Jrk Township
MOHAMMAD · Rangareddy · RERA P02400007017
JRK TOWNSHIP is a plotted development at Arutla, Manchal Mandal, Ranga Reddy District, developed by Mohammed Janipasha. The RERA land area is 6,070.28 sq. m, and the layout approval describes 18 plots; building count, floors and plot configurations are not stated. The project is registered with TG-RERA as P02400007017, and the promoter declared a completion date of 27* March, 2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | JRK TOWNSHIP RERA record |
| Project type | Plotted development; the RERA-filed approval describes a draft technical layout for plots. RERA record |
| Phase / registered portion | Phase is not identified in the TG-RERA project record. The registered project is identified against Survey Nos. 1546/P and 1549/P. RERA record |
| TG-RERA registration | P02400007017, Form C registration certificate; registration commenced 23/09/2023 and ended 27/03/2025. The certificate says extension would require Authority action; no extension is evidenced in the supplied record. |
| RERA status | The supplied record labels the project “New Project.” The certificate’s stated validity ended 27/03/2025; current registration status is not established by the materials supplied. RERA record |
| Registered promoter | The registration and Form-B materials identify Mohammed Janipasha; the header gives the promoter as MOHAMMAD. RERA record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Arutla; the approval identifies Arutla Gram Panchayat and Arutla village. RERA record |
| Mandal / district / PIN | Manchal / Ranga Reddy / 501508. RERA record |
| Project survey numbers | 1546/P and 1549/P. RERA record |
| Registered site extent | RERA land details state total and net area as 6,070.28 sq. m. Land records |
| Approval-area figures | The layout approval records layout area Ac. 1.50 Cents; 7260.00 Sq. Yds., cart-track area Ac. 0.06 Cents; 290.40 Sq. Yds., and net layout area Ac. 1.44 Cents; 6969.60 Sq. Yds. |
| Boundaries on RERA land record | East: EXISTING 40 FEET ROAD; west, north and south: OTHERS LAND. Land records |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | District Town and Country Planning Officer, R.R. District; the document delegates implementation to Arutla Gram Panchayat. Approvals record |
| Principal approval | Draft-TLP.No.04/2023/DTCPO/RR, dated 27.03.2023; Letter reference Lr.Roc.No.67/2023/DTCPO/RR. Approvals record |
| Approval described in document | Draft Technical Layout Pattern - Approved, for 18 plots. |
| Approved built-up area | Not disclosed in the supplied layout-approval extraction. The RERA fields list 3,180.83 sq. m as “Approved Built up Area”; the materials do not explain its scope or provide a building plan. RERA filing |
| Buildings / floor configuration | Not disclosed; this is a plotted-layout record, and no building count or floor schedule is supplied. |
| Layout land-use split in approval | Net layout area: Ac. 1.44 Cents; 6969.60 Sq. Yds.; open space: Ac. 0.144 Cents; 696.96 Sq. Yds. (10.00%); road area: Ac. 0.51 Cents; 2468.40 Sq. Yds. (35.41%); plotted area: Ac. 0.786 Cents; 3804.24 Sq. Yds. (54.59%); mortgage area: Ac. 0.121 Cents; 585.64 Sq. Yds. (15.39%). |
Offering and status
| Item | Record |
|---|---|
| Unit type / count | The approval describes 18 plots. Current booked and available plot counts are not supplied. |
| Plot size range | No plot-size schedule is available in the supplied RERA materials. |
| Construction stage | No site-verified construction-stage evidence is supplied. The RERA header records completeness at 80%, but the underlying measurement, date and verification basis are not stated here. RERA record |
| Completion date | Promoter Form-B declaration: 27* March, 2025. The registration certificate also ended on 27/03/2025. These are distinct from proof of completed works or occupancy certification. |
| Occupancy / completion certificate | Not disclosed in the supplied materials. The layout approval is a draft layout approval, not an occupancy or completion certificate. |
2. The project story
- JRK TOWNSHIP is recorded with TG-RERA as a plotted development at Arutla, Manchal Mandal, Ranga Reddy District, on Survey Nos. 1546/P and 1549/P. Its project record identifies a 6,070.28 sq. m site, while the DTCP approval document describes a draft technical layout for 18 plots and provides a layout land-use schedule. RERA record Land records
- The approval describes roads and open space as components of the layout, and requires specified plots to be mortgaged to Arutla Gram Panchayat as security for development obligations. It also lists proposed layout works including drains, street lighting, electricity facilities and protected water supply. These are approval-document provisions, not evidence that the works have been completed.
