Silver Spring Grand Vip
SHATHABDHI TOWNSHIPS PVT LTD · Rangareddy · RERA P02400004399
SILVER SPRING GRAND VIP is a plotted development in Lemamidi Gram Panchayat, Keshampet Mandal, Ranga Reddy district, developed by registered promoter SHATHABDHI TOWNSHIPS PVT LTD. The registered site extent is 34802.96 sq. m, and the draft-layout document states 119 plots; building or floor configuration is not disclosed. The project is registered under TG-RERA registration P02400004399, issued on 11/04/2022, and the project header lists proposed completion as 30/03/2028.
More from Shathabdhi Townships Pvt Ltd · 21 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | SILVER SPRING GRAND VIP RERA record |
| Project type | Plotted development / layout RERA record RERA filing |
| Phase / registered portion | Phase not separately identified; the registration is for the named project |
| TG-RERA registration | P02400004399; Form C issued under section 5 on 11/04/2022 RERA record |
| Registration validity | 11/04/2022 through 30/11/2027; the certificate states a period of 5 years. This is registration validity, not a completion or occupancy certificate. |
| Registered promoter | SHATHABDHI TOWNSHIPS PVT LTD RERA record Corporate record |
| RERA project status | New Project, as recorded in the project fields RERA filing |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Lemamidi Gram Panchayat RERA record RERA filing |
| Revenue village | Lemamidi RERA record Land records |
| Mandal / district / PIN | Keshampet / Ranga Reddy / 509408 RERA record |
| Project survey numbers | 167/U, 167/EE, 167/E, 167/AA & 167/A RERA record Land records |
| Additional survey numbers in draft-layout document | 42/P and 43/P are also named in the draft-layout mortgage condition; that document’s wider listed survey set is 167/U, 167/EE, 167/E, 167/AA, 167/A, 42/P and 43/P. |
| Registered site extent | 34802.96 sq. m in the project fields RERA filing |
| Layout-document extent | Ac. 8-24 Guntas or Ac.8.60 Cents; 41624.00 Sq. Yds. |
| Net / total area in project fields | Net area 34802.96 sq. m; total area 34802.96 sq. m; affected area recorded as 00. RERA filing |
| Boundaries | North, south, east and west are recorded as NA in the supplied land record. Land records |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Director of Town and Country Planning; the draft layout document states it was delegated to Lemamidi Panchayat. Approvals record |
| Principal approval | Draft- TLP.No.345/2021/ H, approved 30-11-2021; file Lr.Roc.No.12488/2565/2021/le-Panchayat; application 12488/2565. Approvals record |
| Approved built-up area | 34802.96 sq. m is entered as “Approved Built up Area” in the project fields; the supplied evidence does not provide a building built-up-area schedule for this plotted layout. RERA filing |
| Layout scale | Draft-layout document states 119 plots. |
| Building / floor configuration | Not disclosed in the supplied project records; the approval is for a plotted layout, not a building-floor schedule. |
| Parking | No project-wide parking-space count or allocation is supplied. RERA amenities |
| Layout land-use figures in draft approval | Plotted area Ac. 4.69 Cents; 22699.60 Sq. Yds. (54.54%); road area Ac. 3.05 Cents; 14762.00 Sq. Yds. (35.46%); open space Ac. 0.86 Cents; 4162.40 Sq. Yds. (10.00%); mortgage area Ac. 0.74 Cents; 3581.60 Sq. Yds. (15.77%). |
Offering and status
| Field | Project record |
|---|---|
| Unit type | Plots; the draft layout states 119 plots. RERA record |
| Plot sizes | A promoter-associated vendor record lists saleable sizes of 1860 Sq.Ft. and 3102 Sq.Ft.; these are not identified as RERA-filed plot-size bands in the supplied project records. Promoter website |
| Booked / available counts | Not supplied. RERA filing RERA amenities |
| Construction / development stage | No independently verified site-progress record is supplied. The RERA amenities schedule records zero progress for the listed items; those entries do not establish present site condition. RERA amenities |
| Completion date | The promoter’s Form B declares completion by 30-11-2027. The project header lists proposed completion as 30/03/2028. These fields are reported separately here; the supplied record does not identify an approved extension. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. This is a plotted layout; no phase- or plot-specific certificate status is provided. Document index |
2. The project story
SILVER SPRING GRAND VIP is registered as a plotted-development project in Lemamidi village, Keshampet Mandal, Ranga Reddy district. Its RERA land identification lists 167/U, 167/EE, 167/E, 167/AA and 167/A. The draft-layout approval also refers to 42/P and 43/P in its mortgage condition. RERA record Land records
The Director of Town and Country Planning’s Draft Technical Layout Pattern describes a 119-plot layout, with areas designated for plots, roads, open space and mortgage. It also says the open-space and road areas are to be handed to the Gram Panchayat by registered gift deed before release of the final layout. The document lists intended layout works including roads, drains, greenery, street lighting, electricity, sewerage disposal and protected water supply.
