Patels Pearl
FORTUNE AASHVI HARMONY LLP · Suryapet · RERA P01900006880
PATELS PEARL is a plotted development in Kudakuda Revenue Village, Chivemla Mandal, Suryapet District, near New District Collectorate, Suryapet. The registered promoter is FORTUNE AASHVI HARMONY LLP. The tentative layout approval describes 341 plots across a layout extent of 29 Acer 5 Gts 140968 Sq. Yds; the drawing-derived plot sizes range from 140.93 sq. m to 649.79 sq. m. The project is registered under TG-RERA number P01900006880, and the promoter’s Form B declares completion by 01-03-2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | PATELS PEARL. RERA record |
| Project type | Plotted development / plotted layout. RERA record |
| Phase / registered portion | The registration is for the project; no separate phase name or phase-wise land scope is disclosed. |
| TG-RERA registration | P01900006880; Form C registration issued 06/09/2023, valid from 06/09/2023 to 01/03/2026. The supplied certificate says it is valid for two years unless extended; no extension is recorded in the supplied certificate. |
| RERA status | The certificate records registration under section 5. It does not establish current registration validity beyond its stated end date. |
| Registered promoter | FORTUNE AASHVI HARMONY LLP, an LLP. RERA record Corporate record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Near New District Collectorate, Suryapet; revenue location: Kudakuda Revenue Village. RERA record RERA filing |
| Revenue village / mandal / district / PIN | Kudakuda, Chivemla, Suryapet, 508213. The layout approval describes the location as Kudakuda Revenue Village, Suryapet Mandal, Suryapet District. RERA record |
| Project survey numbers and subdivisions | 331/P, 332/P, 333/P, 334/P, 335/P, 336/P, 337/P, 338, 339, 340/P, 341/P, 342/P. |
| Registered site extent | The project land details record 117863.69 sq. m total area, 3041.21 sq. m affected area and 114822.48 sq. m net area. RERA filing |
| Layout approval extent | The tentative-layout approval states 29 Acer 5 Gts 140968 Sq. Yds. |
| Boundaries | East: Neighbours Land; West: 60 feet Road - Neighbors Plot and 30 feet Road; North: Bund Road; South: Musi Canal - 99 Feet Road and Neighbours Property. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | SURYAPET Municipality/Municipal Corporation. |
| Principal layout approval | Tentative layout approval 0037/LO/3049/2023, dated 01 March, 2023; application 009479/LO/DTCP/3049/0053/2022. |
| Approved layout scale | 341 plots. The approval states a layout extent of 29 Acer 5 Gts 140968 Sq. Yds. |
| Land-use schedule in approval | Plotted Area: 16 Acer 19.6 Gts 79813 Sq. Yds (58.12%); Road Area: 8 Acer 5.06 Gts 39334 Sq. Yds (28.64%); Open space (Park): 2 Acer 23.79 Gts 12559 Sq. Yds (9.14%); Social Infrastructure: 0 Acer 28.42 Gts 3439 Sq. Yds (2.5%); Utilities: 0 Acer 11.36 Gts 1375 Sq. Yds (1%). |
| Built-up area / buildings and floors | Not applicable as a plotted-layout offering; no building count, floor configuration or approved building built-up area is disclosed in the supplied project record. |
Offering and status
| Field | Record |
|---|---|
| Unit type | Plots. The tentative layout approval records 341 No's. |
| RERA-filed plot size schedule | Plot count and size bands are software-read from the approved layout drawing, not a RERA unit-type disclosure: 341 plots, with sizes from 140.93 sq. m to 649.79 sq. m. Layout record |
| Booked / available plots | Not disclosed in the supplied evidence. Document index |
| Construction / development stage | No independent site-progress evidence is supplied. The promoter’s Form B declares a completion undertaking of 01-03-2026; this is a declaration, not independent verification of completion. |
| Completion date and registration validity | The RERA certificate states registration validity through 01/03/2026; Form B also declares completion by 01-03-2026. These are recorded separately: the supplied evidence contains no recorded extension and does not confirm completion. |
| OC / completion certificate | No occupancy or completion certificate is included in the supplied evidence. For this plotted layout, the record does not identify any phase or building with an OC. Document index |
2. The project story
PATELS PEARL is registered as a plotted development in Kudakuda Revenue Village, Chivemla, Suryapet District. Its registered survey schedule is 331/P, 332/P, 333/P, 334/P, 335/P, 336/P, 337/P, 338, 339, 340/P, 341/P and 342/P. The RERA certificate gives PIN 508213; the project record describes the locality as near the New District Collectorate, Suryapet. RERA record
The Municipality/Municipal Corporation’s tentative layout approval describes a 341-plot layout and reserves land for plots, roads, park/open space, social infrastructure and utilities. The layout conditions place responsibility for completing the infrastructure and layout development works on the applicant. The approved-layout drawing’s plot schedule was software-read as 341 plots; this is drawing-derived information, not an independently verified count of plots currently available for sale. Layout record
The promoter’s Form B, signed by Shyam Kapoor as authorized signatory on 27th day of March 2023, declares a completion date of 01-03-2026. The supplied material does not establish on-site completion or delivery of the development works, and no completion/occupancy certificate is supplied. The separate RERA registration certificate states validity through 01/03/2026; registration validity and physical completion are distinct matters.
