResidential plots; plot count, individual plot sizes, inventory, and booked/available counts are not disclosed in the supplied project data.
Development statusRERA filing labels the project “New Project”; the supplied architect’s Form–1A states overall completion and refers to an HMDA occupancy certificate. The supplied records do not identify a tower or phase scope. RERA record
Promoter-declared completion date18 July 2022 in the Form-B declaration
Occupancy/completion certificate statusArchitect’s Form–1A records an HMDA certificate numbered 037933/LT/SMD/FLT/U6/HMDA/06082020, dated 20-01-2021, and certifies completion. The evidence identifies the project as a plotted layout and does not establish a separate building or tower scope.
Layout completion recordHMDA’s final layout letter records the final layout release and states roads, open spaces and social infrastructure were taken over by the Local Authority under registered gift deed 10998/2020.

The project story

YBR INFRAS AVASA SOUTH is registered with TG-RERA as a plotted development in Survey No. 46/1 PART, Ramdaspalli village, Ibrahimpatnam mandal, Ranga Reddy district. Its project records describe a residential open-plot layout, not a group of apartment blocks or a set of individually specified villas. The TG-RERA record does not provide plot counts, plot-size bands, or a sale-inventory schedule. RERA record RERA filing

HMDA’s file contains a draft layout letter dated 18 July, 2019 and a final layout letter dated 20 January, 2021. The latter records that roads, open spaces and social infrastructure were handed to the Local Authority under a registered gift deed. Separately, an architect’s Form–1A identifies the project registration number, cites an HMDA certificate dated 20-01-2021, and certifies completion. This is a filed architect’s certification; no independent site inspection or verification is supplied here.

The promoter declared a completion date of 18 July 2022 in Form B, while the TG-RERA certificate states that registration was valid through 18/07/2022 and the supplied certificate does not record an extension. These are distinct records of the completion undertaking and registration validity.

Master plan, architecture & building design

The project is presented in the approval documents as a residential open-plot layout in Survey No. 46/1 PART. The registered site extent is 24,115.92 Sqm. The draft layout record lists the site, net site, plotted area, park and social-infrastructure area as separate entries; the recorded layout-road and amenities-area figures are both 0. The data does not include a drawing-derived plot schedule or enough information to reconstruct the layout’s plot arrangement. RERA filing

The final layout letter identifies permit 000221/LO/Plg/HMDA/2019 and states the permitted use is residential dwelling houses; it also says individual building permission is to be considered separately under the applicable building rules. No approved apartment plans, building footprints, floor counts, building heights, or residential/commercial floor-area distribution are supplied.

Homes, configurations & floor plans

This is a plotted project, so apartment configuration, carpet-area and saleable-area comparisons do not apply on the supplied evidence. The TG-RERA certificate identifies plot number “0” at project level; it does not provide an inventory of individual plots or plot-size bands.

OfferingPlot countBookedAvailableRERA-filed areaDrawing-measured area
Residential plotsNot disclosedNot disclosedNot disclosedIndividual plot areas not disclosedNot available

The drawing file set reports two drawings, both scans pending, with no measured drawings. Accordingly, no software-measured plot or room dimensions are available. Floor plans

Parking & vehicle circulation

The supplied project records do not establish a parking-space count, visitor or accessible parking provision, parking allocation to individual plots, or vehicle-entry arrangement. The draft and final layout records address access and roads, but do not provide a parking schedule. The draft letter says roads should remain open for access to neighbouring sites and that no compound wall or fencing should be constructed around the site.

The Adibatla Municipality proceedings refer to 16 plots mortgaged in favour of HMDA. Those are recorded as mortgage plots, not as buyer parking spaces.

Amenities, recreation & open spaces

The project amenities record marks several layout infrastructure items as available and 100%; these are RERA-recorded progress entries, not independently verified completion. The approval records also list works and facilities required or described for the layout. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsNo dimensions suppliedRERA amenitiesRERA-recorded: YES, 100%; not independently verified
Park / green stripLayout record lists Open space (i) Park 603.74; area unit not stated in that entryRERA amenitiesAmenities record: YES, 100%; not independently verified
Social infrastructure area6720.54; area unit not stated in that entryFinal layout letter says social infrastructure area was taken over by the Local Authority under registered gift deed 10998/2020
Avenue plantation / park developmentNo size suppliedListed in municipality proceedings; no independent completion verification supplied
Community buildingsNo description or size suppliedRERA amenities0% recorded
Swimming pool, gym, children’s play area, clubhousePromoter-marketed features; no sizes suppliedPromoter websiteMarketing claims only; no supplied approval or completion evidence
Open green spaces / landscaped parksPromoter-marketed wording; no sizes suppliedPromoter websiteMarketing claims only; no independent verification

Utilities, building services & safety

The RERA amenities record marks water supply, sewerage, storm-water drains, street lighting, water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station as YES, 100%. These are declared progress entries and are not independently verified in the supplied material. RERA amenities

The approval records list storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, an overhead tank, electrical supply lines, streetlights, a transformer, and rainwater-harvesting pits. The final layout letter also refers to water supply, sewerage and drainage disposal systems, street lighting and rainwater harvesting structures. No water-source details, storage capacities, STP capacity, electrical load, backup provision, or fire-safety system specifications are provided.

