The Blooming Forest
COMMUNE REALTY PRIVATE LIMITED · Rangareddy · RERA P02400006586
THE BLOOMING FOREST is a plotted development in Ramanuthula, Amangal mandal, Ranga Reddy district, developed by registered promoter COMMUNE REALTY PRIVATE LIMITED. The TG-RERA record states a total and net site area of 112203.14 sq. m, and the draft layout order describes 285 plots; no building or floor configuration is disclosed. The plots’ sizes are not disclosed in the RERA record. TG-RERA registration number P02400006586 was issued 07/07/2023, and the proposed completion date in the project header is 13/10/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | THE BLOOMING FOREST RERA record |
| Project type | Plotted development / plotted layout RERA record RERA filing |
| Phase / registered portion | Phase not separately identified; RERA registration is for the project recorded against Survey No. 56/2. RERA record |
| TG-RERA registration | P02400006586, issued 07/07/2023; recorded validity 07/07/2023–13/10/2024. RERA record Approvals record |
| RERA status in supplied record | The certificate’s stated validity ended 13/10/2024; no extension is recorded in the supplied evidence. This is registration validity, not a completion date or occupancy certificate. Approvals record |
| Registered promoter | COMMUNE REALTY PRIVATE LIMITED RERA record Corporate record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Ramanthula / Ramanuthula, as named in the project and approval records RERA record |
| Revenue village | Ramanuthula; the draft layout order identifies Ramanthula Gram Panchayat and Ramanthula village. RERA record |
| Mandal / district / PIN | Amangal / Ranga Reddy / 509358 RERA record RERA filing |
| Project survey number(s) disclosed | Sy. No. 56/2; no project-specific subdivisions are stated in the RERA identity. RERA record Land records |
| Site extent in RERA record | 112203.14 sq. m total and net area Land records |
| Draft layout order’s stated extent | Ac. 27.29.04 Guntas or Ac. 27.726 Cents; its land-use schedule states layout area of Ac. 27.726 Cents; 134193.84 Sq. Yds. |
| Boundaries in RERA record | East: OTHERS LAND; West: EXISTING DTCP LAYOUT; North: FOREST LAND; South: EXISTING DTCP LAYOUT AND 60 FEET WIDE ROAD Land records |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Director of Town and Country Planning; the order delegates the layout matter to Ramanthula Gram Panchayat. Approvals record |
| Principal approval | Draft - TLP.No.297/2022/H, approved 13-10-2022; file no. Lr.Roc.No.12027/926/2022/H/e-Panchayat. Approvals record |
| Layout / plot count | Draft Technical Layout Pattern for 285 plots |
| Land-use schedule in the draft order | Plotted area: Ac. 15.136 Cents; 73258.24 Sq. Yds. (54.60%); roads: Ac. 9.817 Cents; 47514.28 Sq. Yds. (35.40%); open space: Ac. 2.773 Cents; 13421.32 Sq. Yds. (10.00%). |
| Approved built-up area / buildings / floors | Not applicable to the recorded plotted layout as stated in the supplied evidence; no building count or floor configuration is disclosed. The RERA data separately lists “Approved Built up Area (In Sqmts)” as 61253.22, but the supplied materials do not explain its scope for this plotted project. RERA filing |
| Parking | No sanctioned parking count, parking arrangement or parking levels are established by the supplied project records. RERA amenities |
Offering and status
| Field | Record |
|---|---|
| Offering | Plots; the draft layout order records 285 plots. RERA unit-level plot inventory, sizes and booking/availability counts are not supplied. RERA unit table |
| RERA completion undertaking | Promoter’s Form B states completion by 12th October, 2024. |
| Completion date on RERA project record | 13/10/2024 at registration RERA filing |
| Proposed completion date in project header | 13/10/2025 RERA record |
| Occupancy / completion certificate | No project occupancy or completion certificate is included in the supplied documents; the project is a plotted layout. Document index |
| Construction / development stage | RERA amenity records show Internal Roads & Footpaths at 10%; other listed progress percentages are 0%. These are filed progress figures, not independent site verification. RERA amenities |
2. The project story
THE BLOOMING FOREST is a plotted development recorded by TG-RERA in Survey No. 56/2 at Ramanuthula, Amangal mandal, Ranga Reddy district. The project’s RERA filing identifies a site area of 112203.14 sq. m and the draft layout approval describes 285 plots, with land allocated in the order to plots, roads and open space. RERA record Land records
The approval evidence is a draft layout order, not evidence in the supplied pack that final layout release has been issued. Its conditions call for specified plots to be mortgaged to the Gram Panchayat and for roads and open space to be transferred by registered gift deed before final layout release. The order also states that development works are the layout owner/developer’s responsibility.
