Urban Nest
SRI LAKSHMI GANAPATHI DEVELOPERS · Hanamkonda · RERA P00300009178
URBAN NEST is a residential plotted development in Madikonda, Khazipet mandal, Warangal Urban district. The registered promoter is SRI LAKSHMI GANAPATHI DEVELOPERS. The RERA-filed site area is 52,360.80 sq m, and the final-layout record lists 158 residential plots; no plot-size configurations are stated. TG-RERA registration number P00300009178 records a registration period from 24/05/2024 to 24/05/2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | URBAN NEST |
| Project type | Plotted development / residential open-plot layout RERA record |
| Phase / registered portion | Phase not separately identified; the registration covers the Madikonda plotted layout described below. |
| TG-RERA registration | P00300009178 |
| Registration validity | 24/05/2024 to 24/05/2026, for two years unless extended by the Authority. This is the registration period, not a statement of current validity or completion. |
| Registered promoter | SRI LAKSHMI GANAPATHI DEVELOPERS, a partnership. RERA filing Corporate record |
| RERA status | The supplied registration certificate records registration. A later architect’s certificate references this registration number and an OC; see the scope note below. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | Madikonda; the RERA certificate identifies Madikonda. The final-layout document calls it Madikonda Revenue Village. |
| Mandal | Khazipet in the RERA certificate; Kazipet in the final-layout document. |
| District | Warangal Urban in the RERA record; Hanumakonda District in the final-layout document. |
| PIN | 506003 |
| Project survey numbers | SY NO 1922/B, 1922/E, 1924/C/2/2, 1924/C/2/1, 1924/B, 1924/D/3, 1925/A/2, 1925/C/3, 1925/D/1 AND 1925/D/2 |
| RERA-filed site extent | 52,360.80 sq m total and net area in the project fields. RERA filing |
| Approved-layout area | The final-layout record states 52,321.46 sq.m total layout area and separately lists 52,358.82 sq.m as total layout area including road widening. |
| Boundaries | East: remaining land of Sri Lakshmi Ganapathi Developers; west: agricultural land of Narsimha Reddy; north: approved TLP No. 0394 LO 3006 2023; south: 18MT WIDE EXISTING 24MT WIDE PROPOSED ROAD. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Principal layout approval | GWMC tentative layout approval 0369/LO/3006/2024, dated 24 May, 2024. |
| Final layout release | Greater Warangal Municipal Corporation final layout proceeding 0060/GWMC/SWFL/2025, dated 20/11/2025. |
| Approved development | Residential layout with open plots; final-layout record lists 158 plots, numbered 1 through 158 with gaps visible in the plan. |
| Approved built-up area / building floors | Not applicable to the open-plot layout approval; individual building permissions are to be considered separately. No project-wide approved built-up area or floor configuration is supplied. |
| Parking | Final-layout land-use table records 0.00 sq.m common parking area. Individual plot/building parking provision is not established in the supplied records. |
Offering and status
| Field | Project record |
|---|---|
| Offering | Residential plots; RERA-filed plot-by-plot sizes, saleable-area range, inventory, bookings and availability are not supplied here. RERA record |
| Drawing-derived plot count | A software reading of the layout drawing identifies plots numbered 1–74; this is drawing-derived and should be checked against the approved drawing. Layout record |
| Development stage | The supplied architect’s certificate is dated 20/02/2026 and records an OC for a plotted development. The final-layout record is dated 20/11/2025. These records do not provide an independently verified site-progress inspection. |
| Completion deadline | The RERA registration certificate states a registration period ending 24/05/2026. The tentative-layout approval required infrastructure and amenities within two years from 24 May 2024, i.e. by 24 May 2026. These are distinct regulatory/approval dates, not evidence of physical completion. |
| OC status and scope | An architect’s certificate dated 20/02/2026 records a GWMC Occupancy Certificate for a plotted development, 004327/GWMC/00078/SWFL/2025, dated 20/11/2025, and references P00300009178. The supplied final-layout proceeding is for the 158-plot layout. The OC’s precise covered scope should be confirmed from the certificate itself. |
2. The project story
- URBAN NEST is registered as a residential plotted development at Madikonda, Khazipet, in the Warangal Urban area, on the ten survey numbers listed above. The RERA record describes the site as 52,360.80 sq m. The final-layout record describes a residential layout of 158 plots, with internal roads, open space, social-infrastructure land and utility land. RERA filing
- The approval record shows a tentative-layout approval in May 2024 followed by a final-layout proceeding in November 2025. An architect’s certificate dated February 2026 records an OC issued in November 2025 for a plotted development and references the project’s RERA number. The supplied material does not include a site inspection or plot-by-plot status, so it does not establish which infrastructure items are physically complete or the current saleable inventory.