- The promoter declared a completion date of 27* March, 2025. The RERA header records 80% completeness, but the supplied record does not state the date or method for that figure and provides no independent site verification. No occupancy or completion certificate is included. RERA record
3. Master plan, architecture & building design
- The available project-specific design record is a Draft Technical Layout Pattern - Approved, identified as Draft-TLP.No.04/2023/DTCPO/RR, for Survey Nos. 1546/P and 1549/P at Arutla. It specifies 18 plots and divides the net layout area among plotted land, roads, open space and a mortgage area. The approval extraction does not provide plot-by-plot dimensions, a layout drawing description sufficient to detail plot arrangement, or a building plan.
| Layout component | Approval figure |
|---|---|
| Layout area | Ac. 1.50 Cents; 7260.00 Sq. Yds. |
| Area under CART track | Ac. 0.06 Cents; 290.40 Sq. Yds. |
| Net layout area | Ac. 1.44 Cents; 6969.60 Sq. Yds. |
| Open space | Ac. 0.144 Cents; 696.96 Sq. Yds. (10.00%) |
| Road area | Ac. 0.51 Cents; 2468.40 Sq. Yds. (35.41%) |
| Plotted area | Ac. 0.786 Cents; 3804.24 Sq. Yds. (54.59%) |
| Mortgage area | Ac. 0.121 Cents; 585.64 Sq. Yds. (15.39%) |
- No building arrangement, floor configuration, building footprint, tower height, common residential/commercial areas or phase-wise building organization is evidenced.
- The approval states that the layout owner/developer must hand over the open-space and road areas to the Gram Panchayat by registered gift deed before release of the final layout; the supplied document set includes a gift deed record, but this overview does not establish completion of every approval condition. Document index
4. Homes, configurations & floor plans
- This is a plotted project, not an apartment configuration schedule. The approval document identifies 18 plots, but the supplied RERA data does not include a plot-by-plot inventory, plot sizes, booked/available counts or a RERA-filed saleable-area schedule.
- The available floor-plan review reports two drawings, both still pending scanning; none has a software-measured carpet area. Carpet-area measurement is therefore unavailable. Apartment carpet area is not applicable to the evidenced plotted offering. Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 18 (approval document) | Not disclosed | Not disclosed | Not disclosed | Not applicable / not measured | Not disclosed |
Floor plans
5. Parking & vehicle circulation
- The supplied project-specific approval and RERA extracts do not state parking-space counts, visitor or accessible parking, parking allocation, or vehicle-circulation dimensions. No exclusive parking rights or plot-specific parking allocation is established.
- The approval requires roads to be opened for accessibility to neighbouring sites and prohibits a compound wall or fencing around the site. This describes an approval condition, not evidence of the current on-ground access arrangement.
- The approval lists internal layout roads, but no road-width schedule or parking plan is available in the supplied materials.
6. Amenities, recreation & open spaces
- The approval document lists proposed layout facilities and works. The RERA amenity record marks several infrastructure categories as “YES,” while the progress fields shown are 0; these records do not establish completed delivery. No independent completion verification is supplied. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space | Ac. 0.144 Cents; 696.96 Sq. Yds. (10.00%) | Layout approval | Approval provision; completion and handover not verified |
| Greenery / avenue plantation | Greenery in layout, including avenue plantation | Layout approval | Listed as required work; completion not verified |
| Green Strip / TOT LOT / Park | Listed in RERA amenities | RERA amenity record RERA amenities | “YES”; progress recorded as 0 |
| Community buildings | Listed in RERA amenities | RERA amenity record RERA amenities | Progress recorded as 0; no size or further description supplied |
| Internal roads and footpaths | Listed in RERA amenities; approval also specifies road area of Ac. 0.51 Cents; 2468.40 Sq. Yds. (35.41%) | RERA amenities | “YES” in amenity record; progress 0; completion not verified |
| Fencing of open spaces | Required by the approval | Required work; completion not verified |
- No clubhouse, indoor recreation facility or sports facility is specified in the supplied project records. RERA amenities
7. Utilities, building services & safety
- The layout approval lists underground drains/side drains, channelization of nalas, rainwater-harvesting pits (4 per Acre), street lighting and electricity facilities, sewerage disposal, and protected water supply. These are approval-document requirements or proposed provisions; the supplied record does not establish installation, capacity, commissioning or operational status.