The RERA progress schedule records 10% for internal roads and footpaths and 0% for the other listed facilities. These are the figures in the filing; no independent site inspection or verified completion status is supplied. No phase-wise construction or occupancy status is recorded. RERA amenities
3. Master plan, architecture & building design
This is documented as a plotted layout, rather than a multi-building or apartment scheme. The draft layout order states 285 plots and the following land-use split: plotted area 54.60%, roads 35.40%, and open space 10.00%. The order requires demarcation of plots and open spaces on the ground and states that all roads are to be opened for access to neighbouring sites.
The draft order’s stated layout area is Ac. 27.726 Cents; 134193.84 Sq. Yds. Its plotted-area, road-area and open-space figures are set out in the project-at-a-glance table. The RERA land record separately reports 112203.14 sq. m total/net area. No approved building arrangement, building footprint, floor configuration, internal plot dimensions, plot-size schedule or final layout drawing extraction is supplied. Land records
The order lists side drains, Nala channelization, avenue plantation, rainwater-harvesting pits, fencing of open spaces, street lighting and electricity facilities, sewerage disposal and protected water supply as layout works or facilities. This records what the order specifies; it does not establish that these works have been completed.
4. Homes, configurations & floor plans
The RERA offering is plots, not apartments. The evidence supports the approved draft-layout count but does not provide a RERA plot inventory by size, booked or available counts, or unit-level saleable areas. RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading |
|---|---|---|---|---|---|---|
| Plots | 285 in draft layout | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not disclosed |
The supplied third-party vendor data lists plot sizes of 1801 Sq. Ft. and 2047 Sq. Ft.; these are vendor-listed figures, not RERA-filed plot-area measurements. Promoter website
The drawing review records two drawings, both scans pending; no measurements were produced. Therefore no software-measured plot areas or plot-layout dimensions can be reported. Floor plans
5. Parking & vehicle circulation
The supplied evidence does not establish a sanctioned parking count, visitor or accessible parking provision, parking levels, EV charging, or individual plot parking allocations. RERA amenities
The draft layout order requires roads to remain open for accessibility to neighbouring sites. RERA progress records Internal Roads & Footpaths at 10%; this is a filed progress figure, not an independently verified condition on the ground. RERA amenities
6. Amenities, recreation & open spaces
The draft order identifies layout works and facilities; the RERA amenities schedule records availability and progress fields. The listed progress percentages are filed figures and do not independently verify completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | Layout roads; road area in draft schedule: Ac. 9.817 Cents; 47514.28 Sq. Yds. (35.40%) | RERA amenities | RERA schedule: 10%; not independently verified |
| Open space / green area | Open space: Ac. 2.773 Cents; 13421.32 Sq. Yds. (10.00%); draft order requires transfer by registered gift deed before final layout release | RERA green-strip/park progress: 0%; transfer/completion not established | |
| Avenue plantation | Listed in layout order | No completed status supplied | |
| Fencing of open spaces | Listed in layout order | No completed status supplied | |
| Side drains and Nala channelization | Listed in layout order | No completed status supplied | |
| Rainwater-harvesting pits | Listed in layout order; RERA schedule also lists water conservation/rainwater harvesting | RERA amenities | RERA schedule: 0%; completion not established |
| Street lighting | Listed in layout order and RERA schedule | RERA amenities | RERA schedule: 0%; completion not established |
| Community buildings | RERA schedule entry; no size or facility detail supplied | RERA amenities | 0%; completion not established |
Vendor-listed amenities include sports, children’s play areas, sand pits, swimming pool, gym and clubhouse. These are third-party listing claims, not shown in the supplied draft approval or as completed RERA-recorded facilities. Promoter website
7. Utilities, building services & safety
The draft layout order lists protected water supply, a sewerage disposal system, side drains, Nala channelization, rainwater-harvesting pits, and street lighting and electricity facilities. It does not give capacities, technical specifications, treatment details or evidence of completed installation.
