Harithavanam Phase 11
GREEN METRO INFRATECH & PROJECTS PVT LTD · Vikarabad · RERA P02100001679
HARITHAVANAM PHASE 11 is a plotted development in MEKAVANAM, Mominpet, Vikarabad, developed by GREEN METRO INFRATECH & PROJECTS PVT LTD. The approved layout covers Ac. 20-01.6 Gts or Ac. 20.04 Cents; 96993.60 Sq. Yds and records 285 residential plots; building or floor configurations and plot sizes are not disclosed. The project is registered under TG-RERA number P02100001679, with proposed completion dated 31/07/2022.
More from Greenmetro Infratech & Projects Pvt Ltd · 12 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | HARITHAVANAM PHASE 11 RERA record |
| Project type | Plotted development RERA record RERA filing |
| Phase / registered portion | Phase 11; TG-RERA registration is for this named project. RERA record |
| TG-RERA registration number | P02100001679 RERA record |
| Registration validity | 18/02/2020 to 31/07/2022; the certificate records no extension. This is the registration period, not a statement of completion or occupancy status. RERA record |
| Registered promoter | GREEN METRO INFRATECH & PROJECTS PVT LTD RERA record Corporate record |
| RERA status in supplied record | Registration certificate issued. No extension is recorded on the certificate; current registration status is not independently established by the supplied extract. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | MEKAVANAM RERA record RERA filing |
| Revenue village | Mekavanampally (also written “Mekavanampalle” in supplied filed documents); the project identity fields state Mekavanam. RERA record |
| Mandal / district / PIN | Mominpet / Vikarabad / 501202 RERA record |
| Project survey numbers | 22/P, 23/P and 29/P RERA record Land records |
| Registered site extent | Final layout approval records Ac. 20-01.6 Gts or Ac. 20.04 Cents; 96993.60 Sq. Yds. |
| RERA-filed total / affected / net area | 81099.00 sqmts total, 24038.32 sqmts affected in road widening/FTL of Tanks/Nala widening, and 57060.68 sqmts net. RERA filing |
| Boundaries recorded on RERA form | North: Maddikunta Village; South, East and West: neighbouring land. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Director of Town and Country Planning (DTCP); approval is delegated to Mekavanampally Gram Panchayat. |
| Principal layout approval | TLP.No.44/2019/H, Final Technical Layout Pattern – Approved; approved date recorded as 29-06-2022. Approvals record |
| Approved layout scale | 285 plots over the approved layout area. |
| Approved land-use split | Plotted area: Ac. 12.10 Cents; 58564.00 Sq. Yds (60.37%); road area: Ac. 5.94 Cents; 28749.60 Sq. Yds (29.63%); open space: Ac. 2.00 Cents; 9680.00 Sq. Yds (10.00%). |
| RERA-filed built-up area | 48966.96 sqmts; the filing also records a mortgage area of 7405.74 sqmts. These are filing fields; no building/floor configuration is provided. RERA filing |
| Buildings, floors and parking levels | Not disclosed in the supplied project records. The approval is for a plotted layout, not an evidenced multi-storey building plan. Document index |
| Approved versus RERA-declared plot counts | Approval records 285 plots. A separate plot-by-plot RERA inventory/count is not supplied. RERA unit table |
Offering and status
| Item | Record |
|---|---|
| Offering | Residential plots; the approved conditions describe detached, single-family dwelling use for sites. |
| Plot size range | Not disclosed in the supplied records. RERA unit table Layout record |
| Booked / available counts | Not supplied. RERA unit table |
| Construction / development stage | The RERA project information labels the status “New Project”; no current, independently verified site-progress record is supplied. RERA filing |
| Completion dates | RERA registration record: proposed completion 31/07/2022. Form B declaration dated 16/10/2019 undertakes completion by 25th July 2025. RERA record |
| Occupancy / completion certificate | No project completion certificate or occupancy certificate is identified in the supplied documents. The layout approval is not itself evidence of completion or occupancy. Document index |
2. The project story
HARITHAVANAM PHASE 11 is registered as a plotted development in the Mekavanam locality, in the Mekavanampally/Mekavanampalle revenue-location records, Mominpet Mandal, Vikarabad District. Its TG-RERA identity covers survey numbers 22/P, 23/P and 29/P. RERA record Land records
The filed DTCP final technical layout approval describes a residential layout of 285 plots, with land apportioned to plotted sites, roads and open space. Its conditions provide for detached, single-family residential dwelling use on the sites and refer to individual building permissions being considered separately. Thus, the supplied approval establishes a plotted layout; it does not establish that houses have been built on the plots.