| Service | Evidence and scope |
|---|---|
| Water | “Protected water supply system” in the approval; RERA amenity record includes Water Supply. Source, storage and treatment capacities are not disclosed. RERA amenities |
| Sewerage and drainage | Approval lists underground drains/side drains, channelization of nalas and sewerage disposal; RERA amenities list sewerage and storm-water drains. No treatment capacity or completion evidence is supplied. RERA amenities |
| Rainwater management | Approval specifies rainwater-harvesting pits (4 per Acre); RERA amenities list water conservation and rainwater harvesting. Installation is not verified. RERA amenities |
| Electricity and lighting | Approval lists street lighting and electricity facilities; RERA amenities list street lighting and an electrical meter room/sub-station/receiving station. Equipment details and operational status are not supplied. RERA amenities |
| Fire and life safety | A fire-protection category appears in the RERA amenity record, but no project-specific system, clearance or completion details are supplied. RERA amenities |
| Waste management | Solid-waste management and disposal appears in the RERA amenity record; system details and progress are not supplied. RERA amenities |
| Accessibility | The approval requires roads to be opened for accessibility to neighbouring sites. Detailed pedestrian/accessibility design is not supplied. |
8. Location, access & connectivity
- The registered location is Arutla, Manchal Mandal, Ranga Reddy District, Telangana, PIN 501508. The project survey identity is 1546/P and 1549/P. The RERA land record identifies an existing 40 feet road on the eastern boundary. RERA record Land records
- The supplied location data gives a cadastral parcel-centroid coordinate of 17.12714, 78.75131 and an approximate distance of 24.8 km to the nearest sampled Outer Ring Road interchange. The distance is a supplied location-data measurement, not a stated travel time. Location record Cadastral map
- The approval requires roads to be open for access to neighbouring sites. No public-transport routes or landmark distances are established in the project-specific RERA materials.
9. Developer & development status
- The supplied TG-RERA certificate identifies Mohammad Janipasha as promoter; the Form-B affidavit is made by Mohammed Janipasha, S/O Babumiya Mohammed. The project header uses MOHAMMAD as the promoter name. Legal entity type, company or registration identifiers, registered office beyond the Form-B stated residence at # 4-36, Arutla, Manchal mandal, Rangareddy Dist, Telangana-501508, and official contact details are not disclosed in the supplied materials. RERA record
- The promoter’s Form-B declaration states a completion date of 27* March, 2025 and declares that 70% of amounts realised from allottees would be deposited in a separate scheduled-bank account. The RERA header records completeness at 80%, without a stated measurement date or independent verification basis. No occupancy or completion certificate is supplied. RERA record
10. Approvals, official records & documents
| Record | Details |
|---|---|
| TG-RERA registration certificate | Form C; project JRK TOWNSHIP; registration P02400007017; issued 23/09/2023, stated validity to 27/03/2025; covers Survey Nos. 1546/P and 1549/P. |
| Principal layout approval | Draft Technical Layout Pattern - Approved, Draft-TLP.No.04/2023/DTCPO/RR, dated 27.03.2023, District Town and Country Planning Officer, R.R. District; implementation delegated to Arutla Gram Panchayat. |
| Approval reference numbers | Lr.Roc.No.67/2023/DTCPO/RR; E.Pan.No. 3289/1761; Circular Memo.No. 1637/2018/P. |
| Promoter declaration | Form-B affidavit by Mohammed Janipasha, verified at Hyderabad on 21st May, 2023; includes a declared completion date of 27* March, 2025. |
| Commencement/building approvals | No separate building commencement certificate or building-plan approval is established by the supplied extracts. The document filed under “Commencement Certificates for each building in each phase” is described as a draft technical layout approval. Document index |
| Occupancy/completion certificate | Not supplied. Document index |
| Approved layout / drawing materials | Approval extraction provides the layout land-use figures and conditions; the supplied floor-plan review records two drawings, both pending scanning. Floor plans |
The supplied records establish the named registration certificate and draft layout approval, but do not include an occupancy/completion certificate or enough drawing detail to describe plot-by-plot dimensions or building design.