The promoter’s Form B declares completion by 30-11-2027. Separately, the project header records proposed completion as 30/03/2028; no supplied evidence documents an extension or resolves the status of the different dates. No independent site inspection or verified completion evidence is included, and the supplied RERA progress schedule does not report completed works. RERA record RERA amenities
3. Master plan, architecture & building design
The supplied approval is for a Draft Technical Layout Pattern, not a building plan. It records 119 plots and allocates land as follows: 54.54% plotted area, 35.46% roads, 10.00% open space and 15.77% mortgage area. The approval states that the roads and open space are to be gifted to the Gram Panchayat before final layout release.
The approval names mortgage plots as Plot Nos.43 and 102 to 119. It describes the mortgage extent as Ac.0.74 cents or 3581.60 Sq.Yards. It also lists layout-development requirements including formation of roads, drains, greenery, fencing of open spaces, street lighting, electricity, sewerage disposal and protected water supply.
No approved plot-by-plot schedule, dimensions, road widths, building arrangement, architectural plans, landscaping plan or utility-plot schedule is supplied. The floor-plan file set contains two drawings, but both are scans pending measurement and neither is recorded as a layout sheet. Floor plans
4. Homes, configurations & floor plans
This is a plotted project, not an apartment configuration schedule. The draft-layout document states 119 plots, but the supplied records do not give plot-by-plot counts, RERA-filed plot-size bands, or booked and available inventory. RERA filing
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 119 stated in draft-layout document | Not supplied | Not supplied | Not supplied | Not applicable / not measured | Not supplied |
The vendor record lists plot saleable sizes of 1860 Sq.Ft. and 3102 Sq.Ft.; the supplied records do not establish these as the RERA-filed plot-size bands. The floor-plan drawings are scans pending measurement, so there are no software-measured carpet or plot dimensions to report. Promoter website Floor plans
5. Parking & vehicle circulation
No sanctioned parking-space count, visitor or accessible parking provision, plot-level parking allocation, or parking plan is supplied. The draft-layout approval requires roads to be opened for access to neighbouring sites and prohibits a compound wall or fencing around the site; it does not provide road widths, access-point details or a vehicle-circulation plan. RERA amenities
6. Amenities, recreation & open spaces
The draft-layout approval specifies land for open space and lists intended development works and services. The RERA amenities schedule marks some categories “YES,” but records 0% progress for each listed item; the schedule does not establish that any facility is completed or independently verified. RERA amenities
| Description / size | Ac. 0.86 cents (10.00 %); 4162.40 Sq. Yds.; to be handed to the Gram Panchayat by registered gift deed before final layout release. |
|---|---|
| Evidence source | Draft layout |
| Declared progress / verified status | Required by the approval; completion or transfer not verified. RERA schedule: aggregate recreational open space 0%. RERA amenities |
| Description / size | Roads area Ac.3.05 cents (35.46 %); 14762.00 Sq. Yds.; road formation and access to neighbouring sites are specified. |
|---|---|
| Evidence source | Draft layout |
| Declared progress / verified status | RERA schedule: 0%; completion not verified. RERA amenities |
| Description / size | Avenue plantation, greenery and fencing of open spaces are specified. |
|---|---|
| Evidence source | Draft layout |
| Declared progress / verified status | RERA schedule: green strip / park 0%; completion not verified. RERA amenities |
| Description / size | Street lighting and electricity facilities are listed as development works. |
|---|---|
| Evidence source | Draft layout |
| Declared progress / verified status | RERA schedule: street lighting and energy management 0%; completion not verified. RERA amenities |
| Description / size | Protected water supply is specified in the layout conditions; the RERA amenities schedule marks water supply “YES.” |
|---|---|
| Evidence source | Draft layout RERA amenities |
| Declared progress / verified status | RERA schedule: 0%; completion not verified. |
| Description / size | Sewerage disposal, side drains, drains and nala channelization are listed in the layout conditions. The RERA schedule marks sewerage “YES.” |
|---|---|
| Evidence source | Draft layout RERA amenities |