The RERA form calls the project a “New Project,” and the supplied record gives proposed completion dates, but no site inspection or current progress evidence establishes what has been completed. The approval’s references to roads, open spaces and civic services describe the approved layout and its conditions; they do not independently verify present delivery or maintenance. RERA filing Document index
3. Master plan, architecture & building design
The approved plan is a plotted layout, not a building-floor plan in the supplied evidence. The final technical layout approval records 285 plots and a total area of Ac. 20-01.6 Gts or Ac. 20.04 Cents; 96993.60 Sq. Yds. Its stated land-use allocation is 60.37% plotted area, 29.63% road area, and 10.00% open space.
The RERA filing separately records a total land area of 81099.00 sqmts, 24038.32 sqmts affected in road widening/FTL of Tanks/Nala widening, and 57060.68 sqmts net area. The filing also lists 48966.96 sqmts approved built-up area. The supplied records do not explain the built-up-area figure in relation to the plotted-layout approval; it is retained here as the filed figure, not treated as plot area or dwelling carpet area. RERA filing RERA filing
The approval identifies roads, open spaces and plantation/greenery as layout features, and states that roads and open spaces were taken over under registered deeds. It also lists water supply, sewerage, drainage disposal, street lighting, rainwater harvesting and civic amenities among the layout provisions. No plot-by-plot drawing measurements, building footprints, floor configurations, plot-size schedule, or detailed landscape plan are supplied.
4. Homes, configurations & floor plans
This project is presented in the supplied record as a plotted development. The approved layout records 285 plots, but the supplied RERA inventory does not provide plot sizes, plot-by-plot configurations, booking counts, availability counts or filed saleable-area figures. RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 285 plots in the approved layout; RERA unit/inventory count not supplied | Not supplied | Not supplied | Not supplied | Not applicable / not supplied | Not supplied |
Two drawings are listed, but neither has been measured; the records identify both as scans pending. The supplied floor-plan data therefore provides no software-measured carpet or room dimensions. Floor plans
5. Parking & vehicle circulation
The supplied approval and RERA records do not establish parking-space counts, visitor or accessible parking, parking locations, vehicle entry/exit arrangements, or plot-specific parking allocations. The layout approval identifies internal roads and footpaths, but does not provide a detailed circulation or parking schedule in the supplied extract. RERA amenities Document index
6. Amenities, recreation & open spaces
The layout approval allocates Ac. 2.00 Cents; 9680.00 Sq. Yds (10.00%) to open space and Ac. 5.94 Cents; 28749.60 Sq. Yds (29.63%) to roads. It lists plantation and greenery, water supply, sewerage, drainage disposal, street lighting, rainwater-harvesting structures and civic amenities as layout provisions. The amenity data shows these as listed facilities, but all supplied progress percentages are 0; no independent completion verification is provided. RERA amenities
| Description / size | Ac. 2.00 Cents; 9680.00 Sq. Yds; 10.00% of the approved layout. |
|---|---|
| Evidence source | DTCP final technical layout approval; RERA amenities RERA amenities |
| Declared progress / verified status | Approved / listed; current delivery not independently verified. Amenity progress field: 0. |
| Description / size | Listed; no separate size or quantity supplied. RERA amenities |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Listed as YES; progress field: 0; completion not independently verified. |
| Description / size | No specific sports or recreational facility details supplied beyond the approved open-space allocation. |
|---|---|
| Evidence source | DTCP final technical layout approval |
| Declared progress / verified status | Open-space allocation approved; facility fit-out or current condition not verified. |
| Description / size | Listed; no size, capacity or specific building description supplied. RERA amenities |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress field: 0; completion not independently verified. |
| Description / size | Required/identified for roads and open spaces; no planting schedule or quantified area beyond the open-space allocation supplied. |
|---|---|
| Evidence source | DTCP final technical layout approval |