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey building development. The tentative layout approval states a layout extent of 29 Acer 5 Gts 140968 Sq. Yds and provides for 341 plots. Its land-use schedule assigns 58.12% to plots, 28.64% to roads, 9.14% to park/open space, 2.5% to social infrastructure and 1% to utilities.
The approved-layout drawing’s software-read area statement separately records a base of 114817.0 sq. m, comprising 66732.04 sq. m plotted area, 32886.81 sq. m roads, 10500.46 sq. m parks/open space, 1149.48 sq. m utilities and 2874.93 sq. m social infrastructure; it records 0.0 sq. m amenities area. These are drawing-derived figures, not RERA-filed building-area measurements. Layout record The project land record separately reports total area 117863.69 sq. m, affected area 3041.21 sq. m and net area 114822.48 sq. m. RERA filing
No building footprint, building height, floor configuration, apartment arrangement or building-area schedule is supplied for this plotted project. The tentative approval lists development works, including road formation, drains, underground drainage, water pipelines and overhead tank, electrical lines and street lights, avenue plantation, park development and rainwater-harvesting pits; these are approval conditions and stated development requirements, not evidence that the works are complete.
4. Homes, configurations & floor plans
The offering is plots, not apartments. The tentative layout approval records 341 No's. The plot schedule was software-read from the approved drawing and records the following sizes and bands; these measurements are drawing-derived and should be checked against the layout drawing. Layout record
| Plot size band (sq. yd) | Equivalent band shown (sq. m) | Plot count |
|---|---|---|
| 150-200 | 125-167 | 66 |
| 200-250 | 167-209 | 221 |
| 250-300 | 209-251 | 25 |
| 300-400 | 251-334 | 13 |
| 400-500 | 334-418 | 5 |
| 500-1000 | 418-836 | 11 |
The software-read smallest plot is 140.93 sq. m (168.6 sq. yd), the median is 178.07 sq. m (213.0 sq. yd) and the largest is 649.79 sq. m (777.1 sq. yd). Layout record The supplied plan review contains two layout sheets and no apartment floor plans; carpet-area and room-configuration measurements therefore do not apply to the evidenced offering. Floor plans
5. Parking & vehicle circulation
The layout approval’s conditions require roads to be opened for access to neighbouring sites and state that the layout owner/developer shall not construct a compound wall or fencing around the site. It also requires road formation and associated drainage and infrastructure works.
The supplied approval and RERA material do not establish a parking-space count, visitor or accessible parking provision, individual plot parking allocation, or a specific parking arrangement. A vendor listing mentions open and covered parking, but no corresponding project-specific sanctioned count or allocation is supplied. Promoter website
6. Amenities, recreation & open spaces
The approval describes open space, social infrastructure and utilities as reserved land uses, and identifies layout infrastructure works. The listed items below are approval requirements or RERA-recorded amenity fields; the supplied material does not verify their completion on site. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | 2 Acer 23.79 Gts 12559 Sq. Yds (9.14%) in the tentative approval. | Reserved in the tentative layout; completion not independently verified. | |
| Social infrastructure site | 0 Acer 28.42 Gts 3439 Sq. Yds (2.5%). | Reserved in the tentative layout; facility or building details and completion status are not supplied. | |
| Avenue plantation | Listed as a layout development work. | Required/listed work; completion not verified. | |
| Park development | Listed as a layout development work. | Required/listed work; completion not verified. | |
| Community buildings | Listed in the RERA amenities fields, with no facility detail or size supplied. | RERA amenities | No progress percentage or completion evidence supplied. |
7. Utilities, building services & safety
The tentative layout approval requires the applicant to carry out infrastructure and amenity works and lists internal roads, storm-water drains, underground drainage and a common septic tank/STP, internal water-supply pipelines and an overhead tank, an assured water-supply source, electrical supply lines, street lights, a transformer, solid-waste management and rainwater-harvesting pits. The approval also says the applicant is responsible for development and workmanship. These are requirements or proposed layout works in the approval; the supplied evidence does not establish installed capacity or completed operation.