| Declared progress / verified status | RERA schedule: sewerage and storm-water drains 0%; completion not verified. |
| Description / size | Rainwater harvesting pits are listed in the draft-layout approval; the RERA schedule marks water conservation/rainwater harvesting “YES.” |
|---|---|
| Evidence source | Draft layout RERA amenities |
| Declared progress / verified status | RERA schedule: 0%; completion not verified. |
| Description / size | RERA schedule lists community buildings. |
|---|---|
| Evidence source | RERA amenities schedule RERA amenities |
| Declared progress / verified status | 0%; no facility size, design or completion evidence supplied. |
A vendor record additionally advertises kids’ play areas/sand pits, 24 x 7 security, a large green area and 24*7 water supply. These are vendor claims, not evidence of sanctioned or delivered facilities. Promoter website
7. Utilities, building services & safety
The draft-layout approval lists intended provision of protected water supply, sewerage disposal, side drains, nala channelization, street lighting, electricity and rainwater-harvesting pits. It does not provide capacities, technical specifications or evidence of completed works.
The RERA amenities schedule marks water supply, sewerage, water conservation/rainwater harvesting, energy management, fire protection and electrical meter room/sub-station/receiving station as “YES,” while showing 0% progress for each listed item. These entries are not independent confirmation of installation, commissioning or compliance. No water-source or storage details, treatment capacity, electrical-substation capacity, backup-power details, fire-system specifications, waste-management arrangements, security-system details or accessibility provisions are supplied. RERA amenities
8. Location, access & connectivity
The registered location is Lemamidi Gram Panchayat, Lemamidi village, Keshampet Mandal, Ranga Reddy district, PIN 509408. The supplied cadastral centroid is 16.89588297126811, 78.39233159061646. RERA record Cadastral map
The nearest sampled Outer Ring Road interchange is recorded at 37.4 km (approx.). No other verified approach-road, public-transport, local-landmark or travel-time information is supplied. Location record
9. Developer & development status
The registered legal promoter is SHATHABDHI TOWNSHIPS PVT LTD, a company. The supplied corporate identifier is GSTIN 36AALCS9200L1ZZ. The RERA certificate lists the promoter’s office as Village: Mandal: Shaikpet, District: Hyderabad, Pin: 500034. The supplied records identify KASU SRINIVAS REDDY as director and authorized signatory. Corporate record Parties record
The promoter’s Form B declares completion by 30-11-2027; the project header separately records 30/03/2028 as proposed completion. No supplied record confirms an extension, site completion or occupancy/completion certificate. The draft-layout approval identifies development works to be carried out by the owner/developer under Gram Panchayat supervision. RERA record
10. Approvals, official records & documents
| Record | What the supplied document establishes |
|---|---|
| TG-RERA Form C | Registration P02400004399 for SILVER SPRING GRAND VIP; issued 11/04/2022, valid through 30/11/2027. |
| DTCP draft-layout approval | Draft- TLP.No.345/2021/ H, approved 30-11-2021; file Lr.Roc.No.12488/2565/2021/le-Panchayat; application 12488/2565. Describes a 119-plot layout and draft-layout conditions. |
| Promoter Form B declaration | Promoter declaration concerning title, encumbrances, funds, audits and completion by 30-11-2027. |
| Approved layout / final layout | The supplied plan record is expressly a draft layout. It says the roads and open space are to be gifted to the Gram Panchayat before release of the final layout; no final-layout release document is supplied. |
| Commencement, completion and occupancy certificates | No project-specific commencement, completion or occupancy certificate is supplied in the reviewed documents. Document index |
| Other project documents | The supplied document set includes the RERA registration certificate and project declarations; no additional approved building plans or plot-wise schedule is included in this overview’s evidence. Document index |
1. Project at a glance
Project identity
Registered name: SILVER SPRING GRAND VIP
Project type: Plotted development / layout
Phase / registered portion: Phase not separately identified; the registration is for the named project
TG-RERA registration: P02400004399; Form C issued under section 5 on 11/04/2022
Registration validity: 11/04/2022 through 30/11/2027; the certificate states a period of 5 years. This is registration validity, not a completion or occupancy certificate.
