Haritha Gardens Phase-I
SUNRISE INFRA · Suryapet · RERA P01900005590
HARITHA GARDENS PHASE-I is a plotted development in Gunjalur locality, Chivemla Mandal, Suryapet District, developed by registered promoter SUNRISE INFRA. The registered site area is 52,103.28 sq.m.; the DTCP draft layout records 148 plots, and plot configurations are not disclosed in the supplied RERA data. Its TG-RERA registration number is P01900005590, and its proposed completion date is 10/05/2023.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | HARITHA GARDENS PHASE-I RERA record |
| Project type | Plotted development RERA record RERA filing |
| Phase / registered portion | Phase-I; the registration record identifies the project as “HARITHA GARDENS PHASE-I.” The precise phase boundary is not separately set out in the supplied material. RERA record |
| TG-RERA registration | P01900005590, granted under section 5; certificate issued 27/12/2022. |
| Registration validity | 27/12/2022 to 10/05/2023. The certificate says the registration was not extended; this is the registration-validity period, not a statement of current completion or occupancy status. |
| Registered promoter | SUNRISE INFRA RERA record RERA filing |
| RERA status in supplied record | The project is recorded as “New Project”; the supplied certificate gives the validity period above. No extension or later registration-status record is supplied. RERA filing |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Gunjalur / Gunjaluru Revenue Village RERA record RERA filing |
| Mandal / district / PIN | Chivemla / Suryapet / 508213 RERA record RERA filing |
| Project survey numbers | 14P, 17 and 18P; the layout approval document writes these as 14/P, 17 and 18/P. RERA record |
| Registered site extent | 52,103.28 sq.m. (RERA land details: total area and net area both 52,103.28 sq.m.; affected area recorded as 0). RERA filing |
| Boundaries in RERA filing | North: existing 200 feet wide NH road; East, West and South: others land. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority / approval reference | Director of Town and Country Planning; approval file Lr.Roc.No. 14918/1668/2426/11, approved 10-05-2021. The RERA filing identifies plan approval TLP.No.140/2021/H. Approvals record |
| Approval character | The supplied DTCP document describes an approved Draft Technical Layout Pattern. It records 148 plots and states that permission is not proof of title. |
| Approved built-up area | 32,573.15 sq.m. is listed in the RERA filing under “Approved Built up Area”; the supplied material does not clarify how this building-area field applies to the plotted layout. RERA filing |
| Building / floor configuration | Not disclosed in the supplied project record. |
| Parking | No parking count or parking-level arrangement is established in the supplied material. |
| RERA-declared plots | The RERA filing does not provide a plot-count or plot-size schedule in the supplied data. The DTCP document records a 148-plot draft layout. |
Offering and status
| Item | Project record |
|---|---|
| Offering | Plots in a plotted layout; unit-level plot sizes and plot inventory are not supplied. RERA record |
| Booked / available counts | Not disclosed in the supplied material. |
| Construction / development stage | The project header records 80% completeness; this is a reported figure, not independently verified site progress. RERA record |
| Original completion undertaking / proposed date | 10/05/2023, stated in the Form-B declaration and the RERA project information. RERA filing |
| Revised completion date | Not supplied. |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is supplied. For a plotted layout, the supplied record does not establish an OC status for individual buildings or plots. Document index |
2. The project story
HARITHA GARDENS PHASE-I is a plotted development registered by SUNRISE INFRA in Gunjaluru Revenue Village, Chivemla Mandal, Suryapet District. The RERA-filed land identity is Survey Nos. 14P, 17 and 18P, and the RERA land-details record gives a site area of 52,103.28 sq.m. RERA record RERA filing
The DTCP document describes a draft layout with 148 plots, roads, an open-space reserve and plots reserved for mortgage to Gunjaluru Gram Panchayat. It also records conditions concerning ground demarcation, access to neighbouring sites, and transfer of open-space and road areas by registered gift deed before final layout release. These are details of the filed approval document; the supplied material does not establish the subsequent completion of each condition.