| Declared progress / verified status | Approval condition; current maintenance or completion not independently verified. |
7. Utilities, building services & safety
The layout approval lists water supply, sewerage, drainage disposal systems, street lighting and rainwater-harvesting structures as layout services. The RERA amenities list also includes storm-water drains, sewage/sullage treatment and disposal, solid-waste management, energy management, fire-protection requirements, and an electrical meter room/sub-station/receiving station. These amenity entries do not provide capacities, detailed designs or completion evidence; all supplied progress percentages are 0. RERA amenities
The approval states that the local body is to ensure proper and effective maintenance of the listed civic services, and that rainwater-harvesting structures are to be provided. The supplied records do not specify water sources or storage capacity, an STP design or capacity, reuse arrangements, electrical backup, fire-system equipment, security systems, or accessible circulation. RERA amenities
8. Location, access & connectivity
The project’s filed geographic identity is MEKAVANAM, Mekavanampally/Mekavanampalle revenue-location records, Mominpet Mandal, Vikarabad District, PIN 501202, with project land in survey numbers 22/P, 23/P and 29/P. The RERA filing records Maddikunta Village to the north and neighbouring land to the east, south and west. RERA record RERA filing
A cadastral parcel centroid is supplied at 17.41528, 78.35459. The location record lists Financial District (Nanakramguda) at 1.2 km as a connectivity anchor; the supplied data does not give an approach-road route or travel time. Location record
9. Developer & development status
The registered promoter is GREEN METRO INFRATECH & PROJECTS PVT LTD, identified in the project records as a company. Its stated address is APURUPA TURBO, RD NO 36, MEKAVANAMPALLY, MEKAVANAM, Mominpet, Vikarabad, 501202. The supplied corporate identifier is masked as xxxxxx455R. The RERA filing identifies BODDU ASHOK. as an authorized signatory; the Form B declaration is made by BODDU ASHOK BABU on the promoter’s behalf. Corporate record Parties record RERA filing
The RERA registration certificate records registration from 18/02/2020 to 31/07/2022, with no extension recorded on the certificate. The registration fields give 31/07/2022 as the proposed completion date; the later Form B declaration dated 16/10/2019 states an undertaking to complete by 25th July 2025. No supplied project update or independent site verification establishes current progress or completion. RERA record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form “C” registration certificate for HARITHAVANAM PHASE 11, registration P02100001679, issued under section 5; validity stated as 18/02/2020–31/07/2022. Certificate records no extension. |
| Principal layout approval | DTCP Final Technical Layout Pattern – Approved, TLP.No.44/2019/H, approved date 29-06-2022, for a 285-plot layout over Sy.Nos. 22/P, 23/P and 29/P. Approval is delegated to Mekavanampally Gram Panchayat. |
| Non-agricultural conversion proceedings | RDO Vikarabad proceedings C-1644-2018, dated 25/07/2018, concerning conversion permission over 23.1200 Acre-guntas in Sy.Nos. 22/E, 22/A, 29/A, 22/EE, 22/AA and 23/AA at Mekavanampalle Village, Mominpet Mandal. The supplied record describes the permission as granted to Anand Nagloor and lists its conditions. |
| Promoter declaration | Form B affidavit-cum-declaration dated 16/10/2019, signed by authorized signatory BODDU ASHOK BABU for GREENMETRO INFRATECH & PROJECTS PVT LTD; includes the promoter’s stated completion undertaking and other declarations. |
| Building plans and commencement certificates | No project-specific building plan set or commencement certificate for individual buildings is established in the supplied materials. The document labelled “Commencement Certificates for each building in each phase” contains the RDO conversion proceedings described above. Document index |
| Completion / occupancy records | No project completion certificate or occupancy certificate is identified in the supplied materials. Document index |
| Portal / master-plan records | The HMDA layout-status lookup is recorded as unavailable through the public channel; the supplied evidence does not establish a public lookup result for this layout. HMDA |
1. Project at a glance
Project identity
Registered project name: HARITHAVANAM PHASE 11
Project type: Plotted development
Phase / registered portion: Phase 11; TG-RERA registration is for this named project.