| Evidence in the project record | Water reservoir, internal water-supply pipelines, overhead tank and assured water-supply source are listed in the approval. |
|---|---|
| Status limitation | No source details, storage capacity or completion verification supplied. |
| Evidence in the project record | Storm-water drains, underground drainage lines and common septic tank/STP are listed. |
|---|---|
| Status limitation | No capacity, commissioning record or reuse details supplied. |
| Evidence in the project record | Electrical supply lines, street lights and an electric transformer are listed. |
|---|---|
| Status limitation | No load, substation specification or completion evidence supplied. |
| Evidence in the project record | Solid-waste management is listed as a utility/development item. |
|---|---|
| Status limitation | No operating arrangements or completion evidence supplied. |
| Evidence in the project record | Rainwater-harvesting pits are listed. |
|---|---|
| Status limitation | No number, capacity or completion evidence supplied. |
| Evidence in the project record | The RERA amenities fields include fire-protection, but no project-specific fire-system design, clearance, accessible-circulation plan, CCTV or security details are supplied. RERA amenities |
|---|---|
| Status limitation | No evidence of installation, statutory clearance or completion supplied. |
8. Location, access & connectivity
The registered location is Kudakuda Revenue Village, Chivemla Mandal, Suryapet District, Telangana, PIN 508213. The project record describes the locality as near the New District Collectorate, Suryapet. RERA record
The project boundaries recorded in the land details are East: Neighbours Land; West: 60 feet Road - Neighbors Plot and 30 feet Road; North: Bund Road; South: Musi Canal - 99 Feet Road and Neighbours Property. RERA filing The layout approval requires roads to be opened for access to neighbouring sites and lists road formation as part of layout development.
The supplied location data gives an approximate distance of 107.2 km to the nearest sampled Outer Ring Road interchange. Location record A vendor listing names a mall at 4.5 KM and mentions SV Engg. College, Srinidhi Junior College, Metro Hospital and Hi-Tech Bus Stand, but does not provide verified distances for those landmarks. Promoter website
9. Developer & development status
The registered promoter is FORTUNE AASHVI HARMONY LLP, an LLP; the supplied corporate identifier is GSTIN 36AAHFF8813F1ZE. Corporate record The RERA certificate lists the promoter office as Village: Mandal: KHAIRTABAD, District: Hyderabad, Pin: 500034. Project-file information gives the promoter address as Saha Building, Road No 11, Ward No 1 & 2, Near New District Collectorate suryapet, Chivemla, Suryapet, 508213. RERA filing
The RERA file identifies Shyam Kapoor as authorized signatory and partner, and Pankaj Agarwal as partner. Parties record The promoter’s Form B affidavit was made by Shyam Kapoor, stated to be duly authorized, and declares project completion by 01-03-2026. The supplied evidence provides no independently verified construction-progress assessment or completion certificate. A vendor listing labels the project “Completed”; that is a vendor statement, not verified project progress. Promoter website
10. Approvals, official records & documents
| Record | What the supplied material establishes |
|---|---|
| TG-RERA registration certificate | Form C records project PATELS PEARL, registration P01900006880, issued 06/09/2023, valid through 01/03/2026 as stated on the certificate. |
| Tentative layout approval | Suryapet Municipality/Municipal Corporation approval 0037/LO/3049/2023, dated 01 March, 2023, for a plotted layout on the listed surveys; application 009479/LO/DTCP/3049/0053/2022. The approval describes the layout as tentative and states it is not proof of land title. |
| Land-use certificate material | Document headed “LAND USE CERTIFILATE”; OCR identifies survey numbers 333, 334, 335, 336, 337, 339, 340, 341 and 342 and certificate references dated 15.09.2021. It is not identified in the supplied extraction as a building commencement certificate. |
| Promoter Form B | Form B affidavit-cum-declaration by Shyam Kapoor, dated 27th day of March 2023, including a completion undertaking of 01-03-2026. |
| Project-specific completion / occupancy record | No completion or occupancy certificate is included in the supplied evidence. Document index |
| HMDA layout lookup | The supplied record says the public HMDA DPMS approved-layout lookup was unavailable; this is a source-access limitation, not a determination about project approval. HMDA |
1. Project at a glance
Project identity
Registered project name: PATELS PEARL.