The project’s stated completion date was 10/05/2023. The supplied project record reports 80% completeness, but does not identify the measurement basis or provide independent site verification. No revised completion date or completion/occupancy certificate is included in the supplied evidence. RERA record Document index
3. Master plan, architecture & building design
The supplied approval is for a plotted layout, not a building or apartment scheme. The DTCP document records a 148-plot draft layout on Survey Nos. 14/P, 17 and 18/P, with the following land-use figures as stated in that document:
| Layout component | Area / share recorded in approval document |
|---|---|
| Plotted area | 62.53%; Ac. 8.049 cents; 38,957.16 Sq. Yds |
| Roads area | 27.00%; Ac. 3.475 cents; 16,819.00 Sq. Yds |
| Site reserved for open space (park) | 10%; Ac. 1.29 cents; 6,243.60 Sq. Yds |
| Area under HT lines | 0.47%; Ac. 0.061; 295.24 Sq. Yds |
| Mortgage area | 15.21%; Ac. 1.21 cents; 5,856.40 Syds |
These are figures reproduced from the DTCP document; the source uses differing area expressions within the same record. The approval document identifies Plot Nos. 121, 122 and 128 to 148 as mortgage plots, and describes open-space and road areas for transfer to the Gram Panchayat.
The RERA filing lists approved built-up area as 32,573.15 sq.m., but no building plans, building count, floor configuration, or building-use schedule are available in the supplied material to explain that figure. The filed layout-plan document is listed but not extracted. RERA filing Document index
4. Homes, configurations & floor plans
This is a plotted development. The supplied RERA data does not include a plot-wise inventory, plot-size bands, booked or available counts, or RERA-filed saleable areas. The DTCP draft-layout document records 148 plots, but does not provide a plot schedule in the supplied extraction. RERA record
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | Not disclosed by RERA data supplied | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
Two floor-plan drawings are listed, but both are scans pending measurement and no flats are identified. No apartment measurements can therefore be reported. Floor plans
5. Parking & vehicle circulation
No project-wide parking count, visitor or accessible parking provision, parking allocation schedule, or parking arrangement is established in the supplied material. The DTCP document identifies internal roads and requires roads to be opened for access to neighbouring sites, but does not describe vehicle-entry locations, driveway dimensions, pedestrian separation or EV provision. Document index
The DTCP approval document refers to specific plots reserved for mortgage to the Gram Panchayat; this is not evidence of parking allocation.
6. Amenities, recreation & open spaces
The RERA filing lists the following development items and facilities. Each item with a percentage has a recorded progress figure of 0 in the supplied data; no independent verification of completion is provided. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | Size not supplied | RERA-filed amenities RERA amenities | 0%; not independently verified |
| Water Supply | Source, capacity and system details not supplied | RERA-filed amenities RERA amenities | 0%; not independently verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | System components listed; capacity and configuration not supplied | RERA-filed amenities RERA amenities | 0%; not independently verified |
| Storm Water Drains | Details not supplied | RERA-filed amenities RERA amenities | 0%; not independently verified |
| Green Strip/TOT LOT/Park | RERA lists this facility; DTCP document records open space as 10%, Ac. 1.29 cents; 6,243.60 Sq. Yds | RERA amenities | RERA progress 0%; completion not independently verified |
| Street Lighting | Details not supplied | RERA-filed amenities RERA amenities | 0%; not independently verified |
| Community Buildings | Size and intended use not supplied | RERA-filed amenities RERA amenities | 0%; not independently verified |
| Treatment and Disposal of Sewage and Sullage Water | Details not supplied | RERA-filed amenities RERA amenities | 0%; not independently verified |
| Solid Waste Management and Disposal | Details not supplied | RERA-filed amenities RERA amenities | 0%; not independently verified |
| Water Conservation, Rain Water Harvesting | System details and capacity not supplied | RERA-filed amenities RERA amenities | 0%; not independently verified |
| Energy management | Details not supplied | RERA-filed amenities RERA amenities | 0%; not independently verified |
| Fire Protection and Fire Safety Requirements | System details not supplied | RERA-filed amenities RERA amenities | 0%; not independently verified |
| Electrical Meter Room, Sub-Station, Receiving Station | Equipment details and capacity not supplied | RERA-filed amenities RERA amenities | 0%; not independently verified |
| Aggregate area of recreational Open Space | Area not separately stated in this RERA amenity entry; DTCP approval records the open-space figure above | RERA amenities | RERA progress 0%; completion not independently verified |
The DTCP document also records an area under HT lines of 0.47%; it does not describe this as a recreational facility.