The amenities record shows treatment and disposal of sewage/sullage water, solid-waste management and disposal, energy management, and fire protection/fire-safety requirements at 0%. No supplied evidence establishes lifts, accessible circulation, CCTV, security-system specifications, or emergency-access arrangements. RERA amenities

Location, access & connectivity

The registered location is ADIBATLA, Ramdaspalli village, Ibrahimpatnam mandal, Ranga Reddy district, PIN 501510. The project record describes the northern boundary as a 30 FEET WIDE ROAD. The HMDA draft-layout letter states that roads should be open for access to neighbouring sites; the final layout letter says roads are to remain open for free public access. RERA record RERA filing

The location record gives the nearest sampled Outer Ring Road interchange at approximately 8.6 km. The record does not specify a travel time or public-transport connection. Location record

Developer & development status

The registered promoter is YBR INFRA DEVELOPERS, identified in the promoter information as a partnership. The supplied promoter record gives an address at LR PLAZA, HYDERGUDA, RAMDAS[PALLI, ADIBATLA, Ibrahimpatnam, Ranga Reddy, 501510. The TG-RERA certificate’s promoter-office field instead describes its office as Village/Mandal/District: Hyderabad, PIN 500029; the record does not provide a separate corporate registration number or a verified contact telephone or email. RERA record RERA filing Corporate record

The named partner is SRUNGAVARAPU SRIRANGA; Y BHAKTHAVATHSAL REDDY is listed as authorized signatory. Form B, signed by Y. BAKTHAVATHSAL REDDY, declares a completion date of 18 July 2022 and makes other promoter undertakings. These are promoter declarations, not independent confirmations of performance. Corporate record

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400002962; issued 20/05/2021; valid through 18/07/2022
What the supplied record establishesRegistration of YBR INFRAS AVASA SOUTH under section 5; certificate includes promoter conditions, including the separate-account condition.
HMDA draft layout letter
Identifier / date000221/LO/Plg/HMDA/2019; 18 July, 2019
What the supplied record establishesDraft open-plot layout in Survey No. 46/1 PART, referred for local-authority action and final release; records HMDA mortgage plots and development conditions.
Adibatla Municipality proceedings
Identifier / dateProc.Roc.No. G1/491/ADB/ 12019-20.; 04.10.2019
What the supplied record establishesProceedings concerning release orders for the HMDA-sanctioned draft residential layout; records mortgage of 16 plots and layout development/handover conditions.
HMDA final layout letter
Identifier / date000221/LO/Plg/HMDA/2019; 20 January, 2021
What the supplied record establishesFinal residential layout with open plots in Survey No. 46/1 PART; records local-authority handover of roads, open spaces and social infrastructure under gift deed 10998/2020.
Architect’s Form–1A certificate
Identifier / dateHMDA certificate 037933/LT/SMD/FLT/U6/HMDA/06082020; dated 20-01-2021
What the supplied record establishesIdentifies P02400002962 and states HMDA issued the cited certificate; architect certifies project completion.
Promoter Form-B declaration
Identifier / date1 November 2019
What the supplied record establishesPromoter’s declaration concerning the project, including its completion undertaking and other project obligations.

The supplied records do not include an individual plot inventory, a plot-wise sale schedule, a detailed approved layout drawing, or a separate building-permission schedule. The final layout letter refers to a registered gift deed and relinquishment deed, but copies of those instruments are not included in the documents summarized here.

Frequently asked questions

Is YBR INFRAS AVASA SOUTH registered with Telangana RERA?

Yes. YBR INFRAS AVASA SOUTH is registered with the Telangana Real Estate Regulatory Authority as P02400002962; the registration status is New Project.

Who is the developer of YBR INFRAS AVASA SOUTH?

The promoter named in the RERA registration is YBR INFRA DEVELOPERS.

Where is YBR INFRAS AVASA SOUTH located?

YBR INFRAS AVASA SOUTH is in ADIBATLA, Ramdaspalli, Ibrahimpatnam, Rangareddy, Telangana (501510).

When will YBR INFRAS AVASA SOUTH be completed?

The promoter's proposed date of completion filed with RERA is 18/07/2022. This is the promoter's declaration, not a guarantee.

More projects in Ramdaspalli