3. Master plan, architecture & building design
- This is a plotted layout rather than a multi-tower building project. The final-layout record allocates 29,312.66 sq.m (56.02%) to plotted area, 16,438.51 sq.m (31.42%) to roads, 4,723.96 sq.m (9.03%) to open space, 1,315.84 sq.m (2.51%) to social infrastructure and 530.06 sq.m (1.01%) to utility area; the record gives common parking area as 0.00 sq.m.
- The approved layout is for residential use. Its conditions specify dwelling use for individual sites and require prior approval for changes to site boundaries, amalgamation or subdivision. Plot-number gaps are visible in the approved plan; software reading of a separate drawing identifies numbers 1–74 and is not a substitute for the final approved plan or plot register. Layout record
- No project-wide building arrangement, building footprint, tower height, floor configuration, or approved built-up area is supplied for URBAN NEST. The final-layout approval anticipates separate building permissions for individual sites.
4. Homes, configurations & floor plans
- The registered offering is plots, not apartments. The supplied RERA certificate and project fields do not provide plot-wise RERA saleable areas, inventory counts, bookings or availability. The final-layout document records 158 approved plots; a software reading of the drawing identifies plot numbers 1–74, but no plot-size bands are provided in the available drawing-derived data. Layout record
- The vendor material lists “Plot” and “3 & 4 BHK” configurations, but this is not used here to define the registered plotted offering. The software-measured 3BHK room and carpet-area data, and apartment plans associated with other project records, do not establish homes or configurations in this Madikonda layout. Promoter website RERA unit details Floor plans
5. Parking & vehicle circulation
- The final-layout land-use table records 0.00 sq.m for common parking. It does not establish a count of parking spaces, visitor or accessible parking, or parking allocations to individual plot purchasers. Any parking within a future individual dwelling would depend on its separate building plan.
- The layout approvals require roads to remain open for access to neighbouring lands and list internal road widths, including 9.14m, 12.2m, 12.19m and 9.17m internal roads. The final-layout record also identifies an 18.29m Existing Road Width and a 24.39m Proposed Road Width. No vehicle-ramp, pedestrian-separation or EV-charging plan for the layout is supplied.
6. Amenities, recreation & open spaces
The final-layout approval allocates open space, social infrastructure and utility land. The RERA amenity entries indicate some layout infrastructure as available, but those entries are filing data, not independent verification of delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space / park | 4,723.96 sq.m; 9.03% of final-layout area | Approved allocation; physical completion not independently verified | |
| Social infrastructure | 1,315.84 sq.m; 2.51% | Approved allocation; facility type and completion not specified | |
| Utility area | 530.06 sq.m; 1.01% | Approved allocation; site utility assets are described below | |
| Green strip / tot lot / park | RERA amenity record marks available at 100%; no separate size stated | RERA amenities | RERA-filed availability; independent completion not verified |
| Internal roads and footpaths | RERA amenity record marks available at 100% | RERA amenities | RERA-filed availability; independent completion not verified |
No clubhouse, indoor recreation facility or specific sports facility is identified in the supplied project records. RERA amenities
7. Utilities, building services & safety
- The tentative-layout approval lists common infrastructure including internal water-supply pipelines, overhead tank, water reservoir, septic tank / sewerage treatment plant, storm-water drains, street lights, transformer, solid-waste management, avenue planting and rainwater-harvesting pits. These are approval/condition descriptions, not confirmation that each item has been completed or commissioned.
- The RERA amenity record marks water supply, storm-water drains, street lighting, rainwater harvesting and electrical meter room/sub-station/receiving station as available at 100%; it marks sewerage, sewage treatment/disposal and solid-waste management at 0%. These are the supplied RERA-filed status entries and are not an independent technical inspection. RERA amenities
- The supplied records do not establish water-source capacity, storage volume, STP capacity or operational status, electrical capacity, backup power, security systems, accessibility provisions or project-wide fire systems. The final-layout proceeding contains general conditions concerning rainwater harvesting and fire-safety requirements for future buildings; it does not itself establish completed building-level systems.