The RERA amenities schedule lists water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, energy management, fire protection, an electrical meter room/sub-station/receiving station, and solid-waste management. Its progress figures are 0% for these listed items; they are filing data, not independent verification of actual works or statutory compliance. RERA amenities
The supplied records do not specify water source or storage, treatment capacity, sewage-treatment or reuse capacity, electrical supply or backup capacity, fire-system design, security systems, or accessibility features. Vendor listings mention 24 x 7 water supply, security, CCTV, power backup and fire safety; these are not established by the project-specific approval or progress records supplied here. Promoter website
8. Location, access & connectivity
The registered location is Ramanuthula, Amangal mandal, Ranga Reddy district, PIN 509358; the draft approval identifies Ramanthula Gram Panchayat. The project record’s stated boundaries include forest land to the north and an existing DTCP layout and 60 feet wide road to the south. RERA record Land records
The supplied location data lists the nearest sampled Outer Ring Road interchange at 43.4 km (approx.). No other measured road, public-transport or landmark distances are provided. Location record
9. Developer & development status
The TG-RERA registered promoter is COMMUNE REALTY PRIVATE LIMITED, a private limited company; the project record lists GSTIN 36AAECC9820F1ZP. The RERA certificate gives the promoter office as Village: TELAPUR, Mandal: RC PURAM, District: Sangareddy, PIN 502032. Corporate record
The promoter’s Form B affidavit, dated 05 April 2023, undertakes completion by 12th October, 2024. The registration certificate records validity through 13/10/2024; these are separate recorded dates and neither establishes completion or an occupancy certificate. The project header also lists proposed completion as 13/10/2025. No extension order or completion/occupancy certificate is supplied. RERA record
The RERA amenities schedule records 10% progress for Internal Roads & Footpaths and 0% for the other listed items. The supplied evidence does not establish independent construction progress or final layout release. RERA amenities Document index
10. Approvals, official records & documents
| Record | Evidence in supplied project file |
|---|---|
| TG-RERA registration | Form C for THE BLOOMING FOREST, registration P02400006586, issued 07/07/2023, stated validity through 13/10/2024. No extension record is supplied. |
| Draft layout approval | Director of Town and Country Planning order Draft - TLP.No.297/2022/H, dated 13-10-2022; file no. Lr.Roc.No.12027/926/2022/H/e-Panchayat; draft layout for 285 plots in Sy. No. 56/2. |
| Layout drawing | A layout-plan document is listed in the RERA file, but the supplied record does not contain an extracted plan or final-layout release evidence. Document index |
| Promoter Form B | Form-B affidavit dated 05 April 2023, including title, encumbrance, fund-management and completion declarations. These are promoter declarations. |
| Completion / occupancy certificate | Not present in the supplied documents. Document index |
| HMDA layout lookup | The supplied record says the public HMDA DPMS approved-layout lookup was unavailable; this does not establish approval or refusal. HMDA |
The draft approval states that the order is not proof of land title and requires the open-space and road areas to be transferred by registered gift deed before final layout release.
1. Project at a glance
Project identity
Registered project name: THE BLOOMING FOREST
Project type: Plotted development / plotted layout
Phase / registered portion: Phase not separately identified; RERA registration is for the project recorded against Survey No. 56/2.
TG-RERA registration: P02400006586, issued 07/07/2023; recorded validity 07/07/2023–13/10/2024.
RERA status in supplied record: The certificate’s stated validity ended 13/10/2024; no extension is recorded in the supplied evidence. This is registration validity, not a completion date or occupancy certificate.
Registered promoter: COMMUNE REALTY PRIVATE LIMITED
Land and geographic identity
Locality: Ramanthula / Ramanuthula, as named in the project and approval records
Revenue village: Ramanuthula; the draft layout order identifies Ramanthula Gram Panchayat and Ramanthula village.
Mandal / district / PIN: Amangal / Ranga Reddy / 509358
Project survey number(s) disclosed: Sy. No. 56/2; no project-specific subdivisions are stated in the RERA identity.
Site extent in RERA record: 112203.14 sq. m total and net area
Draft layout order’s stated extent: Ac. 27.29.04 Guntas or Ac. 27.726 Cents; its land-use schedule states layout area of Ac. 27.726 Cents; 134193.84 Sq. Yds.
Boundaries in RERA record: East: OTHERS LAND; West: EXISTING DTCP LAYOUT; North: FOREST LAND; South: EXISTING DTCP LAYOUT AND 60 FEET WIDE ROAD
Development identity
Sanctioning authority: Director of Town and Country Planning; the order delegates the layout matter to Ramanthula Gram Panchayat.
Principal approval: Draft - TLP.No.297/2022/H, approved 13-10-2022; file no. Lr.Roc.No.12027/926/2022/H/e-Panchayat.