Project type: Plotted development / plotted layout.
Phase / registered portion: The registration is for the project; no separate phase name or phase-wise land scope is disclosed.
TG-RERA registration: P01900006880; Form C registration issued 06/09/2023, valid from 06/09/2023 to 01/03/2026. The supplied certificate says it is valid for two years unless extended; no extension is recorded in the supplied certificate.
RERA status: The certificate records registration under section 5. It does not establish current registration validity beyond its stated end date.
Registered promoter: FORTUNE AASHVI HARMONY LLP, an LLP.
Land and geographic identity
Locality: Near New District Collectorate, Suryapet; revenue location: Kudakuda Revenue Village.
Revenue village / mandal / district / PIN: Kudakuda, Chivemla, Suryapet, 508213. The layout approval describes the location as Kudakuda Revenue Village, Suryapet Mandal, Suryapet District.
Project survey numbers and subdivisions: 331/P, 332/P, 333/P, 334/P, 335/P, 336/P, 337/P, 338, 339, 340/P, 341/P, 342/P.
Registered site extent: The project land details record 117863.69 sq. m total area, 3041.21 sq. m affected area and 114822.48 sq. m net area.
Layout approval extent: The tentative-layout approval states 29 Acer 5 Gts 140968 Sq. Yds.
Boundaries: East: Neighbours Land; West: 60 feet Road - Neighbors Plot and 30 feet Road; North: Bund Road; South: Musi Canal - 99 Feet Road and Neighbours Property.
Development identity
Sanctioning authority: SURYAPET Municipality/Municipal Corporation.
Principal layout approval: Tentative layout approval 0037/LO/3049/2023, dated 01 March, 2023; application 009479/LO/DTCP/3049/0053/2022.
Approved layout scale: 341 plots. The approval states a layout extent of 29 Acer 5 Gts 140968 Sq. Yds.
Land-use schedule in approval: Plotted Area: 16 Acer 19.6 Gts 79813 Sq. Yds (58.12%); Road Area: 8 Acer 5.06 Gts 39334 Sq. Yds (28.64%); Open space (Park): 2 Acer 23.79 Gts 12559 Sq. Yds (9.14%); Social Infrastructure: 0 Acer 28.42 Gts 3439 Sq. Yds (2.5%); Utilities: 0 Acer 11.36 Gts 1375 Sq. Yds (1%).
Built-up area / buildings and floors: Not applicable as a plotted-layout offering; no building count, floor configuration or approved building built-up area is disclosed in the supplied project record.
Offering and status
Unit type: Plots. The tentative layout approval records 341 No's.
RERA-filed plot size schedule: Plot count and size bands are software-read from the approved layout drawing, not a RERA unit-type disclosure: 341 plots, with sizes from 140.93 sq. m to 649.79 sq. m.
Booked / available plots: Not disclosed in the supplied evidence.
Construction / development stage: No independent site-progress evidence is supplied. The promoter’s Form B declares a completion undertaking of 01-03-2026; this is a declaration, not independent verification of completion.
Completion date and registration validity: The RERA certificate states registration validity through 01/03/2026; Form B also declares completion by 01-03-2026. These are recorded separately: the supplied evidence contains no recorded extension and does not confirm completion.
OC / completion certificate: No occupancy or completion certificate is included in the supplied evidence. For this plotted layout, the record does not identify any phase or building with an OC.
2. The project story
PATELS PEARL is registered as a plotted development in Kudakuda Revenue Village, Chivemla, Suryapet District. Its registered survey schedule is 331/P, 332/P, 333/P, 334/P, 335/P, 336/P, 337/P, 338, 339, 340/P, 341/P and 342/P. The RERA certificate gives PIN 508213; the project record describes the locality as near the New District Collectorate, Suryapet.
The Municipality/Municipal Corporation’s tentative layout approval describes a 341-plot layout and reserves land for plots, roads, park/open space, social infrastructure and utilities. The layout conditions place responsibility for completing the infrastructure and layout development works on the applicant. The approved-layout drawing’s plot schedule was software-read as 341 plots; this is drawing-derived information, not an independently verified count of plots currently available for sale.