8. Location, access & connectivity
- The registered location is Madikonda, Khazipet, Warangal Urban, PIN 506003. The supplied geocode point is 17.9648618, 79.4791859, identified near the Government Ayurvedic Dispensary, Madikonda (Regular). Location record
- The final-layout record lists existing and proposed road connections and several internal road widths. The only supplied measured connectivity point is the Outer Ring Road (nearest sampled interchange, approx): 102.2 km. No public-transport service, additional landmark distances or travel times are supplied. Location record
9. Developer & development status
The registered promoter is SRI LAKSHMI GANAPATHI DEVELOPERS, identified in the project record as a partnership, with GSTIN 36AEYFS6758P1ZJ. The supplied promoter address is H NO 23-6-150/121/A, HUNTER ROAD, MADIKONDA, WARANGAL DISTRICT, PIN 506003. No official project contact details or website are provided in the supplied record. RERA filing Corporate record Parties record
The project’s RERA registration certificate records validity from 24/05/2024 through 24/05/2026. The approval record sets a two-year infrastructure-and-amenities period from 24 May 2024, while the architect’s certificate records an OC dated 20/11/2025 and references the project registration. The material provided does not include a current site-progress inspection or plot-wise delivery status.
10. Approvals, official records & documents
| Issuer / date | TG-RERA; registration begins 24/05/2024, ends 24/05/2026 |
|---|---|
| What it establishes | Registration of URBAN NEST as a project promoted by Sri Lakshmi Ganapathi Developers; certificate conditions include quarterly updates and project-fund requirements. |
| Issuer / date | GWMC; 24 May, 2024 |
|---|---|
| What it establishes | Tentative residential layout approval for the ten listed survey numbers, with infrastructure, land dedication and mortgage conditions. |
| Issuer / date | Greater Warangal Municipal Corporation; 20/11/2025 |
|---|---|
| What it establishes | Final layout release for a 158-plot residential layout and stated land-use allocation. |
| Issuer / date | Architect’s certificate dated 20/02/2026; OC stated as issued by GWMC on 20/11/2025 |
|---|---|
| What it establishes | Certificate references RERA registration P00300009178 and records an OC for a plotted development; the exact covered scope should be confirmed from the underlying certificate. |
| Issuer / date | Includes title report and survey-specific transaction statements |
|---|---|
| What it establishes | Available as filed materials; this Overview does not treat them as a complete or current title/encumbrance clearance. |
The final-layout document lists the project survey numbers as 1922/B, 1922/E, 1924/C/2/2, 1924/C/2/1, 1924/B, 1924/D/3, 1925/A/2, 1925/C/3, 1925/D/1 and 1925/D/2.
1. Project at a glance
Project identity
Registered project name: URBAN NEST
Project type: Plotted development / residential open-plot layout
Phase / registered portion: Phase not separately identified; the registration covers the Madikonda plotted layout described below.
TG-RERA registration: P00300009178
Registration validity: 24/05/2024 to 24/05/2026, for two years unless extended by the Authority. This is the registration period, not a statement of current validity or completion.
Registered promoter: SRI LAKSHMI GANAPATHI DEVELOPERS, a partnership.
RERA status: The supplied registration certificate records registration. A later architect’s certificate references this registration number and an OC; see the scope note below.
Land and geographic identity
Locality / revenue village: Madikonda; the RERA certificate identifies Madikonda. The final-layout document calls it Madikonda Revenue Village.
Mandal: Khazipet in the RERA certificate; Kazipet in the final-layout document.
District: Warangal Urban in the RERA record; Hanumakonda District in the final-layout document.
PIN: 506003
Project survey numbers: SY NO 1922/B, 1922/E, 1924/C/2/2, 1924/C/2/1, 1924/B, 1924/D/3, 1925/A/2, 1925/C/3, 1925/D/1 AND 1925/D/2
RERA-filed site extent: 52,360.80 sq m total and net area in the project fields.
Approved-layout area: The final-layout record states 52,321.46 sq.m total layout area and separately lists 52,358.82 sq.m as total layout area including road widening.
Boundaries: East: remaining land of Sri Lakshmi Ganapathi Developers; west: agricultural land of Narsimha Reddy; north: approved TLP No. 0394 LO 3006 2023; south: 18MT WIDE EXISTING 24MT WIDE PROPOSED ROAD.
Development identity
Principal layout approval: GWMC tentative layout approval 0369/LO/3006/2024, dated 24 May, 2024.
Final layout release: Greater Warangal Municipal Corporation final layout proceeding 0060/GWMC/SWFL/2025, dated 20/11/2025.
Approved development: Residential layout with open plots; final-layout record lists 158 plots, numbered 1 through 158 with gaps visible in the plan.
Approved built-up area / building floors: Not applicable to the open-plot layout approval; individual building permissions are to be considered separately. No project-wide approved built-up area or floor configuration is supplied.