TG-RERA registration number: P02100001679
Registration validity: 18/02/2020 to 31/07/2022; the certificate records no extension. This is the registration period, not a statement of completion or occupancy status.
Registered promoter: GREEN METRO INFRATECH & PROJECTS PVT LTD
RERA status in supplied record: Registration certificate issued. No extension is recorded on the certificate; current registration status is not independently established by the supplied extract.
Land and geographic identity
Locality: MEKAVANAM
Revenue village: Mekavanampally (also written “Mekavanampalle” in supplied filed documents); the project identity fields state Mekavanam.
Mandal / district / PIN: Mominpet / Vikarabad / 501202
Project survey numbers: 22/P, 23/P and 29/P
Registered site extent: Final layout approval records Ac. 20-01.6 Gts or Ac. 20.04 Cents; 96993.60 Sq. Yds.
RERA-filed total / affected / net area: 81099.00 sqmts total, 24038.32 sqmts affected in road widening/FTL of Tanks/Nala widening, and 57060.68 sqmts net.
Boundaries recorded on RERA form: North: Maddikunta Village; South, East and West: neighbouring land.
Development identity
Sanctioning authority: Director of Town and Country Planning (DTCP); approval is delegated to Mekavanampally Gram Panchayat.
Principal layout approval: TLP.No.44/2019/H, Final Technical Layout Pattern – Approved; approved date recorded as 29-06-2022.
Approved layout scale: 285 plots over the approved layout area.
Approved land-use split: Plotted area: Ac. 12.10 Cents; 58564.00 Sq. Yds (60.37%); road area: Ac. 5.94 Cents; 28749.60 Sq. Yds (29.63%); open space: Ac. 2.00 Cents; 9680.00 Sq. Yds (10.00%).
RERA-filed built-up area: 48966.96 sqmts; the filing also records a mortgage area of 7405.74 sqmts. These are filing fields; no building/floor configuration is provided.
Buildings, floors and parking levels: Not disclosed in the supplied project records. The approval is for a plotted layout, not an evidenced multi-storey building plan.
Approved versus RERA-declared plot counts: Approval records 285 plots. A separate plot-by-plot RERA inventory/count is not supplied.
Offering and status
Offering: Residential plots; the approved conditions describe detached, single-family dwelling use for sites.
Plot size range: Not disclosed in the supplied records.
Booked / available counts: Not supplied.
Construction / development stage: The RERA project information labels the status “New Project”; no current, independently verified site-progress record is supplied.
Completion dates: RERA registration record: proposed completion 31/07/2022. Form B declaration dated 16/10/2019 undertakes completion by 25th July 2025.
Occupancy / completion certificate: No project completion certificate or occupancy certificate is identified in the supplied documents. The layout approval is not itself evidence of completion or occupancy.
2. The project story
HARITHAVANAM PHASE 11 is registered as a plotted development in the Mekavanam locality, in the Mekavanampally/Mekavanampalle revenue-location records, Mominpet Mandal, Vikarabad District. Its TG-RERA identity covers survey numbers 22/P, 23/P and 29/P.
The filed DTCP final technical layout approval describes a residential layout of 285 plots, with land apportioned to plotted sites, roads and open space. Its conditions provide for detached, single-family residential dwelling use on the sites and refer to individual building permissions being considered separately. Thus, the supplied approval establishes a plotted layout; it does not establish that houses have been built on the plots.
The RERA form calls the project a “New Project,” and the supplied record gives proposed completion dates, but no site inspection or current progress evidence establishes what has been completed. The approval’s references to roads, open spaces and civic services describe the approved layout and its conditions; they do not independently verify present delivery or maintenance.