The promoter’s Form B, signed by Shyam Kapoor as authorized signatory on 27th day of March 2023, declares a completion date of 01-03-2026. The supplied material does not establish on-site completion or delivery of the development works, and no completion/occupancy certificate is supplied. The separate RERA registration certificate states validity through 01/03/2026; registration validity and physical completion are distinct matters.
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey building development. The tentative layout approval states a layout extent of 29 Acer 5 Gts 140968 Sq. Yds and provides for 341 plots. Its land-use schedule assigns 58.12% to plots, 28.64% to roads, 9.14% to park/open space, 2.5% to social infrastructure and 1% to utilities.
The approved-layout drawing’s software-read area statement separately records a base of 114817.0 sq. m, comprising 66732.04 sq. m plotted area, 32886.81 sq. m roads, 10500.46 sq. m parks/open space, 1149.48 sq. m utilities and 2874.93 sq. m social infrastructure; it records 0.0 sq. m amenities area. These are drawing-derived figures, not RERA-filed building-area measurements. The project land record separately reports total area 117863.69 sq. m, affected area 3041.21 sq. m and net area 114822.48 sq. m.
No building footprint, building height, floor configuration, apartment arrangement or building-area schedule is supplied for this plotted project. The tentative approval lists development works, including road formation, drains, underground drainage, water pipelines and overhead tank, electrical lines and street lights, avenue plantation, park development and rainwater-harvesting pits; these are approval conditions and stated development requirements, not evidence that the works are complete.
4. Homes, configurations & floor plans
The offering is plots, not apartments. The tentative layout approval records 341 No's. The plot schedule was software-read from the approved drawing and records the following sizes and bands; these measurements are drawing-derived and should be checked against the layout drawing.
| Plot size band (sq. yd) | Equivalent band shown (sq. m) | Plot count |
|---|---|---|
| 150-200 | 125-167 | 66 |
| 200-250 | 167-209 | 221 |
| 250-300 | 209-251 | 25 |
| 300-400 | 251-334 | 13 |
| 400-500 | 334-418 | 5 |
| 500-1000 | 418-836 | 11 |
The software-read smallest plot is 140.93 sq. m (168.6 sq. yd), the median is 178.07 sq. m (213.0 sq. yd) and the largest is 649.79 sq. m (777.1 sq. yd). The supplied plan review contains two layout sheets and no apartment floor plans; carpet-area and room-configuration measurements therefore do not apply to the evidenced offering.
5. Parking & vehicle circulation
The layout approval’s conditions require roads to be opened for access to neighbouring sites and state that the layout owner/developer shall not construct a compound wall or fencing around the site. It also requires road formation and associated drainage and infrastructure works.
The supplied approval and RERA material do not establish a parking-space count, visitor or accessible parking provision, individual plot parking allocation, or a specific parking arrangement. A vendor listing mentions open and covered parking, but no corresponding project-specific sanctioned count or allocation is supplied.
6. Amenities, recreation & open spaces
The approval describes open space, social infrastructure and utilities as reserved land uses, and identifies layout infrastructure works. The listed items below are approval requirements or RERA-recorded amenity fields; the supplied material does not verify their completion on site.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | 2 Acer 23.79 Gts 12559 Sq. Yds (9.14%) in the tentative approval. | Reserved in the tentative layout; completion not independently verified. | |
| Social infrastructure site | 0 Acer 28.42 Gts 3439 Sq. Yds (2.5%). | Reserved in the tentative layout; facility or building details and completion status are not supplied. | |
| Avenue plantation | Listed as a layout development work. | Required/listed work; completion not verified. | |
| Park development | Listed as a layout development work. | Required/listed work; completion not verified. | |
| Community buildings | Listed in the RERA amenities fields, with no facility detail or size supplied. | No progress percentage or completion evidence supplied. |
7. Utilities, building services & safety
The tentative layout approval requires the applicant to carry out infrastructure and amenity works and lists internal roads, storm-water drains, underground drainage and a common septic tank/STP, internal water-supply pipelines and an overhead tank, an assured water-supply source, electrical supply lines, street lights, a transformer, solid-waste management and rainwater-harvesting pits. The approval also says the applicant is responsible for development and workmanship. These are requirements or proposed layout works in the approval; the supplied evidence does not establish installed capacity or completed operation.