1. Project at a glance
Project identity
Registered project name: JRK TOWNSHIP
Project type: Plotted development; the RERA-filed approval describes a draft technical layout for plots.
Phase / registered portion: Phase is not identified in the TG-RERA project record. The registered project is identified against Survey Nos. 1546/P and 1549/P.
TG-RERA registration: P02400007017, Form C registration certificate; registration commenced 23/09/2023 and ended 27/03/2025. The certificate says extension would require Authority action; no extension is evidenced in the supplied record.
RERA status: The supplied record labels the project “New Project.” The certificate’s stated validity ended 27/03/2025; current registration status is not established by the materials supplied.
Registered promoter: The registration and Form-B materials identify Mohammed Janipasha; the header gives the promoter as MOHAMMAD.
Land and geographic identity
Locality / revenue village: Arutla; the approval identifies Arutla Gram Panchayat and Arutla village.
Mandal / district / PIN: Manchal / Ranga Reddy / 501508.
Project survey numbers: 1546/P and 1549/P.
Registered site extent: RERA land details state total and net area as 6,070.28 sq. m.
Approval-area figures: The layout approval records layout area Ac. 1.50 Cents; 7260.00 Sq. Yds., cart-track area Ac. 0.06 Cents; 290.40 Sq. Yds., and net layout area Ac. 1.44 Cents; 6969.60 Sq. Yds.
Boundaries on RERA land record: East: EXISTING 40 FEET ROAD; west, north and south: OTHERS LAND.
Development identity
Sanctioning authority: District Town and Country Planning Officer, R.R. District; the document delegates implementation to Arutla Gram Panchayat.
Principal approval: Draft-TLP.No.04/2023/DTCPO/RR, dated 27.03.2023; Letter reference Lr.Roc.No.67/2023/DTCPO/RR.
Approval described in document: Draft Technical Layout Pattern - Approved, for 18 plots.
Approved built-up area: Not disclosed in the supplied layout-approval extraction. The RERA fields list 3,180.83 sq. m as “Approved Built up Area”; the materials do not explain its scope or provide a building plan.
Buildings / floor configuration: Not disclosed; this is a plotted-layout record, and no building count or floor schedule is supplied.
Layout land-use split in approval: Net layout area: Ac. 1.44 Cents; 6969.60 Sq. Yds.; open space: Ac. 0.144 Cents; 696.96 Sq. Yds. (10.00%); road area: Ac. 0.51 Cents; 2468.40 Sq. Yds. (35.41%); plotted area: Ac. 0.786 Cents; 3804.24 Sq. Yds. (54.59%); mortgage area: Ac. 0.121 Cents; 585.64 Sq. Yds. (15.39%).
Offering and status
Unit type / count: The approval describes 18 plots. Current booked and available plot counts are not supplied.
Plot size range: No plot-size schedule is available in the supplied RERA materials.
Construction stage: No site-verified construction-stage evidence is supplied. The RERA header records completeness at 80%, but the underlying measurement, date and verification basis are not stated here.
Completion date: Promoter Form-B declaration: 27* March, 2025. The registration certificate also ended on 27/03/2025. These are distinct from proof of completed works or occupancy certification.
Occupancy / completion certificate: Not disclosed in the supplied materials. The layout approval is a draft layout approval, not an occupancy or completion certificate.
2. The project story
- JRK TOWNSHIP is recorded with TG-RERA as a plotted development at Arutla, Manchal Mandal, Ranga Reddy District, on Survey Nos. 1546/P and 1549/P. Its project record identifies a 6,070.28 sq. m site, while the DTCP approval document describes a draft technical layout for 18 plots and provides a layout land-use schedule.
- The approval describes roads and open space as components of the layout, and requires specified plots to be mortgaged to Arutla Gram Panchayat as security for development obligations. It also lists proposed layout works including drains, street lighting, electricity facilities and protected water supply. These are approval-document provisions, not evidence that the works have been completed.