3. Master plan, architecture & building design
The approved plan is a plotted layout, not a building-floor plan in the supplied evidence. The final technical layout approval records 285 plots and a total area of Ac. 20-01.6 Gts or Ac. 20.04 Cents; 96993.60 Sq. Yds. Its stated land-use allocation is 60.37% plotted area, 29.63% road area, and 10.00% open space.
The RERA filing separately records a total land area of 81099.00 sqmts, 24038.32 sqmts affected in road widening/FTL of Tanks/Nala widening, and 57060.68 sqmts net area. The filing also lists 48966.96 sqmts approved built-up area. The supplied records do not explain the built-up-area figure in relation to the plotted-layout approval; it is retained here as the filed figure, not treated as plot area or dwelling carpet area.
The approval identifies roads, open spaces and plantation/greenery as layout features, and states that roads and open spaces were taken over under registered deeds. It also lists water supply, sewerage, drainage disposal, street lighting, rainwater harvesting and civic amenities among the layout provisions. No plot-by-plot drawing measurements, building footprints, floor configurations, plot-size schedule, or detailed landscape plan are supplied.
4. Homes, configurations & floor plans
This project is presented in the supplied record as a plotted development. The approved layout records 285 plots, but the supplied RERA inventory does not provide plot sizes, plot-by-plot configurations, booking counts, availability counts or filed saleable-area figures.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 285 plots in the approved layout; RERA unit/inventory count not supplied | Not supplied | Not supplied | Not supplied | Not applicable / not supplied | Not supplied |
Two drawings are listed, but neither has been measured; the records identify both as scans pending. The supplied floor-plan data therefore provides no software-measured carpet or room dimensions.
5. Parking & vehicle circulation
The supplied approval and RERA records do not establish parking-space counts, visitor or accessible parking, parking locations, vehicle entry/exit arrangements, or plot-specific parking allocations. The layout approval identifies internal roads and footpaths, but does not provide a detailed circulation or parking schedule in the supplied extract.
6. Amenities, recreation & open spaces
The layout approval allocates Ac. 2.00 Cents; 9680.00 Sq. Yds (10.00%) to open space and Ac. 5.94 Cents; 28749.60 Sq. Yds (29.63%) to roads. It lists plantation and greenery, water supply, sewerage, drainage disposal, street lighting, rainwater-harvesting structures and civic amenities as layout provisions. The amenity data shows these as listed facilities, but all supplied progress percentages are 0; no independent completion verification is provided.
| Description / size | Ac. 2.00 Cents; 9680.00 Sq. Yds; 10.00% of the approved layout. |
|---|---|
| Evidence source | DTCP final technical layout approval; RERA amenities |
| Declared progress / verified status | Approved / listed; current delivery not independently verified. Amenity progress field: 0. |
| Description / size | Listed; no separate size or quantity supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Listed as YES; progress field: 0; completion not independently verified. |
| Description / size | No specific sports or recreational facility details supplied beyond the approved open-space allocation. |
|---|---|
| Evidence source | DTCP final technical layout approval |
| Declared progress / verified status | Open-space allocation approved; facility fit-out or current condition not verified. |
| Description / size | Listed; no size, capacity or specific building description supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress field: 0; completion not independently verified. |
| Description / size | Required/identified for roads and open spaces; no planting schedule or quantified area beyond the open-space allocation supplied. |
|---|---|
| Evidence source | DTCP final technical layout approval |
| Declared progress / verified status | Approval condition; current maintenance or completion not independently verified. |
7. Utilities, building services & safety
The layout approval lists water supply, sewerage, drainage disposal systems, street lighting and rainwater-harvesting structures as layout services. The RERA amenities list also includes storm-water drains, sewage/sullage treatment and disposal, solid-waste management, energy management, fire-protection requirements, and an electrical meter room/sub-station/receiving station. These amenity entries do not provide capacities, detailed designs or completion evidence; all supplied progress percentages are 0.