| Evidence in the project record | Water reservoir, internal water-supply pipelines, overhead tank and assured water-supply source are listed in the approval. |
|---|---|
| Status limitation | No source details, storage capacity or completion verification supplied. |
| Evidence in the project record | Storm-water drains, underground drainage lines and common septic tank/STP are listed. |
|---|---|
| Status limitation | No capacity, commissioning record or reuse details supplied. |
| Evidence in the project record | Electrical supply lines, street lights and an electric transformer are listed. |
|---|---|
| Status limitation | No load, substation specification or completion evidence supplied. |
| Evidence in the project record | Solid-waste management is listed as a utility/development item. |
|---|---|
| Status limitation | No operating arrangements or completion evidence supplied. |
| Evidence in the project record | Rainwater-harvesting pits are listed. |
|---|---|
| Status limitation | No number, capacity or completion evidence supplied. |
| Evidence in the project record | The RERA amenities fields include fire-protection, but no project-specific fire-system design, clearance, accessible-circulation plan, CCTV or security details are supplied. |
|---|---|
| Status limitation | No evidence of installation, statutory clearance or completion supplied. |
8. Location, access & connectivity
The registered location is Kudakuda Revenue Village, Chivemla Mandal, Suryapet District, Telangana, PIN 508213. The project record describes the locality as near the New District Collectorate, Suryapet.
The project boundaries recorded in the land details are East: Neighbours Land; West: 60 feet Road - Neighbors Plot and 30 feet Road; North: Bund Road; South: Musi Canal - 99 Feet Road and Neighbours Property. The layout approval requires roads to be opened for access to neighbouring sites and lists road formation as part of layout development.
The supplied location data gives an approximate distance of 107.2 km to the nearest sampled Outer Ring Road interchange. A vendor listing names a mall at 4.5 KM and mentions SV Engg. College, Srinidhi Junior College, Metro Hospital and Hi-Tech Bus Stand, but does not provide verified distances for those landmarks.
9. Developer & development status
The registered promoter is FORTUNE AASHVI HARMONY LLP, an LLP; the supplied corporate identifier is GSTIN 36AAHFF8813F1ZE. The RERA certificate lists the promoter office as Village: Mandal: KHAIRTABAD, District: Hyderabad, Pin: 500034. Project-file information gives the promoter address as Saha Building, Road No 11, Ward No 1 & 2, Near New District Collectorate suryapet, Chivemla, Suryapet, 508213.
The RERA file identifies Shyam Kapoor as authorized signatory and partner, and Pankaj Agarwal as partner. The promoter’s Form B affidavit was made by Shyam Kapoor, stated to be duly authorized, and declares project completion by 01-03-2026. The supplied evidence provides no independently verified construction-progress assessment or completion certificate. A vendor listing labels the project “Completed”; that is a vendor statement, not verified project progress.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C records project PATELS PEARL, registration P01900006880, issued 06/09/2023, valid through 01/03/2026 as stated on the certificate.
Tentative layout approval: Suryapet Municipality/Municipal Corporation approval 0037/LO/3049/2023, dated 01 March, 2023, for a plotted layout on the listed surveys; application 009479/LO/DTCP/3049/0053/2022. The approval describes the layout as tentative and states it is not proof of land title.
Land-use certificate material: Document headed “LAND USE CERTIFILATE”; OCR identifies survey numbers 333, 334, 335, 336, 337, 339, 340, 341 and 342 and certificate references dated 15.09.2021. It is not identified in the supplied extraction as a building commencement certificate.
Promoter Form B: Form B affidavit-cum-declaration by Shyam Kapoor, dated 27th day of March 2023, including a completion undertaking of 01-03-2026.
Project-specific completion / occupancy record: No completion or occupancy certificate is included in the supplied evidence.
HMDA layout lookup: The supplied record says the public HMDA DPMS approved-layout lookup was unavailable; this is a source-access limitation, not a determination about project approval.
Frequently asked questions
Is PATELS PEARL registered with Telangana RERA?
Yes. PATELS PEARL is registered with the Telangana Real Estate Regulatory Authority as P01900006880; the registration status is New Project.
Who is the developer of PATELS PEARL?
The promoter named in the RERA registration is FORTUNE AASHVI HARMONY LLP.
Where is PATELS PEARL located?
PATELS PEARL is in Near New District Collectorate suryapet, Kudakuda, Chivemla, Suryapet, Telangana (508213).
When will PATELS PEARL be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.