Parking: Final-layout land-use table records 0.00 sq.m common parking area. Individual plot/building parking provision is not established in the supplied records.
Offering and status
Offering: Residential plots; RERA-filed plot-by-plot sizes, saleable-area range, inventory, bookings and availability are not supplied here.
Drawing-derived plot count: A software reading of the layout drawing identifies plots numbered 1–74; this is drawing-derived and should be checked against the approved drawing.
Development stage: The supplied architect’s certificate is dated 20/02/2026 and records an OC for a plotted development. The final-layout record is dated 20/11/2025. These records do not provide an independently verified site-progress inspection.
Completion deadline: The RERA registration certificate states a registration period ending 24/05/2026. The tentative-layout approval required infrastructure and amenities within two years from 24 May 2024, i.e. by 24 May 2026. These are distinct regulatory/approval dates, not evidence of physical completion.
OC status and scope: An architect’s certificate dated 20/02/2026 records a GWMC Occupancy Certificate for a plotted development, 004327/GWMC/00078/SWFL/2025, dated 20/11/2025, and references P00300009178. The supplied final-layout proceeding is for the 158-plot layout. The OC’s precise covered scope should be confirmed from the certificate itself.
2. The project story
- URBAN NEST is registered as a residential plotted development at Madikonda, Khazipet, in the Warangal Urban area, on the ten survey numbers listed above. The RERA record describes the site as 52,360.80 sq m. The final-layout record describes a residential layout of 158 plots, with internal roads, open space, social-infrastructure land and utility land.
- The approval record shows a tentative-layout approval in May 2024 followed by a final-layout proceeding in November 2025. An architect’s certificate dated February 2026 records an OC issued in November 2025 for a plotted development and references the project’s RERA number. The supplied material does not include a site inspection or plot-by-plot status, so it does not establish which infrastructure items are physically complete or the current saleable inventory.
3. Master plan, architecture & building design
- This is a plotted layout rather than a multi-tower building project. The final-layout record allocates 29,312.66 sq.m (56.02%) to plotted area, 16,438.51 sq.m (31.42%) to roads, 4,723.96 sq.m (9.03%) to open space, 1,315.84 sq.m (2.51%) to social infrastructure and 530.06 sq.m (1.01%) to utility area; the record gives common parking area as 0.00 sq.m.
- The approved layout is for residential use. Its conditions specify dwelling use for individual sites and require prior approval for changes to site boundaries, amalgamation or subdivision. Plot-number gaps are visible in the approved plan; software reading of a separate drawing identifies numbers 1–74 and is not a substitute for the final approved plan or plot register.
- No project-wide building arrangement, building footprint, tower height, floor configuration, or approved built-up area is supplied for URBAN NEST. The final-layout approval anticipates separate building permissions for individual sites.
4. Homes, configurations & floor plans
- The registered offering is plots, not apartments. The supplied RERA certificate and project fields do not provide plot-wise RERA saleable areas, inventory counts, bookings or availability. The final-layout document records 158 approved plots; a software reading of the drawing identifies plot numbers 1–74, but no plot-size bands are provided in the available drawing-derived data.
- The vendor material lists “Plot” and “3 & 4 BHK” configurations, but this is not used here to define the registered plotted offering. The software-measured 3BHK room and carpet-area data, and apartment plans associated with other project records, do not establish homes or configurations in this Madikonda layout.
5. Parking & vehicle circulation
- The final-layout land-use table records 0.00 sq.m for common parking. It does not establish a count of parking spaces, visitor or accessible parking, or parking allocations to individual plot purchasers. Any parking within a future individual dwelling would depend on its separate building plan.
- The layout approvals require roads to remain open for access to neighbouring lands and list internal road widths, including 9.14m, 12.2m, 12.19m and 9.17m internal roads. The final-layout record also identifies an 18.29m Existing Road Width and a 24.39m Proposed Road Width. No vehicle-ramp, pedestrian-separation or EV-charging plan for the layout is supplied.
6. Amenities, recreation & open spaces
The final-layout approval allocates open space, social infrastructure and utility land. The RERA amenity entries indicate some layout infrastructure as available, but those entries are filing data, not independent verification of delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space / park | 4,723.96 sq.m; 9.03% of final-layout area | Approved allocation; physical completion not independently verified | |
| Social infrastructure | 1,315.84 sq.m; 2.51% | Approved allocation; facility type and completion not specified | |
| Utility area | 530.06 sq.m; 1.01% | Approved allocation; site utility assets are described below | |
| Green strip / tot lot / park | RERA amenity record marks available at 100%; no separate size stated | RERA-filed availability; independent completion not verified | |
| Internal roads and footpaths | RERA amenity record marks available at 100% | RERA-filed availability; independent completion not verified |
No clubhouse, indoor recreation facility or specific sports facility is identified in the supplied project records.