The approval states that the local body is to ensure proper and effective maintenance of the listed civic services, and that rainwater-harvesting structures are to be provided. The supplied records do not specify water sources or storage capacity, an STP design or capacity, reuse arrangements, electrical backup, fire-system equipment, security systems, or accessible circulation.
8. Location, access & connectivity
The project’s filed geographic identity is MEKAVANAM, Mekavanampally/Mekavanampalle revenue-location records, Mominpet Mandal, Vikarabad District, PIN 501202, with project land in survey numbers 22/P, 23/P and 29/P. The RERA filing records Maddikunta Village to the north and neighbouring land to the east, south and west.
A cadastral parcel centroid is supplied at 17.41528, 78.35459. The location record lists Financial District (Nanakramguda) at 1.2 km as a connectivity anchor; the supplied data does not give an approach-road route or travel time.
9. Developer & development status
The registered promoter is GREEN METRO INFRATECH & PROJECTS PVT LTD, identified in the project records as a company. Its stated address is APURUPA TURBO, RD NO 36, MEKAVANAMPALLY, MEKAVANAM, Mominpet, Vikarabad, 501202. The supplied corporate identifier is masked as xxxxxx455R. The RERA filing identifies BODDU ASHOK. as an authorized signatory; the Form B declaration is made by BODDU ASHOK BABU on the promoter’s behalf.
The RERA registration certificate records registration from 18/02/2020 to 31/07/2022, with no extension recorded on the certificate. The registration fields give 31/07/2022 as the proposed completion date; the later Form B declaration dated 16/10/2019 states an undertaking to complete by 25th July 2025. No supplied project update or independent site verification establishes current progress or completion.
10. Approvals, official records & documents
TG-RERA registration: Form “C” registration certificate for HARITHAVANAM PHASE 11, registration P02100001679, issued under section 5; validity stated as 18/02/2020–31/07/2022. Certificate records no extension.
Principal layout approval: DTCP Final Technical Layout Pattern – Approved, TLP.No.44/2019/H, approved date 29-06-2022, for a 285-plot layout over Sy.Nos. 22/P, 23/P and 29/P. Approval is delegated to Mekavanampally Gram Panchayat.
Non-agricultural conversion proceedings: RDO Vikarabad proceedings C-1644-2018, dated 25/07/2018, concerning conversion permission over 23.1200 Acre-guntas in Sy.Nos. 22/E, 22/A, 29/A, 22/EE, 22/AA and 23/AA at Mekavanampalle Village, Mominpet Mandal. The supplied record describes the permission as granted to Anand Nagloor and lists its conditions.
Promoter declaration: Form B affidavit-cum-declaration dated 16/10/2019, signed by authorized signatory BODDU ASHOK BABU for GREENMETRO INFRATECH & PROJECTS PVT LTD; includes the promoter’s stated completion undertaking and other declarations.
Building plans and commencement certificates: No project-specific building plan set or commencement certificate for individual buildings is established in the supplied materials. The document labelled “Commencement Certificates for each building in each phase” contains the RDO conversion proceedings described above.
Completion / occupancy records: No project completion certificate or occupancy certificate is identified in the supplied materials.
Portal / master-plan records: The HMDA layout-status lookup is recorded as unavailable through the public channel; the supplied evidence does not establish a public lookup result for this layout.
Other registrations of Harithavanam
Frequently asked questions
Is HARITHAVANAM PHASE 11 registered with Telangana RERA?
Yes. HARITHAVANAM PHASE 11 is registered with the Telangana Real Estate Regulatory Authority as P02100001679; the registration status is New Project.
Who is the developer of HARITHAVANAM PHASE 11?
The promoter named in the RERA registration is GREEN METRO INFRATECH & PROJECTS PVT LTD.
Where is HARITHAVANAM PHASE 11 located?
HARITHAVANAM PHASE 11 is in MEKAVANAM, Mominpet, Vikarabad, Telangana (501202).
When will HARITHAVANAM PHASE 11 be completed?
The promoter's proposed date of completion filed with RERA is 31/07/2022. This is the promoter's declaration, not a guarantee.