Registered promoter: SHATHABDHI TOWNSHIPS PVT LTD
RERA project status: New Project, as recorded in the project fields
Land and geographic identity
Locality: Lemamidi Gram Panchayat
Revenue village: Lemamidi
Mandal / district / PIN: Keshampet / Ranga Reddy / 509408
Project survey numbers: 167/U, 167/EE, 167/E, 167/AA & 167/A
Additional survey numbers in draft-layout document: 42/P and 43/P are also named in the draft-layout mortgage condition; that document’s wider listed survey set is 167/U, 167/EE, 167/E, 167/AA, 167/A, 42/P and 43/P.
Registered site extent: 34802.96 sq. m in the project fields
Layout-document extent: Ac. 8-24 Guntas or Ac.8.60 Cents; 41624.00 Sq. Yds.
Net / total area in project fields: Net area 34802.96 sq. m; total area 34802.96 sq. m; affected area recorded as 00.
Boundaries: North, south, east and west are recorded as NA in the supplied land record.
Development identity
Sanctioning authority: Director of Town and Country Planning; the draft layout document states it was delegated to Lemamidi Panchayat.
Principal approval: Draft- TLP.No.345/2021/ H, approved 30-11-2021; file Lr.Roc.No.12488/2565/2021/le-Panchayat; application 12488/2565.
Approved built-up area: 34802.96 sq. m is entered as “Approved Built up Area” in the project fields; the supplied evidence does not provide a building built-up-area schedule for this plotted layout.
Layout scale: Draft-layout document states 119 plots.
Building / floor configuration: Not disclosed in the supplied project records; the approval is for a plotted layout, not a building-floor schedule.
Parking: No project-wide parking-space count or allocation is supplied.
Layout land-use figures in draft approval: Plotted area Ac. 4.69 Cents; 22699.60 Sq. Yds. (54.54%); road area Ac. 3.05 Cents; 14762.00 Sq. Yds. (35.46%); open space Ac. 0.86 Cents; 4162.40 Sq. Yds. (10.00%); mortgage area Ac. 0.74 Cents; 3581.60 Sq. Yds. (15.77%).
Offering and status
Unit type: Plots; the draft layout states 119 plots.
Plot sizes: A promoter-associated vendor record lists saleable sizes of 1860 Sq.Ft. and 3102 Sq.Ft.; these are not identified as RERA-filed plot-size bands in the supplied project records.
Booked / available counts: Not supplied.
Construction / development stage: No independently verified site-progress record is supplied. The RERA amenities schedule records zero progress for the listed items; those entries do not establish present site condition.
Completion date: The promoter’s Form B declares completion by 30-11-2027. The project header lists proposed completion as 30/03/2028. These fields are reported separately here; the supplied record does not identify an approved extension.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. This is a plotted layout; no phase- or plot-specific certificate status is provided.
2. The project story
SILVER SPRING GRAND VIP is registered as a plotted-development project in Lemamidi village, Keshampet Mandal, Ranga Reddy district. Its RERA land identification lists 167/U, 167/EE, 167/E, 167/AA and 167/A. The draft-layout approval also refers to 42/P and 43/P in its mortgage condition.
The Director of Town and Country Planning’s Draft Technical Layout Pattern describes a 119-plot layout, with areas designated for plots, roads, open space and mortgage. It also says the open-space and road areas are to be handed to the Gram Panchayat by registered gift deed before release of the final layout. The document lists intended layout works including roads, drains, greenery, street lighting, electricity, sewerage disposal and protected water supply.