7. Utilities, building services & safety
The RERA-filed amenity schedule lists water supply; sewerage components including chambers, lines, septic tank and STP; storm-water drains; sewage and sullage-water treatment/disposal; rainwater harvesting; energy management; an electrical meter room/substation/receiving station; fire-protection and safety requirements; and solid-waste management. The supplied record does not specify capacities, water sources, storage, treatment or reuse details, electrical supply or backup, security systems, accessibility features, or the progress of individual systems beyond the listed 0% figures. These entries are filed disclosures, not evidence of completed works or statutory compliance. RERA amenities
8. Location, access & connectivity
The registered location is Gunjaluru Revenue Village, Gunjalur locality, Chivemla Mandal, Suryapet District, PIN 508213. The RERA land details state that the north boundary is an existing 200 feet wide NH road; the other three boundaries are described as “OTHERS LAND.” RERA record RERA filing
The supplied location data identifies the cadastral parcel centroid as 17.09478059978548, 79.75767302938327 and gives the nearest sampled Outer Ring Road interchange as approximately 121.1 km away. No other measured distances, public-transport details or landmark access information are supplied. Location record
9. Developer & development status
The registered promoter is SUNRISE INFRA, identified in the RERA filing as a partnership. The supplied GSTIN is 36AEHFS1658F1ZW. The RERA certificate lists the promoter office as Village: Kavirajnagar, Mandal: Khammam (Urban) Mandal, District: Khammam, PIN 507002. The project address field separately gives Venkatarama Enclave, Kaviraj Nagar, Gunjalur, Chivemla, Suryapet, 508213. RERA filing Corporate record
The Form-B declaration by the promoter’s authorized signatory states a completion undertaking of 10th May, 2023. The project record reports 80% completeness; no independent measurement or later revised timeline is supplied. No occupancy or completion certificate is provided. RERA record Document index
10. Approvals, official records & documents
| Record | Supplied evidence and scope |
|---|---|
| TG-RERA registration | Form ‘C’ registration certificate for HARITHA GARDENS PHASE-I, P01900005590, under section 5, valid 27/12/2022–10/05/2023. |
| DTCP layout approval | Director of Town and Country Planning letter, file Lr.Roc.No. 14918/1668/2426/11, dated 10-05-2021, for a draft technical layout pattern on Survey Nos. 14/P, 17 and 18/P, Gunjalur Revenue Village. |
| RERA-filed plan reference | TLP.No.140/2021/H. Approvals record |
| Title material | Advocate’s title search report dated 27.04.2022 is listed as document 244619; the supplied record describes its conclusion as subject to production of originals and the scope of documents reviewed. |
| Form-B declaration | SUNRISE INFRA declaration dated 23° June, 2022; includes the promoter’s title/encumbrance declaration and completion undertaking. |
| Layout plan document | A layout-plan submission is listed in the RERA documents, but the supplied record has no extracted plan content. Document index |
| Completion / occupancy certificates | None supplied. Document index |
1. Project at a glance
Project identity
Registered project name: HARITHA GARDENS PHASE-I
Project type: Plotted development
Phase / registered portion: Phase-I; the registration record identifies the project as “HARITHA GARDENS PHASE-I.” The precise phase boundary is not separately set out in the supplied material.
TG-RERA registration: P01900005590, granted under section 5; certificate issued 27/12/2022.
Registration validity: 27/12/2022 to 10/05/2023. The certificate says the registration was not extended; this is the registration-validity period, not a statement of current completion or occupancy status.
Registered promoter: SUNRISE INFRA
RERA status in supplied record: The project is recorded as “New Project”; the supplied certificate gives the validity period above. No extension or later registration-status record is supplied.
Land and geographic identity
Locality / revenue village: Gunjalur / Gunjaluru Revenue Village
Mandal / district / PIN: Chivemla / Suryapet / 508213
Project survey numbers: 14P, 17 and 18P; the layout approval document writes these as 14/P, 17 and 18/P.
Registered site extent: 52,103.28 sq.m. (RERA land details: total area and net area both 52,103.28 sq.m.; affected area recorded as 0).
Boundaries in RERA filing: North: existing 200 feet wide NH road; East, West and South: others land.
Development identity
Sanctioning authority / approval reference: Director of Town and Country Planning; approval file Lr.Roc.No. 14918/1668/2426/11, approved 10-05-2021. The RERA filing identifies plan approval TLP.No.140/2021/H.
Approval character: The supplied DTCP document describes an approved Draft Technical Layout Pattern. It records 148 plots and states that permission is not proof of title.
Approved built-up area: 32,573.15 sq.m. is listed in the RERA filing under “Approved Built up Area”; the supplied material does not clarify how this building-area field applies to the plotted layout.
Building / floor configuration: Not disclosed in the supplied project record.
Parking: No parking count or parking-level arrangement is established in the supplied material.
RERA-declared plots: The RERA filing does not provide a plot-count or plot-size schedule in the supplied data. The DTCP document records a 148-plot draft layout.