Layout / plot count: Draft Technical Layout Pattern for 285 plots
Land-use schedule in the draft order: Plotted area: Ac. 15.136 Cents; 73258.24 Sq. Yds. (54.60%); roads: Ac. 9.817 Cents; 47514.28 Sq. Yds. (35.40%); open space: Ac. 2.773 Cents; 13421.32 Sq. Yds. (10.00%).
Approved built-up area / buildings / floors: Not applicable to the recorded plotted layout as stated in the supplied evidence; no building count or floor configuration is disclosed. The RERA data separately lists “Approved Built up Area (In Sqmts)” as 61253.22, but the supplied materials do not explain its scope for this plotted project.
Parking: No sanctioned parking count, parking arrangement or parking levels are established by the supplied project records.
Offering and status
Offering: Plots; the draft layout order records 285 plots. RERA unit-level plot inventory, sizes and booking/availability counts are not supplied.
RERA completion undertaking: Promoter’s Form B states completion by 12th October, 2024.
Completion date on RERA project record: 13/10/2024 at registration
Proposed completion date in project header: 13/10/2025
Occupancy / completion certificate: No project occupancy or completion certificate is included in the supplied documents; the project is a plotted layout.
Construction / development stage: RERA amenity records show Internal Roads & Footpaths at 10%; other listed progress percentages are 0%. These are filed progress figures, not independent site verification.
2. The project story
THE BLOOMING FOREST is a plotted development recorded by TG-RERA in Survey No. 56/2 at Ramanuthula, Amangal mandal, Ranga Reddy district. The project’s RERA filing identifies a site area of 112203.14 sq. m and the draft layout approval describes 285 plots, with land allocated in the order to plots, roads and open space.
The approval evidence is a draft layout order, not evidence in the supplied pack that final layout release has been issued. Its conditions call for specified plots to be mortgaged to the Gram Panchayat and for roads and open space to be transferred by registered gift deed before final layout release. The order also states that development works are the layout owner/developer’s responsibility.
The RERA progress schedule records 10% for internal roads and footpaths and 0% for the other listed facilities. These are the figures in the filing; no independent site inspection or verified completion status is supplied. No phase-wise construction or occupancy status is recorded.
3. Master plan, architecture & building design
This is documented as a plotted layout, rather than a multi-building or apartment scheme. The draft layout order states 285 plots and the following land-use split: plotted area 54.60%, roads 35.40%, and open space 10.00%. The order requires demarcation of plots and open spaces on the ground and states that all roads are to be opened for access to neighbouring sites.
The draft order’s stated layout area is Ac. 27.726 Cents; 134193.84 Sq. Yds. Its plotted-area, road-area and open-space figures are set out in the project-at-a-glance table. The RERA land record separately reports 112203.14 sq. m total/net area. No approved building arrangement, building footprint, floor configuration, internal plot dimensions, plot-size schedule or final layout drawing extraction is supplied.
The order lists side drains, Nala channelization, avenue plantation, rainwater-harvesting pits, fencing of open spaces, street lighting and electricity facilities, sewerage disposal and protected water supply as layout works or facilities. This records what the order specifies; it does not establish that these works have been completed.
4. Homes, configurations & floor plans
The RERA offering is plots, not apartments. The evidence supports the approved draft-layout count but does not provide a RERA plot inventory by size, booked or available counts, or unit-level saleable areas.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading |
|---|---|---|---|---|---|---|
| Plots | 285 in draft layout | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not disclosed |
The supplied third-party vendor data lists plot sizes of 1801 Sq. Ft. and 2047 Sq. Ft.; these are vendor-listed figures, not RERA-filed plot-area measurements.
The drawing review records two drawings, both scans pending; no measurements were produced. Therefore no software-measured plot areas or plot-layout dimensions can be reported.
5. Parking & vehicle circulation
The supplied evidence does not establish a sanctioned parking count, visitor or accessible parking provision, parking levels, EV charging, or individual plot parking allocations.
The draft layout order requires roads to remain open for accessibility to neighbouring sites. RERA progress records Internal Roads & Footpaths at 10%; this is a filed progress figure, not an independently verified condition on the ground.