The promoter’s Form B declares completion by 30-11-2027. Separately, the project header records proposed completion as 30/03/2028; no supplied evidence documents an extension or resolves the status of the different dates. No independent site inspection or verified completion evidence is included, and the supplied RERA progress schedule does not report completed works.
3. Master plan, architecture & building design
The supplied approval is for a Draft Technical Layout Pattern, not a building plan. It records 119 plots and allocates land as follows: 54.54% plotted area, 35.46% roads, 10.00% open space and 15.77% mortgage area. The approval states that the roads and open space are to be gifted to the Gram Panchayat before final layout release.
The approval names mortgage plots as Plot Nos.43 and 102 to 119. It describes the mortgage extent as Ac.0.74 cents or 3581.60 Sq.Yards. It also lists layout-development requirements including formation of roads, drains, greenery, fencing of open spaces, street lighting, electricity, sewerage disposal and protected water supply.
No approved plot-by-plot schedule, dimensions, road widths, building arrangement, architectural plans, landscaping plan or utility-plot schedule is supplied. The floor-plan file set contains two drawings, but both are scans pending measurement and neither is recorded as a layout sheet.
4. Homes, configurations & floor plans
This is a plotted project, not an apartment configuration schedule. The draft-layout document states 119 plots, but the supplied records do not give plot-by-plot counts, RERA-filed plot-size bands, or booked and available inventory.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 119 stated in draft-layout document | Not supplied | Not supplied | Not supplied | Not applicable / not measured | Not supplied |
The vendor record lists plot saleable sizes of 1860 Sq.Ft. and 3102 Sq.Ft.; the supplied records do not establish these as the RERA-filed plot-size bands. The floor-plan drawings are scans pending measurement, so there are no software-measured carpet or plot dimensions to report.
5. Parking & vehicle circulation
No sanctioned parking-space count, visitor or accessible parking provision, plot-level parking allocation, or parking plan is supplied. The draft-layout approval requires roads to be opened for access to neighbouring sites and prohibits a compound wall or fencing around the site; it does not provide road widths, access-point details or a vehicle-circulation plan.
6. Amenities, recreation & open spaces
The draft-layout approval specifies land for open space and lists intended development works and services. The RERA amenities schedule marks some categories “YES,” but records 0% progress for each listed item; the schedule does not establish that any facility is completed or independently verified.
| Description / size | Ac. 0.86 cents (10.00 %); 4162.40 Sq. Yds.; to be handed to the Gram Panchayat by registered gift deed before final layout release. |
|---|---|
| Evidence source | Draft layout |
| Declared progress / verified status | Required by the approval; completion or transfer not verified. RERA schedule: aggregate recreational open space 0%. |
| Description / size | Roads area Ac.3.05 cents (35.46 %); 14762.00 Sq. Yds.; road formation and access to neighbouring sites are specified. |
|---|---|
| Evidence source | Draft layout |
| Declared progress / verified status | RERA schedule: 0%; completion not verified. |
| Description / size | Avenue plantation, greenery and fencing of open spaces are specified. |
|---|---|
| Evidence source | Draft layout |
| Declared progress / verified status | RERA schedule: green strip / park 0%; completion not verified. |
| Description / size | Street lighting and electricity facilities are listed as development works. |
|---|---|
| Evidence source | Draft layout |
| Declared progress / verified status | RERA schedule: street lighting and energy management 0%; completion not verified. |
| Description / size | Protected water supply is specified in the layout conditions; the RERA amenities schedule marks water supply “YES.” |
|---|---|
| Evidence source | Draft layout |
| Declared progress / verified status | RERA schedule: 0%; completion not verified. |
| Description / size | Sewerage disposal, side drains, drains and nala channelization are listed in the layout conditions. The RERA schedule marks sewerage “YES.” |
|---|---|
| Evidence source | Draft layout |
| Declared progress / verified status | RERA schedule: sewerage and storm-water drains 0%; completion not verified. |
| Description / size | Rainwater harvesting pits are listed in the draft-layout approval; the RERA schedule marks water conservation/rainwater harvesting “YES.” |
|---|---|
| Evidence source | Draft layout |
| Declared progress / verified status | RERA schedule: 0%; completion not verified. |
| Description / size | RERA schedule lists community buildings. |
|---|---|
| Evidence source | RERA amenities schedule |
| Declared progress / verified status | 0%; no facility size, design or completion evidence supplied. |
A vendor record additionally advertises kids’ play areas/sand pits, 24 x 7 security, a large green area and 24*7 water supply. These are vendor claims, not evidence of sanctioned or delivered facilities.