Offering and status
Offering: Plots in a plotted layout; unit-level plot sizes and plot inventory are not supplied.
Booked / available counts: Not disclosed in the supplied material.
Construction / development stage: The project header records 80% completeness; this is a reported figure, not independently verified site progress.
Original completion undertaking / proposed date: 10/05/2023, stated in the Form-B declaration and the RERA project information.
Revised completion date: Not supplied.
Occupancy / completion certificate: No occupancy certificate or completion certificate is supplied. For a plotted layout, the supplied record does not establish an OC status for individual buildings or plots.
2. The project story
HARITHA GARDENS PHASE-I is a plotted development registered by SUNRISE INFRA in Gunjaluru Revenue Village, Chivemla Mandal, Suryapet District. The RERA-filed land identity is Survey Nos. 14P, 17 and 18P, and the RERA land-details record gives a site area of 52,103.28 sq.m.
The DTCP document describes a draft layout with 148 plots, roads, an open-space reserve and plots reserved for mortgage to Gunjaluru Gram Panchayat. It also records conditions concerning ground demarcation, access to neighbouring sites, and transfer of open-space and road areas by registered gift deed before final layout release. These are details of the filed approval document; the supplied material does not establish the subsequent completion of each condition.
The project’s stated completion date was 10/05/2023. The supplied project record reports 80% completeness, but does not identify the measurement basis or provide independent site verification. No revised completion date or completion/occupancy certificate is included in the supplied evidence.
3. Master plan, architecture & building design
The supplied approval is for a plotted layout, not a building or apartment scheme. The DTCP document records a 148-plot draft layout on Survey Nos. 14/P, 17 and 18/P, with the following land-use figures as stated in that document:
Plotted area: 62.53%; Ac. 8.049 cents; 38,957.16 Sq. Yds
Roads area: 27.00%; Ac. 3.475 cents; 16,819.00 Sq. Yds
Site reserved for open space (park): 10%; Ac. 1.29 cents; 6,243.60 Sq. Yds
Area under HT lines: 0.47%; Ac. 0.061; 295.24 Sq. Yds
Mortgage area: 15.21%; Ac. 1.21 cents; 5,856.40 Syds
These are figures reproduced from the DTCP document; the source uses differing area expressions within the same record. The approval document identifies Plot Nos. 121, 122 and 128 to 148 as mortgage plots, and describes open-space and road areas for transfer to the Gram Panchayat.
The RERA filing lists approved built-up area as 32,573.15 sq.m., but no building plans, building count, floor configuration, or building-use schedule are available in the supplied material to explain that figure. The filed layout-plan document is listed but not extracted.
4. Homes, configurations & floor plans
This is a plotted development. The supplied RERA data does not include a plot-wise inventory, plot-size bands, booked or available counts, or RERA-filed saleable areas. The DTCP draft-layout document records 148 plots, but does not provide a plot schedule in the supplied extraction.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | Not disclosed by RERA data supplied | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
Two floor-plan drawings are listed, but both are scans pending measurement and no flats are identified. No apartment measurements can therefore be reported.
5. Parking & vehicle circulation
No project-wide parking count, visitor or accessible parking provision, parking allocation schedule, or parking arrangement is established in the supplied material. The DTCP document identifies internal roads and requires roads to be opened for access to neighbouring sites, but does not describe vehicle-entry locations, driveway dimensions, pedestrian separation or EV provision.
The DTCP approval document refers to specific plots reserved for mortgage to the Gram Panchayat; this is not evidence of parking allocation.