- The promoter declared a completion date of 27* March, 2025. The RERA header records 80% completeness, but the supplied record does not state the date or method for that figure and provides no independent site verification. No occupancy or completion certificate is included.
3. Master plan, architecture & building design
- The available project-specific design record is a Draft Technical Layout Pattern - Approved, identified as Draft-TLP.No.04/2023/DTCPO/RR, for Survey Nos. 1546/P and 1549/P at Arutla. It specifies 18 plots and divides the net layout area among plotted land, roads, open space and a mortgage area. The approval extraction does not provide plot-by-plot dimensions, a layout drawing description sufficient to detail plot arrangement, or a building plan.
Layout area: Ac. 1.50 Cents; 7260.00 Sq. Yds.
Area under CART track: Ac. 0.06 Cents; 290.40 Sq. Yds.
Net layout area: Ac. 1.44 Cents; 6969.60 Sq. Yds.
Open space: Ac. 0.144 Cents; 696.96 Sq. Yds. (10.00%)
Road area: Ac. 0.51 Cents; 2468.40 Sq. Yds. (35.41%)
Plotted area: Ac. 0.786 Cents; 3804.24 Sq. Yds. (54.59%)
Mortgage area: Ac. 0.121 Cents; 585.64 Sq. Yds. (15.39%)
- No building arrangement, floor configuration, building footprint, tower height, common residential/commercial areas or phase-wise building organization is evidenced.
- The approval states that the layout owner/developer must hand over the open-space and road areas to the Gram Panchayat by registered gift deed before release of the final layout; the supplied document set includes a gift deed record, but this overview does not establish completion of every approval condition.
4. Homes, configurations & floor plans
- This is a plotted project, not an apartment configuration schedule. The approval document identifies 18 plots, but the supplied RERA data does not include a plot-by-plot inventory, plot sizes, booked/available counts or a RERA-filed saleable-area schedule.
- The available floor-plan review reports two drawings, both still pending scanning; none has a software-measured carpet area. Carpet-area measurement is therefore unavailable. Apartment carpet area is not applicable to the evidenced plotted offering.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 18 (approval document) | Not disclosed | Not disclosed | Not disclosed | Not applicable / not measured | Not disclosed |
5. Parking & vehicle circulation
- The supplied project-specific approval and RERA extracts do not state parking-space counts, visitor or accessible parking, parking allocation, or vehicle-circulation dimensions. No exclusive parking rights or plot-specific parking allocation is established.
- The approval requires roads to be opened for accessibility to neighbouring sites and prohibits a compound wall or fencing around the site. This describes an approval condition, not evidence of the current on-ground access arrangement.
- The approval lists internal layout roads, but no road-width schedule or parking plan is available in the supplied materials.
6. Amenities, recreation & open spaces
- The approval document lists proposed layout facilities and works. The RERA amenity record marks several infrastructure categories as “YES,” while the progress fields shown are 0; these records do not establish completed delivery. No independent completion verification is supplied.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space | Ac. 0.144 Cents; 696.96 Sq. Yds. (10.00%) | Layout approval | Approval provision; completion and handover not verified |
| Greenery / avenue plantation | Greenery in layout, including avenue plantation | Layout approval | Listed as required work; completion not verified |
| Green Strip / TOT LOT / Park | Listed in RERA amenities | RERA amenity record | “YES”; progress recorded as 0 |
| Community buildings | Listed in RERA amenities | RERA amenity record | Progress recorded as 0; no size or further description supplied |
| Internal roads and footpaths | Listed in RERA amenities; approval also specifies road area of Ac. 0.51 Cents; 2468.40 Sq. Yds. (35.41%) | “YES” in amenity record; progress 0; completion not verified | |
| Fencing of open spaces | Required by the approval | Required work; completion not verified |
- No clubhouse, indoor recreation facility or sports facility is specified in the supplied project records.
7. Utilities, building services & safety
- The layout approval lists underground drains/side drains, channelization of nalas, rainwater-harvesting pits (4 per Acre), street lighting and electricity facilities, sewerage disposal, and protected water supply. These are approval-document requirements or proposed provisions; the supplied record does not establish installation, capacity, commissioning or operational status.