6. Amenities, recreation & open spaces
The draft order identifies layout works and facilities; the RERA amenities schedule records availability and progress fields. The listed progress percentages are filed figures and do not independently verify completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | Layout roads; road area in draft schedule: Ac. 9.817 Cents; 47514.28 Sq. Yds. (35.40%) | RERA schedule: 10%; not independently verified | |
| Open space / green area | Open space: Ac. 2.773 Cents; 13421.32 Sq. Yds. (10.00%); draft order requires transfer by registered gift deed before final layout release | RERA green-strip/park progress: 0%; transfer/completion not established | |
| Avenue plantation | Listed in layout order | No completed status supplied | |
| Fencing of open spaces | Listed in layout order | No completed status supplied | |
| Side drains and Nala channelization | Listed in layout order | No completed status supplied | |
| Rainwater-harvesting pits | Listed in layout order; RERA schedule also lists water conservation/rainwater harvesting | RERA schedule: 0%; completion not established | |
| Street lighting | Listed in layout order and RERA schedule | RERA schedule: 0%; completion not established | |
| Community buildings | RERA schedule entry; no size or facility detail supplied | 0%; completion not established |
Vendor-listed amenities include sports, children’s play areas, sand pits, swimming pool, gym and clubhouse. These are third-party listing claims, not shown in the supplied draft approval or as completed RERA-recorded facilities.
7. Utilities, building services & safety
The draft layout order lists protected water supply, a sewerage disposal system, side drains, Nala channelization, rainwater-harvesting pits, and street lighting and electricity facilities. It does not give capacities, technical specifications, treatment details or evidence of completed installation.
The RERA amenities schedule lists water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, energy management, fire protection, an electrical meter room/sub-station/receiving station, and solid-waste management. Its progress figures are 0% for these listed items; they are filing data, not independent verification of actual works or statutory compliance.
The supplied records do not specify water source or storage, treatment capacity, sewage-treatment or reuse capacity, electrical supply or backup capacity, fire-system design, security systems, or accessibility features. Vendor listings mention 24 x 7 water supply, security, CCTV, power backup and fire safety; these are not established by the project-specific approval or progress records supplied here.
8. Location, access & connectivity
The registered location is Ramanuthula, Amangal mandal, Ranga Reddy district, PIN 509358; the draft approval identifies Ramanthula Gram Panchayat. The project record’s stated boundaries include forest land to the north and an existing DTCP layout and 60 feet wide road to the south.
The supplied location data lists the nearest sampled Outer Ring Road interchange at 43.4 km (approx.). No other measured road, public-transport or landmark distances are provided.
9. Developer & development status
The TG-RERA registered promoter is COMMUNE REALTY PRIVATE LIMITED, a private limited company; the project record lists GSTIN 36AAECC9820F1ZP. The RERA certificate gives the promoter office as Village: TELAPUR, Mandal: RC PURAM, District: Sangareddy, PIN 502032.
The promoter’s Form B affidavit, dated 05 April 2023, undertakes completion by 12th October, 2024. The registration certificate records validity through 13/10/2024; these are separate recorded dates and neither establishes completion or an occupancy certificate. The project header also lists proposed completion as 13/10/2025. No extension order or completion/occupancy certificate is supplied.
The RERA amenities schedule records 10% progress for Internal Roads & Footpaths and 0% for the other listed items. The supplied evidence does not establish independent construction progress or final layout release.
10. Approvals, official records & documents
TG-RERA registration: Form C for THE BLOOMING FOREST, registration P02400006586, issued 07/07/2023, stated validity through 13/10/2024. No extension record is supplied.
Draft layout approval: Director of Town and Country Planning order Draft - TLP.No.297/2022/H, dated 13-10-2022; file no. Lr.Roc.No.12027/926/2022/H/e-Panchayat; draft layout for 285 plots in Sy. No. 56/2.
Layout drawing: A layout-plan document is listed in the RERA file, but the supplied record does not contain an extracted plan or final-layout release evidence.
Promoter Form B: Form-B affidavit dated 05 April 2023, including title, encumbrance, fund-management and completion declarations. These are promoter declarations.
Completion / occupancy certificate: Not present in the supplied documents.
HMDA layout lookup: The supplied record says the public HMDA DPMS approved-layout lookup was unavailable; this does not establish approval or refusal.
The draft approval states that the order is not proof of land title and requires the open-space and road areas to be transferred by registered gift deed before final layout release.
Frequently asked questions
Is THE BLOOMING FOREST registered with Telangana RERA?
Yes. THE BLOOMING FOREST is registered with the Telangana Real Estate Regulatory Authority as P02400006586; the registration status is New Project.
Who is the developer of THE BLOOMING FOREST?
The promoter named in the RERA registration is COMMUNE REALTY PRIVATE LIMITED.
Where is THE BLOOMING FOREST located?
THE BLOOMING FOREST is in Ramanthula, Ramanuthula, Amangal, Rangareddy, Telangana (509358).
When will THE BLOOMING FOREST be completed?
The promoter's proposed date of completion filed with RERA is 13/10/2025. This is the promoter's declaration, not a guarantee.