6. Amenities, recreation & open spaces
The RERA filing lists the following development items and facilities. Each item with a percentage has a recorded progress figure of 0 in the supplied data; no independent verification of completion is provided.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | Size not supplied | RERA-filed amenities | 0%; not independently verified |
| Water Supply | Source, capacity and system details not supplied | RERA-filed amenities | 0%; not independently verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | System components listed; capacity and configuration not supplied | RERA-filed amenities | 0%; not independently verified |
| Storm Water Drains | Details not supplied | RERA-filed amenities | 0%; not independently verified |
| Green Strip/TOT LOT/Park | RERA lists this facility; DTCP document records open space as 10%, Ac. 1.29 cents; 6,243.60 Sq. Yds | RERA progress 0%; completion not independently verified | |
| Street Lighting | Details not supplied | RERA-filed amenities | 0%; not independently verified |
| Community Buildings | Size and intended use not supplied | RERA-filed amenities | 0%; not independently verified |
| Treatment and Disposal of Sewage and Sullage Water | Details not supplied | RERA-filed amenities | 0%; not independently verified |
| Solid Waste Management and Disposal | Details not supplied | RERA-filed amenities | 0%; not independently verified |
| Water Conservation, Rain Water Harvesting | System details and capacity not supplied | RERA-filed amenities | 0%; not independently verified |
| Energy management | Details not supplied | RERA-filed amenities | 0%; not independently verified |
| Fire Protection and Fire Safety Requirements | System details not supplied | RERA-filed amenities | 0%; not independently verified |
| Electrical Meter Room, Sub-Station, Receiving Station | Equipment details and capacity not supplied | RERA-filed amenities | 0%; not independently verified |
| Aggregate area of recreational Open Space | Area not separately stated in this RERA amenity entry; DTCP approval records the open-space figure above | RERA progress 0%; completion not independently verified |
The DTCP document also records an area under HT lines of 0.47%; it does not describe this as a recreational facility.
7. Utilities, building services & safety
The RERA-filed amenity schedule lists water supply; sewerage components including chambers, lines, septic tank and STP; storm-water drains; sewage and sullage-water treatment/disposal; rainwater harvesting; energy management; an electrical meter room/substation/receiving station; fire-protection and safety requirements; and solid-waste management. The supplied record does not specify capacities, water sources, storage, treatment or reuse details, electrical supply or backup, security systems, accessibility features, or the progress of individual systems beyond the listed 0% figures. These entries are filed disclosures, not evidence of completed works or statutory compliance.
8. Location, access & connectivity
The registered location is Gunjaluru Revenue Village, Gunjalur locality, Chivemla Mandal, Suryapet District, PIN 508213. The RERA land details state that the north boundary is an existing 200 feet wide NH road; the other three boundaries are described as “OTHERS LAND.”
The supplied location data identifies the cadastral parcel centroid as 17.09478059978548, 79.75767302938327 and gives the nearest sampled Outer Ring Road interchange as approximately 121.1 km away. No other measured distances, public-transport details or landmark access information are supplied.
9. Developer & development status
The registered promoter is SUNRISE INFRA, identified in the RERA filing as a partnership. The supplied GSTIN is 36AEHFS1658F1ZW. The RERA certificate lists the promoter office as Village: Kavirajnagar, Mandal: Khammam (Urban) Mandal, District: Khammam, PIN 507002. The project address field separately gives Venkatarama Enclave, Kaviraj Nagar, Gunjalur, Chivemla, Suryapet, 508213.
The Form-B declaration by the promoter’s authorized signatory states a completion undertaking of 10th May, 2023. The project record reports 80% completeness; no independent measurement or later revised timeline is supplied. No occupancy or completion certificate is provided.
10. Approvals, official records & documents
TG-RERA registration: Form ‘C’ registration certificate for HARITHA GARDENS PHASE-I, P01900005590, under section 5, valid 27/12/2022–10/05/2023.
DTCP layout approval: Director of Town and Country Planning letter, file Lr.Roc.No. 14918/1668/2426/11, dated 10-05-2021, for a draft technical layout pattern on Survey Nos. 14/P, 17 and 18/P, Gunjalur Revenue Village.
RERA-filed plan reference: TLP.No.140/2021/H.
Title material: Advocate’s title search report dated 27.04.2022 is listed as document 244619; the supplied record describes its conclusion as subject to production of originals and the scope of documents reviewed.
Form-B declaration: SUNRISE INFRA declaration dated 23° June, 2022; includes the promoter’s title/encumbrance declaration and completion undertaking.
Layout plan document: A layout-plan submission is listed in the RERA documents, but the supplied record has no extracted plan content.
Completion / occupancy certificates: None supplied.
Frequently asked questions
Is HARITHA GARDENS PHASE-I registered with Telangana RERA?
Yes. HARITHA GARDENS PHASE-I is registered with the Telangana Real Estate Regulatory Authority as P01900005590; the registration status is New Project.
Who is the developer of HARITHA GARDENS PHASE-I?
The promoter named in the RERA registration is SUNRISE INFRA.
Where is HARITHA GARDENS PHASE-I located?
HARITHA GARDENS PHASE-I is in Gunjalur, Gunjaluru, Chivemla, Suryapet, Telangana (508213).
When will HARITHA GARDENS PHASE-I be completed?
The promoter's proposed date of completion filed with RERA is 10/05/2023. This is the promoter's declaration, not a guarantee.