7. Utilities, building services & safety
The draft-layout approval lists intended provision of protected water supply, sewerage disposal, side drains, nala channelization, street lighting, electricity and rainwater-harvesting pits. It does not provide capacities, technical specifications or evidence of completed works.
The RERA amenities schedule marks water supply, sewerage, water conservation/rainwater harvesting, energy management, fire protection and electrical meter room/sub-station/receiving station as “YES,” while showing 0% progress for each listed item. These entries are not independent confirmation of installation, commissioning or compliance. No water-source or storage details, treatment capacity, electrical-substation capacity, backup-power details, fire-system specifications, waste-management arrangements, security-system details or accessibility provisions are supplied.
8. Location, access & connectivity
The registered location is Lemamidi Gram Panchayat, Lemamidi village, Keshampet Mandal, Ranga Reddy district, PIN 509408. The supplied cadastral centroid is 16.89588297126811, 78.39233159061646.
The nearest sampled Outer Ring Road interchange is recorded at 37.4 km (approx.). No other verified approach-road, public-transport, local-landmark or travel-time information is supplied.
9. Developer & development status
The registered legal promoter is SHATHABDHI TOWNSHIPS PVT LTD, a company. The supplied corporate identifier is GSTIN 36AALCS9200L1ZZ. The RERA certificate lists the promoter’s office as Village: Mandal: Shaikpet, District: Hyderabad, Pin: 500034. The supplied records identify KASU SRINIVAS REDDY as director and authorized signatory.
The promoter’s Form B declares completion by 30-11-2027; the project header separately records 30/03/2028 as proposed completion. No supplied record confirms an extension, site completion or occupancy/completion certificate. The draft-layout approval identifies development works to be carried out by the owner/developer under Gram Panchayat supervision.
10. Approvals, official records & documents
TG-RERA Form C: Registration P02400004399 for SILVER SPRING GRAND VIP; issued 11/04/2022, valid through 30/11/2027.
DTCP draft-layout approval: Draft- TLP.No.345/2021/ H, approved 30-11-2021; file Lr.Roc.No.12488/2565/2021/le-Panchayat; application 12488/2565. Describes a 119-plot layout and draft-layout conditions.
Promoter Form B declaration: Promoter declaration concerning title, encumbrances, funds, audits and completion by 30-11-2027.
Approved layout / final layout: The supplied plan record is expressly a draft layout. It says the roads and open space are to be gifted to the Gram Panchayat before release of the final layout; no final-layout release document is supplied.
Commencement, completion and occupancy certificates: No project-specific commencement, completion or occupancy certificate is supplied in the reviewed documents.
Other project documents: The supplied document set includes the RERA registration certificate and project declarations; no additional approved building plans or plot-wise schedule is included in this overview’s evidence.
Frequently asked questions
Is SILVER SPRING GRAND VIP registered with Telangana RERA?
Yes. SILVER SPRING GRAND VIP is registered with the Telangana Real Estate Regulatory Authority as P02400004399; the registration status is New Project.
Who is the developer of SILVER SPRING GRAND VIP?
The promoter named in the RERA registration is SHATHABDHI TOWNSHIPS PVT LTD.
Where is SILVER SPRING GRAND VIP located?
SILVER SPRING GRAND VIP is in LEMAMIDI GRAMPANCHAYAT, Lemamidi, Keshampet, Rangareddy, Telangana (509408).
When will SILVER SPRING GRAND VIP be completed?
The promoter's proposed date of completion filed with RERA is 30/03/2028. This is the promoter's declaration, not a guarantee.
More projects in Lemamidi