Water: “Protected water supply system” in the approval; RERA amenity record includes Water Supply. Source, storage and treatment capacities are not disclosed.
Sewerage and drainage: Approval lists underground drains/side drains, channelization of nalas and sewerage disposal; RERA amenities list sewerage and storm-water drains. No treatment capacity or completion evidence is supplied.
Rainwater management: Approval specifies rainwater-harvesting pits (4 per Acre); RERA amenities list water conservation and rainwater harvesting. Installation is not verified.
Electricity and lighting: Approval lists street lighting and electricity facilities; RERA amenities list street lighting and an electrical meter room/sub-station/receiving station. Equipment details and operational status are not supplied.
Fire and life safety: A fire-protection category appears in the RERA amenity record, but no project-specific system, clearance or completion details are supplied.
Waste management: Solid-waste management and disposal appears in the RERA amenity record; system details and progress are not supplied.
Accessibility: The approval requires roads to be opened for accessibility to neighbouring sites. Detailed pedestrian/accessibility design is not supplied.
8. Location, access & connectivity
- The registered location is Arutla, Manchal Mandal, Ranga Reddy District, Telangana, PIN 501508. The project survey identity is 1546/P and 1549/P. The RERA land record identifies an existing 40 feet road on the eastern boundary.
- The supplied location data gives a cadastral parcel-centroid coordinate of 17.12714, 78.75131 and an approximate distance of 24.8 km to the nearest sampled Outer Ring Road interchange. The distance is a supplied location-data measurement, not a stated travel time.
- The approval requires roads to be open for access to neighbouring sites. No public-transport routes or landmark distances are established in the project-specific RERA materials.
9. Developer & development status
- The supplied TG-RERA certificate identifies Mohammad Janipasha as promoter; the Form-B affidavit is made by Mohammed Janipasha, S/O Babumiya Mohammed. The project header uses MOHAMMAD as the promoter name. Legal entity type, company or registration identifiers, registered office beyond the Form-B stated residence at # 4-36, Arutla, Manchal mandal, Rangareddy Dist, Telangana-501508, and official contact details are not disclosed in the supplied materials.
- The promoter’s Form-B declaration states a completion date of 27* March, 2025 and declares that 70% of amounts realised from allottees would be deposited in a separate scheduled-bank account. The RERA header records completeness at 80%, without a stated measurement date or independent verification basis. No occupancy or completion certificate is supplied.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C; project JRK TOWNSHIP; registration P02400007017; issued 23/09/2023, stated validity to 27/03/2025; covers Survey Nos. 1546/P and 1549/P.
Principal layout approval: Draft Technical Layout Pattern - Approved, Draft-TLP.No.04/2023/DTCPO/RR, dated 27.03.2023, District Town and Country Planning Officer, R.R. District; implementation delegated to Arutla Gram Panchayat.
Approval reference numbers: Lr.Roc.No.67/2023/DTCPO/RR; E.Pan.No. 3289/1761; Circular Memo.No. 1637/2018/P.
Promoter declaration: Form-B affidavit by Mohammed Janipasha, verified at Hyderabad on 21st May, 2023; includes a declared completion date of 27* March, 2025.
Commencement/building approvals: No separate building commencement certificate or building-plan approval is established by the supplied extracts. The document filed under “Commencement Certificates for each building in each phase” is described as a draft technical layout approval.
Occupancy/completion certificate: Not supplied.
Approved layout / drawing materials: Approval extraction provides the layout land-use figures and conditions; the supplied floor-plan review records two drawings, both pending scanning.
The supplied records establish the named registration certificate and draft layout approval, but do not include an occupancy/completion certificate or enough drawing detail to describe plot-by-plot dimensions or building design.
Frequently asked questions
Is JRK TOWNSHIP registered with Telangana RERA?
Yes. JRK TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P02400007017; the registration status is New Project.
Who is the developer of JRK TOWNSHIP?
The promoter named in the RERA registration is MOHAMMAD.
Where is JRK TOWNSHIP located?
JRK TOWNSHIP is in Arutla, Manchal, Rangareddy, Telangana (501508).
When will JRK TOWNSHIP be completed?
The promoter's proposed date of completion filed with RERA is 27/03/2025. This is the promoter's declaration, not a guarantee.