7. Utilities, building services & safety
- The tentative-layout approval lists common infrastructure including internal water-supply pipelines, overhead tank, water reservoir, septic tank / sewerage treatment plant, storm-water drains, street lights, transformer, solid-waste management, avenue planting and rainwater-harvesting pits. These are approval/condition descriptions, not confirmation that each item has been completed or commissioned.
- The RERA amenity record marks water supply, storm-water drains, street lighting, rainwater harvesting and electrical meter room/sub-station/receiving station as available at 100%; it marks sewerage, sewage treatment/disposal and solid-waste management at 0%. These are the supplied RERA-filed status entries and are not an independent technical inspection.
- The supplied records do not establish water-source capacity, storage volume, STP capacity or operational status, electrical capacity, backup power, security systems, accessibility provisions or project-wide fire systems. The final-layout proceeding contains general conditions concerning rainwater harvesting and fire-safety requirements for future buildings; it does not itself establish completed building-level systems.
8. Location, access & connectivity
- The registered location is Madikonda, Khazipet, Warangal Urban, PIN 506003. The supplied geocode point is 17.9648618, 79.4791859, identified near the Government Ayurvedic Dispensary, Madikonda (Regular).
- The final-layout record lists existing and proposed road connections and several internal road widths. The only supplied measured connectivity point is the Outer Ring Road (nearest sampled interchange, approx): 102.2 km. No public-transport service, additional landmark distances or travel times are supplied.
9. Developer & development status
The registered promoter is SRI LAKSHMI GANAPATHI DEVELOPERS, identified in the project record as a partnership, with GSTIN 36AEYFS6758P1ZJ. The supplied promoter address is H NO 23-6-150/121/A, HUNTER ROAD, MADIKONDA, WARANGAL DISTRICT, PIN 506003. No official project contact details or website are provided in the supplied record.
The project’s RERA registration certificate records validity from 24/05/2024 through 24/05/2026. The approval record sets a two-year infrastructure-and-amenities period from 24 May 2024, while the architect’s certificate records an OC dated 20/11/2025 and references the project registration. The material provided does not include a current site-progress inspection or plot-wise delivery status.
10. Approvals, official records & documents
| Issuer / date | TG-RERA; registration begins 24/05/2024, ends 24/05/2026 |
|---|---|
| What it establishes | Registration of URBAN NEST as a project promoted by Sri Lakshmi Ganapathi Developers; certificate conditions include quarterly updates and project-fund requirements. |
| Issuer / date | GWMC; 24 May, 2024 |
|---|---|
| What it establishes | Tentative residential layout approval for the ten listed survey numbers, with infrastructure, land dedication and mortgage conditions. |
| Issuer / date | Greater Warangal Municipal Corporation; 20/11/2025 |
|---|---|
| What it establishes | Final layout release for a 158-plot residential layout and stated land-use allocation. |
| Issuer / date | Architect’s certificate dated 20/02/2026; OC stated as issued by GWMC on 20/11/2025 |
|---|---|
| What it establishes | Certificate references RERA registration P00300009178 and records an OC for a plotted development; the exact covered scope should be confirmed from the underlying certificate. |
| Issuer / date | Includes title report and survey-specific transaction statements |
|---|---|
| What it establishes | Available as filed materials; this Overview does not treat them as a complete or current title/encumbrance clearance. |
The final-layout document lists the project survey numbers as 1922/B, 1922/E, 1924/C/2/2, 1924/C/2/1, 1924/B, 1924/D/3, 1925/A/2, 1925/C/3, 1925/D/1 and 1925/D/2.
Frequently asked questions
Is URBAN NEST registered with Telangana RERA?
Yes. URBAN NEST is registered with the Telangana Real Estate Regulatory Authority as P00300009178; the registration status is New Project.
Who is the developer of URBAN NEST?
The promoter named in the RERA registration is SRI LAKSHMI GANAPATHI DEVELOPERS.
Where is URBAN NEST located?
URBAN NEST is in WARANGAL DISTRICT, Madikonda, Khazipet, Hanamkonda, Telangana (506003).
When will URBAN NEST be completed?
The promoter's proposed date of completion filed with RERA is 24/05/2026. This is the promoter's declaration, not a guarantee.